CN102561511A - Extensible building steel structure - Google Patents

Extensible building steel structure Download PDF

Info

Publication number
CN102561511A
CN102561511A CN2011103218090A CN201110321809A CN102561511A CN 102561511 A CN102561511 A CN 102561511A CN 2011103218090 A CN2011103218090 A CN 2011103218090A CN 201110321809 A CN201110321809 A CN 201110321809A CN 102561511 A CN102561511 A CN 102561511A
Authority
CN
China
Prior art keywords
steel structure
form cross
interconnective
construction steel
groups
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103218090A
Other languages
Chinese (zh)
Other versions
CN102561511B (en
Inventor
唐柏鉴
裴波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bao Du International Engineering Technology Co., Ltd.
Original Assignee
Jiangsu University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu University of Science and Technology filed Critical Jiangsu University of Science and Technology
Priority to CN2011103218090A priority Critical patent/CN102561511B/en
Publication of CN102561511A publication Critical patent/CN102561511A/en
Application granted granted Critical
Publication of CN102561511B publication Critical patent/CN102561511B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an extensible building steel structure, which comprises X-shaped components. Each X-shaped component is capable of rotating around a middle pin, all ends of the X-shaped component are provided with holes for mutual connection, and a limit block is further disposed on a side, close to the middle pin, of the X-shaped component. A middle connector is further connected between two pairs of mutually connected X-shaped components. The middle connector is in the shape of a short cylinder, a plurality of groups of two parallel and spaced lugs provided with holes for connection are evenly distributed on the periphery of the short cylinder. A pull bar is connected at the unconnected end of each X-shaped component. The extensible building steel structure is novel in structure and convenient in assembly and disassembly, transport cost is saved, and construction installation speed is increased.

Description

A kind of telescopic construction steel structure
Technical field
The invention belongs to the building structure technology field, but relate to a kind of building structure of integral installation, more particularly, relate to a kind of telescopic construction steel structure.
Background technology
Steel work belongs to pollution-free industry, is the architecture structure form that China and world developed country actively advocate, and its remarkable advantage is constructional materials reusable edible and construction fast.
At present, the Construction of Steel Structure flow process is substantially: accomplish member at produce in factory, comprise beam, post, support etc.; Transportation is installed by the root member at the scene.So mounting technique still can not embody " construction fast " advantage of steel work fully, and owing to be to install by the root member, need more interim member and auxiliary equipment, causes construction cost higher.
On the structural entity mounting technique, Japanese Kawaguchi defends professor to the grid dome structure, and the bar structure design and construction is installed and organically combined; Proposed a kind of climbing and reached dome system, he disassembles the hoop effect and the radial effect of dome structure, removes part hoop member; Make it become the structure that the one dimension degree of freedom is only arranged; Thereby can structural entity is folding, carry out assembly unit at subaerial height, arrive predetermined altitude to folding dome jacking then; The rod member that temporarily removes is installed again, and dome is promptly accused completion.This integral installation technology undoubtedly; Dome structure is striden in construction that can be more reasonable, safer, more economical greatly; But this techniques make use is the mechanism principle that has and only have the one dimension degree of freedom, and promptly mechanism only can planar rotate, the implementation space moulding that can't settle at one go.Secondly, this technology is only applicable to the grid dome structure, therefore needs the plant equipment of lifting or turning power super large.In addition, it is irreversible to climb the work progress that reaches dome, and promptly structure is non-scalable.
Summary of the invention
The objective of the invention is further to enrich the form of structure that adopts integral installation technology to form, and can multidirectionally stretch, and a kind of telescopic construction steel structure is provided in order to overcome the defective of existing steel work by root member mounting technique.
In order to achieve the above object, the technical scheme taked of technical solution problem of the present invention is:
A kind of telescopic construction steel structure comprises around the rotating X-form cross member 1 of middle pivot pin, it is characterized in that, the two ends of said X-form cross member 1 all offer and are used for interconnective hole, also is provided with a limited block 2 on the corresponding surface at the middle pivot pin of distance place; Also be connected with an intermediate connector 3 between some interconnective X-form cross members 1; Said intermediate connector 3 is a short cylindrical shape, be evenly equipped with on its periphery some groups two parallel isolated and have an otic placode in the hole that is used to connect; Said X-form cross member 1 is failed an interconnective end and is provided with cylinder lever connecting rod 4.Wherein, said some interconnective X-form cross members 1 are at least 2; Said some groups of otic placodes are 4 groups; Said connection is flexible connection.
The disconnected cross section of the rod member of the X-type member 1 of the above is a rectangle.
Technical essential of the present invention is intermediate connector 3, end pull bar 4 and limited block 2.The existence of intermediate connector 3 makes that this structure both can be a planar design, also can two-way even multidirectional connection, form the space structures form.End pull bar 4 has guaranteed that structure can uphold with collapsible.Limited block 2 with end pull bar 4 common guarantee structure final molding position.
The present invention has the following advantages and effect compared with prior art:
1. save engineering time and the construction cost of installing by the root member greatly.The overwhelming majority of the present invention has adopted the pin connected mode; Can finish in floor mounted, utilize the rotating function of pin, make structure in the pin rotation process, arrive the design assigned address; Last several pull bars that only need mounting end can form final building structure.Floor mounted has been guaranteed architecture quality, the structure initial internal force of effectively having avoided traditional alignment error to cause.Utilize the pin rotating function, the installation overall structure that settles at one go has improved installation rate undoubtedly greatly.
2. structure is scalable, has saved cost of transportation.The present invention is under the situation that does not have the mounting end pull bar; May be collapsed to very little state; Therefore can be at some groups of X-type members of factory's installation, even the composite member of X-type member and intermediate connector, the scene that transports to is very easily carried out " rotation " installation and is got final product.
3. structure is scalable, for the structure dismounting is provided convenience.Traditional structure, even adopt Kawaguchi to defend climbing that professor's integral installation technology forms to reach dome structure, all need be undertaken by root during dismounting, therefore for the temporary building structure, this is a problem.The present invention only need dismantle the end pull bar, and structure i.e. overall shrinkage automatically, big convenience unloading process.
Description of drawings
Fig. 1 is an organigram of the present invention;
Fig. 2 is the enlarged drawing of intermediate connector 3;
Fig. 3 is Fig. 2 vertical view;
Among the figure: 1-X type member; The 2-limited block; The 3-intermediate connector; The 4-pull bar.
The specific embodiment
Below in conjunction with accompanying drawing, the technical scheme of a kind of telescopic construction steel structure of the present invention is done further explain through embodiment.
To shown in Figure 3, a kind of telescopic construction steel structure is made up of X-type member 1, limited block 2, intermediate connector 3, pull bar 4 like Fig. 1.Wherein said X-type member 1 forms for connecting the center by 2 slender rod pieces through pivot pin, and the two ends of X-form cross member 1 all offer and are used for interconnective hole, the limited block 2 of welding one short cylinder on the corresponding surface at the middle pivot pin of distance place; Adopt pin to interconnect two X-form cross members 1 then, connect an intermediate connector 3 in twos between the X-form cross member 1; Said intermediate connector 3 is a short cylindrical shape, be evenly equipped with on its periphery four groups two parallel isolated and have an otic placode in the hole that is used to connect; Said X-form cross member 1 is failed an interconnective end and is adopted pull bar 4 to connect.
During on-the-spot the installation, adopt the jack tension two ends, limited block 2 positions, i.e. design attitude are arrived in structure stretch-draw.Adopt pin cylinder lever connecting rod 4 and X-type member 1 then, thereby accomplish the installation of end pull bar 4.
During dismounting, then dismantle end pull bar 4 earlier,, structural entity is progressively bounced back by jack.
More than combine accompanying drawing that embodiments of the invention are described in detail; But those of ordinary skill in the art can be recognized; Previous embodiment is just in order to explain design feature of the present invention and advantage; And non-limiting the present invention, so design is done according to the present invention variation or modification all should belong in the appended claims restricted portion.

Claims (5)

1. telescopic construction steel structure; Comprise around the rotating X-form cross member of middle pivot pin (1); It is characterized in that the two ends of said X-form cross member (1) all offer and are used for interconnective hole, also be provided with a limited block (2) on the corresponding surface at the middle pivot pin of distance place; Also be connected with an intermediate connector (3) between some interconnective X-form cross members (1); Said intermediate connector 3 is a short cylindrical shape, be evenly equipped with on its periphery some groups two parallel isolated and have an otic placode in the hole that is used to connect; Said X-form cross member (1) is failed an interconnective end and is provided with cylinder lever connecting rod (4).
2. telescopic construction steel structure according to claim 1 is characterized in that, said some interconnective X-form cross members (1) are at least 2.
3. telescopic construction steel structure according to claim 1 is characterized in that, said some groups of otic placodes are 4 groups.
4. telescopic construction steel structure according to claim 1 is characterized in that said connection is flexible connection.
5. telescopic construction steel structure according to claim 1 and 2 is characterized in that, the disconnected cross section of described X-type member (1) is a rectangle.
CN2011103218090A 2012-03-02 2012-03-02 Extensible building steel structure Active CN102561511B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103218090A CN102561511B (en) 2012-03-02 2012-03-02 Extensible building steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103218090A CN102561511B (en) 2012-03-02 2012-03-02 Extensible building steel structure

Publications (2)

Publication Number Publication Date
CN102561511A true CN102561511A (en) 2012-07-11
CN102561511B CN102561511B (en) 2013-12-04

Family

ID=46407986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103218090A Active CN102561511B (en) 2012-03-02 2012-03-02 Extensible building steel structure

Country Status (1)

Country Link
CN (1) CN102561511B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5711337A (en) * 1996-05-15 1998-01-27 Mckenney; Joseph E. Tent frame and party tent
KR20020062530A (en) * 2001-01-22 2002-07-26 한주환 Folding tent frame
CN2630395Y (en) * 2003-05-07 2004-08-04 厦门进雄企业有限公司 Fully-folding pavilion type tent frame
CN2778915Y (en) * 2005-03-17 2006-05-10 黄华龙 Detachable combination house
CN2821050Y (en) * 2005-08-09 2006-09-27 厦门世宗贸易有限公司 Tent top rod limiting structure
CN101100909A (en) * 2006-07-08 2008-01-09 郑世平 Folding tent support

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5711337A (en) * 1996-05-15 1998-01-27 Mckenney; Joseph E. Tent frame and party tent
KR20020062530A (en) * 2001-01-22 2002-07-26 한주환 Folding tent frame
CN2630395Y (en) * 2003-05-07 2004-08-04 厦门进雄企业有限公司 Fully-folding pavilion type tent frame
CN2778915Y (en) * 2005-03-17 2006-05-10 黄华龙 Detachable combination house
CN2821050Y (en) * 2005-08-09 2006-09-27 厦门世宗贸易有限公司 Tent top rod limiting structure
CN101100909A (en) * 2006-07-08 2008-01-09 郑世平 Folding tent support

Also Published As

Publication number Publication date
CN102561511B (en) 2013-12-04

Similar Documents

Publication Publication Date Title
CN102817484B (en) Heavy multifunctional combined supporting frame
CN204081538U (en) A kind of assembling turnover processing protection canopy
CN201850747U (en) Scaffold system
CN203729440U (en) Stay bar lower joint of rigid supporting dome structure
CN102561511B (en) Extensible building steel structure
US9908751B2 (en) Telescopic boom and crane
CN103216014A (en) Assembling type frame structure joint
CN202848923U (en) Space truss tower crane convenient to maintain
CN102605862B (en) Cable-pole type foldable grid structure
CN208763525U (en) A kind of anti-high wind composite electrical tower structure
CN201815805U (en) Large-sized steel pipe manufacturing device
CN104234199A (en) High-strength bamboo composite material movable house
CN103953195A (en) Composite material cantilever section for cantilever crane of concrete pump truck and manufacturing method thereof
CN202864744U (en) Space truss type tower crane
CN202913357U (en) Conveniently maintained space truss bridge erecting machine
CN204344598U (en) A kind of piecing devices for rod member spatial joins
CN105064906B (en) Plane working ladder and plane maintenance device adopting same
CN209083467U (en) A kind of lattice tower support component
CN208202163U (en) A kind of square tube truss connection structure
CN203452448U (en) Tent with quick assembly function
CN104164995A (en) Lattice steel pipe columns, power transmission tower and construction method of lattice steel pipe columns and power transmission tower
CN202193570U (en) Tower crane lower support and tower crane comprising same
CN221031629U (en) High-efficient reinforced structure of combined surface of reinforced concrete column
CN109667345A (en) A kind of simple steel frame construction
CN220748457U (en) Assembled fan pylon

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 212028 Zhenjiang, Dantu Metro Industrial Park Rui East Road, No. 9

Patentee after: Jiangsu University of Science and Technology

Address before: 212003 Zhenjiang City, Jiangsu province dream Creek Road, No. 2

Patentee before: Jiangsu University of Science and Technology

TR01 Transfer of patent right

Effective date of registration: 20170911

Address after: A village Beijing city Xihongmen town Daxing District 102600 east 500 meters

Patentee after: Beijing Baodu Steel Structure Engineering Co., Ltd.

Address before: 212028 Zhenjiang, Dantu Metro Industrial Park Rui East Road, No. 9

Patentee before: Jiangsu University of Science and Technology

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: 100000 11 floor 1102, 6 building, 9 Hongye Road, Daxing District, Beijing.

Patentee after: Bao Du International Engineering Technology Co., Ltd.

Address before: 102600 Beijing Daxing District Xihongmen Town Village Committee East 500 meters

Patentee before: Beijing Baodu Steel Structure Engineering Co., Ltd.

CP03 Change of name, title or address