CN102561319A - Composite soil retaining tubular pile with reinforcing bars and manufacturing method thereof - Google Patents

Composite soil retaining tubular pile with reinforcing bars and manufacturing method thereof Download PDF

Info

Publication number
CN102561319A
CN102561319A CN201210025399XA CN201210025399A CN102561319A CN 102561319 A CN102561319 A CN 102561319A CN 201210025399X A CN201210025399X A CN 201210025399XA CN 201210025399 A CN201210025399 A CN 201210025399A CN 102561319 A CN102561319 A CN 102561319A
Authority
CN
China
Prior art keywords
reinforcement
cage
pile tube
reinforcing bars
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210025399XA
Other languages
Chinese (zh)
Inventor
崔凤祥
刘永超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN JIANCHENG JIYE GROUP CO Ltd
Original Assignee
TIANJIN JIANCHENG JIYE GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN JIANCHENG JIYE GROUP CO Ltd filed Critical TIANJIN JIANCHENG JIYE GROUP CO Ltd
Priority to CN201210025399XA priority Critical patent/CN102561319A/en
Publication of CN102561319A publication Critical patent/CN102561319A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a composite soil retaining tubular pile with reinforcing bars, which comprises a concrete body and end plates at two ends of the concrete body. A reinforcing cage is arranged in the concrete body and comprises a plurality of main prestress reinforcing bars, non-prestress reinforcing bars and helical reinforcing bars. The invention further provides a manufacturing method of the composite soil retaining tubular pile with reinforcing bars. The composite soil retaining tubular pile with reinforcing bars has the advantages that bending resistance of prestress concrete is effectively improved by the composite soil retaining tubular pile, ductility of the pile body is improved by more than 20%, cracking of the pile body is avoided, and the integral performance of the tubular pile is improved by more than 30%. Besides, the composite soil retaining tubular pile is simple in process, low in cost and high in cost performance and can be widely applied to foundation construction of various soil textures. The problem that the reinforcing bars of the tubular piles in the tension zone are retracted to be cracked is reduced, and the composite soil retaining tubular pile with the reinforcing bars is high in adaptability to geological conditions, particularly geological conditions with the bearing stratum of higher fluctuation, high in concrete strength, compact and resistant to impact and has higher penetrating capacity.

Description

Keep off native compound reinforcement pile tube and preparation method thereof
Technical field
The present invention relates to foundation construction technology in the civil works, native compound reinforcement pile tube of particularly a kind of retaining and preparation method thereof.
Background technology
In the production and construction technology of pile tube, it is poor to exist anti-bending strength, destroys to be brittle fracture at present; Ductility is poor; Exist pile tube to occur carrying out rapidly behind the cracking, the tensile region reinforcing bar gets into very soon surrender and constriction until fracture, ultimate bending moment and cracking moment phenomenon such as be more or less the same.These phenomenons cause pile tube to occur quality accidents such as broken pile, bottleneck stake easily, and particularly in containing the ground of soft soil layer, situation is even more serious.
Summary of the invention
To structural deficiency in the prior art; The purpose of this invention is to provide native compound reinforcement pile tube of a kind of retaining and preparation method thereof, be beneficial to improve effectively the bending resistance of pile tube, avoided in the tube pile construction process; Tilt, displacement is excessive, even the phenomenon of fracture.
For realizing above-mentioned purpose; The technical scheme that the present invention adopts provides the native compound reinforcement pile tube of a kind of retaining; This pile tube includes the end plate at concrete body and two ends; Wherein: in said concrete body, be provided with the cage of reinforcement cage, described cage of reinforcement cage includes many prestressing force master muscle, nonprestressed reinforcement and spiral bars, and said prestressing force master muscle and nonprestressed reinforcement are asymmetric arrangement.
A kind of preparation method of keeping off native compound reinforcement pile tube is provided simultaneously.
The invention has the beneficial effects as follows the anti-bending strength of using this arrangement of reinforcement pile tube to improve prestressed concrete effectively; The ductility that has improved pile body has been avoided the phenomenon of pile body cracking more than 20%, and the overall performance that improves pile tube is more than 30%; And technology is simple; Cost is low, and cost performance is high, is widely used in the foundation construction of various soil properties.The tensile region reinforcing bar of this arrangement of reinforcement pile tube gets into surrender and flexible phenomenon minimizing until fracture very soon; Strong to geological conditions compliance, concrete strength of pile is high, closely knit anti-beating; Stronger penetration capacity is arranged, the big geological conditions of bearing stratum fluctuations is had stronger compliance.
Description of drawings
Fig. 1 is a structural section sketch map of the present invention;
Fig. 2 is the structural representation of cage of reinforcement cage of the present invention and end plate;
Fig. 3 is the structural representation of the present invention in underground activities.
Among the figure:
1, prestressing force master muscle 2, nonprestressed reinforcement 3, spiral bar 4, concrete body
5, fixing end plate 6, cage of reinforcement cage 7, tensile region, two ends
The specific embodiment
Below in conjunction with accompanying drawing native compound reinforcement pile tube of retaining of the present invention and preparation method thereof is explained.
The native compound reinforcement pile tube of retaining of the present invention; This pile tube includes the end plate 5 at concrete body 4 and two ends; In said concrete body 4, be provided with cage of reinforcement cage 6; Described cage of reinforcement cage 6 includes many prestressing force master muscle 1, nonprestressed reinforcement 2 and spiral bars 3, and said prestressing force master muscle 1 is an asymmetric arrangement with nonprestressed reinforcement 2.
Described nonprestressed reinforcement 2 is evenly distributed on the spiral bar 3 in the one side tensile region 7, pile tube cross section, and described prestressing force master muscle 1 is the PC rod iron of tensile strength >=1570Mpa.
The preparation method of the native compound reinforcement pile tube of retaining of the present invention may further comprise the steps:
Earlier with prestressed reinforcement 1, nonprestressed reinforcement 2, spiral bar 3 fixed length, cut off blanking, again with prestressed reinforcement 1 heading, and then spiral bar 3 wire rod cold-drawns are become hand-drawn wire;
Prestressed reinforcement 1 becomes the steel cage with spiral bar 3 roll weldings, again with nonprestressed reinforcement 2 vertical colligations and be evenly distributed on the inboard of the spiral bar 3 in the pile tube tensile zone 7, processes cage of reinforcement cage 6;
Make end plate 5; Then cage of reinforcement cage 6 is put into pipe die with end plate 5; Will be according to the concrete of national pile tube preparation standard GB13476-2009 " Pretensioned spun concrete piles "; Install concrete body 4 feedings in the pipe die of cage of reinforcement cage 6 and end plate 5, carry out prestressed stretch-draw behind the cover mold that closes, nonprestressed reinforcement 2 is not participated in prestressed stretch-draw;
And then will Pipe diePlace and carry out centrifugal forming on the centrifuge, topple over surplus slurry after finishing;
Then the pipe die that centrifugal forming is good is put into steam-cured pond, carries out stream curing by the strength grade of concrete requirement; And then put and open, judge the pile tube credit rating through the Quality Inspector after the demoulding, pile tube entrucking is again gone into still and is carried out steam curing at high pressure, puts into the pile tube yard then, carries out natural curing.
Like Fig. 1, shown in 2, be example with stake type φ 400 * 95, specify the implementation procedure of the native compound reinforcement pile tube of retaining of the present invention function:
Adopt conventional formulation design concrete body 4; Its strength grade is C80; It is the high-strength prestressed concrete steel stick of φ 10.7 that prestressed reinforcement 1 can adopt seven diameters, and its compressive strength is 1570Mpa, the HRB335 screw-thread steel that it is φ 12 that nonprestressed reinforcement 2 can adopt eight diameters.
Earlier with prestressed reinforcement 1, nonprestressed reinforcement 2, spiral bar 3 fixed length, cut off blanking, again with prestressed reinforcement 1 heading, and then spiral bar 3 cold-drawns are become hand-drawn wire; Prestressed reinforcement 1 becomes the steel cage with spiral bar 3 roll weldings, again with nonprestressed reinforcement 2 vertical colligations and be evenly distributed on the inboard of the spiral bar 3 in the pile tube tensile zone 7, processes cage of reinforcement cage 6; Make end plate 5; Then cage of reinforcement cage 6 is put into pile tube with end plate 5; To install in the pipe die of cage of reinforcement cage 6 and end plate 5 according to concrete body 4 feedings of national pile tube preparation standard GB13476-2009, and carry out prestressed stretch-draw behind the cover mold that closes, nonprestressed reinforcement 2 is not participated in prestressed stretch-draw; And then pipe die placed carry out centrifugal forming on the centrifuge, topple over surplus slurry after finishing; Then pipe die is put into steam-cured pond, carry out stream curing by the strength grade of concrete requirement; And then put and open, judge the pile tube credit rating through the Quality Inspector after the demoulding, pile tube entrucking is again gone into still and is carried out steam curing at high pressure, puts into the pile tube yard then, carries out natural curing.
As shown in Figure 3, the arrow direction is the direction from soil pressure among the figure.Should keep off native compound reinforcement pile tube in the construction when underground; Owing to increased nonprestressed reinforcement 2; Can more effectively improve the retaining soil ability of soil blocking pile; Improved the bending resistance shearing resistance and the horizontal bearing capacity of pile tube, particularly in the ground of soft soil layer, this structure can better be brought into play its effect.

Claims (4)

1. one kind is kept off native compound reinforcement pile tube; This pile tube includes the end plate (5) at concrete body (4) and two ends; It is characterized in that: in said concrete body (4), be provided with cage of reinforcement cage (6); Described cage of reinforcement cage (6) includes many prestressing force master muscle (1), nonprestressed reinforcement (2) and spiral bar (3), and said prestressing force master muscle (1) is an asymmetric arrangement with nonprestressed reinforcement (2).
2. the native compound reinforcement pile tube of retaining according to claim 1 is characterized in that: described nonprestressed reinforcement (2) is evenly distributed on the spiral bar (3) in the one side tensile region (7), pile tube cross section.
3. the native compound reinforcement pile tube of retaining according to claim 1 is characterized in that: described prestressing force master muscle (1) is the PC rod iron of tensile strength >=1570Mpa.
4. preparation method of keeping off native compound reinforcement pile tube, this method may further comprise the steps:
Earlier with prestressed reinforcement (1), nonprestressed reinforcement (2), spiral bar (3) fixed length, cut off blanking, again with prestressed reinforcement (1) heading, and then spiral bar (3) wire rod cold-drawn become hand-drawn wire;
Prestressed reinforcement (1) becomes the steel cage with spiral bar (3) roll welding, with vertically colligation and be evenly distributed on the inboard of the spiral bar (3) in the pile tube tensile zone (7) of nonprestressed reinforcement (2), processes cage of reinforcement cage (6) again;
Make end plate (5); Then cage of reinforcement cage (6) is put into pipe die with end plate (5); Will be according to the concrete of national pile tube preparation standard GB13476-2009 " Pretensioned spun concrete piles "; Install concrete body (4) feeding in the pipe die of cage of reinforcement cage (6) and end plate (5), carry out prestressed stretch-draw behind the cover mold that closes, nonprestressed reinforcement (2) is not participated in prestressed stretch-draw;
And then pipe die placed carry out centrifugal forming on the centrifuge, topple over surplus slurry after finishing;
Then the pipe die that centrifugal forming is good is put into steam-cured pond, carries out stream curing by the strength grade of concrete requirement; And then put and open, judge the pile tube credit rating through the Quality Inspector after the demoulding, pile tube entrucking is again gone into still and is carried out steam curing at high pressure, puts into the pile tube yard then, carries out natural curing.
CN201210025399XA 2012-02-06 2012-02-06 Composite soil retaining tubular pile with reinforcing bars and manufacturing method thereof Pending CN102561319A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210025399XA CN102561319A (en) 2012-02-06 2012-02-06 Composite soil retaining tubular pile with reinforcing bars and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210025399XA CN102561319A (en) 2012-02-06 2012-02-06 Composite soil retaining tubular pile with reinforcing bars and manufacturing method thereof

Publications (1)

Publication Number Publication Date
CN102561319A true CN102561319A (en) 2012-07-11

Family

ID=46407800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210025399XA Pending CN102561319A (en) 2012-02-06 2012-02-06 Composite soil retaining tubular pile with reinforcing bars and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN102561319A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147438A (en) * 2013-01-28 2013-06-12 江苏鼎达建筑新技术有限公司 Cast-in-place post-tensioning method-based I-shaped support pile and manufacturing method of support pile
CN103358398A (en) * 2012-09-26 2013-10-23 苏州混凝土水泥制品研究院有限公司 Method for producing high-strength pipe pile
CN103481363A (en) * 2013-09-07 2014-01-01 安徽富强混凝土有限公司管桩分公司 Production process of concrete pipe pile
CN113172750A (en) * 2021-04-12 2021-07-27 建华建材(中国)有限公司 Tensioning device and tensioning process for enhanced precast pile

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1560380A (en) * 2004-02-27 2005-01-05 胡柏英 Structure of precast rainforced concrete tubular pile and manufacture method thereof
CN101570969A (en) * 2009-06-04 2009-11-04 河南建华管桩有限公司 Horizontal force supporting pile and production process thereof
CN202492836U (en) * 2012-02-06 2012-10-17 天津建城基业集团有限公司 Soil-retaining duplex-type reinforced tube pile

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1560380A (en) * 2004-02-27 2005-01-05 胡柏英 Structure of precast rainforced concrete tubular pile and manufacture method thereof
CN101570969A (en) * 2009-06-04 2009-11-04 河南建华管桩有限公司 Horizontal force supporting pile and production process thereof
CN202492836U (en) * 2012-02-06 2012-10-17 天津建城基业集团有限公司 Soil-retaining duplex-type reinforced tube pile

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103358398A (en) * 2012-09-26 2013-10-23 苏州混凝土水泥制品研究院有限公司 Method for producing high-strength pipe pile
CN103147438A (en) * 2013-01-28 2013-06-12 江苏鼎达建筑新技术有限公司 Cast-in-place post-tensioning method-based I-shaped support pile and manufacturing method of support pile
CN103481363A (en) * 2013-09-07 2014-01-01 安徽富强混凝土有限公司管桩分公司 Production process of concrete pipe pile
CN113172750A (en) * 2021-04-12 2021-07-27 建华建材(中国)有限公司 Tensioning device and tensioning process for enhanced precast pile

Similar Documents

Publication Publication Date Title
CN101570969B (en) Horizontal force supporting pile and production process thereof
CN101544020B (en) Preparation method for prestressed high-strength concrete pile
CN210122713U (en) Wedge-shaped block reinforced concrete pipe pile
CN104929117B (en) Construction method of concrete pole body composite anchor rod
CN202492836U (en) Soil-retaining duplex-type reinforced tube pile
CN102561319A (en) Composite soil retaining tubular pile with reinforcing bars and manufacturing method thereof
CN103670470A (en) Full coal roadway safe and speedy drivage supporting method
CN102345291A (en) Partially prestressed supporting cantilever pile
CN102345292B (en) A kind of composite prestressed uplift pile with enlarged footing
CN101544021B (en) Preparation method for prestressed high-strength concrete octagonal pile
CN201512788U (en) Horizontal load-bearing enhancement pre-stressed concrete pipe pile
CN201420262Y (en) Circular solid preload-stress concrete tubular pile
CN201512787U (en) Horizontal load-bearing enhancement pre-stressed concrete centrifugal square-sectioned pile
CN104652430A (en) Composite reinforcement partially prestressed concrete solid square pile and manufacturing method thereof
CN202610797U (en) Prestress solid concrete precast pile
CN104563103A (en) Composite-reinforcement partially-prestressed concrete solid square pile and production method thereof
CN202194131U (en) Partially prestressed cantilever soldier pile
CN201343726Y (en) Horizontal force bearing pile
CN202787252U (en) Partially prestressed concrete hollow triangular pile
CN100560318C (en) A kind of high-bearing capacity prestressed tubular pile and production method thereof
CN202492843U (en) Anti-bending enhancement-type prestressed-concrete centrifugal square pile
CN204940273U (en) A kind of Prestressed anchor rope with pressure dispersing construction equipment
CN210975547U (en) Suspension bridge bell jar formula anchorage structure
CN102966092A (en) TSC (Two Subcarrier System) tube pile provided with nonprestressed reinforcement cage
CN202194144U (en) Ground pit inclined tension pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120711