CN102545120B - Hand winch with buffer braking function of tail rope for construction of distribution circuit - Google Patents

Hand winch with buffer braking function of tail rope for construction of distribution circuit Download PDF

Info

Publication number
CN102545120B
CN102545120B CN201110435077.8A CN201110435077A CN102545120B CN 102545120 B CN102545120 B CN 102545120B CN 201110435077 A CN201110435077 A CN 201110435077A CN 102545120 B CN102545120 B CN 102545120B
Authority
CN
China
Prior art keywords
ratchet
main
hand
tail rope
bracing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110435077.8A
Other languages
Chinese (zh)
Other versions
CN102545120A (en
Inventor
谢勇泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PANZHIHUA ELECTRIC POWER BUREAU OF SICHUAN ELECTRIC POWER Corp
State Grid Corp of China SGCC
Original Assignee
Panzhihua Electric Power Bureau Sichuan Electricpower Co ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panzhihua Electric Power Bureau Sichuan Electricpower Co ltd, State Grid Corp of China SGCC filed Critical Panzhihua Electric Power Bureau Sichuan Electricpower Co ltd
Priority to CN201110435077.8A priority Critical patent/CN102545120B/en
Publication of CN102545120A publication Critical patent/CN102545120A/en
Application granted granted Critical
Publication of CN102545120B publication Critical patent/CN102545120B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Orthopedics, Nursing, And Contraception (AREA)
  • Finish Polishing, Edge Sharpening, And Grinding By Specific Grinding Devices (AREA)

Abstract

The invention discloses a hand winch with a buffer braking function of a tail rope for construction of a distribution circuit, which comprises a hand winch arranged on a support frame. A tail rope buffer braking mechanism is also arranged on the support frame which is positioned below the hand winch; a secondary grinding center for winding the tail rope is fixed on a shaft, and the shaft can be rotationally arranged on the support frame; a ratchet is integrally arranged at one side of the secondary grinding center; and a pawl matched with the ratchet is arranged on the support frame. The structure of the hand winch is that a main grinding center is fixed on a driven shaft; a set of gear speed reduction transmission mechanism and a set of gear speed acceleration transmission mechanism are respectively arranged on a drive shaft and the driven shaft; a main ratchet is integrally arranged at one side of a main grinding center; and a main pawl matched with the main ratchet is arranged on the support frame. The hand winch with the buffer braking function of the tail rope for construction of the distribution circuit has the characteristics of high security, strong practicability, flexible operation and high efficiency of circuit construction.

Description

Distribution line construction equipment has the hand operated wring grinder of tail rope buffer-braking function
Technical field
The present invention relates to power construction utensil, particularly in the stringing of large span distribution line, vertical rod construction, play the swaying type wire grip of cable tensioning function by steel wire tail rope.
Background technology
Existing hand operated wring grinder structurally has the main mill heart of a coiling and a set of shaking gear transmission mechanism, and the brake mechanism of main mill heart employing hood type structure, is similar to the brake structure of existing electric bicycle.In practice of construction, owing to only having a main mill heart, cause the pulling force of tail rope large, strand mill tail rope operating personnel's danger coefficient is high, brings hidden danger to safety in production.
Summary of the invention
The object of this invention is to provide and a kind ofly can firmly control steel wire tail rope, safe distribution line construction equipment and have the hand operated wring grinder of tail rope buffer-braking function.
The object of the present invention is achieved like this: a kind of distribution line construction equipment has the hand operated wring grinder of tail rope buffer-braking function, comprise the hand operated wring grinder being arranged on bracing frame, tail rope buffer-braking mechanism is also installed: be fixed on axle as time mill heart that is wound around tail rope on the bracing frame of described hand operated wring grinder below, axle is installed in rotation on bracing frame, in the inferior mill heart one side, integrated setting has ratchet, is arranged on bracing frame with the ratchet of ratchet mating reaction.
Above-mentioned hand operated wring grinder structure is: driving shaft and driven shaft respectively along continuous straight runs are installed in rotation on bracing frame, a driving shaft left side, right side is separately installed with the first hand driving gear and the second hand driving gear, a driven shaft left side, right both sides are separately installed with the first driven gear and the second driven gear, the first hand driving gear and the first driven gear engaged transmission, the second hand driving gear and the second driven gear engaged transmission, and the first hand driving gear is identical with the second driven gear, the second hand driving gear is identical with the first driven gear, the gear ratio of the first hand driving gear and the first driven gear is 3: 1, the main mill heart is fixed on driving shaft, and in the main mill heart one side, integrated setting has main ratchet, is arranged on bracing frame with the main ratchet of main ratchet mating reaction.
The above-mentioned main mill heart and time mill heart are the column with indent curved surfaces.
Operating personnel is by steel wire rope after the main mill heart is wound around, and steel wire tail rope draws to the inferior mill of buffer-braking mechanism and is wound around in the heart two circles, and controls steel wire rope tail rope by special messenger.Its Main Function is the operating personnel who prevents from controlling steel wire rope, because a variety of causes causes the control of steel wire tail rope insecure, now the click brake apparatus in buffer-braking mechanism will play secondary braking effect, avoid impacting operating personnel and equipment being damaged suddenly.
The present invention disperses the pulling force of tail rope to bear, and the pulling force of tail rope is diminished, and easy operating control reduces associative operation personnel's security risk, effectively enhances productivity.Time mill heart of main mill heart below is shared the power that original power transmission shaft is born, and then reduces operating personnel's tensile load.
The beneficial effect of this device is: this equipment safety is high, and the main mill heart and time mill heart all adopt click brake mechanism, have brake operating convenient, brake feature fast and effectively.At the bottom of cost, practical, flexible operation (increased a set of shaking gear transmission mechanism on existing hand operated wring grinder, wherein a sets of transmission mechanism is for take-up, and another set of transmission mechanism uses for unwrapping wire).Time saving and energy saving, improve line construction efficiency, can overcome preferably the potential risk in the use procedure of hand operated wring grinder tail rope, can well meet construction requirement defeated, distribution line, possess larger production, popularization and practical value.
Accompanying drawing explanation
Fig. 1 is front view of the present invention.
Fig. 2 is the right view of Fig. 1.
Fig. 3 is the upward view of the operated wring grinder of hand shown in Fig. 1 part.
Embodiment
Fig. 1, Fig. 2, Fig. 3 illustrate, this distribution line construction equipment has the hand operated wring grinder of tail rope buffer-braking function, comprise, be arranged on the hand operated wring grinder on bracing frame 101, tail rope buffer-braking mechanism is also installed: be fixed on axle as time mill heart 301 that is wound around tail rope on the bracing frame 101 of hand operated wring grinder below, axle is installed in rotation on bracing frame 101, and in the inferior mill heart one side, integrated setting has ratchet 302, is arranged on bracing frame with the ratchet 303 of ratchet mating reaction.Hand operated wring grinder structure is: driving shaft 201 and driven shaft 203 respectively along continuous straight runs are installed in rotation on bracing frame 101, a driving shaft left side, right side is separately installed with the first hand driving gear 202 and the second hand driving gear 206, driven shaft 203 left sides, right both sides are separately installed with the first driven gear 204 and the second driven gear 207, the first hand driving gear 202 and the first driven gear 204 engaged transmission, the second hand driving gear 206 and the second driven gear 207 engaged transmission, and the first hand driving gear 202 is identical with the second driven gear 207, the second hand driving gear 206 is identical with the first driven gear 204, the gear ratio of the first hand driving gear 202 and the first driven gear is 3: 1, the main mill heart 205 is fixed on driving shaft 203, and in the main mill heart one side, integrated setting has main ratchet 208, is arranged on bracing frame 101 with the main ratchet 209 of main ratchet mating reaction.The main mill heart 205 and time mill heart 301 are the column (being formed by cylinder processing concave curved surface) with indent curved surfaces.Referring to Fig. 1, the two ends of driving shaft is square head (cross section is rectangle or square), pulls to be inserted in the instruments such as spanner.Buffer-braking mechanism also claims backward-pressure.Driving shaft and driven shaft all can be arranged on bracing frame through bearing or axle sleeve, are mounted in specifically between two risers on bracing frame.Bracing frame adopts angle steel or channel-section steel to be welded, and four legs of bracing frame are positive truncated rectangular pyramids and arrange.
Construction operation step is as follows:
1, operating personnel is in place hand operated wring grinder.
2, operating personnel, after the main mill heart is wound around, grinds wirerope-winding in the heart at the inferior of buffer-braking mechanism.
3, main mill heart steel wire rope forward is wound around 4-5 circle.
4, the traction downwards of steel wire rope tail rope is enclosed to time grinding reverse-winding 2 in the heart.
5,, when tight rope is constructed, tail rope is held by operating personnel's manpower.

Claims (2)

1. a distribution line construction equipment has the hand operated wring grinder of tail rope buffer-braking function, comprise, be arranged on the hand operated wring grinder on bracing frame (101), it is characterized in that, tail rope buffer-braking mechanism is also installed: be fixed on axle as time mill heart (301) that is wound around tail rope on the bracing frame (101) of described hand operated wring grinder below, axle is installed in rotation on bracing frame (101), in the inferior mill heart one side, integrated setting has ratchet (302), is arranged on bracing frame with the ratchet (303) of ratchet mating reaction, described hand operated wring grinder structure is: driving shaft (201) and driven shaft (203) respectively along continuous straight runs are installed in rotation on bracing frame (101), a driving shaft left side, right side is separately installed with the first hand driving gear (202) and the second hand driving gear (206), driven shaft (203) left side, right both sides are separately installed with the first driven gear (204) and the second driven gear (207), the first hand driving gear (202) and the first driven gear (204) engaged transmission, the second hand driving gear (206) and the second driven gear (207) engaged transmission, and the first hand driving gear (202) is identical with the second driven gear (207), the second hand driving gear (206) is identical with the first driven gear (204), the first hand driving gear (202) is 3: 1 with the gear ratio of the first driven gear, it is upper that the main mill heart (205) is fixed on driving shaft (203), and in the main mill heart one side, integrated setting has main ratchet (208), is arranged on bracing frame (101) with the main ratchet (209) of main ratchet mating reaction.
2. hand operated wring grinder according to claim 1, is characterized in that, the described main mill heart (205) and time mill heart (301) are the column with indent curved surfaces.
CN201110435077.8A 2011-12-22 2011-12-22 Hand winch with buffer braking function of tail rope for construction of distribution circuit Active CN102545120B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110435077.8A CN102545120B (en) 2011-12-22 2011-12-22 Hand winch with buffer braking function of tail rope for construction of distribution circuit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110435077.8A CN102545120B (en) 2011-12-22 2011-12-22 Hand winch with buffer braking function of tail rope for construction of distribution circuit

Publications (2)

Publication Number Publication Date
CN102545120A CN102545120A (en) 2012-07-04
CN102545120B true CN102545120B (en) 2014-06-04

Family

ID=46351351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110435077.8A Active CN102545120B (en) 2011-12-22 2011-12-22 Hand winch with buffer braking function of tail rope for construction of distribution circuit

Country Status (1)

Country Link
CN (1) CN102545120B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104229548A (en) * 2013-06-20 2014-12-24 国家电网公司 Winding mill with reverse rotation preventing function
CN105923557B (en) * 2016-06-13 2018-05-22 廖永春 A kind of motor-driven grinding mill tail rope control device
CN109748196B (en) * 2019-03-25 2024-03-26 扬州国网电力工具研发制造有限公司 Mechanical grinding emergency stop safety device and manufacturing and mounting method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201458618U (en) * 2009-08-27 2010-05-12 河南省电力公司平顶山供电公司 Portable hand-operated wring grinder
CN102180419A (en) * 2011-03-16 2011-09-14 中国南方电网有限责任公司超高压输电公司 Hand operated grinding mill
CN102234077A (en) * 2011-06-26 2011-11-09 江西赣州供电公司 Automatic tail rope rolling and releasing manual capstan
CN202373941U (en) * 2011-12-22 2012-08-08 四川省电力公司攀枝花电业局 Hand winch with tail rope buffering and braking function for distribution line construction

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0847126A (en) * 1994-07-29 1996-02-16 Toa Hatsudouki Kk Wire-kink detection device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201458618U (en) * 2009-08-27 2010-05-12 河南省电力公司平顶山供电公司 Portable hand-operated wring grinder
CN102180419A (en) * 2011-03-16 2011-09-14 中国南方电网有限责任公司超高压输电公司 Hand operated grinding mill
CN102234077A (en) * 2011-06-26 2011-11-09 江西赣州供电公司 Automatic tail rope rolling and releasing manual capstan
CN202373941U (en) * 2011-12-22 2012-08-08 四川省电力公司攀枝花电业局 Hand winch with tail rope buffering and braking function for distribution line construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP平8-47126A 1996.02.16

Also Published As

Publication number Publication date
CN102545120A (en) 2012-07-04

Similar Documents

Publication Publication Date Title
CN202214152U (en) Trolley walking traction mechanism of bridge crane
CN201739428U (en) Wire-drawing regulator
CN103618258B (en) A kind of electric transmission line erection tightener
CN102545120B (en) Hand winch with buffer braking function of tail rope for construction of distribution circuit
CN104538887B (en) A kind of lightning conducter lifts converter
CN104332890B (en) A kind of portable manual take-up line concentrator
CN109610922A (en) A kind of typical case's landform tower erection construction equipment
CN202864713U (en) Ultrahigh-lift electric hoist
CN102361261A (en) Single-lead maintaining aerodyne
CN202373941U (en) Hand winch with tail rope buffering and braking function for distribution line construction
CN202467629U (en) Auxiliary climbing system
CN104577870A (en) Automatic obstacle-crossing type overhead earth wire pay-off tool for maintenance
CN209344647U (en) A kind of secretly effective constructing device of deposited cable joint-box protection
CN202633831U (en) Manual multifunctional wire tensioning device
CN106986231A (en) A kind of copper-clad aluminum conductor spooling equipment
CN102536107A (en) Uphill assisting device and operation method thereof
CN102923603B (en) Automatic controller of tail rope of winching machine
CN204407099U (en) The static stranding machine of formula of putting in one
CN202004371U (en) Pulley for overhauling electric transmission line
CN204720888U (en) Portable power distribution less important work platform
CN203582383U (en) Automatic brake set for power-driven winches
CN103696600A (en) Winch driving steel rope hoisting fixing device and fixing method thereof
CN201829862U (en) Saddle type wire hoist
CN205367548U (en) Mountain region pole transport means
CN203398633U (en) Manual transmission line double-wheel aerodyne

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121217

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121217

Address after: 617000 Panzhihua Road, Panzhihua, No. 702 middle section of Sichuan

Applicant after: Panzhihua Electric Power Bureau of Sichuan Electric Power Corporation

Applicant after: State Grid Corporation of China

Address before: 617000 Panzhihua Road, Panzhihua, No. 702 middle section of Sichuan

Applicant before: Panzhihua Electric Power Bureau of Sichuan Electric Power Corporation

C14 Grant of patent or utility model
GR01 Patent grant