CN102541227A - Method for isolated optimizing design of a plurality of wind passages - Google Patents

Method for isolated optimizing design of a plurality of wind passages Download PDF

Info

Publication number
CN102541227A
CN102541227A CN2012100271998A CN201210027199A CN102541227A CN 102541227 A CN102541227 A CN 102541227A CN 2012100271998 A CN2012100271998 A CN 2012100271998A CN 201210027199 A CN201210027199 A CN 201210027199A CN 102541227 A CN102541227 A CN 102541227A
Authority
CN
China
Prior art keywords
air channel
wind
design
server
isolated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100271998A
Other languages
Chinese (zh)
Inventor
于光义
李钟勇
彭红江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inspur Electronic Information Industry Co Ltd
Original Assignee
Inspur Electronic Information Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inspur Electronic Information Industry Co Ltd filed Critical Inspur Electronic Information Industry Co Ltd
Priority to CN2012100271998A priority Critical patent/CN102541227A/en
Publication of CN102541227A publication Critical patent/CN102541227A/en
Pending legal-status Critical Current

Links

Landscapes

  • Ventilation (AREA)
  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

The invention provides a method for the isolated optimizing design of a plurality of wind passages. According to the method, some positions inside a server are found out by calculation and analysis according to the arrangement of a mainboard of the server because the heat radiation of a system is possibly changed by the change of the flow resistance of the positions, a wind pressing structural component is also installed, the height of the wind pressing structural component is regulated, and the design of different wind passages inside the server is realized. Compared with the prior art, the time and the expense of designing various wind passage isolating devices with different structures are reduced according to the method for the isolated optimizing design of the wind passages, and the optimization of wind passages under the condition of different system configurations is realized.

Description

A kind of multiple duct is isolated optimal design method
Technical field
The present invention relates to the computer communication technology field, the inner multiple duct of specifically a kind of four road servers of new generation is isolated optimal design method.
Background technology
Current server product along with the continuous variation of client's application demand, is had higher requirement to server heat radiation power consumption and running noises, and this just requires the cooling system scheme of our design of High Efficiency, and the design in system air channel is a wherein important part.
In previous generation four tunnel server design, internal memory generally is positioned at the CPU rear and front end, and four CPU are arranged in a row, and the air channel design is simple relatively, mainly is that the pressure wind of carrying out the cpu heat position gets final product.On up-to-date romley platform, internal memory is arranged in the CPU left and right sides, and therefore whole four road server master boards need layout again; Arrange before and after four CPU; Whole server interior flow field is compared different fully with the previous generation platform, the air channel design is more complicated, and design difficulty is higher.The server interior flow field that different air channel designs forms is all inequality, and the efficient of cooling system also can change to some extent.Because in four tunnel server design of new generation, what the server interior flow field can change is local a lot, and the design that we carry out the air channel is difficult more.
Summary of the invention
Technical assignment of the present invention is to the deficiency in prior art, provides a kind of multiple duct that is applied to four road servers of new generation to isolate optimal design method.
Technical scheme of the present invention realizes that by following mode this a kind of multiple duct is isolated optimal design method, and the concrete steps of its realization are:
Step 1 is built configuration platform, carries out system emulation according to motherboard layout, confirms system's air channel design direction to simulation result, and wind construct device is pressed in design;
Step 2 is confirmed system configuration, and according to the configuring condition of system, will press wind construct device to be installed in corresponding position;
Step 3 is placed on the configuration platform of building under the hot environment and tests, through taking away various structure part, record test data;
Step 4, data recorded in the analytical procedure three is confirmed the division in system air channel, finds out the optimum isolation scheme in air channel under the different configurations;
Step 5, according to the results verification of step 4 after the division in air channel, the height dimension of wind structural member is pressed in adjustment, changes the flow resistance distribution situation in each air channel;
Step 6, continuation is placed on the configuration platform in the step 5 under the hot environment and tests, and the test data of each assembly radiating situation of record server;
Step 7 is analyzed according to the step 6 data recorded, finds optimum air channel scheme, realizes the isolation optimal design in server air channel.
The beneficial effect that the present invention is compared with prior art produced is:
A kind of multiple duct of the present invention is isolated the configuring condition of optimal design method according to system, will press wind construct device to be installed in corresponding position, through taking away the corresponding structure part, tests out the optimum isolation scheme in air channel under the different configurations; Through the height dimension of adjustment pressure wind structural member, change the flow resistance distribution situation in each air channel, through each assembly radiating situation of testing server, find optimum air channel scheme; So just carry out system's air channel design very easily; Not only reach purpose of design, and saved R&D costs, improved work efficiency; Realize the design in multiple air channel through a pressure wind construct device, reduced the time of the air channel spacer assembly that designs multiple different structure; Realize the air channel optimization under the different system configuring condition.
Description of drawings
Accompanying drawing 1 is the design cycle synoptic diagram of method of the present invention.
Embodiment
Below in conjunction with accompanying drawing a kind of multiple duct provided by the present invention is isolated optimal design method and do following the detailed description.
At present, in the inner air channel design of four road servers of new generation, for the problem of resolution system heat radiation power consumption and too noisy, shown in accompanying drawing 1, provide a kind of multiple duct to isolate optimal design method, the concrete steps of its realization are at present:
Step 1 is built configuration platform, carries out system emulation according to motherboard layout, confirms system's air channel design direction to simulation result, and wind construct device is pressed in design;
Step 2 is confirmed system configuration, and according to the configuring condition of system, will press wind construct device to be installed in corresponding position;
Step 3 is placed on the configuration platform of building under the hot environment and tests, through taking away various structure part, record test data;
Step 4, data recorded in the analytical procedure three is confirmed the division in system air channel, finds out the optimum isolation scheme in air channel under the different configurations;
Step 5, according to the results verification of step 4 after the division in air channel, the height of wind structural member is pressed in adjustment
Size changes the flow resistance distribution situation in each air channel;
Step 6, continuation is placed on the configuration platform in the step 5 under the hot environment and tests, and the test data of each assembly radiating situation of record server;
Step 7 is analyzed according to the step 6 data recorded, finds optimum air channel scheme, realizes the isolation optimal design in server air channel.
Quantity and the height dimension of the present invention through changing the isallobaric wind structural member; Realize the Flow Field Distribution that server is inner different; According to the server master board layout; Through computational analysis, the change of finding out inner which the position flow resistance of server might change system radiating, is pressing design and installation hole, wind construct device relevant position; Install through mounting hole then and press the wind structural member; And adjustment pressure wind structural member height, realize the different air channels design that server is inner, find out the optimal design in air channel through contrastive test; The final isolation optimal design that realizes four road server air channels; Thereby realize the design in multiple air channel through a pressure wind construct device, reduced the time and the expense of the air channel spacer assembly that designs multiple different structure, realize the air channel optimization under the different system configuring condition.

Claims (1)

1. a multiple duct is isolated optimal design method, it is characterized in that the concrete steps of its realization are:
Step 1 is built configuration platform, carries out system emulation according to motherboard layout, confirms system's air channel design direction to simulation result, and wind construct device is pressed in design;
Step 2 is confirmed system configuration, and according to the configuring condition of system, will press wind construct device to be installed in corresponding position;
Step 3 is placed on the configuration platform of building under the hot environment and tests, through taking away various structure part, record test data;
Step 4, data recorded in the analytical procedure three is confirmed the division in system air channel, finds out the optimum isolation scheme in air channel under the different configurations;
Step 5, according to the results verification of step 4 after the division in air channel, the height dimension of wind structural member is pressed in adjustment, changes the flow resistance distribution situation in each air channel;
Step 6, continuation is placed on the configuration platform in the step 5 under the hot environment and tests, and the test data of each assembly radiating situation of record server;
Step 7 is analyzed according to the step 6 data recorded, finds optimum air channel scheme, realizes the isolation optimal design in server air channel.
CN2012100271998A 2012-02-08 2012-02-08 Method for isolated optimizing design of a plurality of wind passages Pending CN102541227A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100271998A CN102541227A (en) 2012-02-08 2012-02-08 Method for isolated optimizing design of a plurality of wind passages

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100271998A CN102541227A (en) 2012-02-08 2012-02-08 Method for isolated optimizing design of a plurality of wind passages

Publications (1)

Publication Number Publication Date
CN102541227A true CN102541227A (en) 2012-07-04

Family

ID=46348276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100271998A Pending CN102541227A (en) 2012-02-08 2012-02-08 Method for isolated optimizing design of a plurality of wind passages

Country Status (1)

Country Link
CN (1) CN102541227A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102662445A (en) * 2012-03-20 2012-09-12 浪潮电子信息产业股份有限公司 Optimization design method for isolation of multiple radiation air ducts of server
CN116070467A (en) * 2023-03-13 2023-05-05 四川华鲲振宇智能科技有限责任公司 Heat dissipation simulation analysis method for GPU card in 3U reinforcement server

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6407917B1 (en) * 2000-10-30 2002-06-18 Lucent Technologies Inc. Fluid flow management system
CN2745086Y (en) * 2004-10-22 2005-12-07 明基电通股份有限公司 Adjustable air duct device
CN101211205A (en) * 2006-12-26 2008-07-02 联想(北京)有限公司 Blade type server system and its radiation method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6407917B1 (en) * 2000-10-30 2002-06-18 Lucent Technologies Inc. Fluid flow management system
CN2745086Y (en) * 2004-10-22 2005-12-07 明基电通股份有限公司 Adjustable air duct device
CN101211205A (en) * 2006-12-26 2008-07-02 联想(北京)有限公司 Blade type server system and its radiation method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
汪淇: "高密度服务器的热特性分析及其热设计", 《中国优秀硕士学位论文全文数据库信息科技辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102662445A (en) * 2012-03-20 2012-09-12 浪潮电子信息产业股份有限公司 Optimization design method for isolation of multiple radiation air ducts of server
CN116070467A (en) * 2023-03-13 2023-05-05 四川华鲲振宇智能科技有限责任公司 Heat dissipation simulation analysis method for GPU card in 3U reinforcement server

Similar Documents

Publication Publication Date Title
CN201044545Y (en) Fixing rack and electronic equipments with the same
CN101959390A (en) Combined wind scooper
US8077458B2 (en) Airflow guiding cover and electronic device having the same
CN102541227A (en) Method for isolated optimizing design of a plurality of wind passages
CN104317368A (en) Server
Jin et al. The study of servers’ arrangement and air distribution strategy under partial load in data centers
WO2008141293A3 (en) Image segmentation system and method
CN104010478A (en) Realizing method for data center free of fan arrangement in cabinets
CN102662445A (en) Optimization design method for isolation of multiple radiation air ducts of server
CN104460908B (en) A kind of multi-channel cooling design method of 1U servers
CN103167779A (en) Electronic equipment and heat dissipating device thereof
CN101807100B (en) High-density rack server radiating system
CN203645927U (en) Novel flexibly-assembled engineering control cabinet
CN101386050A (en) Processing method and device of heat radiation model set
CN204679947U (en) Intensive high-power components radiation wind-guiding hood
CN204906957U (en) Intellectual detection system equipment is synthesized to train monitoring device host computer
CN202502446U (en) Casing and computer system with same
CN219778160U (en) Modularized all-in-one machine
CN103391702A (en) Cooling device and manufacturing method thereof
CN105740493A (en) Simulation model and simulation method for obtaining cooling flow of expansion card
CN204906923U (en) Rack of intellectual detection system equipment is synthesized to train monitoring device host computer
CN204697468U (en) The heat radiation testing apparatus of T/R assembly
CN106200832A (en) A kind of adjustable server heat sink
CN204695199U (en) A kind of adjustable server heat sink
CN211742652U (en) Solid state disk pressure measurement tool for server

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120704