CN102535349B - 双层围挡断流水下修筑系梁承力梁建桥方法 - Google Patents
双层围挡断流水下修筑系梁承力梁建桥方法 Download PDFInfo
- Publication number
- CN102535349B CN102535349B CN201210071412.5A CN201210071412A CN102535349B CN 102535349 B CN102535349 B CN 102535349B CN 201210071412 A CN201210071412 A CN 201210071412A CN 102535349 B CN102535349 B CN 102535349B
- Authority
- CN
- China
- Prior art keywords
- enclosing
- bearing beam
- binder
- double
- enclosing barrier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210071412.5A CN102535349B (zh) | 2012-03-19 | 2012-03-19 | 双层围挡断流水下修筑系梁承力梁建桥方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210071412.5A CN102535349B (zh) | 2012-03-19 | 2012-03-19 | 双层围挡断流水下修筑系梁承力梁建桥方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102535349A CN102535349A (zh) | 2012-07-04 |
CN102535349B true CN102535349B (zh) | 2014-03-05 |
Family
ID=46343255
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210071412.5A Active CN102535349B (zh) | 2012-03-19 | 2012-03-19 | 双层围挡断流水下修筑系梁承力梁建桥方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102535349B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB208620A (en) * | 1922-10-28 | 1923-12-27 | Francis Gascoigne Lynde | Improvements in and relating to caissons, coffer dams, platforms and the like |
FR1316341A (fr) * | 1962-02-28 | 1963-01-25 | Procédé destiné à la construction des fondations d'ouvrages au-dessous du niveau de la nappe liquide dans une fouille asséchée | |
CN101074561A (zh) * | 2006-05-19 | 2007-11-21 | 中船第九设计研究院 | 一种水中大直径圆形钢板桩围堰及其施工方法 |
CN101205720A (zh) * | 2007-12-05 | 2008-06-25 | 中铁大桥局股份有限公司 | 一种超大型钢围堰下放、着床、下沉控制技术 |
CN201254727Y (zh) * | 2008-09-09 | 2009-06-10 | 武汉武大巨成加固实业有限公司 | 桥梁桩柱水下维修施工围堰 |
CN201883444U (zh) * | 2010-11-11 | 2011-06-29 | 中铁十三局集团有限公司 | 水中低桩承台双壁钢围堰 |
-
2012
- 2012-03-19 CN CN201210071412.5A patent/CN102535349B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB208620A (en) * | 1922-10-28 | 1923-12-27 | Francis Gascoigne Lynde | Improvements in and relating to caissons, coffer dams, platforms and the like |
FR1316341A (fr) * | 1962-02-28 | 1963-01-25 | Procédé destiné à la construction des fondations d'ouvrages au-dessous du niveau de la nappe liquide dans une fouille asséchée | |
CN101074561A (zh) * | 2006-05-19 | 2007-11-21 | 中船第九设计研究院 | 一种水中大直径圆形钢板桩围堰及其施工方法 |
CN101205720A (zh) * | 2007-12-05 | 2008-06-25 | 中铁大桥局股份有限公司 | 一种超大型钢围堰下放、着床、下沉控制技术 |
CN201254727Y (zh) * | 2008-09-09 | 2009-06-10 | 武汉武大巨成加固实业有限公司 | 桥梁桩柱水下维修施工围堰 |
CN201883444U (zh) * | 2010-11-11 | 2011-06-29 | 中铁十三局集团有限公司 | 水中低桩承台双壁钢围堰 |
Also Published As
Publication number | Publication date |
---|---|
CN102535349A (zh) | 2012-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104695380B (zh) | 一种塑钢板桩与混凝土组合的护岸结构 | |
CN102677592B (zh) | 在浅海裸露基岩上搭设深水钢栈桥及平台的方法 | |
CN103422510B (zh) | 钢管框架式围堰结构及施工方法 | |
CN205314116U (zh) | 一种复合式连续型钻孔抗滑结构 | |
CN202220341U (zh) | 一种淤泥中基坑的支护结构 | |
CN104404949A (zh) | 一种树根形灌注桩 | |
CN101824825A (zh) | 一种深基坑明挖施工方法 | |
CN202969370U (zh) | 一种新型钢管桩 | |
CN102535349B (zh) | 双层围挡断流水下修筑系梁承力梁建桥方法 | |
CN204645058U (zh) | 一种设有加芯旋喷桩的h型双排桩结构 | |
CN204212161U (zh) | 基坑支护斜钢顶撑体系 | |
CN217517602U (zh) | 近江堤基坑支护结构 | |
CN203741852U (zh) | 一种管式地下水排渗盲沟 | |
CN202430742U (zh) | 预制板组装挡土墙 | |
CN103967033A (zh) | 一种水电站厂房地基处理方法 | |
CN210887256U (zh) | 挡水围堰平直组合板桩地连墙式框架 | |
CN103866787A (zh) | 一种敞挖逆筑法混凝土防渗墙建造施工工艺 | |
CN103938585A (zh) | 土坝+重力坝混合坝型的布置结构 | |
CN203924005U (zh) | 水域泥炭质土层中的填土筑坝结构 | |
CN203603162U (zh) | 一种位于基坑边的施工电梯荷载基础系统 | |
CN102704489B (zh) | 基坑支护结构及其建造方法 | |
CN203741782U (zh) | 一种高面板堆石坝多段面板结构 | |
CN202705883U (zh) | 在浅海裸露基岩上搭设的深水钢栈桥及平台 | |
CN204875665U (zh) | 用于中等厚度砂砾石基础上的电站尾水渠挡墙 | |
CN202530450U (zh) | 一种柔性桩与刚性桩上下同体组合桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: CHIFENG HONGJI BUILDING (GROUP) CO., LTD. Free format text: FORMER OWNER: DONG LANTIAN Effective date: 20140117 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Xiaoming Inventor after: Yu Jingwu Inventor before: Wang Weikai Inventor before: Li Lei Inventor before: Dong Na Inventor before: Dong Tingting Inventor before: Dong Lantian |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: WANG WEIKAI LI LEI DONG NA DONG TINGTING DONG LANTIAN TO: LI XIAOMING YU JINGWU Free format text: CORRECT: ADDRESS; FROM: 250013 JINAN, SHANDONG PROVINCE TO: 024005 CHIFENG, INNER MONGOLIA AUTONOMOUS REGION |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20140117 Address after: The northern section of Songshan District, Chifeng city the Inner Mongolia Autonomous Region road 024005 English Applicant after: Chifeng Acer building (Group) Co. Ltd. Address before: 250013 Shandong Province, Lixia District of Ji'nan City Luo River District 8 Building 4 unit 301 room Applicant before: Dong Lantian |
|
GR01 | Patent grant | ||
GR01 | Patent grant |