CN102534678A - Long interval type crust breaking and blanking method for alumina electrolysis bath - Google Patents
Long interval type crust breaking and blanking method for alumina electrolysis bath Download PDFInfo
- Publication number
- CN102534678A CN102534678A CN2010105916834A CN201010591683A CN102534678A CN 102534678 A CN102534678 A CN 102534678A CN 2010105916834 A CN2010105916834 A CN 2010105916834A CN 201010591683 A CN201010591683 A CN 201010591683A CN 102534678 A CN102534678 A CN 102534678A
- Authority
- CN
- China
- Prior art keywords
- blanking
- crust breaking
- crust
- blanking device
- electrolysis bath
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a long interval type crust breaking and blanking method for an alumina electrolysis bath. When blanking is performed on each aluminum electrolysis bath, A and B groups of crust breakers and blanking devices are adopted for performing crust breaking and blanking on the aluminum electrolysis bath, namely one group comprises the A crust breaker and the A blanking device, the other group comprises the B crust breaker and the B blanking device, the A and the B groups of the crust breakers and the blanking devices are controlled to perform the crust breaking and the blanking on the aluminum electrolysis bath through a controller and the long interval type crust breaking and blanking method specifically comprises the following steps of: (1) blanking through the A blanking device after crust breaking through the A crust breaker; (2) blanking through the B blanking device after crust breaking through the B crust breaker; (3) blanking through the A blanking device; and (4) blanking through the B blanking device, so that one crust breaking and blanking cycle is completed; and crust breaking and blanking work of the aluminum electrolysis bath can be completed through the cycles. The long interval type crust breaking and blanking method disclosed by the invention has the advantages of not only meeting blanking quantity within a same period of time and prolonging the service life of the crust breakers, but also having high working efficiency, convenience in transformation and capability of prolonging the service life of the crust breakers without increasing any investment.
Description
Technical field
The present invention relates to a kind of alumina eltrolysis flute length compartment crust breaking baiting method, belong to the aluminum cell supplying technical field.
Background technology
At present; When in the prior art aluminium cell being carried out alumina blanking; Generally adopt one group or two groups of crust breaking machines and blanking device to carry out crust breaking and blanking; When adopting two groups of crust breaking machines of AB and blanking device that aluminium cell is carried out the crust breaking blanking, its mode of operation generally all is to carry out Control Circulation work according to the following steps through unit: 1., behind the A crust breaking machine crust breaking, the blanking of A blanking device, 2., behind the B crust breaking machine crust breaking, the blanking of B blanking device; Be again then 1., behind the A crust breaking machine crust breaking, the blanking of A blanking device, 2., behind the B crust breaking machine crust breaking, the blanking of B blanking device; Carry out crust breaking and blanking work so circularly.This mode of operation; For every group crust breaking machine, each blanking of this group blanking device all has a crust breaking action, hundreds of times of every group of blanking device blanking every day; The action frequency of every group of crust breaking machine is all also more than hundreds of times; So frequent action, causing the crust breaking machine fault is one of on-the-spot common equipment failure, so its maintenance capacity is very big.So existing alumina blanking mode still is not ideal enough.
Summary of the invention
The objective of the invention is to: provide a kind of and can satisfy the blanking amount, can prolong the crust breaking machine alumina eltrolysis flute length compartment crust breaking baiting method in work-ing life again, to overcome the deficiency of prior art.
The present invention is achieved in that a kind of alumina eltrolysis flute length compartment crust breaking baiting method of the present invention comprises that adopting unit to control crust breaking machine carries out crust breaking; And carry out blanking through the aluminium cell of unit control blanking device after to crust breaking; When every aluminium cell is carried out blanking, adopt two groups of crust breaking machines of AB and blanking device that it is carried out crust breaking and blanking, promptly one group is A crust breaking machine and A blanking device; Another group is B crust breaking machine and B blanking device; And control two groups of crust breaking machines of AB according to the following steps and blanking device carries out crust breaking and blanking to aluminium cell through unit: 1., behind the A crust breaking machine crust breaking, the blanking of A blanking device, 2., behind the B crust breaking machine crust breaking, the blanking of B blanking device, 3., the blanking of A blanking device; 4., the blanking of B blanking device, so just accomplished a crust breaking and blanking the circulation; Then and from 1., behind the A crust breaking machine crust breaking, the blanking of A blanking device, 2., behind the B crust breaking machine crust breaking, the blanking of B blanking device, 3., the blanking of A blanking device, 4., the blanking of B blanking device; So circulation can be accomplished crust breaking and blanking work to aluminium cell.
Owing to adopted technique scheme; For every among the present invention crust breaking machine, shell is just made a call in per twice blanking of this group blanking device one time; Therefore the traditional relatively crust breaking cutting mode number of times of action frequency of every group of crust breaking machine reduces by half, so the present invention greatly reduces the crust breaking machine failure rate.Each group crust breaking machine simultaneously of the present invention is after having beaten shell; The blanking device of this group carry out a blanking and at interval behind the interval of a crust breaking time and a blanking time (approximately less than 4 minutes time) carry out a blanking again; Because pitch time is shorter; Can not cause the card of aluminum cell shell face pinkeye stifled, and the not smooth situation of blanking can not occur.So, the present invention compared with prior art, the present invention not only has the blanking amount that in the identical time, can satisfy, can prolong the crust breaking machine advantage in work-ing life again, and transforms convenient and do not increase any investment and can prolong the crust breaking machine advantage in work-ing life.
Embodiment
Below in conjunction with embodiment the present invention is done further detailed description.
Embodiments of the invention: a kind of alumina eltrolysis flute length compartment crust breaking baiting method of the present invention need not increase any device when implementing can directly transform enforcement on existing equipment; This method comprises that adopting existing unit to control crust breaking machine carries out crust breaking; And carry out blanking through the aluminium cell of unit control blanking device after to crust breaking; When every aluminium cell is carried out blanking, adopt two groups of crust breaking machines of AB and blanking device that it is carried out crust breaking and blanking by traditional mode, promptly one group is A crust breaking machine and A blanking device; Another group is B crust breaking machine and B blanking device; During enforcement, the each blanking time of each crust breaking time and every blanking device that makes every crust breaking machine through existing unit is all with of the prior art the same, and controls two groups of crust breaking machines of AB according to the following steps and blanking device carries out crust breaking and blanking to aluminium cell: promptly 1., behind the A crust breaking machine crust breaking, the blanking of A blanking device; 2., behind the B crust breaking machine crust breaking, B blanking device blanking; 3., the blanking of A blanking device, 4., the blanking of B blanking device, so just accomplished a crust breaking and blanking circulation; Then and from 1., behind the A crust breaking machine crust breaking, the blanking of A blanking device, 2., behind the B crust breaking machine crust breaking, the blanking of B blanking device, 3., the blanking of A blanking device, 4., the blanking of B blanking device; So constantly circulation can be accomplished crust breaking and blanking work to aluminium cell.
Claims (1)
1. alumina eltrolysis flute length compartment crust breaking baiting method; Comprise and adopt unit control crust breaking machine to carry out crust breaking; And carry out blanking through the aluminium cell of unit control blanking device after to crust breaking; It is characterized in that: when every aluminium cell is carried out blanking, adopt two groups of crust breaking machines of AB and blanking device that it is carried out crust breaking and blanking, promptly one group is A crust breaking machine and A blanking device; Another group is for B crust breaking machine and B blanking device, and controls two groups of crust breaking machines of AB according to the following steps and blanking device carries out crust breaking and blanking to aluminium cell through unit:
1., behind the A crust breaking machine crust breaking, the blanking of A blanking device, 2., behind the B crust breaking machine crust breaking, the blanking of B blanking device, 4., the blanking of B blanking device 3., the blanking of A blanking device,, so just accomplished a crust breaking and blanking circulation; Then and from 1., behind the A crust breaking machine crust breaking, the blanking of A blanking device, 2., behind the B crust breaking machine crust breaking, the blanking of B blanking device, 3., the blanking of A blanking device, 4., the blanking of B blanking device; So circulation can be accomplished crust breaking and blanking work to aluminium cell.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105916834A CN102534678A (en) | 2010-12-16 | 2010-12-16 | Long interval type crust breaking and blanking method for alumina electrolysis bath |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105916834A CN102534678A (en) | 2010-12-16 | 2010-12-16 | Long interval type crust breaking and blanking method for alumina electrolysis bath |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102534678A true CN102534678A (en) | 2012-07-04 |
Family
ID=46342666
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105916834A Pending CN102534678A (en) | 2010-12-16 | 2010-12-16 | Long interval type crust breaking and blanking method for alumina electrolysis bath |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102534678A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87103606A (en) * | 1987-05-14 | 1988-11-30 | 贵阳铝镁设计研究院 | The hermetic feeding device on the self-roasting tank is inserted on a kind of side |
CN201418000Y (en) * | 2009-06-26 | 2010-03-03 | 北京希翼新兴能源科技有限公司 | Outer rotor generator for vertical shaft wind power generator |
-
2010
- 2010-12-16 CN CN2010105916834A patent/CN102534678A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87103606A (en) * | 1987-05-14 | 1988-11-30 | 贵阳铝镁设计研究院 | The hermetic feeding device on the self-roasting tank is inserted on a kind of side |
CN201418000Y (en) * | 2009-06-26 | 2010-03-03 | 北京希翼新兴能源科技有限公司 | Outer rotor generator for vertical shaft wind power generator |
Non-Patent Citations (3)
Title |
---|
徐刚: "预焙阳极铝电解槽中心下料及打壳的自动控制", 《CHINA ACADEMIC JOURNAL ELECTRONIC PUBLISHING HOUSE》, 31 December 1994 (1994-12-31), pages 27 - 30 * |
朱丹青等: "铝电解槽气控管路及车间压缩空气管路设计", 《轻金属》 * |
王天成: "180kA铝电解槽打壳、下料系统方式的改造实践", 《开发应用》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106033904B (en) | The charging method of matrix form flexibility charging heap and dynamically distributes power | |
WO2012100538A1 (en) | Communication power source with multi-energy supply and control method thereof | |
CN103904681B (en) | High-power centralized parallel network power generation coordinated control system and method | |
CN201582146U (en) | Main-circulation main pump system of pure water cooling device | |
CN103806015B (en) | Electric welding compensation system is with under a kind of potline total current | |
CN102534678A (en) | Long interval type crust breaking and blanking method for alumina electrolysis bath | |
CN102534679A (en) | Quasi-continuous blanking type crust breaking and blanking method for alumina electrolysis bath | |
CN102230184B (en) | Method for keeping activity of electrolytic ozone generator | |
CN103047122A (en) | Water pump control device for sewage pumping station and control method of water pump control device | |
CN107813722B (en) | Charging system and charging power dynamic distribution method thereof | |
CN206389116U (en) | The random power flow tuning controller of Port Power Feed System | |
CN104882885A (en) | Control method of multi-machine parallel optimized operation of active power filters | |
CN211118684U (en) | Guide rail lubricating system of surface grinding machine | |
CN204835545U (en) | Little grid system of gas turbine generator group and flywheel energy storage system implementation | |
CN104319782B (en) | A kind of parallel reactive compensation system and its control method | |
CN102136396A (en) | Contractor control circuit for prolonging service life of contact terminal of locomotive contactor | |
CN202395456U (en) | High and low voltage dynamic energy-saving compensation complete equipment of ore furnace | |
CN104993471A (en) | Multi-module parallel type vehicle large power DC-DC system and control method therefor | |
CN206517054U (en) | A kind of intelligent AC line voltage control system | |
CN206209386U (en) | A kind of high efficiency modular i GBT melting power supplys for consumable electrode vacuum furnace | |
CN213968128U (en) | Water-cooling plate belt cleaning device | |
CN205222704U (en) | Graphitization double -furnace power transmission system based on high current switch | |
EP2789717B1 (en) | Method for spinning-in on a spinning machine, particularly on an air-jet spinning machine or an open-end spinning machine | |
CN205222705U (en) | High current switch with switch function | |
CN204893356U (en) | Bearing detaching device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120704 |
|
RJ01 | Rejection of invention patent application after publication |