CN102522816A - 水电站黑启动中直流逆变的实现方法 - Google Patents
水电站黑启动中直流逆变的实现方法 Download PDFInfo
- Publication number
- CN102522816A CN102522816A CN2011104559497A CN201110455949A CN102522816A CN 102522816 A CN102522816 A CN 102522816A CN 2011104559497 A CN2011104559497 A CN 2011104559497A CN 201110455949 A CN201110455949 A CN 201110455949A CN 102522816 A CN102522816 A CN 102522816A
- Authority
- CN
- China
- Prior art keywords
- power
- inverter
- motor
- power supply
- oil pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/70—Hybrid systems, e.g. uninterruptible or back-up power supplies integrating renewable energies
Landscapes
- Control Of Eletrric Generators (AREA)
Abstract
本发明公开了一种水电站黑启动中直流逆变的实现方法,在水电站无交流电源情况下,利用水电站自身的直流系统,通过逆变装置实现了各种泵电机(油泵电机、润滑电机等)的短时间运行,顺利地使发电机启动到空载状态,可靠地实现了水电站的黑启动,让发生故障的电厂尽快实现并网发电,同时带动本区域内的其他电厂实现并网发电,为发生故障区域的电厂尽快并网创造了有利条件,可方便实现各种中小功率电动机的运行。
Description
技术领域
本发明涉及一种水电站黑启动中直流逆变的实现方法。
背景技术
目前各个水电站均连接到电网系统中,当发生大的区域性故障时,在该区域所有水电厂交流电消失并且外部电源也断开的情况下,要实现黑启动,将发电机启动并达到自身带厂用电的阶段是非常困难的。主要的原因是各种使用交流电源的必需设备不能运行,从而导致黑启动失败,例如球阀油泵电机、机组油压装置油泵电机、润滑泵电机等,而如果泵电机不能运行,那么气源压力不能建立,球阀和快速门也不能打开,调速器油压装置压力也不能建立,水轮机运转必须的润滑油也不能供给。一般情况下是通过解决故障点,接入外部电源的情况下才能启动机组实现该区域的并网发电,需要的时间比较长。因此目前各个区域内比较大型的水电厂均提出了黑启动的问题。
发明内容
为了克服现有技术的上述缺点,本发明提供了一种水电站黑启动中直流逆变的实现方法,可方便实现各种中小功率电动机的运行。
本发明解决其技术问题所采用的技术方案是:一种水电站黑启动中直流逆变的实现方法,包括以下步骤:
第一步、选择逆变装置:
统计电厂内启动发电机必需的各电动机功率,按以下公式计算出逆变装置的功率:
第二步、将逆变装置的输入电源与电厂自身具备的直流电源连接,将逆变装置输出的三相交流电源与电厂内启动发电机必须的各电动机的供电电源连接,作为各电动机的备用电源;
第三步、当发生区域故障,交流电源消失后,将电厂内启动发电机必需的各电动机的供电电源切换为逆变装置的输出;
第四步、当任意一台发电机组启动到空载状态后,将使用逆变装置供电的各电动机的电源再切换到原厂用电系统中;至此,整个黑启动过程结束。
在第三步所述的将电厂内启动发电机必需的各电动机的供电电源切换为逆变装置的输出时,采用分步启动的方式,按顺序分别对润滑油泵电机、高压气机电机、球阀油泵电机和机组油压装置油泵电机依次启动,先建立气源压力,然后才打开球阀或提开快速门。
在第四步所述的将使用逆变装置供电的各电动机的电源再切换到原厂用电系统中时,采用分步切换的方式,按顺序分别对润滑油泵电机、高压气机电机、球阀油泵电机和机组油压装置油泵电机供上主用的厂用电源后,再切断逆变装置提供的备用直流供电回路。
与现有技术相比,本发明的积极效果是:在水电站无交流电源情况下,利用水电站自身的直流系统,通过逆变装置实现了各种泵电机(油泵电机、润滑电机等)的短时间运行,顺利地使发电机启动到空载状态,可靠地实现了水电站的黑启动,让发生故障的电厂尽快实现并网发电,同时带动本区域内的其他电厂实现并网发电,为发生故障区域的电厂尽快并网创造了有利条件。
具体实施方式
一种水电站黑启动中直流逆变的实现方法,包括以下步骤:
第一步、选择逆变装置:
统计电厂内启动发电机必需的各电动机(包括球阀油泵电机、机组油压装置油泵电机、润滑油泵电机、高压气机电机)功率,按以下公式计算出逆变装置的功率:
第二步、将逆变装置的输入电源与电厂自身具备的直流电源连接,将逆变装置输出的三相交流电源与电厂内启动发电机必须的各电动机的供电电源连接,作为各电动机的备用电源。
第三步、当发生区域故障,交流电源消失后,将电厂内启动发电机必需的各电动机的供电电源,切换为逆变装置的输出,其中:
根据机组启动的条件要求,按顺序分别对润滑油泵电机、高压气机电机、球阀油泵电机、机组油压装置油泵电机采用分步启动,先建立气源压力,然后才打开球阀或提开快速门。分步启动的目的,是减少同时使用逆变装置的电机,这样可以降低逆变装置的总功率,也满足了机组启动要求。
第四步、当任意一台发电机组启动到空载状态后(即建立了电压),即可实现带自身厂用电(交流电源)。这个时候即可将使用逆变装置供电的各电动机的电源再分步切换到原厂用电系统中,即分别对润滑油泵电机、高压气机电机、球阀油泵电机、机组油压装置油泵电机的厂用电源供上后(主用),再切断直流供电回路(备用)。至此,整个黑启动过程结束。
因此使用逆变装置带动泵电机运行的时间时比较短的,对直流系统性能不会有影响。
本发明的工作原理是:本方法利用每个水电站自身配置的直流电源系统,采用逆变装置,把直流电源转换为电厂内启动发电机必需的各电动机可使用的交流电源的方式,实现发电机的黑启动。一般来说,只要这种方式支持到发电机达到空载态,发电机即可发出厂用电,泵电机使用直流电源即可结束。由于仅仅在发电机启动的时段使用,时间比较短,不会影响直流系统本身的性能及使用寿命。
Claims (3)
1.一种水电站黑启动中直流逆变的实现方法,其特征在于,包括以下步骤:
第一步、选择逆变装置:
统计电厂内启动发电机必需的各电动机功率,按以下公式计算出逆变装置的功率:
第二步、将逆变装置的输入电源与电厂自身具备的直流电源连接,将逆变装置输出的三相交流电源与电厂内启动发电机必须的各电动机的供电电源连接,作为各电动机的备用电源;
第三步、当发生区域故障,交流电源消失后,将电厂内启动发电机必需的各电动机的供电电源切换为逆变装置的输出;
第四步、当任意一台发电机组启动到空载状态后,将使用逆变装置供电的各电动机的电源再切换到原厂用电系统中;至此,整个黑启动过程结束。
2.根据权利要求1所述的水电站黑启动中直流逆变的实现方法,其特征在于:在第三步所述的将电厂内启动发电机必需的各电动机的供电电源切换为逆变装置的输出时,采用分步启动的方式,按顺序分别对润滑油泵电机、高压气机电机、球阀油泵电机和机组油压装置油泵电机依次启动,先建立气源压力,然后才打开球阀或提开快速门。
3.根据权利要求1所述的水电站黑启动中直流逆变的实现方法,其特征在于:在第四步所述的将使用逆变装置供电的各电动机的电源再切换到原厂用电系统中时,采用分步切换的方式,按顺序分别对润滑油泵电机、高压气机电机、球阀油泵电机和机组油压装置油泵电机供上主用的厂用电源后,再切断逆变装置提供的备用直流供电回路。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104559497A CN102522816A (zh) | 2011-12-31 | 2011-12-31 | 水电站黑启动中直流逆变的实现方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104559497A CN102522816A (zh) | 2011-12-31 | 2011-12-31 | 水电站黑启动中直流逆变的实现方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102522816A true CN102522816A (zh) | 2012-06-27 |
Family
ID=46293638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011104559497A Pending CN102522816A (zh) | 2011-12-31 | 2011-12-31 | 水电站黑启动中直流逆变的实现方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102522816A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110912190A (zh) * | 2019-12-03 | 2020-03-24 | 国网冀北电力有限公司电力科学研究院 | 一种抽蓄电站的黑启动方法及装置 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1993184A1 (en) * | 2007-05-14 | 2008-11-19 | Siemens Aktiengesellschaft | Method of start up at least a part of a wind power plant, wind power plant and use of the wind power plant |
-
2011
- 2011-12-31 CN CN2011104559497A patent/CN102522816A/zh active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1993184A1 (en) * | 2007-05-14 | 2008-11-19 | Siemens Aktiengesellschaft | Method of start up at least a part of a wind power plant, wind power plant and use of the wind power plant |
Non-Patent Citations (3)
Title |
---|
《黑龙江电力》 20061031 王磊 等 苏丹EIGLI电厂"黑启动"实验 第387页右边栏第1段至第388页左边栏第1段;第386页图1 1-3 第28卷, 第5期 * |
汪志强: "利用自备小电源进行黑启动的方案", 《水电自动化与大坝监测》 * |
王磊 等: "苏丹EIGLI电厂"黑启动"实验", 《黑龙江电力》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110912190A (zh) * | 2019-12-03 | 2020-03-24 | 国网冀北电力有限公司电力科学研究院 | 一种抽蓄电站的黑启动方法及装置 |
CN110912190B (zh) * | 2019-12-03 | 2022-03-04 | 国网冀北电力有限公司电力科学研究院 | 一种抽蓄电站的黑启动方法及装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8803344B2 (en) | Renewable energy storage and conversion system | |
US20160006254A1 (en) | Serial Hybrid Microgrid with PPSA-mediated interface to Genset and to Non-Dispatchable Power | |
CN104065065B (zh) | 利用黑启动用柴油发电机兼做保安电源用柴油发电机的方法 | |
GB2489753A (en) | Power generation system | |
JP2016103968A (ja) | 送電網損失ライドスルー機能を有する誘導発電機システム | |
CN105122625B (zh) | 具有有源和无源整流器的发电机系统 | |
CN102996190B (zh) | 用于运行和启动发电厂的方法、用于减小发电厂电力的方法 | |
Dang et al. | Islanded microgrids black start procedures with wind power integration | |
CN104505859A (zh) | 水电站孤网运行联动并网发电时调速器的使用方法 | |
CN110970932A (zh) | 光伏储能型抽蓄电站备用电源系统及其控制方法 | |
CN103560659A (zh) | 避免光伏并网逆变器在弱光下频繁开关机的方法 | |
CN113991731A (zh) | 一种大型燃机储能系统黑启动方法 | |
CN104169573A (zh) | 风力涡轮发电机的快速启动 | |
CN106936154B (zh) | 用于大规模远距离海上风电并网的混联直流电网启动方法 | |
CN102522816A (zh) | 水电站黑启动中直流逆变的实现方法 | |
CN107508320B (zh) | 一种风力发电站及其黑启动方法 | |
Liu et al. | Selection and simulation of black-start diesel generating set in regional power grid | |
RU2580577C1 (ru) | Способ управления компрессорной станцией с электроприводными газоперекачивающими агрегатами | |
Barsali et al. | Restoration islands supplied by gas turbines | |
RU2419957C1 (ru) | Электроэнергетическая установка | |
CN111711200A (zh) | 一种电网同步调相机系统 | |
RU2272937C1 (ru) | Способ работы компрессорной станции магистральных газопроводов с электроприводными газоперекачивающими агрегатами | |
CN202914189U (zh) | 一种柴油发电机启动负载控制系统 | |
CN104393669A (zh) | 多台柴油发电机组辅助系统供电电路 | |
RU97227U1 (ru) | Электроэнергетическая установка |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120627 |