China
Prior art keywords
pressure vessel
steel
ring
steel bracket
insulation layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104569677A
Other languages
Chinese (zh)
Other versions
CN102522126B (en
Inventor
杨忠
苟锐
王泽锋
张发奇
李建
董培科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry Fifth Construction Co Ltd
Original Assignee
China Nuclear Industry Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry Fifth Construction Co Ltd filed Critical China Nuclear Industry Fifth Construction Co Ltd
Priority to CN201110456967.7A priority Critical patent/CN102522126B/en
Publication of CN102522126A publication Critical patent/CN102522126A/en
Application granted granted Critical
Publication of CN102522126B publication Critical patent/CN102522126B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Structure Of Emergency Protection For Nuclear Reactors (AREA)

Abstract

The invention aims to provide mounting process for a metal reflective heat-insulation layer of a pressure vessel of a nuclear island. By the aid of the mounting process, an integral hoisting process of heat-insulation layers can be omitted, difficulty in engineering quality control is reduced, heat-insulation layer mounting operation on the periphery of the pressure vessel when the pressure vessel is hung can be avoided, and safety risks of mounting of the heat-insulation layers are reduced. In order to realize the purposes, the mounting process for the metal reflective heat-insulation layers of the pressure vessel of the nuclear island is characterized in that the metal reflective heat-insulation layers are sequentially hoisted into a reactor cavity in a layering and blocking manner so as to be mounted on a wall of the reactor cavity of a reactor step by step, and the pressure vessel of the reactor is mounted on the wall; and after the pressure vessel of the reactor is mounted, the metal reflective heat-insulation layers of a nozzle and a bottom head are sequentially hoisted into the reactor cavity in a layering and blocking manner so as to be mounted on the peripheries of the nozzle and the bottom head of the pressure vessel of the reactor step by step.

Description

Nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process
Technical field
The present invention relates to the technology of Nuclear Power Station, relate in particular to nuclear island primary device---reactor pressure vessel heat-insulation layer mounting process.
Background technology
Existing nuclear island of nuclear power station reactor pressure vessel cylindrical shell heat-insulation layer is installed and is mainly contained following dual mode.
One, after pressure vessel is just adorned completion, use crane that reactor pressure vessel is sling earlier, on the reactor pressure vessel outer wall,, heat-insulation layer is installed piecemeal then according to order from top to bottom.Heat-insulation layer must be installed after the reactor pressure vessel arrival, and pressure vessel is in the lifting stress for a long time when installing, and has long construction period, and there is big potential safety hazard in work progress, and Engineering Quality Control is than shortcomings such as complicacies.
Two, make a channel-section steel circle that is used for the assembly unit heat-insulation layer earlier, utilize the channel-section steel circle to assemble the heat-insulation layer abutment ring then, lift again on the stand, warming plate successively is installed then, thereby is precast heat-insulation layer.Before the pressure vessel hoisted in position, the heat-insulation layer that precasts is lifted up into the reactor chamber then, and be placed in the pressure vessel support.During the pressure vessel hoisted in position, pressure container cylinder is inserted in the prefabricated heat-insulation layer, and the heat-insulation layer support ring is connected with pressure vessel.Compare first kind of technology, second kind of technology shortened the later construction period of pressure vessel arrival effectively, reduced under the state that pressure vessel is sling the workload of on pressure vessel, installing.But second kind of technology still has certain shortcoming, heat-insulation layer diameter big (4464mm) at first, highly higher (7650mm), and the channel-section steel circle that supports heat-insulation layer is that bolt connects, warming plate is the self-plugging rivet riveted joint, causes the heat-insulation layer distortion during lifting easily; Secondly have only 100mm at heat-insulation layer to the distance of reactor cavity, during the heat-insulation layer integral hoisting, be easy to cause heat-insulation layer to touch surface, heap chamber, cause the heat-insulation layer damage; In addition, heat-insulation layer be operated in heap being connected of pressure container cylinder and carry out in the chamber, working space is narrow and small, difficulty of construction is bigger, and has potential safety hazard.
Summary of the invention
The object of the present invention is to provide a kind of nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process; The integral hoisting of its desirable XBWC; Reduce the difficulty of Engineering Quality Control; Also can avoid under the state that pressure vessel is hung, around it, carrying out the heat-insulation layer installation exercise, reduce the security risk that heat-insulation layer is installed.
For realizing said purpose nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process; Be characterized in; Comprise step 1); Before reactor pressure vessel is installed, the layering of metallic reflection formula heat-insulation layer, the piecemeal at the cylindrical shell position of pressure vessel hung in the heap chamber one by one, be installed in substep on the reactor cavity body of wall at reactor pressure vessel place; Step 2), after reactor pressure vessel is installed, the ozzle of pressure vessel and the layering of metallic reflection formula heat-insulation layer, the piecemeal at bottom (head) position are hung in the heap chamber one by one, to be installed in step by step around the ozzle and bottom (head) of reactor pressure vessel.
Described nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process; Its further characteristics are; Step 1) comprises: the composite steel bracket is installed to the reactor cavity body of wall in A, cylindrical shell position; Every layer of steel corbel installed ring-shaped steel bracket respectively then along an annular substep on the composite steel bracket of correspondence; And B, installation warming plate install the water conservancy diversion liner plate at the internal layer of warming plate then to the firm support of annular, and the water conservancy diversion liner plate is fixed on the ring-shaped steel bracket; Step 2) comprise C, bottom neutron shield thing steel bracket (before reactor pressure vessel is in place or after) and the support of bottom (head) steel are installed; Bottom neutron shield thing steel bracket is mounted on the body of wall steel corbel, and the bottom (head) steel supports and is mounted on the pre-embedded bolt or expansion bolt on ground; D, installation bottom neutron shield thing are to neutron shield thing steel bracket; Water conservancy diversion liner plate or warming plate to bottom (head) steel are installed are supported, every layer of water conservancy diversion liner plate or warming plate will be installed warming plate along an annular substep respectively at the water conservancy diversion liner plate skin of correspondence; And E, mounting pipe mouth portion insulation construction, comprise upper neutron shielding thing support, upper neutron shielding thing, ozzle warming plate and top warming plate are installed.
Described nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process, its further characteristics are, in steps A; Elder generation's spot welding fixedly steel corbel after the passed examination of affirmation installation site, is installed ring-shaped steel bracket to reactor cavity body of wall precalculated position to steel corbel in advance; After ring-shaped steel bracket installs in advance; Whether the distance of vertical outer edge to the pressure vessel center line of inspection ring-shaped steel bracket can meet design requirement in adjustable extent, if can satisfy, by steel corbel is carried out the full weld operation; If ring-shaped steel bracket can not satisfy in adjustable extent; Then to the steel corbel base plate jump a queue backing plate, repair a die, ring-shaped steel bracket carried out reaming; In order to revise ring-shaped steel bracket, ring-shaped steel bracket is met design requirement in adjustable extent, and then steel corbel is carried out the full weld operation; After treating all steel corbels all full weld finishing, formally ring-shaped steel bracket is adjusted, the distance of vertical outer edge to the pressure vessel center line of ring-shaped steel bracket is met design requirement, with bolt ring-shaped steel bracket is fixed on the steel corbel then.
Described nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process; Its further characteristics are; In step B, adopt the heat insulating block clearance measuring method: be mounted to all heat insulating blocks on the ring-shaped steel bracket earlier, on warming plate, select two points then; Measure the spacing between every adjacent two warming plates through these two points; Maximal clearance according between every adjacent two warming plates is no more than designing requirement adjustment, again according to the spacing between every adjacent two warming plates of said two point measurements, this spacing is met design requirement after the adjustment.
Described nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process, its further characteristics are, in step B; After the warming plate installation; Carry out the installation of water conservancy diversion liner plate, the water conservancy diversion liner plate is connected on the ring-shaped steel bracket with bolt, and is used for protecting warming plate.
Described nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process, its further characteristics are that in step C, bottom neutron shield thing support is installed to the body of wall steel corbel by elder generation, suitably adjusts to make it to meet design requirement, and tightens with bolt then; The bottom (head) steel is installed to be supported on pre-embedded bolt or the expansion bolt; The support ring that adjustment bottom (head) steel supports is apart from the absolute altitude on ground, if meet design requirement, tighting a bolt gets final product; If can not meet design requirement, need under the supporting leg that the bottom (head) steel supports, add backing plate and make it to meet design requirement.
Described nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process; Its further characteristics are in step D, neutron shield thing in bottom to be installed to bottom neutron shield thing steel bracket; According to on-site actual situations; Neutron shield things all except that corner part can move inward, the neutron shield thing at elder generation mount angle position during installation, but must guarantee the upper strata of all bottom neutron shield things and the gap between the body of wall of heap chamber; Lower floor's the first section of all bottom neutron shield things and the gap between the part of back meet design requirement; If can not meet the demands, need carry out reaming to the bolt hole of bottom neutron shield thing steel bracket, make it to meet the demands; Water conservancy diversion liner plate or warming plate to bottom (head) steel are installed are supported, promptly at first be installed into mouth of a river warming plate to bottom (head) steel and support, bottom (head) fair water fin to bottom (head) steel is installed is again supported, at the water conservancy diversion liner plate skin of correspondence the bottom (head) warming plate is installed respectively again.
Described nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process; Its further characteristics are; In step e; Install earlier on the steel corbel of upper neutron shielding thing support to the reactor cavity body of wall, the upper neutron shielding thing be installed again, guarantee between all upper neutron shielding things and the heap chamber body of wall the gap and and pressure vessel between the gap all meet design requirement; Ozzle root warming plate is installed then, is guaranteed that all warming plates install according to design attitude, mounting pipe mouth position steel supports again, and ozzle and top warming plate are installed at last.
The present invention is employed in before the pressure vessel installation; Through bracket heat-insulation layer is fixed on method on the reactor cavity body of wall; After reactor pressure vessel is installed; The layering of metallic reflection formula heat-insulation layer, the piecemeal at ozzle and bottom (head) position hung in the heap chamber one by one, be installed in around the ozzle and bottom (head) of reactor pressure vessel, solved the described prior art shortcoming of preamble like this with substep.At first, heat-insulation layer is directly installed on the reactor cavity body of wall, need not directly to be connected with the pressure vessel barrel, and all reactor pressure vessel cylindrical shell heat-insulation layer installment works were all carried out before pressure vessel is installed, and did not take the main line progress of Nuclear Power Station; Secondly heat-insulation layer layering, piecemeal hang in the heap chamber one by one, the risk of having avoided the lifting deformation effect installation accuracy that the heat-insulation layer integral hoisting exists during with lifting the heap cavity wall can collide the ruined risk of heat-insulation layer that heat-insulation layer causes; In addition, also be very important safety problem, the heat-insulation layer field engineering that the present invention adopted has been avoided around the pressure vessel that is played, carrying out construction operation, thereby greatly reduces the security risk of heat-insulation layer installation exercise.
Description of drawings
Fig. 1 is the process flow diagram of nuclear island pressure container cylinder metallic reflection formula heat-insulation layer mounting process.
Fig. 2 is the outside drawing according to the profile of the metallic reflection formula heat-insulation layer of nuclear island pressure container cylinder metallic reflection formula heat-insulation layer mounting process of the present invention.
Embodiment
Through an embodiment mounting process of the present invention is described below, should be noted in the discussion above that following embodiment is merely of the present invention and illustrates, but not limitation of the present invention.
Shown in Figure 2 is that nuclear island pressure vessel metallic reflection formula heat-insulation layer installs, and reactor pressure vessel reaches the diagrammatic cross-section that reactor core 100 wherein also installs.Heat-insulation layer 102 is installed in the reactor cavity 103, and the internal layer of heat-insulation layer 102 is made up of the stainless steel diversion liner plate, and skin is the stainless steel warming plate.Heat-insulation layer 102 around whole pressure vessel 101 and pressure vessel (RV) pipe arrangement ozzle 110 around forming.It is cylinder-shaped that heat-insulation layer is, and is antidetonation 2 kind equipments, non-nuclear safety relevant device.Heat-insulation layer 102 is metallic reflection formula heat-insulation layer.What Reference numeral 112 indicated among Fig. 2 is pore.
As shown in Figure 1, in step 1, set up suitable framing scaffold in reactor cavity (the CA04 module of AP1000 system) inside, utilize the absolute altitude line of reactor cavity metope and metope perpendicular line to emit steel corbel installation outline line.
In step 2, steel corbel and ring-shaped steel bracket are installed, steel corbel has multilayer; Each layer steel corbel be substep ringwise, and ring-shaped steel bracket is connected on corresponding one deck steel corbel, in one embodiment of this invention through bolt; Totally 8 layers of steel corbel and 6 layers of steel bracket; In other embodiments of the invention, can carry out number of plies adjustment, be not limited only to this according to actual conditions.
Utilize framing scaffold, with tightrope steel corbel is pulled to corresponding absolute altitude position, adjustment steel corbel position makes it to overlap with the outline line of reactor cavity metope, and first spot welding is fixed, and checks with tape measure again, after the passed examination of installation site, ring-shaped steel bracket is installed in advance.
After ring-shaped steel bracket installed in advance, whether the distance of vertical outer edge to the pressure vessel center line of inspection ring-shaped steel bracket can meet design requirement in adjustable extent.If can satisfy, steel corbel carried out the full weld operation by welding requirements.If ring-shaped steel bracket can not satisfy in adjustable extent; Then must to the steel corbel base plate jump a queue backing plate, repair a die, ring-shaped steel bracket carried out reaming etc. in order to revise ring-shaped steel bracket; Ring-shaped steel bracket is met the demands in adjustable extent, by welding requirements steel corbel is carried out the full weld operation then.After treating all steel corbels all full weld finishing, formally ring-shaped steel bracket is carried out adjustment in place, the distance of vertical outer edge to the pressure vessel center line of steel bracket is met design requirement, tight a bolt then, fix ring-shaped steel bracket.Additive methods such as the nose situation jack capable of using that occurs for ring-shaped steel bracket, lifting jack carry out cold sizing to it, to satisfy installation requirement.
In step 3, cylindrical shell warming plate (warming plate of corresponding pressure shell part) and water conservancy diversion liner plate are installed.
Before warming plate and water conservancy diversion liner plate are installed,, set up the clear area to once cleaning completely in the reactor cavity chamber.Installation requirements according to reality are transported to the reactor cavity chamber interior to warming plate.
Be transported to corresponding absolute altitude position to warming plate, be linked in sequence together, confirm the concrete measuring method in adjacent two heat insulating block gaps: the heat insulating block clearance measuring method: through surveying the gap that warming plate front end spacing substitutes the rear end warming plate.Be mounted to all heat insulating blocks on the ring-shaped steel bracket earlier; On warming plate, select two points then; Measure the spacing between every adjacent two warming plates through these two points, be no more than designing requirement adjustment according to the maximal clearance between every adjacent two warming plates, after the adjustment again according to the spacing between every adjacent two warming plates of said two point measurements; This spacing is met design requirement, and all warming plates that utilize spring shackle to connect do not need measurement clearance.
After the warming plate installation, carry out the installation of water conservancy diversion liner plate, the water conservancy diversion liner plate connects with bolt, makes it reach design load in every face wall body direction with the steel tape inspection and the distance of regulating water conservancy diversion liner plate to pressure vessel center line.Tighten all bolts after satisfying tolerance.
In step 4, bottom neutron shield thing steel bracket is installed
Be connected to 16 neutron screen steel bracket MKLNS2-B (MKLNS2-B is a product type) on 8 groups of neutron shield thing steel bracket MKLNS2-A (MKLNS2-A is a product type) with bolt.After the assembled; Winch to steel corbel (in step 2, installing) absolute altitude in place to one group of neutron shield thing assembly wherein with two groups of tightropes, regulate tightrope, make that each bolt hole of neutron shield thing assembly is corresponding one by one with the bolt hole of steel corbel; Tighten in advance with bolt, connect into integral body.
In the step 5; (MK310 is a product type with bottom (head) water conservancy diversion liner plate MK310 in order with additive methods such as tightrope, manual works; The water conservancy diversion liner plate of corresponding pressure container bottom end socket) is transported to corresponding position; Be connected to water conservancy diversion liner plate MK310 on the bolt hole of lower bolt hole and orlop steel corbel front end on the cylindrical shell orlop water conservancy diversion liner plate (being aforementioned mounted water conservancy diversion liner plate orlop) with bolt then, utilize bolt to fix again.
In step 6, after reactor pressure vessel is in place, the gap between pressure vessel and the water conservancy diversion liner plate is tested, for example wait other speciality tools with logical ball (Go Gage).
In step 7; Neutron shield thing in bottom is installed to bottom neutron shield thing steel bracket (being fixed on reactor cavity 103 bottoms); According to on-site actual situations; All neutron shield things can move inward (annotate: the neutron shield thing of corner part can not move), the neutron shield thing at elder generation mount angle position when every face wall body is installed, but must guarantee the upper strata of all bottom neutron shield things and the gap between the body of wall of heap chamber; Gap between lower floor's the first section (near the pressure vessel position) of all bottom neutron shield things and the back part (near heap body of wall position, chamber) meets design requirement; If can not meet the demands, need carry out reaming to the bolt hole of bottom neutron shield thing steel bracket, make it to meet the demands.
Water conservancy diversion liner plate or warming plate to bottom (head) steel are installed to be supported on (being fixed on reactor cavity 103 bottoms).At first be installed into mouth of a river warming plate to bottom (head) steel and support, will guarantee that in installation process the hook of spring shackle all connects, and will guarantee that the hinged door installation of water delivering orifice is suitable, and can freely open.Bottom (head) fair water fin to bottom (head) steel is installed is supported, guarantee that the gap meets design requirement to get final product, at the water conservancy diversion liner plate skin of correspondence the bottom (head) warming plate is installed respectively again, must guarantee that the hook of all spring shackles all connects.
In step 8; Upper neutron shielding thing support is installed earlier (to install in step 2 to steel corbel; Be positioned at the top of reactor cavity 103) on; The upper neutron shielding thing is installed again, is guaranteed that gap and the gap between the reactor pressure vessel between all upper neutron shielding things and the heap chamber body of wall all meets design requirement.Ozzle root warming plate is installed then to steel bracket, (is fixed on the body of wall respective tube mouth position of reactor cavity 103); Guarantee that all warming plates install according to design attitude; Mounting pipe mouth position steel supports to reactor cavity 103 bodies of wall again; Guarantee the spacing uniformity between all steel brackets, the supporting ozzle of last setting pressure container and installation top warming plate are to the steel bracket on the body of wall top of reactor cavity 103.
In step 9, all installment works should in time be removed construction rubbish after finishing, and the chamber interior clean room are thoroughly swept, to reach the requirement of C level cleanliness.

Claims (8)

1. nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process is characterized in that, comprises
Step 1) before reactor pressure vessel is installed, hangs in the heap chamber with the layering of metallic reflection formula heat-insulation layer, the piecemeal at the cylindrical shell position of pressure vessel one by one, is installed in substep on the reactor cavity body of wall at reactor pressure vessel place;
Step 2), after reactor pressure vessel is installed, the ozzle of pressure vessel and the layering of metallic reflection formula heat-insulation layer, the piecemeal at bottom (head) position are hung in the heap chamber one by one, to be installed in step by step around the ozzle and bottom (head) of reactor pressure vessel.
2. nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process as claimed in claim 1 is characterized in that step 1) comprises:
The composite steel bracket is installed to the reactor cavity body of wall in A, cylindrical shell position, and every layer of steel corbel installed ring-shaped steel bracket respectively then along an annular substep on the composite steel bracket of correspondence; And
B, installation warming plate are installed the water conservancy diversion liner plate at the internal layer of warming plate then to ring-shaped steel bracket, the water conservancy diversion liner plate is fixed on the ring-shaped steel bracket;
In step 1) and step 2) between also comprise: before reactor pressure vessel is in place or after installation bottom neutron shield thing steel bracket is installed;
Step 2) comprises
C, installation bottom (head) steel support, and bottom neutron shield thing steel bracket is mounted on the body of wall steel corbel, and the bottom (head) steel supports and is mounted on the pre-embedded bolt or expansion bolt on ground;
D, installation bottom neutron shield thing are to neutron shield thing steel bracket; Water conservancy diversion liner plate or warming plate to bottom (head) steel are installed are supported, every layer of water conservancy diversion liner plate or warming plate will be installed warming plate along an annular substep respectively at the water conservancy diversion liner plate skin of correspondence; And
E, mounting pipe mouth portion insulation construction comprise upper neutron shielding thing support, upper neutron shielding thing and top warming plate are installed.
3. nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process as claimed in claim 2; It is characterized in that, in steps A, first spot welding fixedly steel corbel to reactor cavity body of wall precalculated position; After confirming the installation site passed examination; Ring-shaped steel bracket is installed in advance to steel corbel, after ring-shaped steel bracket installed in advance, whether the distance of vertical outer edge to the pressure vessel center line of inspection ring-shaped steel bracket can meet design requirement in adjustable extent; If can satisfy, steel corbel is carried out the full weld operation; If ring-shaped steel bracket can not satisfy in adjustable extent; Then to the steel corbel base plate jump a queue backing plate, repair a die, ring-shaped steel bracket carried out reaming; In order to revise ring-shaped steel bracket, ring-shaped steel bracket is met design requirement in adjustable extent, and then steel corbel is carried out the full weld operation; After treating all steel corbels all full weld finishing, formally ring-shaped steel bracket is adjusted, the distance of vertical outer edge to the pressure vessel center line of ring-shaped steel bracket is met design requirement, with bolt ring-shaped steel bracket is fixed on the steel corbel then.
4. nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process as claimed in claim 2; It is characterized in that; In step B, adopt the heat insulating block clearance measuring method: be mounted to all heat insulating blocks on the ring-shaped steel bracket earlier, on warming plate, select two points then; Measure the spacing between every adjacent two warming plates through these two points; Maximal clearance according between every adjacent two warming plates is no more than designing requirement adjustment, again according to the spacing between every adjacent two warming plates of said two point measurements, this spacing is met design requirement after the adjustment.
5. nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process as claimed in claim 2 is characterized in that, in step B; After the warming plate installation; Carry out the installation of water conservancy diversion liner plate, the water conservancy diversion liner plate is connected on the ring-shaped steel bracket with bolt, and is used for protecting warming plate.
6. nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process as claimed in claim 2 is characterized in that, in step C, bottom neutron shield thing support is installed earlier to the body of wall steel corbel, and suitably adjustment makes it to meet design requirement, and tightens with bolt then; The bottom (head) steel is installed to be supported on pre-embedded bolt or the expansion bolt; The support ring that adjustment bottom (head) steel supports is apart from the absolute altitude on ground, if meet design requirement, tighting a bolt gets final product; If can not meet design requirement, need under the supporting leg that the bottom (head) steel supports, add backing plate and make it to meet design requirement.
7. nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process as claimed in claim 2; It is characterized in that, in step D, neutron shield thing in bottom is installed to bottom neutron shield thing steel bracket; According to on-site actual situations; Neutron shield things all except that corner part can move inward, the neutron shield thing at elder generation mount angle position during installation, but must guarantee the upper strata of all bottom neutron shield things and the gap between the body of wall of heap chamber; Lower floor's the first section of all bottom neutron shield things and the gap between the part of back meet design requirement; If can not meet the demands, need carry out reaming to the bolt hole on the bottom neutron shield thing steel bracket, make it to meet the demands;
Water conservancy diversion liner plate or warming plate to bottom (head) steel are installed are supported, promptly at first be installed into mouth of a river warming plate to bottom (head) steel and support, bottom (head) fair water fin to bottom (head) steel is installed is again supported, at the water conservancy diversion liner plate skin of correspondence the bottom (head) warming plate is installed respectively again.
8. nuclear island pressure vessel metallic reflection formula heat-insulation layer mounting process as claimed in claim 2; It is characterized in that; In step e; Install earlier on the steel corbel of upper neutron shielding thing support to the reactor cavity body of wall, the upper neutron shielding thing be installed again, guarantee between all upper neutron shielding things and the heap chamber body of wall the gap and and pressure vessel between the gap all meet design requirement; Ozzle root warming plate is installed then, is guaranteed that all warming plates install according to design attitude, mounting pipe mouth position steel supports again, and ozzle warming plate and top warming plate are installed at last.
CN201110456967.7A 2011-12-30 2011-12-30 Mounting process for metal reflective heat-insulation layers of pressure vessel of nuclear island Active CN102522126B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110456967.7A CN102522126B (en) 2011-12-30 2011-12-30 Mounting process for metal reflective heat-insulation layers of pressure vessel of nuclear island

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110456967.7A CN102522126B (en) 2011-12-30 2011-12-30 Mounting process for metal reflective heat-insulation layers of pressure vessel of nuclear island

Publications (2)

Publication Number Publication Date
CN102522126A true CN102522126A (en) 2012-06-27
CN102522126B CN102522126B (en) 2014-04-16

Family

ID=46293018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110456967.7A Active CN102522126B (en) 2011-12-30 2011-12-30 Mounting process for metal reflective heat-insulation layers of pressure vessel of nuclear island

Country Status (1)

Country Link
CN (1) CN102522126B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104141373A (en) * 2013-05-07 2014-11-12 中国核工业二四建设有限公司 Regulating device for steel liner of nuclear island
CN105427902A (en) * 2015-11-05 2016-03-23 中国核电工程有限公司 Direct evaporative passive self-cooling flow guide plate
CN107093472A (en) * 2017-05-03 2017-08-25 中国核工业第五建设有限公司 The assemble method of steel containment vessel and its end socket in AP1000 nuclear power stations
CN107919174A (en) * 2017-11-17 2018-04-17 中国核工业第五建设有限公司 Insulating layer installation method in the middle part of AP1000 reactor pressure vessels
CN112037955A (en) * 2020-08-20 2020-12-04 中国核工业第五建设有限公司 Method for installing metal heat-insulating layer of reactor pressure vessel

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3928133A (en) * 1972-04-26 1975-12-23 Siemens Ag Biological shield for a nuclear reactor
GB1458730A (en) * 1973-07-27 1976-12-15 Siemens Ag Nuclear reactor installation
CN101577145A (en) * 2008-05-07 2009-11-11 中广核工程有限公司 Mounting method for insulating layer of nuclear reactor pressure vessel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3928133A (en) * 1972-04-26 1975-12-23 Siemens Ag Biological shield for a nuclear reactor
GB1458730A (en) * 1973-07-27 1976-12-15 Siemens Ag Nuclear reactor installation
CN101577145A (en) * 2008-05-07 2009-11-11 中广核工程有限公司 Mounting method for insulating layer of nuclear reactor pressure vessel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
F.BREMER: "Multi-layer (double-wall) prestressed concrete pressure vessel", 《NUCLEAR ENGINEERING AND DESIGN》 *
谭国成 等: "基于非能动系统功能可靠性的IVR-ERVC保温层几何优化与可靠性评估", 《原子能科学技术》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104141373A (en) * 2013-05-07 2014-11-12 中国核工业二四建设有限公司 Regulating device for steel liner of nuclear island
CN105427902A (en) * 2015-11-05 2016-03-23 中国核电工程有限公司 Direct evaporative passive self-cooling flow guide plate
CN105427902B (en) * 2015-11-05 2019-12-13 中国核电工程有限公司 Direct evaporation type passive self-cooling guide plate
CN107093472A (en) * 2017-05-03 2017-08-25 中国核工业第五建设有限公司 The assemble method of steel containment vessel and its end socket in AP1000 nuclear power stations
CN107919174A (en) * 2017-11-17 2018-04-17 中国核工业第五建设有限公司 Insulating layer installation method in the middle part of AP1000 reactor pressure vessels
CN107919174B (en) * 2017-11-17 2019-07-23 中国核工业第五建设有限公司 Insulating layer installation method in the middle part of AP1000 reactor pressure vessel
CN112037955A (en) * 2020-08-20 2020-12-04 中国核工业第五建设有限公司 Method for installing metal heat-insulating layer of reactor pressure vessel
CN112037955B (en) * 2020-08-20 2023-03-10 中国核工业第五建设有限公司 Method for installing metal heat-insulating layer of reactor pressure vessel

Also Published As

Publication number Publication date
CN102522126B (en) 2014-04-16

Similar Documents

Publication Publication Date Title
CN102522126B (en) Mounting process for metal reflective heat-insulation layers of pressure vessel of nuclear island
CN105443871B (en) A kind of new suspension and support and construction technology for the connection of horizontal multi-pipeline counterpart
CN101126279B (en) Silo slipform construction technique
CN103015781B (en) Method for top lift installation of inner tank and outer tank of double-wall storage tank
CN101538936B (en) Hydraulic slip-and-lift construction method for water tower
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN106865414B (en) A kind of combined hanging installation method of Con casting ladle revolving platform
CN101225708A (en) Method for mounting up-sliding bottom-brick-building derrick-free hydraulic sliding formwork of chimney
CN106437178A (en) Integral lifting construction method and integral lifting construction device of veranda of multi-layer steel structure
CN104627330B (en) Forward installation construction method for construction platform system of super-huge storage tank
CN110306782A (en) Reactor building shell dome template and its assembling and construction method
CN105569242A (en) Assembling method for composite floor slabs
CN103603504A (en) Method of hoisting super high-rise building electrochemical large-diameter rises along with progress of main structure
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN108756441A (en) A kind of hydraulic lifting flipped device and its hanging method for reducing tower
CN206428974U (en) A kind of multi-storey steel structure vestibule integral hoisting construction device
CN102146492A (en) Method for installing converter body equipment and tooling platform
CN104590487B (en) A kind of working ship is with large-scale stern cylinder flange disk high precision assembling and welding process
CN202139255U (en) Tooling platform for assembling converter body equipment
CN105438400A (en) Mounting method for large movable ramp
CN101818563B (en) Jack-up integral lifting mobile platform and using method
CN208686187U (en) A kind of hydraulic lifting flipped device for variable diameter tower
CN105834272A (en) Method for mounting large aluminum plate drawing mill equipment in confined space
CN102423833A (en) Method for welding and integrally hoisting volute choke plug of large-sized hydropower station
CN202393382U (en) Hanging center aligning and leveling device for composite furnace shell

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant