CN102521671B CN201110388041.9A CN201110388041A CN102521671B CN 102521671 B CN102521671 B CN 102521671B CN 201110388041 A CN201110388041 A CN 201110388041A CN 102521671 B CN102521671 B CN 102521671B
Authority
CN
China
Prior art keywords
sample set
wind power
training
vector machine
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110388041.9A
Other languages
Chinese (zh)
Other versions
CN102521671A (en
Inventor
李元诚
杨瑞仙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CN201110388041.9A priority Critical patent/CN102521671B/en
Publication of CN102521671A publication Critical patent/CN102521671A/en
Application granted granted Critical
Publication of CN102521671B publication Critical patent/CN102521671B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses the technical field of wind power prediction, particularly, relates to an ultrashort-term power prediction method. The method comprises the following steps of: firstly, acquiring the wind speed, the wind direction and the wind power of a wind power farm to form a sample set; then, preprocessing the data of the sample set; reducing dimensions of the preprocessed sample set by a depth autocoder network; and finally, training a relevance vector machine regression model by the sample set with reduced dimensions, and predicting the ultrashort-term wind power through the trained relevance vector machine regression model. The method reduces the training time of a prediction model, satisfies the requirements on precision and real-time property in system status estimation, and enables the prediction method to be more accurate.

Description

A kind of ultrashort-term wind power prediction method
Technical field
The invention belongs to wind power electric powder prediction, relate in particular to a kind of ultrashort-term wind power prediction method.
Background technology
Along with becoming increasingly conspicuous of the energy and environmental problem, wind energy is as a kind of energy with fastest developing speed in renewable energy power generation technology, more and more be subject to people's attention, because the output power of wind energy turbine set has the feature of intermittent and undulatory property, so can produce important impact to the stability of the quality of power supply of whole electrical network and Operation of Electric Systems after wind-powered electricity generation access electrical network, for reducing this adverse effect, the forecasting accuracy of wind power is just seemed to particularly important.< < wind power forecast function standard > > in the power industry standard > > of the < < People's Republic of China (PRC) being issued by National Energy Board of the People's Republic of China (PRC) has pointed out that the prediction of ultra-short term wind power refers to the prediction wind energy turbine set active power of following 0-4 hour.Because dispatching of power netwoks, required time of resource distribution mainly concentrate on 0~3 hours section, therefore, ultra-short term prediction to wind power seems particularly important, especially ultrashort-term wind power prediction can effectively alleviate the impact of wind-electricity integration on whole electrical network, all significant for power grid security economic load dispatching, electricity market and wind energy turbine set operation.
The Forecasting Methodology of wind power can be divided into two classes according to the physical quantity difference of directly prediction at present: a class is directly to predict the output power of wind energy turbine set, another kind of is advanced row forecasting wind speed, then according to the relation of wind-powered electricity generation unit or wind power output power and wind speed, obtains wind power output power.Wherein, direct forecast methods often comprises two kinds of physical model method and statistic laws.Physical model is by carrying out physical modeling to wind energy turbine set location, utilize the numerical weather forecasts such as wind speed, wind direction, temperature and air pressure to predict, the model quality that predicts the outcome and set up of the method has very large relation, if model is too coarse, precision of prediction will be poor.The essence of statistical method is to utilize effective historical data (as numerical value data of weather forecast, historical statistics wind power data) to predict.Common correlation technique has persistence forecasting method, space smoothing method, time series method, Kalman filtering method, grey method, artificial neural network method, wavelet analysis method, the support vector machine Return Law, least square method, fuzzy logic method etc.Wherein persistence forecasting method is the simplest, the method nearest any power observed reading as more lower predicted value.The correlative study of artificial neural network and support vector machine is the method for mainly applying now, but artificial neural network complexity is higher, and the parameter of support vector machine selects that model prediction precision is had to considerable influence.
Summary of the invention
For the existing wind power forecasting method of mentioning in above-mentioned background technology, the complicated and not high deficiency of precision of prediction, the present invention proposes a kind of ultrashort-term wind power prediction method.
Technical scheme of the present invention is that a kind of ultrashort-term wind power prediction method, is characterized in that the method comprises the following steps:
Step 1: gather wind speed, wind direction and the wind power data of wind energy turbine set, form sample set;
Step 2: sample set is carried out to data pre-service;
Step 3: utilize degree of depth autocoder network to carry out dimensionality reduction to pretreated sample set;
Step 4: to the training of Relevance vector machine for regression model, then utilize the Relevance vector machine for regression model after training to predict the wind power of ultra-short term with the sample set after dimensionality reduction.
Described step 2 specifically comprises the following steps:
Step 2.1: the sample set application finite ridgelet transform to gathering, obtain ridge wave system matrix number, every row of ridge wave system matrix number are carried out respectively to one-dimensional discrete multi-scale wavelet transformation, obtain finite ridgelet transform matrix of coefficients;
Step 2.2: each row to finite ridgelet transform matrix of coefficients carry out wavelet adaptive threshold denoising, and low frequency sub-band coefficient is not processed, carries out soft-threshold processing to each high-frequency sub-band coefficient;
Step 2.3: to the finite ridgelet transform matrix of coefficients application finite ridgelet inverse transformation reconstruction signal after processing;
Step 2.4: reconstruction signal is carried out to self-adaptation dimension and receive Wiener filtering, obtain the sample set after denoising.
Described step 3 specifically comprises the following steps:
Step 3.1: adopt restriction Boltzmann machine model continuously to the sample set after denoising is trained in advance, to obtain one group and independently limit continuously Boltzmann machine model and one group of weights;
Step 3.2: the output neuron that each is limited to Boltzmann machine model is continuously merged into one deck with the input neuron of the next Boltzmann machine of restriction continuously model, expansion formation degree of depth autocoder network;
Step 3.3: weights are finely tuned, adopt the BP algorithm based on cross entropy function to carry out network training, adjust weights so that cross entropy function reaches minimum, complete reduction process.
Described step 4 specifically comprises the following steps:
Step 4.1: the sample set after dimensionality reduction is formatd to processing according to the call format of Method Using Relevance Vector Machine instruction input to sample set;
Step 4.2: select gaussian kernel function as the kernel function of Method Using Relevance Vector Machine model, the parameter initialization to kernel function;
Step 4.3: the sample set after processing with format is to the training of Method Using Relevance Vector Machine model;
Step 4.4: on the basis of step 4.3, utilize the wind power of the Method Using Relevance Vector Machine model prediction ultra-short term training.
The computing formula of described finite ridgelet transform is:
FRAT f [ k , l ] = 1 p &Sigma; ( a , b ) &Element; L k , l f ( a , b )
In formula:
FRAT f[k, l] is finite ridgelet transform matrix of coefficients;
P is the dimension of matrix of coefficients;
F (a, b) is discrete data signal;
A is horizontal ordinate;
B is ordinate;
L k, lrepresent grid Z p 2upper composition take the set of k as the point of slope, the l straight line that is intercept.The computing formula of described soft-threshold is:
T = &sigma; n 2 &sigma; j 2 , ( j = 0,1 , &CenterDot; &CenterDot; &CenterDot; , n )
Wherein:
T is soft-threshold;
variance for estimating noise;
for estimator band signal variance.
The method that the present invention predicts wind power is first with ridgelet transform, the sample set obtaining to be carried out to denoising, then with degree of depth autocoder network, sample set data is carried out to dimensionality reduction, finally with Relevance vector machine for regression model, predicts.The present invention is suitable for the prediction of wind energy turbine set ultra-short term power, realized the principle of structural risk minimization, the introduction of degree of depth autocoder network, make sample set can in the sample data of low dimension, carry out model training, greatly reduce the training time expense of forecast model, and then finely meet in system state estimation for the requirement of precision and real-time, make forecast model more accurate.
Accompanying drawing explanation
Fig. 1 is ultra-short term wind power forecasting method process flow diagram;
Fig. 2 is the process flow diagram of the method based on ridgelet transform to the sample set denoising obtaining;
Fig. 3 is the process flow diagram with Relevance vector machine for regression model prediction.
Embodiment
Below in conjunction with accompanying drawing, preferred embodiment is elaborated.Should be emphasized that, following explanation is only exemplary, rather than in order to limit the scope of the invention and to apply.
Good forecast model must be considered precision and the Space-time Complexity problem that prediction can reach simultaneously, considers above-mentioned reason, and the thought that has adopted degree of depth autocoder network and associated vector regression model to combine in this method is predicted.The data that directly gather are coarse uneven and have noise, so adopt ridgelet transform to process sample set data.But the training Space-time Complexity under higher-dimension sample set is too large, and degree of depth autocoder network (Deep Autoencoder Network, DAN) method adopts successive value restricted type Boltzmann model (Continouse Restricted Boltzmann Machine, CRBM) network structure, the two-way deep layer neural network by training with a plurality of middle layers converts high dimensional data to low-dimensional nested and reconstruct high dimensional data then.Especially, DAN provides the two-way mapping of high-dimensional data space and low-dimensional nested structure, efficiently solves the not available reverse Mapping problem of most of Method of Nonlinear Dimensionality Reductions.High dimensional data converts the nested and reconstruct high dimensional data method then of low-dimensional to, can, at the prerequisite decline low spatial dimension that keeps overall situation and partial situation's character of observation space as far as possible, can solve and under higher-dimension sample set, train the problem that Space-time Complexity is large.Method Using Relevance Vector Machine (Relevance Vector Machine, RVM) has solved the problem of precision of prediction well.Solution thinking of the present invention is: first, adopt ridgelet transform to process sample set data, then by DAN method, carry out dimension and approximately subtract, make it to be mapped as lower dimensional space data from High dimensional space data, finally with RVM, carry out sample training and prediction.
Fig. 1 is a kind of ultra-short term power forecasting method process flow diagram provided by the invention.In Fig. 1, method provided by the invention comprises following step:
Step 1: gather certain wind energy turbine set wind speed, wind direction and the wind power data in August, form sample set;
These data gathered once every 15 minutes, formed N * T two-dimensional array.
Step 2: sample set is carried out to data pre-service, and the method for employing based on ridgelet transform is to the sample set denoising obtaining; Fig. 2 is method based on the ridgelet transform process flow diagram to the sample set denoising obtaining.Step 2 comprises again the following step:
Step 2.1: to the sample set application finite ridgelet transform gathering, in each direction, will produce a FRAT sequence, therefore the result of finite ridgelet transform is the ridge wave system matrix number that produces a p * (p+1), every row of ridge wave system matrix number are carried out respectively to one-dimensional discrete multi-scale wavelet transformation, obtain finite ridgelet transform matrix of coefficients FRAT f[k, l], (k, l) ∈ P i, j, whole process is called finite ridgelet transform.
If p is a prime number, definition set Z p=0,1,2 ..., p-1}, defines discrete data signal f (x) so at limited grid Z p 2on the matrix of coefficients of finite ridgelet transform be:
FRAT f [ k , l ] = 1 p &Sigma; ( a , b ) &Element; L k , l f ( a , b ) - - - ( 1 )
In formula:
FRAT f[k, l] is finite ridgelet transform matrix of coefficients;
P is the dimension of matrix of coefficients;
F (a, b) is discrete data signal;
A is horizontal ordinate;
B is ordinate.
L k, lrepresent grid Z p 2the set of point of take the straight line that k is intercept as slope, l (when k=p, representing the infinitely great or vertical straight line of slope) of upper composition, that is:
L k,l={(i,j)|j=ki+l(mod)p,i∈Z p},k∈Z p (2)
Wherein:
Z pfor the grid length of side.
L p,l={(l,j)|j∈Z P} (3)
Above formula has defined limited grid Z p 2straight line in the individual direction of upper p * (p+1), wherein all comprises p point on every straight line, for any given direction, have p bar straight line parallel to each other, and they have covered grid Z completely p 2.Its reconstruction formula is:
F ( a , b ) = 1 p &Sigma; ( k , l ) &Element; p a , b FRAT f [ k , l ] - - - ( 4 )
In formula:
P a, bfor process point (a, b) ∈ Z p 2the slope of straight line and the array set that forms of intercept, can be expressed as:
P a , b = { ( k , l ) | l = b - ka ( mod ) p , k &Element; Z p 2 } &cup; { ( p , a ) } ;
Step 2.2: each row to finite ridgelet transform matrix of coefficients, carry out wavelet adaptive threshold denoising, low frequency sub-band is not processed, and each high-frequency sub-band coefficient is carried out to soft-threshold processing.Threshold value formula is:
T = &sigma; n 2 &sigma; b 2 , ( b = 0,1 , &CenterDot; &CenterDot; &CenterDot; , n ) - - - ( 5 )
Wherein:
T is threshold value;
variance for estimating noise;
for estimator band signal variance;
Step 2.3: the ridge wave system matrix number application finite ridgelet inverse transformation reconstruction signal after processing;
Step 2.4: reconstruction signal is carried out to self-adaptation dimension and receive Wiener filtering, to reduce " coiling " effect, obtain the sample set after denoising.
Step 3: utilize degree of depth autocoder network to carry out dimensionality reduction to the sample set obtaining.Step 3 comprises again the following step:
Step 3.1: the sample set N * M array note after processing for ridgelet transform is X={x 1, x 2..., x i∈ R m, wherein, i≤M, vector x idimension be N;
Step 3.2: adopt CRBM to train in advance data, can obtain one group of independently CRBM model and one group of weights;
Wherein the pre-training process of CRBM is:
CRBM is connected to form by a visual layers and a hidden layer and their interlayer.Between visual element and hidden unit, by weight matrix w, be connected, the input of each unit in hidden layer comes from the state of all unit in visual layers, contribution according to each visual element to each Hidden unit, connection between them is composed with corresponding weights, the state value of each hidden unit be connected all visual element weights and.With s, represent the state of visual element and hidden unit, s below jrepresent that input comes from visual element state set { s ithe output of hidden unit j, w ijrepresent the weights between visual element i and hidden unit j, and the bi-phases weights ' between them is equal, i.e. w ij=w ji, by following formula, carry out right value update calculating.
s j = &phi; j ( &Sigma; i w ij s i + &sigma; N j ( 0,1 ) ) - - - ( 6 )
Function phi in formula jexpression formula as follows:
&phi; j ( x j ) = &theta; L + ( &theta; H - &theta; L ) 1 1 + exp ( - a j x j ) - - - ( 7 )
Wherein, N j(0,1) represents the Gaussian random variable of zero-mean, unit variance.Constant σ and N j(0,1) has produced a noisy input component n jointly j=σ N j(0,1), its probability distribution is:
p ( n j ) = 1 &sigma; 2 &pi; exp ( - n j 2 2 &sigma; 2 ) - - - ( 8 )
By (2) formula, can be known φ j(x) be that asymptotic line is at θ land θ hthe sigmoid function at place.Parameter a jcontrol sigmoid slope of a curve, formula noise control variable, works as a jwhile changing from small to big, can complete from muting determinacy state seamlessly transitting to scale-of-two random state.
CRBM adopts and minimizes the relaxation search that sdpecific dispersion training criterion has been substituted to the Boltzmann machine that only depends on Gibbs sampling, has greatly reduced calculated amount.Minimize the weights { w that training criterion is used for upgrading CRBM ijand " noise control " parameter { a i}:
&Delta; w ij = &eta; w ( < s i s j > - < s ^ i s ^ j > ) - - - ( 9 )
&Delta; a ^ j = &eta; a a j 2 ( < s j 2 > - < s ^ j 2 > ) - - - ( 10 )
Wherein:
a step reconstituted state that represents unit j;
<> represents the average of training data;
η wit is the learning rate of weight w.
When formula (4) and formula (5) show to train in advance with CRBM, only carry out simple addition and multiplication, calculated amount is little, can complete easily the renewal process of weights.
Step 3.3: the output neuron of each CRBM model and the input neuron of next CRBM are merged into one deck, launches to form own coding neural network;
Step 3.4: weights are finely tuned.The BP algorithm of employing based on cross entropy (Cross Entropy) function carries out network training, adjusts weights so that cross entropy function reaches minimum;
Step 3.5: the two-dimensional array that the data set after dimensionality reduction forms is as the input data of carrying out next step data processing.
Step 4: to the training of Relevance vector machine for regression model, then utilize the Relevance vector machine for regression model training to predict the wind power of ultra-short term with the sample set after dimensionality reduction.Step 4 comprises the following step:
Step 4.1: using the data of first 30 days of the sample set after dimensionality reduction as training sample, and according to the call format of Method Using Relevance Vector Machine training sample, input data are formatd to processing;
Step 4.2: select gaussian kernel function as the kernel function of Method Using Relevance Vector Machine, to parameter initialization;
Step 4.3: the input data using the prediction data of first 24 hours constantly as training sample, the prediction wind power of latter two hours is constantly as output data, to the training of Relevance vector machine for regression model;
Step 4.4: on the basis of step 4.3, utilize the Method Using Relevance Vector Machine model training to predict the wind power of following 2 hours.
According to the dimensionality reduction result of step 3, x ibe i the data after moment dimensionality reduction.
The model output of RVM is defined as
y ( x , w ) = &Sigma; i = 1 N w i K ( x , x i ) + w 0 = &Phi;w - - - ( 11 )
In formula:
X ifor observation vector;
W iweights for model;
K (x, x i) be kernel function;
Φ is the rank matrix of N * (N+1).
The likelihood function of training sample set can be expressed as
P ( t | w , &sigma; 2 ) = ( 2 &pi; &sigma; 2 ) - N / 2 exp ( - 1 2 &sigma; 2 | | t - &Phi;w | | 2 ) - - - ( 12 )
In formula:
N is vector x idimension;
W is weights;
T is object vector, t=[t 1, t 2..., t n] t;
σ 2variance for Gaussian noise.
The posterior probability of calculating weights is distributed as:
p ( w | t , &alpha; , &sigma; 2 ) = p ( t | w , &sigma; 2 ) p ( w | &alpha; ) p ( t | &alpha; , &sigma; 2 ) = N ( &mu; , &Sigma; ) - - - ( 13 )
In formula:
α is the super parameter of the prior distribution of power to make decision value matrix w, α=[α 0, α 1..., α n] t, each super parameter alpha ia corresponding weight w i;
μ is weights posteriority statistic average, μ=σ 2∑ Φ tt;
∑ is summation symbol, ∑=(σ 2Φ tΦ+A) -1, A=diag (α wherein 0, α 1..., α n).
By maximizing super parameter likelihood distribution, find its most probable value α mPwith the employing estimation technique that iterates, to p (t| α, σ 2)=∫ p (t|w, σ 2) p (w| α) dw is about α differentiate, to make it be zero and formula is reset:
&alpha; i new = &gamma; i / &mu; i 2 - - - ( 14 )
In formula:
μ ifor weight w iposteriority statistic average, μ i=1-α iii;
iifor current α and σ 2i diagonal element of posteriority weights covariance matrix.
Equally to noise variance σ 2differentiate, obtains upgrading rule:
2) new=||t-∑μ|| 2/(N-∑ iγ i) (15)
Learning algorithm calculates (4) (5) formula repeatedly, upgrades μ and ∑ simultaneously, knows and meets certain suitable condition of convergence.
Modeling process may be summarized to be the following steps:
1. initialization α iand σ 2;
2. calculate weights posteriority statistic average μ and posterior variance ∑;
3. calculate all γ iand reappraise α iand σ 2;
4. if convergence, to step 5, does not restrain and returns to step 2;
5. delete α ithe weights of → ∞ and basis function, obtain training pattern.
In the process of wind power prediction, to use a large amount of historical datas, these data all likely break down or are interfered at collection, transmission, conversion links, cause data exception, and wind speed and these data variation amplitudes of power large, there is no regularity, therefore in invention, with ridgelet transform, carry out the denoising of data.The new sample set of data formation after processing, then utilizes degree of depth autocoder network to carry out dimensionality reduction, finally with Relevance vector machine for regression model, carries out power prediction.The present invention is guaranteeing under the prerequisite of precision of prediction, can in the sample data of low dimension, carry out model training, has reduced the training time expense of prediction.
The above; be only the present invention's embodiment preferably, but protection scope of the present invention is not limited to this, is anyly familiar with in technical scope that those skilled in the art disclose in the present invention; the variation that can expect easily or replacement, within all should being encompassed in protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain of claim.

Claims (3)

1. a ultrashort-term wind power prediction method, is characterized in that the method comprises the following steps:
Step 1: gather wind speed, wind direction and the wind power data of wind energy turbine set, form sample set;
Step 2: sample set is carried out to data pre-service, and concrete steps comprise:
Step 2.1: the sample set application finite ridgelet transform to gathering, obtain ridge wave system matrix number, every row of ridge wave system matrix number are carried out respectively to one-dimensional discrete multi-scale wavelet transformation, obtain finite ridgelet transform matrix of coefficients;
Step 2.2: each row to finite ridgelet transform matrix of coefficients carry out wavelet adaptive threshold denoising, and low frequency sub-band coefficient is not processed, carries out soft-threshold processing to each high-frequency sub-band coefficient;
Step 2.3: to the finite ridgelet transform matrix of coefficients application finite ridgelet inverse transformation reconstruction signal after processing;
Step 2.4: reconstruction signal is carried out to self-adaptation dimension and receive Wiener filtering, obtain the sample set after denoising;
Step 3: utilize degree of depth autocoder network to carry out dimensionality reduction to pretreated sample set, concrete steps comprise:
Step 3.1: the sample set after adopting continuously restriction Boltzmann machine model to denoising is trained in advance, obtains one group and independently limits continuously Boltzmann machine model and one group of weights;
Step 3.2: the output neuron that each is limited to Boltzmann machine model is continuously merged into one deck with the input neuron of the next Boltzmann machine of restriction continuously model, expansion formation degree of depth autocoder network;
Step 3.3: weights are finely tuned, adopt the BP algorithm based on cross entropy function to carry out network training, adjust weights so that cross entropy function reaches minimum, complete reduction process;
Step 4: to the training of Relevance vector machine for regression model, then utilize the Relevance vector machine for regression model after training to predict the wind power of ultra-short term with the sample set after dimensionality reduction, concrete steps comprise:
Step 4.1: the sample set after dimensionality reduction is formatd to processing according to the call format of Method Using Relevance Vector Machine input to sample set;
Step 4.2: select gaussian kernel function as the kernel function of Method Using Relevance Vector Machine model, the parameter initialization to kernel function;
Step 4.3: the sample set after processing with format is to the training of Method Using Relevance Vector Machine model;
Step 4.4: on the basis of step 4.3, utilize the Method Using Relevance Vector Machine model training to carry out the wind power prediction of ultra-short term.
2. a kind of ultrashort-term wind power prediction method according to claim 1, is characterized in that the computing formula of described finite ridgelet transform is:
FRAT f [ k , l ] = 1 p &Sigma; ( a , b ) &Element; L k , l f ( a , b )
In formula:
FRAT f[k, l] is finite ridgelet transform matrix of coefficients;
P is the dimension of matrix of coefficients;
F (a, b) is discrete data signal;
A is horizontal ordinate;
B is ordinate;
L k,lrepresent grid Z p 2upper composition take the set of k as the point of slope, the l straight line that is intercept.
3. a kind of ultrashort-term wind power prediction method according to claim 1, is characterized in that the computing formula of described soft-threshold is:
T = &sigma; n 2 &sigma; j 2 , ( j = 0,1 , . . . , n )
Wherein:
T is soft-threshold;
variance for estimating noise;
for estimator band signal variance.
CN201110388041.9A 2011-11-29 2011-11-29 Ultrashort-term wind power prediction method Expired - Fee Related CN102521671B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110388041.9A CN102521671B (en) 2011-11-29 2011-11-29 Ultrashort-term wind power prediction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110388041.9A CN102521671B (en) 2011-11-29 2011-11-29 Ultrashort-term wind power prediction method

Publications (2)

Publication Number Publication Date
CN102521671A CN102521671A (en) 2012-06-27
CN102521671B true CN102521671B (en) 2014-10-29

Family

ID=46292582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110388041.9A Expired - Fee Related CN102521671B (en) 2011-11-29 2011-11-29 Ultrashort-term wind power prediction method

Country Status (1)

Country Link
CN (1) CN102521671B (en)

Families Citing this family (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102709926A (en) * 2012-06-28 2012-10-03 哈尔滨工业大学 Rotary hot spare dispatching method in construction of intelligent power grid on basis of relevance vector machine
CN103065049B (en) * 2012-12-28 2015-08-19 东北电力大学 A kind of wind power real-time estimate computing method based on coif5 small echo real-time decomposition
CN103020485B (en) * 2013-01-08 2016-01-06 天津大学 Based on the short-term wind speed forecasting method of beta noise core ridge regression technology
CN103218674A (en) * 2013-04-07 2013-07-24 国家电网公司 Method for predicating output power of photovoltaic power generation system based on BP (Back Propagation) neural network model
CN103279804B (en) * 2013-04-29 2016-08-17 清华大学 The Forecasting Methodology of super short-period wind power
CN103489037B (en) * 2013-07-04 2016-05-18 清华大学 A kind of Forecasting Methodology that can power generating wind resource
CN103440529B (en) * 2013-08-12 2016-05-25 新疆大学 A kind of lateral error translation modification method of wind power forecasting system
CN103489041A (en) * 2013-09-17 2014-01-01 国家电网公司 Short-term wind power forecast method
CN103955755A (en) * 2014-04-18 2014-07-30 国家电网公司 Wind electricity power short-term prediction method by adopting composite data source based on self-learning polynomial kernel function support vector machine
CN103984987B (en) * 2014-05-05 2017-11-24 国家电网公司 A kind of arma modeling ultrashort-term wind power prediction method of wind measurement network real time correction
CN104239689B (en) * 2014-08-18 2017-11-21 华北电力大学 Short-term wind speed forecasting method based on optimization Method Using Relevance Vector Machine
CN104200282A (en) * 2014-08-26 2014-12-10 南京信息工程大学 Rapid prediction method for facility agriculture environment factor
CN104200290B (en) * 2014-09-26 2017-05-10 国家电网公司 Wind power forecast method
CN104680246B (en) * 2015-01-29 2017-12-12 北京交通大学 A kind of wind power plant realtime power Forecasting Methodology based on data-driven
CN104657786A (en) * 2015-02-03 2015-05-27 河海大学 Short-term wind power mixed predicting method based on Boosting algorithm
CN104679863B (en) * 2015-02-28 2018-05-04 武汉烽火众智数字技术有限责任公司 It is a kind of based on deep learning to scheme to search drawing method and system
CN104915736A (en) * 2015-06-29 2015-09-16 东北电力大学 Method for improving accuracy of wind power combined prediction based on improved entropy weight method
US10443577B2 (en) 2015-07-17 2019-10-15 General Electric Company Systems and methods for improved wind power generation
CN105160866A (en) * 2015-08-07 2015-12-16 浙江高速信息工程技术有限公司 Traffic flow prediction method based on deep learning nerve network structure
CN105046383A (en) * 2015-09-19 2015-11-11 东北电力大学 Real-time wind power predicting method based on ensemble empirical mode decomposition and relevant vector machine
CN105844350B (en) * 2016-03-21 2019-12-17 广西电网有限责任公司电力科学研究院 Short-term wind power prediction system based on covariance optimal combination model
CN105956720A (en) * 2016-06-07 2016-09-21 中南大学 Wind power ultra short period prediction method based on T-S fuzzy model
CN106250988B (en) * 2016-07-28 2018-09-11 武汉理工大学 Relevance vector regression Incremental Learning Algorithm based on sample properties and system
CN106778571B (en) * 2016-12-05 2020-03-27 天津大学 Digital video feature extraction method based on deep neural network
CN107437112B (en) * 2017-04-19 2018-07-17 武汉理工大学 A kind of mixing RVM model prediction methods based on the multiple dimensioned kernel function of improvement
CN107358323A (en) * 2017-07-13 2017-11-17 上海交通大学 A kind of power forecasting method of short-term photovoltaic generation
CN109409915B (en) * 2017-08-18 2024-03-08 厦门雅迅网络股份有限公司 Automobile part sales prediction method, terminal equipment and storage medium
CN108428021B (en) * 2018-05-21 2021-10-12 国网山东省电力公司青岛供电公司 Micro-grid short-term load prediction model based on HSA-RRNN
CN108830428A (en) * 2018-07-04 2018-11-16 吉林大学 A kind of short-time wind speed prediction technique based on four parameter mixed kernel function LSSVM
CN109214575B (en) * 2018-09-12 2021-08-31 河海大学 Ultrashort-term wind power prediction method based on small-wavelength short-term memory network
CN109858664A (en) * 2018-11-23 2019-06-07 国网新疆电力有限公司电力科学研究院 Thermal power plant unit thermoelectricity Relationship Prediction method and device based on Method Using Relevance Vector Machine
CN110175639B (en) * 2019-05-17 2021-06-11 华北电力大学 Short-term wind power prediction method based on feature selection
CN111274532B (en) * 2020-01-21 2023-05-02 南方电网科学研究院有限责任公司 Short-term wind power prediction method and device based on CEEMD-LZC and manifold learning
CN111539482B (en) * 2020-04-28 2021-03-09 三峡大学 RBF kernel function-based space multidimensional wind power data dimension reduction and reconstruction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101916998A (en) * 2010-07-12 2010-12-15 东北电力科学研究院有限公司 Support vector machine-based wind electric powder prediction device and method
CN102170130A (en) * 2011-04-26 2011-08-31 华北电力大学 Short-term wind power prediction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101916998A (en) * 2010-07-12 2010-12-15 东北电力科学研究院有限公司 Support vector machine-based wind electric powder prediction device and method
CN102170130A (en) * 2011-04-26 2011-08-31 华北电力大学 Short-term wind power prediction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘峻 等.基于超短期风电功率预测的风电场自动发电控制.《中国电力》.2011,第44卷(第2期),第74-77页.
基于超短期风电功率预测的风电场自动发电控制;刘峻 等;《中国电力》;20110228;第44卷(第2期);第74-77页 *

Also Published As

Publication number Publication date
CN102521671A (en) 2012-06-27

Similar Documents

Publication Publication Date Title
CN102521671B (en) Ultrashort-term wind power prediction method
Li et al. Research and application of a combined model based on variable weight for short term wind speed forecasting
Wang et al. Deterministic and probabilistic forecasting of photovoltaic power based on deep convolutional neural network
Memarzadeh et al. A new short-term wind speed forecasting method based on fine-tuned LSTM neural network and optimal input sets
Wang et al. A novel system based on neural networks with linear combination framework for wind speed forecasting
Wang et al. A review of deep learning for renewable energy forecasting
Liu et al. Short-term wind speed forecasting based on spectral clustering and optimised echo state networks
Wang et al. A robust combination approach for short-term wind speed forecasting and analysis–Combination of the ARIMA (Autoregressive Integrated Moving Average), ELM (Extreme Learning Machine), SVM (Support Vector Machine) and LSSVM (Least Square SVM) forecasts using a GPR (Gaussian Process Regression) model
Hu et al. Short-term wind speed prediction using empirical wavelet transform and Gaussian process regression
CN104239964B (en) Ultra-short term wind speed forecasting method based on spectral clustering and genetic optimization ExtremeLearningMachine
De Giorgi et al. Assessment of the benefits of numerical weather predictions in wind power forecasting based on statistical methods
Deka et al. Discrete wavelet neural network approach in significant wave height forecasting for multistep lead time
Hu et al. Very short-term spatial and temporal wind power forecasting: A deep learning approach
Hu et al. A hybrid approach based on the Gaussian process with t-observation model for short-term wind speed forecasts
CN102170130B (en) Short-term wind power prediction method
Korprasertsak et al. Robust short-term prediction of wind power generation under uncertainty via statistical interpretation of multiple forecasting models
CN102867132B (en) The online fault combination forecasting method of aviation DC converter based on fractional wavelet transform
Ding et al. A time series model based on hybrid-kernel least-squares support vector machine for short-term wind power forecasting
Truong et al. Wave prediction based on a modified grey model MGM (1, 1) for real-time control of wave energy converters in irregular waves
Ambach et al. A new high-dimensional time series approach for wind speed, wind direction and air pressure forecasting
Wu et al. A novel hybrid model based on artificial neural networks for solar radiation prediction
CN102270279A (en) Short-term power load predicting method
Li et al. Decomposition integration and error correction method for photovoltaic power forecasting
CN107909209A (en) The wind speed forecasting method of complete overall experience mode decomposition and depth belief network
Jiang et al. Two combined forecasting models based on singular spectrum analysis and intelligent optimized algorithm for short-term wind speed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141029

Termination date: 20151129