CN102520273B - 一种大型发电机组的节能检测方法 - Google Patents
一种大型发电机组的节能检测方法 Download PDFInfo
- Publication number
- CN102520273B CN102520273B CN201110382813.8A CN201110382813A CN102520273B CN 102520273 B CN102520273 B CN 102520273B CN 201110382813 A CN201110382813 A CN 201110382813A CN 102520273 B CN102520273 B CN 102520273B
- Authority
- CN
- China
- Prior art keywords
- time
- consumption rate
- distribute
- coalrate
- generated output
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000001514 detection method Methods 0.000 title claims abstract description 39
- 239000003245 coal Substances 0.000 claims abstract description 101
- 238000005315 distribution function Methods 0.000 claims abstract description 69
- 238000009826 distribution Methods 0.000 claims abstract description 50
- 238000005457 optimization Methods 0.000 claims description 24
- 238000005265 energy consumption Methods 0.000 abstract description 21
- 230000005611 electricity Effects 0.000 abstract description 3
- 238000004134 energy conservation Methods 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 3
- 230000010354 integration Effects 0.000 description 3
- 238000002360 preparation method Methods 0.000 description 3
- 238000010998 test method Methods 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000007619 statistical method Methods 0.000 description 2
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000002860 competitive effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000010977 unit operation Methods 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110382813.8A CN102520273B (zh) | 2011-11-25 | 2011-11-25 | 一种大型发电机组的节能检测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110382813.8A CN102520273B (zh) | 2011-11-25 | 2011-11-25 | 一种大型发电机组的节能检测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102520273A CN102520273A (zh) | 2012-06-27 |
CN102520273B true CN102520273B (zh) | 2014-06-18 |
Family
ID=46291259
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110382813.8A Active CN102520273B (zh) | 2011-11-25 | 2011-11-25 | 一种大型发电机组的节能检测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102520273B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105262119B (zh) * | 2015-09-29 | 2018-07-17 | 中国电力科学研究院 | 一种蓄能用电系统的节能评价和节能控制方法 |
CN116990619B (zh) * | 2023-09-25 | 2023-12-26 | 华夏天信智能物联股份有限公司 | 一种矿井变频一体机的智能监测方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1167900A (zh) * | 1997-03-19 | 1997-12-17 | 魏楠 | 火电厂单元机组煤耗测量方法和测量装置 |
CN101393453A (zh) * | 2008-11-04 | 2009-03-25 | 江苏方天电力技术有限公司 | 火力发电机组能耗实时监测系统 |
CN101738971A (zh) * | 2009-12-14 | 2010-06-16 | 贵州电力试验研究院 | 可确保煤耗在线监测系统公平、公正、公开运行的方法 |
CN101893877A (zh) * | 2009-05-20 | 2010-11-24 | 中国国电集团公司九江发电厂 | 一种发电厂基于能耗分析的优化运行方法及其系统 |
-
2011
- 2011-11-25 CN CN201110382813.8A patent/CN102520273B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1167900A (zh) * | 1997-03-19 | 1997-12-17 | 魏楠 | 火电厂单元机组煤耗测量方法和测量装置 |
CN101393453A (zh) * | 2008-11-04 | 2009-03-25 | 江苏方天电力技术有限公司 | 火力发电机组能耗实时监测系统 |
CN101893877A (zh) * | 2009-05-20 | 2010-11-24 | 中国国电集团公司九江发电厂 | 一种发电厂基于能耗分析的优化运行方法及其系统 |
CN101738971A (zh) * | 2009-12-14 | 2010-06-16 | 贵州电力试验研究院 | 可确保煤耗在线监测系统公平、公正、公开运行的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102520273A (zh) | 2012-06-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sawle et al. | Optimal sizing of standalone PV/Wind/Biomass hybrid energy system using GA and PSO optimization technique | |
Wang et al. | Cost and CO2 reductions of solar photovoltaic power generation in China: Perspectives for 2020 | |
CN108510122B (zh) | 基于最优双约束条件的综合能源系统优化方法 | |
CN109586284B (zh) | 考虑弃能约束的送端电力系统随机生产模拟方法及应用 | |
CN109347152B (zh) | 考虑多类型电源参与调峰的随机生产模拟方法及应用 | |
CN103248048B (zh) | 一种弃风电量预估方法 | |
CN105515058A (zh) | 一种光伏发电参与的功率就地消纳方法 | |
CN104377726A (zh) | 一种大规模新能源并网发电的调峰方法 | |
Liu et al. | Impacts of distributed renewable energy generations on smart grid operation and dispatch | |
CN104124685A (zh) | 基于样板风机法的风电场理论功率计算方法 | |
Grant et al. | Environmental payback periods of multi-crystalline silicon photovoltaics in the United States–How prioritizing based on environmental impact compares to solar intensity | |
Raugei et al. | A multi-disciplinary analysis of UK grid mix scenarios with large-scale PV deployment | |
CN105656026A (zh) | 可再生能源的设备建设资源配置方法和系统 | |
CN115330021A (zh) | 一种考虑沼气电热利用比的综合能源运行优化系统及方法 | |
CN102520273B (zh) | 一种大型发电机组的节能检测方法 | |
CN109978331A (zh) | 一种高比例水电现货市场下日电量分解方法 | |
Petrichenko et al. | The assessment of long-term import-export capabilities of Baltic power system | |
Ch et al. | Integration of renewable energy sources in Zero energy buildings with economical and environmental aspects by using HOMER | |
Xiu et al. | Study on energy storage system investment decision based on real option theory | |
CN106203742A (zh) | 一种基于节能回报率的电网设备节能评价及选型方法 | |
Han et al. | Analysis of economic operation model for virtual power plants considering the uncertainties of renewable energy power generation | |
Tomšić et al. | Optimizing integration of the new RES generation and electrical energy storage in a power system: Case study of Croatia | |
CN103955765A (zh) | 一种基于发电能力评估和负载分级的微电源容量配置方法 | |
Pazouki et al. | Short term scheduling of multi carrier systems through interruptible load and Energy Storage toward future sustainable energy needs | |
Siraganyan et al. | Evaluating the need for energy storage to enhance autonomy of neighborhoods |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Free format text: FORMER OWNER: ZHEJIANG ELECTRIC POWER TEST AND RESEARCH INSITITUTE Effective date: 20130510 Owner name: ZHEJIANG ELECTRIC POWER TEST AND RESEARCH INSITITU Free format text: FORMER OWNER: YINENG ELECTRIC TECHNOLOGY CO., LTD., HANGZHOU HANGZHOU YINENG ENERGY-SAVING TECHNOLOGY CO., LTD. Effective date: 20130510 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 310014 HANGZHOU, ZHEJIANG PROVINCE TO: 100031 DONGCHENG, BEIJING |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20130510 Address after: 100031 West Chang'an Avenue, Beijing, No. 86 Applicant after: State Grid Corporation of China Applicant after: Zhejiang Electric Power Test And Research Insititute Applicant after: Yineng Electric Technology Co., Ltd., Hangzhou Applicant after: Hangzhou Yineng Energy-Saving Technology Co., Ltd. Address before: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane Applicant before: Zhejiang Electric Power Test And Research Insititute Applicant before: Yineng Electric Technology Co., Ltd., Hangzhou Applicant before: Hangzhou Yineng Energy-Saving Technology Co., Ltd. |
|
ASS | Succession or assignment of patent right |
Owner name: ZHEJIANG ELECTRIC POWER TEST AND RESEARCH INSITITU Free format text: FORMER OWNER: ZHEJIANG ELECTRIC POWER TEST AND RESEARCH INSITITUTE YINENG ELECTRIC TECHNOLOGY CO., LTD., HANGZHOU HANGZHOU YINENG ENERGY-SAVING TECHNOLOGY CO., LTD. Effective date: 20140107 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20140107 Address after: 100031 West Chang'an Avenue, Beijing, No. 86 Applicant after: State Grid Corporation of China Applicant after: Zhejiang Electric Power Test And Research Insititute Applicant after: Yineng Electric Technology Co., Ltd., Hangzhou Address before: 100031 West Chang'an Avenue, Beijing, No. 86 Applicant before: State Grid Corporation of China Applicant before: Zhejiang Electric Power Test And Research Insititute Applicant before: Yineng Electric Technology Co., Ltd., Hangzhou Applicant before: Hangzhou Yineng Energy-Saving Technology Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |