CN102518294A - Scaffold standing pole connector - Google Patents
Scaffold standing pole connector Download PDFInfo
- Publication number
- CN102518294A CN102518294A CN2011104072630A CN201110407263A CN102518294A CN 102518294 A CN102518294 A CN 102518294A CN 2011104072630 A CN2011104072630 A CN 2011104072630A CN 201110407263 A CN201110407263 A CN 201110407263A CN 102518294 A CN102518294 A CN 102518294A
- Authority
- CN
- China
- Prior art keywords
- wedge shape
- connecting cylinder
- wedge
- shape iron
- installation portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The invention discloses a scaffold standing pole connector which is characterized by comprising a connecting cylinder and a mounting part. The upper end of the connecting cylinder is fixedly connected with an upper standing pole; the mounting part and the connecting cylinder are formed integrally; seen from top to bottom, the mounting part is a U-shaped hollow cavity with a large upper opening and a small lower opening and is arranged like a wedge with a large upper part and a small lower part; wedge-shaped iron is arranged in the U-shaped hollow cavity; the upper end of the wedge-shaped iron is provided with a falling-preventing mechanism, and the inner side of the lower part of the wedge-shaped iron is an arc-shaped contact surface conforming to the external diameter of an lower standing pole; when the upper standing pole and the lower standing pole are connected, a pressure surface acts on the external diameter of the lower standing pole is formed; the outer side of the middle part of the wedge-shaped iron is provided with a ball-shaped bulge; when the upper standing pole and the lower standing pole are connected, the ball-shaped bulge falls down and coincides with the bottom edge of the U-shaped hollow cavity and is clamped.
Description
Technical field
The present invention relates to a kind of device that scaffold upright rod connects that is used for.
Background technology
In building trade scaffolds erecting construction, existing be used for that the interconnective connector of two rod members (vertical rod) is had connectors such as fastener type, bowl fastening type, the complex structure of its connector own, attended operation is loaded down with trivial details, and efficiency of construction is low.And can not effectively eliminate problem because of rod member processing unbalance stress when rod member that alignment error causes is connected.
Summary of the invention
The purpose of this invention is to provide a kind of simple in structurely, cost of manufacture is low, processing ease, efficiency of construction are high, good connecting effect be used for the device that scaffold upright rod connects.
For reaching above purpose, the present invention takes following technical scheme to be achieved:
A kind of scaffold upright rod connector comprises that the connecting cylinder that the upper end connects firmly on upper pright stanchion reaches and the integrated installation portion of connecting cylinder, sees that from top to bottom installation portion is " U " shape cavity, suitable for reading big, following young, the big up and small down wedge shape laying of " U " shape cavity; In " U " shape cavity, wedge shape iron is set; Wedge shape iron upper end is provided with anti-shedding mechanism; Wedge shape iron lower inside is the arc contact surface that matches with following vertical rod external diameter, constitutes a pressure face to following vertical rod external diameter during connection, and the outside, wedge shape iron middle part is provided with a hemisphere jut; During connection, hemisphere jut falls and installation portion " U " shape cavity base kissing merges locked.
In the such scheme, the semicircle inboard of the relative installation portion of said connecting cylinder is provided with the twice arcuate friction surface.The formed radius r in said arcuate friction surface to connecting cylinder axle center is less than the connecting cylinder radius R, and upper and lower vertical rod radius equates with r.
On the arcuate friction surface below the upper pright stanchion lower end, have endless groove.The described wedge shape iron first half is up-small and down-big wedge structure on the side direction both sides.Said anti-shedding mechanism is to have pin hole near wedge shape iron upper end, and pin is housed in the hole.
Advantage of the present invention is, structure is ingenious, and component are few; Processing ease; Utilize wedge shape iron to move down, the inboard arc contact surface in its underpart is pressed to down vertical rod, and outside hemisphere jut and installation portion " U " shape cavity base kissing merges locked; Following vertical rod realizes that under wedge shape iron pressure face and the two arcuate friction surface actings in conjunction of connecting cylinder inwall three frictions of upper and lower vertical rod are connected, and can effectively eliminate the problem of unbalance stress when being connected because of the rod member that rod member is processed with alignment error causes.
Description of drawings
Fig. 1 is an assembling drawing of the present invention.
Fig. 2 is that the A-A of Fig. 1 is to sectional view.
Fig. 3 is that the B-B of Fig. 1 is to sectional view.
Fig. 4 is the unassembled state diagram of the present invention.
Reference numeral among Fig. 1~Fig. 4: 1, connecting cylinder; 2, wedge shape iron; 3, upper pright stanchion; 4, vertical rod down; 5, installation portion; 6, arcuate friction surface; 7, endless groove; 8, pin hole.
The specific embodiment
Like Fig. 1, shown in Figure 2; A kind of scaffold upright rod connector comprises that the connecting cylinder 1 that the upper end is welded on the upper pright stanchion 3 reaches and the integrated installation portion 5 of connecting cylinder, sees from top to bottom; Installation portion 5 is " U " shape cavity; " U " shape cavity suitable for reading big, following young laid with connecting cylinder 1 big up and small down wedge shape.The semicircle inboard of connecting cylinder 1 relative installation portion is provided with the arcuate friction surface 6 that twice are symmetrical in symmetrical center line p, and upper and lower vertical rod 3,4 radiuses equate that with the formed radius r in arcuate friction surface to connecting cylinder axle center r is less than the connecting cylinder radius R.On the arcuate friction surface below the upper pright stanchion lower end, have endless groove 7, can effectively avoid down the vertical rod upper end, guarantee that vertical rod contacts with the effective of arcuate friction surface down because of the distortion of ends such as the end burr that cause in the use or crimping.
Like Fig. 3, shown in Figure 4; In connector installation portion 5 " U " shape cavity, wedge shape iron 2 is set; The wedge shape iron first half is up-small and down-big wedge-shaped design (Fig. 3) on the side direction both sides; When wedge shape iron was in Fig. 4 position, the tapering through wedge shape iron can self be fixed on highest order with wedge shape iron, and install convenient next time.The arc contact surface of wedge shape iron lower inside for matching with following vertical rod external diameter constitutes during connection a pressure face of vertical rod external diameter down, and this pressure face and two arcuate friction surface 6 realize that to vertical rod down three rub to fix.The outside, wedge shape iron middle part is provided with a hemisphere jut, and during connection, hemisphere jut falls and installation portion " U " shape cavity base kissing merges locked.Wedge shape iron upper end can simply be provided with solder joint, just can prevent that wedge shape iron 2 from deviating from from " U " shape cavity downwards; Also can have a pin hole 8, in the time of in wedge shape iron 2 places " U " shape cavity, load onto pin at this pin hole 8 and can prevent that wedge shape iron 2 from deviating from from " U " shape cavity downwards near wedge shape iron upper end.
Operating principle of the present invention is, leans on last periphery fixed slightly connector connecting cylinder 1 upper end and upper pright stanchion 3 bottoms, in installation portion 5 " U " the shape cavity wedge shape iron 2 is set in advance; And load onto pin at pin hole 8, and will descend vertical rod 4 upper ends to insert connecting cylinder 1, upper and lower vertical rod two ends are contacted; Downward hammering wedge shape iron 2 upper ends; Wedge shape iron moves down, and the inboard arc contact surface in its underpart is pressed to down vertical rod, and outside hemisphere jut and installation portion " U " shape cavity base kissing merges locked.Following vertical rod 4 realizes that under wedge shape iron pressure face and 6 actings in conjunction of connecting cylinder 1 inwall two arcuate friction surface upper and lower vertical rod face friction is connected, and wedge shape iron 2 downward pressures are big more, and the connection power that rubs is big more.
During dismounting, hammering wedge shape iron bottom upwards, rubbing surface pressure disappears, and wedge shape iron the gap occurs with following vertical rod, and connector can be removed from descending vertical rod.
Claims (5)
1. a scaffold upright rod connector is characterized in that, comprises that the connecting cylinder that the upper end connects firmly on upper pright stanchion reaches and the integrated installation portion of connecting cylinder; See that from top to bottom installation portion is " U " shape cavity, " U " shape cavity suitable for reading big; Young down, big up and small down wedge shape is laid; In " U " shape cavity, wedge shape iron is set; Wedge shape iron upper end is provided with anti-shedding mechanism; Wedge shape iron lower inside is the arc contact surface that matches with following vertical rod external diameter, constitutes a pressure face to following vertical rod external diameter during connection, and the outside, wedge shape iron middle part is provided with a hemisphere jut; During connection, hemisphere jut falls and installation portion " U " shape cavity base kissing merges locked.
2. scaffold upright rod connector as claimed in claim 1; It is characterized in that; The semicircle inboard of the relative installation portion of said connecting cylinder is provided with the twice arcuate friction surface, and the formed radius r in this arcuate friction surface to connecting cylinder axle center is less than the connecting cylinder radius R, and upper and lower vertical rod radius equates with r.
3. scaffold upright rod connector as claimed in claim 1 is characterized in that, on the arcuate friction surface below the upper pright stanchion lower end, has endless groove.
4. scaffold upright rod connector as claimed in claim 1 is characterized in that, the described wedge shape iron first half is up-small and down-big wedge structure on the side direction both sides.
5. scaffold upright rod connector as claimed in claim 1 is characterized in that, said anti-shedding mechanism is to have pin hole near wedge shape iron upper end, and pin is housed in the hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110407263.0A CN102518294B (en) | 2011-12-08 | 2011-12-08 | Scaffold standing pole connector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110407263.0A CN102518294B (en) | 2011-12-08 | 2011-12-08 | Scaffold standing pole connector |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102518294A true CN102518294A (en) | 2012-06-27 |
CN102518294B CN102518294B (en) | 2014-01-08 |
Family
ID=46289333
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110407263.0A Active CN102518294B (en) | 2011-12-08 | 2011-12-08 | Scaffold standing pole connector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102518294B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU537175A1 (en) * | 1975-02-03 | 1976-11-30 | Предприятие П/Я А-7102 | Connecting device of tubular racks of scaffolding |
SU962532A1 (en) * | 1981-02-19 | 1982-09-30 | Проектно-Технологический Трест "Оргтехстрой" Министерства Строительства Ссср | Device for connecting scaffold posts |
CN1108340A (en) * | 1993-12-24 | 1995-09-13 | 谭锦泉 | Steel tube scaffolding |
CN201250508Y (en) * | 2008-08-27 | 2009-06-03 | 何勇 | Steel tube scaffold wedging butt-joint fastener |
CN201962938U (en) * | 2011-02-23 | 2011-09-07 | 开平市优赢金属制品有限公司 | Scaffold plug |
CN202031315U (en) * | 2011-01-04 | 2011-11-09 | 青岛农业大学 | A vertical rod of a fastener type steel pipe scaffold |
-
2011
- 2011-12-08 CN CN201110407263.0A patent/CN102518294B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU537175A1 (en) * | 1975-02-03 | 1976-11-30 | Предприятие П/Я А-7102 | Connecting device of tubular racks of scaffolding |
SU962532A1 (en) * | 1981-02-19 | 1982-09-30 | Проектно-Технологический Трест "Оргтехстрой" Министерства Строительства Ссср | Device for connecting scaffold posts |
CN1108340A (en) * | 1993-12-24 | 1995-09-13 | 谭锦泉 | Steel tube scaffolding |
CN201250508Y (en) * | 2008-08-27 | 2009-06-03 | 何勇 | Steel tube scaffold wedging butt-joint fastener |
CN202031315U (en) * | 2011-01-04 | 2011-11-09 | 青岛农业大学 | A vertical rod of a fastener type steel pipe scaffold |
CN201962938U (en) * | 2011-02-23 | 2011-09-07 | 开平市优赢金属制品有限公司 | Scaffold plug |
Also Published As
Publication number | Publication date |
---|---|
CN102518294B (en) | 2014-01-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102315176A (en) | Electrical connector assembly | |
CN202120790U (en) | Keyboard switch | |
WO2008013891A3 (en) | Conductor connection | |
CN106352183A (en) | Clamping jaw type quick joint for pipelines | |
CN101867110B (en) | Electric connection terminal and relay socket thereof | |
CN102518294B (en) | Scaffold standing pole connector | |
CN102969595B (en) | Quick inserting type grounding terminal | |
CN105372831B (en) | Double-core inner positioning elastic glasses leg | |
CN202423624U (en) | End face contacted contact mechanism | |
CN202231240U (en) | Power plug fixing auxiliary device | |
CN201616532U (en) | Electric connection terminal used for connecting electric conductors | |
CN213026624U (en) | Fixed mounting structure of electric connector contact pin | |
CN107611705A (en) | Change connection plug | |
CN201826596U (en) | Fence | |
CN202473989U (en) | Improving diode connection structure photovoltaic junction box | |
KR101044623B1 (en) | Multiple stick | |
KR101250183B1 (en) | Terminal connecting apparatus | |
CN104848014A (en) | TV set base socket structure connected by buckle | |
CN206458678U (en) | A kind of plate support of glass partition | |
CN208904271U (en) | A kind of socket of specific arrangement pin relay | |
CN104183980A (en) | Socket structure capable of preventing falling of plug | |
CN214314969U (en) | Expansion core for assembling motor stator and magnetic shoe | |
CN201336426Y (en) | Probe type connector | |
CN204418792U (en) | A kind of positioner being used in folding awn column | |
CN209056399U (en) | Double power supply automatic transfer switch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 710032 No. 242 middle Changle Road, Xincheng District, Shaanxi, Xi'an Patentee after: SCEGC NO.5 CONSTRUCTION ENGINEERING GROUP Co.,Ltd. Address before: 710032 No. 242 middle Changle Road, Xincheng District, Shaanxi, Xi'an Patentee before: No.5 Construction Engineering Company Limited of Shaanxi Construction Group |
|
CP01 | Change in the name or title of a patent holder |