CN102513958B - Beam body butting assembly fixture - Google Patents

Beam body butting assembly fixture Download PDF

Info

Publication number
CN102513958B
CN102513958B CN201110399041.9A CN201110399041A CN102513958B CN 102513958 B CN102513958 B CN 102513958B CN 201110399041 A CN201110399041 A CN 201110399041A CN 102513958 B CN102513958 B CN 102513958B
Authority
CN
China
Prior art keywords
workpiece
block
support
type frame
door type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110399041.9A
Other languages
Chinese (zh)
Other versions
CN102513958A (en
Inventor
秦正
雍国宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Chuanchuan Daye Steel Structure Co., Ltd.
Original Assignee
CHONGQING CHUANDONG SHIPBUILDING HEAVY INDUSTRY Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING CHUANDONG SHIPBUILDING HEAVY INDUSTRY Corp filed Critical CHONGQING CHUANDONG SHIPBUILDING HEAVY INDUSTRY Corp
Priority to CN201110399041.9A priority Critical patent/CN102513958B/en
Publication of CN102513958A publication Critical patent/CN102513958A/en
Application granted granted Critical
Publication of CN102513958B publication Critical patent/CN102513958B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a beam body butting assembly fixture, which comprises a door-shaped frame, supporting blocks and lifting devices, wherein the supporting blocks are arranged at the bottom of the door-shaped frame, and are used for supporting the ends of a workpiece to be subjected to butting assembly on the inner side of the door-shaped frame; and the lifting devices are used for at least lifting the supporting blocks relative to the ends of the workpiece, so that the ends of the workpiece are leveled to be subjected to the butting assemble. According to the beam body butting assembly fixture, the lifting devices are operated, so that the assembly ends of the workpiece can be supported by the supporting blocks, and are leveled and subjected to butt joint in the door-shaped frame; during assembly, the surface of the workpiece is not damaged, and work of polishing and cleaning is not needed; furthermore, the labor resources can be saved; and the environment pollution can be reduced.

Description

Beam body docking assembly tooling
Technical field
The present invention relates to a kind of assembly tooling, relate in particular to a kind of beam body docking assembly tooling.
Background technology
At bridge, in building railway process, often need to dock assembling to various girder constructions, as steel case beam, track switch beam etc., conventionally the precision to its assembling and surface quality are had relatively high expectations, to ensure serviceability, conventionally adopt Hua Lanhe to set up horse plate to be used in conjunction with hammer and dock assembling for beam structure in prior art, iron pin carries out assembly work, particularly comparatively frequent to the use of horse plate, and horse plate be by after the workpiece docking of need docking assembling in order to keep and to ensure precision and be welded in the assistant board on workpiece, after having assembled, workpiece needs horse plate cutting disassembling, therefore after using in a large number horse plate, can produce a large amount of pads and defective material, i.e. " something that gives the game away ", need by the mode of polishing, " something that gives the game away " to be removed, the workload of polishing is larger, need expend a large amount of manpowers, and in bruting process, produce a large amount of powdery chips, working environment is more severe, seriously polluted, and can leave obvious vestige after polishing, surface quality is poor.
Therefore, in order addressing the above problem, to need a kind of beam body docking assembly tooling, to be applied in the docking assembling process of girder construction and not destroy surface of the work, without polishing removing work, to save human resources, to reduce environmental pollution.
Summary of the invention
In view of this, the object of this invention is to provide a kind of beam body docking assembly tooling, be applied in the docking assembling process of girder construction and do not destroy surface of the work, without polishing removing work, can save human resources, reduce environmental pollution.
Beam body docking assembly tooling of the present invention, comprises door type frame, back-up block and lifting apparatus, and described back-up block is arranged at door type frame bottom and is positioned at for supporting the end that door type frame inner side needs to dock the workpiece assembling; Described lifting apparatus is for making the end of workpiece lift flat docking to major general's back-up block with respect to the end lifting of workpiece.
Further, described door type frame is made up of crossbeam, support I and support II, described back-up block comprises dismountable back-up block I and dismountable back-up block II that is connected in support II bottom that is connected in support I bottom, and described lifting apparatus is used for door type frame entirety with respect to the end lifting of workpiece and then drive back-up block I and back-up block II lifting;
Further, described lifting apparatus is arranged at crossbeam below for being supported between workpiece and crossbeam and jack-up door type frame, and described lifting apparatus is jack;
Further, the inside top that is positioned at support I and support II is respectively provided with a fixed pulley;
Further, be positioned at crossbeam middle part and be provided with hanger.
The invention has the beneficial effects as follows: beam body docking assembly tooling of the present invention, operating its lifting apparatus just can support workpiece assembling by back-up block and hold and in door type frame, lift flat docking, in assembling process, do not destroy surface of the work, without polishing removing work, can save human resources, reduce environmental pollution.
Brief description of the drawings
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is structural representation of the present invention.
Detailed description of the invention
Fig. 1 is structural representation of the present invention, as shown in the figure: the beam body docking assembly tooling of the present embodiment, comprise door type frame 1, back-up block 2 and lifting apparatus 3, described back-up block 2 is arranged at door type frame 1 bottom and is positioned at door type frame 1 inner side and needs the end of the workpiece 4 of docking assembling for supporting; Described lifting apparatus 3 is for making the end of workpiece lift flat docking to major general's back-up block 2 with respect to the end lifting of workpiece, operating its lifting apparatus 3 just can support workpiece assembling by back-up block 2 and hold to lift in door type frame 1 and flatly dock and keep mated condition, in assembling process, do not destroy surface of the work, without polishing removing work, can save human resources, reduce environmental pollution.
In the present embodiment, described door type frame 1 is by crossbeam 11, support I 12 and support II13 form, crossbeam 11 support I 12 and support II13 all adopt the I-steel that bending strength is higher, between support I 12 and crossbeam 11 and support II13 and crossbeam 11, can be welded and fixed also can be bolted fixing, the present embodiment is set to bolt and is connected and fixed, and longitudinally distribute in crossbeam 11 bottom surfaces and be provided with many group connecting holes, make the spacing of support I 12 and support II13 adjustable, workpiece that can corresponding different in width rationally arranges, practicality is stronger, applied widely, described back-up block 2 comprises dismountable back-up block I 21 and dismountable back-up block II22 that is connected in support II13 bottom that is connected in support I 12 bottoms, described lifting apparatus 3 for by door type frame 1 entirety with respect to the end lifting of workpiece and then drive back-up block I 21 and back-up block II22 lifting, when use, first door type frame 1 is across to workpiece, then back-up block I 21 and back-up block II22 are installed fixing respectively at relevant position, the present embodiment arranges support I 12 and back-up block I 21, support II13 and back-up block II22 are bolted fixing, be positioned at and on support I 12 and support II13, be vertically arranged with respectively multiple equally distributed screwed holes for fixing respective support piece, make the height of back-up block I 21 and back-up block II22 adjustable, can suitable height be set according to the differing heights size of different workpieces, practical, the scope of application is wider, lifting apparatus 3 can be lever, boom hoisting or jack, while using lever or jack, lever or jack can be arranged between crossbeam 11 and workpiece 4 taking one of them workpiece or workpiece part and prop and carry out lifting for propping up door type frame 1 entirety of naming a person for a particular job, and then another workpiece or workpiece another part are lifted to flat docking with workpiece or workpiece part as fulcrum, while using boom hoisting (as crane), by boom hoisting, door type frame is sling, operation easier is high, and merging precision is not good enough.
In the present embodiment, described lifting apparatus 3 is arranged at crossbeam 11 belows for being supported between workpiece 4 and crossbeam 11 and jack-up door type frame 1, described lifting apparatus 3 is jack, for two workpiece end of mutual dislocation, lifting apparatus 3 is positioned over crossbeam 11 and is positioned at a upper workpiece end or workpiece part, jack-up door type frame 1 is lifted flat by back-up block 2 by being positioned at another the next workpiece end or workpiece another part, for improving the overall stressed effect of beam body docking assembly tooling of the present invention, jack and back-up block I 21 and back-up block II22 are set to two one to one, correspondence is arranged at back-up block I 21 or back-up block II22 top, the bearing capacity of jack is strong, support force is continual and steady, do not destroy surface of the work, simple to operate, structure is little, flexible and convenient to use.
In the present embodiment, the inside top that is positioned at support I 12 and support II13 is respectively provided with a fixed pulley 5, in the time multistage beam body being carried out to continuous docking assembling, can door type frame 1 be slided mobile along beam body, without back-up block I 21 and back-up block II22 are carried out to dismounting frequently, make between door type frame 1 and beam body coefficient of friction less by two fixed pulleys 5 are set, be convenient to the movement of door type frame 1, serviceability is better.
In the present embodiment, be positioned at crossbeam 11 middle parts and be provided with hanger 6, be beneficial to and adopt various ways by door type frame 1 lifting, hanger 6 is set and makes other equipment and being connected of door type frame 1 more convenient, reliable.
Finally explanation is, above embodiment is only unrestricted in order to technical scheme of the present invention to be described, although the present invention is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify or be equal to replacement technical scheme of the present invention, and not departing from aim and the scope of technical solution of the present invention, it all should be encompassed in the middle of claim scope of the present invention.

Claims (4)

1. a beam body docking assembly tooling, is characterized in that: comprise door type frame, back-up block and lifting apparatus, described back-up block is arranged at door type frame bottom and is positioned at for supporting the end that door type frame inner side needs to dock the workpiece assembling; Described lifting apparatus is for making the end of workpiece lift flat docking to major general's back-up block with respect to the end lifting of workpiece; Described door type frame is made up of crossbeam, support I and support II, and the inside top that is positioned at support I and support II is respectively provided with a fixed pulley; Described lifting apparatus is arranged at crossbeam below for being supported between workpiece and crossbeam and jack-up door type frame.
2. beam body docking assembly tooling according to claim 1, it is characterized in that: described back-up block comprises dismountable back-up block I and dismountable back-up block II that is connected in support II bottom that is connected in support I bottom, and described lifting apparatus is used for door type frame entirety with respect to the end lifting of workpiece and then drive back-up block I and the lifting of back-up block II.
3. beam body docking assembly tooling according to claim 2, is characterized in that: described lifting apparatus is jack.
4. beam body docking assembly tooling according to claim 3, is characterized in that: be positioned at crossbeam middle part and be provided with hanger.
CN201110399041.9A 2011-12-05 2011-12-05 Beam body butting assembly fixture Active CN102513958B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110399041.9A CN102513958B (en) 2011-12-05 2011-12-05 Beam body butting assembly fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110399041.9A CN102513958B (en) 2011-12-05 2011-12-05 Beam body butting assembly fixture

Publications (2)

Publication Number Publication Date
CN102513958A CN102513958A (en) 2012-06-27
CN102513958B true CN102513958B (en) 2014-07-16

Family

ID=46285166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110399041.9A Active CN102513958B (en) 2011-12-05 2011-12-05 Beam body butting assembly fixture

Country Status (1)

Country Link
CN (1) CN102513958B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105195557A (en) * 2015-10-16 2015-12-30 重庆宝汇建筑材料有限公司 Cross steel column end correction device convenient to transfer
CN105215920B (en) * 2015-10-30 2017-09-08 大连志远鹏富船舶科技有限公司 Plane of submarine by CFD rib is made without code frock

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1154230A1 (en) * 2000-05-09 2001-11-14 Snap-On Deutschland Holding GmbH Device and method for measuring a vehicle chassis
CN201395467Y (en) * 2008-12-23 2010-02-03 巨力索具股份有限公司 Rotary crossing hanger
CN101695984A (en) * 2009-09-28 2010-04-21 中铁八局集团第一工程有限公司 Assembly method and assembly lifting appliance of vertical beam and horizontal beam under arc of midheight deck steel pipe concrete arch bridge
CN101886720A (en) * 2010-06-30 2010-11-17 广东省基础工程公司 Device for shifting and butting large-caliber and large-tonnage pipes in pipe pit

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11254343A (en) * 1998-03-11 1999-09-21 Toshiba Fa Syst Eng Corp Tank docking device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1154230A1 (en) * 2000-05-09 2001-11-14 Snap-On Deutschland Holding GmbH Device and method for measuring a vehicle chassis
CN201395467Y (en) * 2008-12-23 2010-02-03 巨力索具股份有限公司 Rotary crossing hanger
CN101695984A (en) * 2009-09-28 2010-04-21 中铁八局集团第一工程有限公司 Assembly method and assembly lifting appliance of vertical beam and horizontal beam under arc of midheight deck steel pipe concrete arch bridge
CN101886720A (en) * 2010-06-30 2010-11-17 广东省基础工程公司 Device for shifting and butting large-caliber and large-tonnage pipes in pipe pit

Also Published As

Publication number Publication date
CN102513958A (en) 2012-06-27

Similar Documents

Publication Publication Date Title
KR20120114465A (en) Board fixed device for hull block welding
CN101987651B (en) Assembling method and assembling bracket of total segments of small ship
CN106734400A (en) A kind of automobile handware bender
CN101249927A (en) Mounting and dismounting method for gantry crane
CN110901851A (en) Ship large-scale equipment broadside installation device
CN102513958B (en) Beam body butting assembly fixture
CN105946104B (en) A kind of die station tipper
CN103601078B (en) Suspension type hanging device
JP5473294B2 (en) Overhead crane installation method and installation system
CN202244429U (en) Bracket for assembly and translation of bulk carrier superstructure
CN103935910A (en) Climbing device for internal-climbing tower crane
CN206970027U (en) Main frame jack up unit
CN205329443U (en) Rail lifting devices
CN108583404A (en) Cloud type rail carry vehicle
CN205329558U (en) It becomes straddle mounting trigger not have to dismantle
CN210025139U (en) Wheel pulling device
KR200358812Y1 (en) Diaghragm Maintenance worktable of steam turbine
CN202481964U (en) Truss arm butt-joint structure and truss arm comprising same and truss arm crane
CN205873699U (en) Change composite set of crane wheel
CN104259808A (en) Offshore derrick splicing and integrally hanging boarding method
CN220538443U (en) Integral type longitudinal moving device for simply supported beam bridge template
CN210561732U (en) Movable type bent cap support
CN204588479U (en) The track structure of ton Moveable door type hoisting crane
CN217345969U (en) Trolley for processing railway passenger station assembly type canopy plate
CN219547598U (en) Bridge support maintenance device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190415

Address after: 408000 Shuanghekou, Ma'an Street, Fuling District, Chongqing

Patentee after: Chongqing Chuanchuan Daye Steel Structure Co., Ltd.

Address before: 408102 Shuanghekou, Lidu Town, Fuling District, Chongqing

Patentee before: Chongqing Chuandong Shipbuilding Heavy Industry Corporation

TR01 Transfer of patent right