CN102505733A - 双层式泵闸布置结构 - Google Patents

双层式泵闸布置结构 Download PDF

Info

Publication number
CN102505733A
CN102505733A CN2011103619132A CN201110361913A CN102505733A CN 102505733 A CN102505733 A CN 102505733A CN 2011103619132 A CN2011103619132 A CN 2011103619132A CN 201110361913 A CN201110361913 A CN 201110361913A CN 102505733 A CN102505733 A CN 102505733A
Authority
CN
China
Prior art keywords
lock
pump
gate
water
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103619132A
Other languages
English (en)
Other versions
CN102505733B (zh
Inventor
卢永金
周金明
潘世虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Water Engineering Design and Research Institute Co Ltd
Original Assignee
Shanghai Water Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Water Engineering Design and Research Institute Co Ltd filed Critical Shanghai Water Engineering Design and Research Institute Co Ltd
Priority to CN201110361913.2A priority Critical patent/CN102505733B/zh
Publication of CN102505733A publication Critical patent/CN102505733A/zh
Application granted granted Critical
Publication of CN102505733B publication Critical patent/CN102505733B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)
  • Barrages (AREA)

Abstract

本发明公开的双层泵闸布置结构,包括泵站站身与水闸闸室合二为一的混凝土结构,在混凝土结构内设置有泵站站身、泵站前池、出水池,在泵站站身内设置有站身自流道和安装有水泵,站身自流道通过水泵;在站身自流道的进口处设置有泵站进水流道闸门,出口处设置有开泵工作闸门和停泵工作闸门;其在站身自流道的下方设置有构建闸室的闸涵孔,闸涵孔的进口外设置有与泵站前池共用的水闸前池,在闸涵孔的出口外设置有与出水池共用的消力池,并在闸涵孔的出口前方设置有涵闸门。本发明特别适用于泵、闸枢纽场地和进出水引渠宽度受限制的情况,如中心城区、江(河)心动力提升和自流相结合的取水。

Description

双层式泵闸布置结构
技术领域
本发明涉及水利工程技术领域,特别涉及泵站与水闸结合的一种紧密布置方式,尤其涉及一种双层式泵闸布置结构,该布置结构特别适用于泵、闸枢纽场地和进出水引渠宽度受限制的情况,如中心城区、江(河)心动力提升和自流相结合的取水。
背景技术
泵站和水闸是水利工程中常用的水工建筑物,两种经常布置在一起,以实现对同一水体的动力提升或自流引排水需要。两者布置在一起的方式有站身、闸身分离的独立布置,有站身和闸身相连的并列结合式布置。并列结合式布置又有泵站和水闸集中于一侧的单侧布置,泵站在中间、水闸分列两侧或水闸在中间、泵站分列两侧的对称式布置等平面结合的方式。平面结合的并列结合式布置较泵闸分离独立布置,结构紧凑占地少,但在场地极为狭小,或进出水渠很窄且难以拓宽,或进水为管道且管道不便分汊时,平面结合的并列布置仍难以满足要求。本发明就是针对场地或进出水引渠(管)限制极为苛刻的情况提出的一个解决方案。
发明内容
本发明所要解决的技术问题在于针对现有站身和闸身相连的并列结合式布置方式所存在的不足而提供一种将常规的泵站站身与水闸闸室合二为一,站身自流道进口至流道出口下方布置水闸过流通道(涵),泵站前池和出水池与水闸的前池和消力池共用,在站(闸)身段形成竖向结合的双层泵闸布置结构。
本发明所要解决的技术问题可以通过以下技术方案来实现:
双层泵闸布置结构,包括泵站站身与水闸闸室合二为一的混凝土结构,在所述混凝土结构内设置有泵站站身、泵站前池、出水池,在所述泵站站身内设置有站身自流道,其中所述泵站前池设置在站身自流道进口的前侧,出水池设置在站身自流道出口的后侧,在所述泵站站身内安装有水泵,所述站身自流道通过水泵;在站身自流道的进口处设置有泵站进水流道闸门,在站身自流道的出口处设置有开泵工作闸门和停泵工作闸门,停泵工作闸门位于开泵工作闸门之后;其特征在于,在所述站身自流道的下方设置有构建闸室的闸涵孔,所述闸涵孔的进口外设置有与所述泵站前池共用的水闸前池,在闸涵孔的出口外设置有与所述出水池共用的消力池,并在闸涵孔的出口前方设置有涵闸门。
在本发明的一个优选实施例中,在所述站身自流道进口的前侧设置有拦污栅,所述闸涵孔的进口设置在所述拦污栅之前。
在本发明的一个优选实施例中,所述闸涵孔的出口设置在所述停泵工作闸门之后。
在本发明的一个优选实施例中,所述闸涵孔的宽度不大于站身自流道中的水泵进水流道的净宽,闸涵孔的净高由站身自流道的引排水断面需求确定。
在本发明的一个优选实施例中,在所述混凝土结构内设置有若干台水泵机组,每一台水泵均设置有站身流道;在每一台水泵流道的进口处设置有泵站进水流道闸门,在每一台水泵流道的出口处设置有开泵工作闸门和停泵工作闸门,停泵工作闸门位于开泵工作闸门之后;每一泵站站身两侧的隔墙向下延伸进入所述闸涵孔,将所述闸涵孔分隔成与水泵台数相当的闸涵分孔;闸涵分孔的宽度不大于对应的站身自流道中的水泵进水流道的净宽,闸涵分孔的净高由对应的站身自流道的引排水断面需求确定;每一闸涵孔的出口前方设置有涵闸门。
在结构受力需要时,可在每一闸涵分孔内设隔墙或隔墩。
由于采用了如上结构,本发明相对现有技术而言,基坑开挖深度加深,但基坑围护范围减小,因此特别适用于泵、闸枢纽场地和进出水引渠宽度受限制的情况,如中心城区、江(河)心动力提升和自流相结合的取水。
附图说明
图1为本发明双层式泵闸布置结构在水泵提水时的流路示意图。
图2为本发明双层式泵闸布置结构在闸涵过水时的流路示意图。
具体实施方式
为了使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体图示,进一步阐述本发明。
参见图1和图2,图中所示的双层式泵闸布置结构,包括泵站站身与水闸闸室合二为一的混凝土结构100,在混凝土结构100内设置有若干台水泵机组110,泵站前池120、出水池130,每一泵站站身110内均设置有站身流道140,并安装有水泵150,每一站身流道140通过对应的水泵150。
泵站前池120设置在所有站身流道140进口141的前侧,出水池设130置在站身流道140出口142的后侧。
在每一站身流道140的进口141处设置有泵站进水流道闸门160,出口142处设置有开泵工作闸门170和停泵工作闸门180,停泵工作闸门180位于开泵工作闸门170之后;每一泵站站身110两侧的隔墙向下延伸进入闸涵孔,将闸涵孔分隔成与水泵150台数相当的闸涵分孔200;闸涵分孔200的宽度不大于对应的站身流道140中的水泵进水流道143的净宽,闸涵分孔200的净高由对应的站身流道140的引排水断面需求确定。
所有闸涵分孔200的进口210外设置有与泵站前池120共用的水闸前池,所有闸涵分孔200的出口220外设置有与出水池130共用的消力池。
在每一闸涵分孔200的出口220前方设置有涵闸门230。每一闸涵分孔200的出口220设置在停泵工作闸门180之后。
在站身流道140进口141的前侧设置有拦污栅300,闸涵分孔200的进口210设置在拦污栅300之前。
在结构受力需要时,可在每一闸涵分孔200内设隔墙或隔墩。
本发明的工作方法是:参见图1,在泵站前池120的水位低于出水池130的水位时,这时,关闭涵闸门230,开始开泵工作闸门170和停泵工作闸门180,并启动水泵150提水,在水泵150的作用下,泵站前池120的水由站身自流道110的进口141流向出口142,再流入出水池130。
参见图2,在泵站前池120的水位高于出水池130的水位时,关闭水泵150、开泵工作闸门170和停泵工作闸门180,开启涵闸门230,泵站前池120的水由各个闸涵分孔200的进口210流向出口220,再流入出水池130。
以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等同物界定。

Claims (5)

1.双层泵闸布置结构,包括泵站站身与水闸闸室合二为一的混凝土结构,在所述混凝土结构内设置有泵站站身、泵站前池、出水池,在所述泵站站身内设置有站身自流道,其中所述泵站前池设置在站身自流道进口的前侧,出水池设置在站身自流道出口的后侧,在所述泵站站身内安装有水泵,所述站身流道通过水泵;在站身流道的进口处设置有泵站进水流道闸门,在站身流道的出口处设置有开泵工作闸门和停泵工作闸门,停泵工作闸门位于开泵工作闸门之后;其特征在于,在所述站身流道的下方设置有构建闸室的闸涵孔,所述闸涵孔的进口外设置有与所述泵站前池共用的水闸前池,在闸涵孔的出口外设置有与所述出水池共用的消力池,并在闸涵孔的出口前方设置有涵闸门。
2.如权利要求1所述的双层泵闸布置结构,其特征在于,在所述站身流道进口的前侧设置有拦污栅,所述闸涵孔的进口设置在所述拦污栅之前。
3.如权利要求1所述的双层泵闸布置结构,其特征在于,所述闸涵孔的出口设置在所述停泵工作闸门之后。
4.如权利要求1所述的双层泵闸布置结构,其特征在于,所述闸涵孔的宽度不大于站身自流道中的水泵进水流道的净宽,闸涵孔的净高由站身自流道的引排水断面需求确定。
5.如权利要求1所述的双层泵闸布置结构,其特征在于,在所述混凝土结构内设置有若干台水泵机组,每一台泵机组两侧的隔墙向下延伸进入所述闸涵孔,将所述闸涵孔分隔成与水泵台数相当的闸涵分孔;闸涵分孔的宽度不大于对应的站身自流道中的水泵进水流道的净宽,结构受力需要时,可在每一闸涵分孔内设隔墙或隔墩;闸涵分孔的净高由对应的站身自流道的引排水断面需求确定;每一闸涵孔的出口前方设置有涵闸门。
CN201110361913.2A 2011-11-15 2011-11-15 双层式泵闸布置结构 Active CN102505733B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110361913.2A CN102505733B (zh) 2011-11-15 2011-11-15 双层式泵闸布置结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110361913.2A CN102505733B (zh) 2011-11-15 2011-11-15 双层式泵闸布置结构

Publications (2)

Publication Number Publication Date
CN102505733A true CN102505733A (zh) 2012-06-20
CN102505733B CN102505733B (zh) 2014-04-16

Family

ID=46217860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110361913.2A Active CN102505733B (zh) 2011-11-15 2011-11-15 双层式泵闸布置结构

Country Status (1)

Country Link
CN (1) CN102505733B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155621A (zh) * 2015-09-24 2015-12-16 扬州大学 一种将单用途泵站改造为多用途泵站的施工方法和应用
CN105178257A (zh) * 2015-09-06 2015-12-23 苏州汇诚智造工业设计有限公司 笼式泵站闸门拦污栅及其施工和使用方法
CN105369779A (zh) * 2015-11-12 2016-03-02 李春劲 防洪闸与排涝泵站一体结构
CN109371922A (zh) * 2018-11-22 2019-02-22 浙江省水利水电勘测设计院 一种泵闸结合排水结构

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1513971A1 (ru) * 1987-08-17 1992-06-07 V A Belotelov Насосная станция подъем/; жидкости
HUP9702466A1 (hu) * 1997-12-12 2000-05-28 FÖMTERV Fővárosi Mérnöki Tervező Rt. Egyesített elrendezésű térszint alatti szivattyúgépház
CN2444876Y (zh) * 2000-08-18 2001-08-29 何富荣 双向浮动泵站
CN202324058U (zh) * 2011-11-15 2012-07-11 上海市水利工程设计研究院 双层泵闸布置结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1513971A1 (ru) * 1987-08-17 1992-06-07 V A Belotelov Насосная станция подъем/; жидкости
HUP9702466A1 (hu) * 1997-12-12 2000-05-28 FÖMTERV Fővárosi Mérnöki Tervező Rt. Egyesített elrendezésű térszint alatti szivattyúgépház
CN2444876Y (zh) * 2000-08-18 2001-08-29 何富荣 双向浮动泵站
CN202324058U (zh) * 2011-11-15 2012-07-11 上海市水利工程设计研究院 双层泵闸布置结构

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
梁民阳,熊孟果: "水闸与泵站合建的一种新的布置形式", 《中国农村水利水电》 *
王爱芬: "常熟枢纽闸站合一工程的优化调度运用", 《江苏水利》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178257A (zh) * 2015-09-06 2015-12-23 苏州汇诚智造工业设计有限公司 笼式泵站闸门拦污栅及其施工和使用方法
CN105155621A (zh) * 2015-09-24 2015-12-16 扬州大学 一种将单用途泵站改造为多用途泵站的施工方法和应用
CN105155621B (zh) * 2015-09-24 2017-03-15 扬州大学 一种将单用途泵站改造为多用途泵站的施工方法
CN105369779A (zh) * 2015-11-12 2016-03-02 李春劲 防洪闸与排涝泵站一体结构
CN105369779B (zh) * 2015-11-12 2017-10-17 李春劲 防洪闸与排涝泵站一体结构
CN109371922A (zh) * 2018-11-22 2019-02-22 浙江省水利水电勘测设计院 一种泵闸结合排水结构
CN109371922B (zh) * 2018-11-22 2023-09-26 浙江省水利水电勘测设计院有限责任公司 一种泵闸结合排水结构

Also Published As

Publication number Publication date
CN102505733B (zh) 2014-04-16

Similar Documents

Publication Publication Date Title
CN202324058U (zh) 双层泵闸布置结构
CN102505733A (zh) 双层式泵闸布置结构
CN103410130A (zh) 一种多用途隧洞布置结构
CN207582409U (zh) 一种可实现交叉河道换排水的泵站结构
CN110145011A (zh) 一种竖井与深隧衔接结构
KR101286623B1 (ko) 세정형 하향식 수문
CN204645011U (zh) 单侧主廊道-横支廊道-顶支孔船闸分散输水系统
CN104878823B (zh) 一种合流管道初期雨水截流蓄排系统及蓄排方法
CN205475436U (zh) 一种强适应性自然渗流过滤双重取水系统
JP5622113B2 (ja) ポンプユニット
CN205712294U (zh) 一种油田用河水供水系统
CN205348101U (zh) 一种储水防洪装置
CN101153482A (zh) 地上梯级水库及其建造方法
CN109853492B (zh) 闸阀管道式过鱼方法
CN203769036U (zh) 一种合流管道初期雨水截流蓄排系统
CN103397681B (zh) 一种核电站高泥沙海水联合泵房布置方法
CN204151847U (zh) 循环水系统及其虹吸井
CN105155621B (zh) 一种将单用途泵站改造为多用途泵站的施工方法
CN206538731U (zh) 一种具有多次消波功能的泄洪防波堤
CN109469025A (zh) 一种用于高坝逐级挡水放空系统的溢水廊道系统
CN108560694A (zh) 具有试车功能的雨水泵站
CN220225153U (zh) 一种解决生态基流的结构
CN214940869U (zh) 多通道侧堰式截污溢流井
CN210636389U (zh) 景观型立式安装潜水泵一体化泵闸
JP2013044274A (ja) ポンプユニット

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI WATER ENGINEERING DESIGN + RESEARCH INSTI

Free format text: FORMER NAME: SHANGHAI WATER ENGINEERING DESIGN + RESEARCH INSTITUTE

CP03 Change of name, title or address

Address after: 200000 No. 193, Hankou Road, Shanghai, Huangpu District

Patentee after: Shanghai Water Engineering Design & Research Institute Co., Ltd.

Address before: 200061 Shanghai Putuo District City Huachi Road 58 Lane 3 Building

Patentee before: Shanghai Water Engineering Design & Research Institute