CN102500523A - Low-friction spraying process for escalator skirt board - Google Patents

Low-friction spraying process for escalator skirt board Download PDF

Info

Publication number
CN102500523A
CN102500523A CN2011102881382A CN201110288138A CN102500523A CN 102500523 A CN102500523 A CN 102500523A CN 2011102881382 A CN2011102881382 A CN 2011102881382A CN 201110288138 A CN201110288138 A CN 201110288138A CN 102500523 A CN102500523 A CN 102500523A
Authority
CN
China
Prior art keywords
workpiece
gets
spraying
seconds
coating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102881382A
Other languages
Chinese (zh)
Other versions
CN102500523B (en
Inventor
罗爱明
关泽营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IFE Elevators Co Ltd
Original Assignee
IFE Elevators Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IFE Elevators Co Ltd filed Critical IFE Elevators Co Ltd
Priority to CN2011102881382A priority Critical patent/CN102500523B/en
Publication of CN102500523A publication Critical patent/CN102500523A/en
Application granted granted Critical
Publication of CN102500523B publication Critical patent/CN102500523B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention relates to the technical field of spraying processes, in particular to a low-friction spraying process for an escalator skirt board, which adopts the whole process flow that: after being degreased, derusted, acid-washed, phosphated, washed, dried and the like, a workpiece satisfies the spraying requirements; and then the workpiece is sprayed with low-friction powder and is solidified after spraying, so that a coating layer with low friction coefficient is formed on the surface of the workpiece. Therefore, the escalator skirt board satisfies the corresponding requirements in the EN115-2008 standards.

Description

The low friction of staircase skirtboard spraying coating process
Technical field:
The present invention relates to the spraying coating process technical field, relate in particular to the low friction of staircase skirtboard spraying coating process.
Background technology:
Staircase is a kind of circular flow step that has; The fixedly driven by power equipment of conveying people is used for tilting up or down; Its structure is mainly by step, step driving unit, driving host, drive disk assembly, nervous device, armrest system, metal structure, step roller track, cover plate, fishback, safety device and the electrical part parts that grade are formed up and down; Has continuous operation; The characteristics that freight volume is big are widely used in the vertical transport of the public places such as subway, light rail, station, airport, harbour, shop and mansion that the stream of people concentrates.
In staircase EN115-2008 standard-required 5.5.3.4 bar; Require escalator should reduce the possibility that stagnates and hinder between its step and the apron plate; D wherein) point requires below apron clamp preventer, to use suitable material or suitable lining face, and purpose makes the coefficient of friction of itself and leather, PVC and rubber less than 0.45.In the existing staircase skirtboard production technology, be difficult to accomplish the requirement of above standard.
Summary of the invention:
The objective of the invention is to be directed against the deficiency of prior art and provide a kind of staircase skirtboard the low spraying coating process that rubs, make the staircase skirtboard satisfy the corresponding requirements of staircase EN115-2008 standard.
For realizing above-mentioned purpose, the present invention adopts following technical scheme:
The low friction of staircase skirtboard spraying coating process, it may further comprise the steps:
Step 1, degreasing: earlier standard workpiece working index value is arrived in the parameter adjustment of the degreasing working solution in the degreasing bath; Then workpiece is hung in the degreasing bath, guarantee that the degreasing working solution did not have workpiece 10cm; Reach the regulation degreasing time, take out workpiece in the degreasing bath and put into rinsing bowl and clean the back and observe moisture film and change, occur, then get into step 2 like moisture film crack-free situation after 30 seconds;
Step 2, washing: open the recirculated water tap, in rinsing bowl one, put into workpiece and dynamically clean, scavenging period is no less than 60 seconds, gets into step 3;
Step 3, whether rust cleaning or pickling: observing workpiece has rust, has rust then to change rust cleaning in the rust cleaning groove over to, and the rust cleaning back gets into step 4; Rustlessly then carry out pickling, get into step 4 after the pickling;
Step 4, washing: open the recirculated water tap, in rinsing bowl two, put into workpiece and dynamically clean, scavenging period is no less than 60 seconds, gets into step 5;
Step 5, neutralization: in the neutralization chamber, arrive standard workpiece working index value earlier with the parameter adjustment of working solution; Put into workpiece and dynamically clean, the time is no less than 60 seconds, gets into step 6;
Step 6, table is transferred: the parameter adjustment that will show to transfer the table accent working solution in the groove earlier is to standard workpiece working index value; Put into workpiece and dynamically clean, the time is no less than 60 seconds, gets into step 7;
Step 7, phosphatization: earlier standard workpiece working index value is arrived in the parameter adjustment of the phosphatization working solution in the phosphatization groove; Put into workpiece and dynamically clean, the time is no less than 15-20 minute, gets into step 8;
Step 8, washing: open the recirculated water tap, in rinsing bowl three, put into workpiece and dynamically clean, scavenging period is no less than 60 seconds, gets into step 9;
Step 9, washing: open the recirculated water tap, in rinsing bowl four, put into workpiece and dynamically clean, scavenging period is no less than 60 seconds, gets into step 10;
Step 10, oven dry: in 100 ℃ of-140 ℃ of temperature environments, workpiece is dried, drying time is 10-20 minute, gets into step 11;
Step 11, dedusting: with the antistatic rag workpiece is carried out wiping earlier; Carry out dedusting with hairbrush then; With compressed air surface of the work is cleaned again; Get into step 12;
Step 12, inspection before the spraying: whether the inspection workpiece meets the spraying standard, gets into step 13;
Step 13, spraying: if the workpiece material is a galvanized sheet, then use the trade mark to dust as dusting coating as the low friction black of I53690052250, coating thickness is 2mm; If the workpiece material is the hairline stainless steel, then use the trade mark to dust as dusting coating as the low friction of I536-0053 2200 is transparent, coating thickness is 1.5mm; The spraying back gets into step 14;
Step 14, inspection before solidifying: inspection Workpiece painting situation gets into step 15;
Step 15 is solidified: preset the solidification temperature and the constant temperature time of curing oven, workpiece is placed in the curing oven solidify; Solidify the back that finishes and get into step 10 six;
Step 10 six, product examination: comprise the observation workpieces surface condition, detect coating layer thickness, detect coating hardness, detect coating adhesion; Get into step 10 seven;
Step 10 seven, packing: the spraying workpiece must be isolated product with the pearl cotton behind the first pasting protective film again, packs then or cases;
Above-mentioned workpiece is the staircase skirtboard.
For preventing to go here and there liquid, said step 1 is to step 9, and each step needs the first drop workpiece liquid next step of being allowed for access to the greatest extent.
Said step 12, inspection before the said spraying, for inspection workpiece phosphating coat whether careful, closely knit and complete, and whether non-secondary pollution and no rusty stain.
Inspection before the said step 14, said curing, whether evenly smooth for inspection Workpiece painting face, whether do not have the spray of leakage, tong mark and people and be the grazing vestige.
Beneficial effect of the present invention is:
The low friction of staircase skirtboard of the present invention spraying coating process; After its whole process flow has carried out comprising that to workpiece degreasing, rust cleaning, pickling, phosphatization, washing, oven dry etc. are handled; Make workpiece satisfy the spraying requirement, to the low friction powder-spraying of Workpiece painting, carried out cured after the spraying again; Make surface of the work be formed with the coating of low-friction coefficient, make the staircase skirtboard satisfy the corresponding requirements of staircase EN115-2008 standard.
The specific embodiment:
Mode the present invention with embodiment is further described below:
The low friction of staircase skirtboard according to the invention spraying coating process, it may further comprise the steps:
Step 1, degreasing: earlier standard workpiece working index value is arrived in the parameter adjustment of the degreasing working solution in the degreasing bath; Then workpiece is hung in the degreasing bath, guarantee that the degreasing working solution did not have workpiece 10cm; Reach the regulation degreasing time, take out workpiece in the degreasing bath and put into rinsing bowl and clean the back and observe moisture film and change, occur, then get into step 2 like moisture film crack-free situation after 30 seconds; Further, in the step 1, need the workpiece that in the degreasing working solution, teetertotters of not timing, make degreasing effect reach best.
Step 2, washing: open the recirculated water tap, in rinsing bowl one, put into workpiece and dynamically clean, scavenging period is no less than 60 seconds, gets into step 3; Further, in the step 2, to observe also whether the tank liquor surface has pollution in the rinsing bowl one, have then and need handle.
Step 3, whether rust cleaning or pickling: observing workpiece has rust, has rust then to change rust cleaning in the rust cleaning groove over to, and the rust cleaning back gets into step 4; Rustlessly then carry out pickling, get into step 4 after the pickling; Further, in the step 3, to observe also whether the tank liquor surface has pollution in rust cleaning groove or the descaling bath, have then and need handle, will confirm also that in addition tank liquor is whether in operating temperature range.
Step 4, washing: open the recirculated water tap, in rinsing bowl two, put into workpiece and dynamically clean, scavenging period is no less than 60 seconds, gets into step 5; Further, in the step 4, to observe also whether the tank liquor surface has pollution in the rinsing bowl two, have then and need handle.
Step 5, neutralization: in the neutralization chamber, arrive standard workpiece working index value earlier with the parameter adjustment of working solution; Put into workpiece and dynamically clean, the time is no less than 60 seconds, gets into step 6; Further, in the step 5, with the working solution surface whether pollution is arranged in also will observing in the neutralization chamber, have then and need handle.
Step 6, table is transferred: the parameter adjustment that will show to transfer the table accent working solution in the groove earlier is to standard workpiece working index value; Put into workpiece and dynamically clean, the time is no less than 60 seconds, gets into step 7; Further, in the step 6, also to transfer whether table accent working solution surface has pollution in the groove by the observation table, have then and need handle.
Step 7, phosphatization: earlier standard workpiece working index value is arrived in the parameter adjustment of the phosphatization working solution in the phosphatization groove; Put into workpiece and dynamically clean, the time is no less than 15-20 minute, gets into step 8; Further, in the step 7, to observe also whether phosphatization working solution surface has pollution in the phosphatization groove, have then and need handle.
Step 8, washing: open the recirculated water tap, in rinsing bowl three, put into workpiece and dynamically clean, scavenging period is no less than 60 seconds, gets into step 9; Further, in the step 8, to observe also whether the tank liquor surface has pollution in the rinsing bowl three, have then and need handle.
Step 9, washing: open the recirculated water tap, in rinsing bowl four, put into workpiece and dynamically clean, scavenging period is no less than 60 seconds, gets into step 10; Further, in the step 9, to observe also whether the tank liquor surface has pollution in the rinsing bowl four, have then and need handle.
Step 10, oven dry: in 100 ℃ of-140 ℃ of temperature environments, workpiece is dried, drying time is 10-20 minute, gets into step 11.
For preventing to go here and there liquid, said step 1 is to step 9, and each step needs the first drop workpiece liquid next step of being allowed for access to the greatest extent.
Step 11, dedusting: with the antistatic rag workpiece is carried out wiping earlier; Carry out dedusting with hairbrush then; With compressed air surface of the work is cleaned again; Get into step 12.
Step 12, inspection before the spraying: whether the inspection workpiece meets the spraying standard, gets into step 13.Further, inspection before the said spraying, whether careful, closely knit and complete for inspection workpiece phosphating coat, whether and non-secondary pollution and no rusty stain help guaranteeing yield of products.
Step 13, spraying: if the workpiece material is a galvanized sheet, then use the trade mark to dust as dusting coating as the low friction black of I53690052250, coating thickness is 2mm; If the workpiece material is the hairline stainless steel, then use the trade mark to dust as dusting coating as the low friction of I536-0053 2200 is transparent, coating thickness is 1.5mm; The spraying back gets into step 14; Further, need adjustment spraying field temperature, rate of air circulation to reach production requirement before the spraying.Wherein, Preferably; The supplier of sprayed coating is Jiangsu Marine Victory Coating Co., Ltd., and the said firm is and the German BASF Relius Coatings Gmbh & Co. of wholly-owned subsidiary the coating material production enterprise of family's specialty that the KG technological cooperation is set up; Also be German Relius company in the coating material production base of China, above-mentioned coating meets the standard-required of international environment.
Step 14, inspection before solidifying: inspection Workpiece painting situation gets into step 15; Further, inspection before the said curing, whether evenly smooth for inspection Workpiece painting face, whether there are not the spray of leakage, tong mark and people for the grazing vestige, help guaranteeing yield of products.
Step 15 is solidified: preset the solidification temperature and the constant temperature time of curing oven, workpiece is placed in the curing oven solidify; Solidify the back that finishes and get into step 10 six;
Step 10 six, product examination: comprise the observation workpieces surface condition, detect coating layer thickness, detect coating hardness, detect coating adhesion; Get into step 10 seven;
Step 10 seven, packing: the spraying workpiece must be isolated product with the pearl cotton behind the first pasting protective film again, packs then or cases;
The low friction of above-mentioned staircase skirtboard spraying coating process; Its whole process flow makes workpiece satisfy the spraying requirement after workpiece has been carried out comprising that degreasing, rust cleaning, pickling, phosphatization, washing, oven dry etc. are handled, again to the low friction powder-spraying of Workpiece painting; Carried out cured after the spraying; Make surface of the work be formed with the coating of low-friction coefficient, make the staircase skirtboard satisfy the corresponding requirements of staircase EN115-2008 standard, the coefficient of friction that makes itself and leather, PVC and rubber is less than 0.45.
Staircase skirtboard character by after the low friction of the staircase skirtboard according to the invention spraying coating process spray treatment sees the following form:
Figure BSA00000581045200071
Figure BSA00000581045200081
The above only is a preferred embodiments of the present invention, so all equivalences of doing according to the described structure of patent claim of the present invention, characteristic and principle change or modify, includes in patent claim of the present invention.

Claims (4)

1. the staircase skirtboard hangs down the friction spraying coating process, it is characterized in that it may further comprise the steps:
Step 1, degreasing: earlier standard workpiece working index value is arrived in the parameter adjustment of the degreasing working solution in the degreasing bath; Then workpiece is hung in the degreasing bath, guarantee that the degreasing working solution did not have workpiece 10cm; Reach the regulation degreasing time, take out workpiece in the degreasing bath and put into rinsing bowl and clean the back and observe moisture film and change, occur, then get into step 2 like moisture film crack-free situation after 30 seconds;
Step 2, washing: open the recirculated water tap, in rinsing bowl one, put into workpiece and dynamically clean, scavenging period is no less than 60 seconds, gets into step 3;
Step 3, whether rust cleaning or pickling: observing workpiece has rust, has rust then to change rust cleaning in the rust cleaning groove over to, and the rust cleaning back gets into step 4; Rustlessly then carry out pickling, get into step 4 after the pickling;
Step 4, washing: open the recirculated water tap, in rinsing bowl two, put into workpiece and dynamically clean, scavenging period is no less than 60 seconds, gets into step 5;
Step 5, neutralization: in the neutralization chamber, arrive standard workpiece working index value earlier with the parameter adjustment of working solution; Put into workpiece and dynamically clean, the time is no less than 60 seconds, gets into step 6;
Step 6, table is transferred: the parameter adjustment that will show to transfer the table accent working solution in the groove earlier is to standard workpiece working index value; Put into workpiece and dynamically clean, the time is no less than 60 seconds, gets into step 7;
Step 7, phosphatization: earlier standard workpiece working index value is arrived in the parameter adjustment of the phosphatization working solution in the phosphatization groove; Put into workpiece and dynamically clean, the time is no less than 15-20 minute, gets into step 8;
Step 8, washing: open the recirculated water tap, in rinsing bowl three, put into workpiece and dynamically clean, scavenging period is no less than 60 seconds, gets into step 9;
Step 9, washing: open the recirculated water tap, in rinsing bowl four, put into workpiece and dynamically clean, scavenging period is no less than 60 seconds, gets into step 10;
Step 10, oven dry: in 100 ℃ of-140 ℃ of temperature environments, workpiece is dried, drying time is 10-20 minute, gets into step 11;
Step 11, dedusting: with the antistatic rag workpiece is carried out wiping earlier; Carry out dedusting with hairbrush then; With compressed air surface of the work is cleaned again; Get into step 12;
Step 12, inspection before the spraying: whether the inspection workpiece meets the spraying standard, gets into step 13;
Step 13, spraying: if the workpiece material is a galvanized sheet, then use the trade mark to dust as dusting coating as the low friction black of I53690052250, coating thickness is 2mm; If the workpiece material is the hairline stainless steel, then use the trade mark to dust as dusting coating as the low friction of I536-0053 2200 is transparent, coating thickness is 1.5mm; The spraying back gets into step 14;
Step 14, inspection before solidifying: inspection Workpiece painting situation gets into step 15;
Step 15 is solidified: preset the solidification temperature and the constant temperature time of curing oven, workpiece is placed in the curing oven solidify; Solidify the back that finishes and get into step 10 six;
Step 10 six, product examination: comprise the observation workpieces surface condition, detect coating layer thickness, detect coating hardness, detect coating adhesion; Get into step 10 seven;
Step 10 seven, packing: the spraying workpiece must be isolated product with the pearl cotton behind the first pasting protective film again, packs then or cases;
Above-mentioned workpiece is the staircase skirtboard.
2. the low friction of staircase skirtboard according to claim 1 spraying coating process is characterized in that: for preventing to go here and there liquid, said step 1 is to step 9, and each step needs the first drop workpiece liquid next step of being allowed for access to the greatest extent.
3. the low friction of staircase skirtboard according to claim 1 spraying coating process is characterized in that: inspection before the said step 12, said spraying, for inspection workpiece phosphating coat whether careful, closely knit and complete, and whether non-secondary pollution and no rusty stain.
4. the low friction of staircase skirtboard according to claim 3 spraying coating process is characterized in that: inspection before the said step 14, said curing, and whether evenly smooth for inspection Workpiece painting face, whether do not have the spray of leakage, tong mark and people and be the grazing vestige.
CN2011102881382A 2011-09-23 2011-09-23 Low-friction spraying process for escalator skirt board Active CN102500523B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102881382A CN102500523B (en) 2011-09-23 2011-09-23 Low-friction spraying process for escalator skirt board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102881382A CN102500523B (en) 2011-09-23 2011-09-23 Low-friction spraying process for escalator skirt board

Publications (2)

Publication Number Publication Date
CN102500523A true CN102500523A (en) 2012-06-20
CN102500523B CN102500523B (en) 2013-11-20

Family

ID=46212689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102881382A Active CN102500523B (en) 2011-09-23 2011-09-23 Low-friction spraying process for escalator skirt board

Country Status (1)

Country Link
CN (1) CN102500523B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103357561A (en) * 2013-06-03 2013-10-23 苏州汉森电梯有限公司 Low-friction spraying technology of apron board of escalator
CN109371411A (en) * 2018-12-10 2019-02-22 广东远见精密五金有限公司 Process of surface treatment for electrolytic zinc-coated steel sheet, galvanized sheet, aluminium sheet or hot dipping zine plate

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1341491A (en) * 2000-09-07 2002-03-27 四川艺精技术开发总公司 Electrostatic plastic spraying process for garbage can
CN1634668A (en) * 2003-12-31 2005-07-06 重庆宗申技术开发研究有限公司 Powder injection process for machining metal parts
CN1730164A (en) * 2005-09-06 2006-02-08 贵州科盛彩色喷涂有限公司 Outdoor metal surface double coating antiseptic chromatic spray painting method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1341491A (en) * 2000-09-07 2002-03-27 四川艺精技术开发总公司 Electrostatic plastic spraying process for garbage can
CN1634668A (en) * 2003-12-31 2005-07-06 重庆宗申技术开发研究有限公司 Powder injection process for machining metal parts
CN1730164A (en) * 2005-09-06 2006-02-08 贵州科盛彩色喷涂有限公司 Outdoor metal surface double coating antiseptic chromatic spray painting method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103357561A (en) * 2013-06-03 2013-10-23 苏州汉森电梯有限公司 Low-friction spraying technology of apron board of escalator
CN109371411A (en) * 2018-12-10 2019-02-22 广东远见精密五金有限公司 Process of surface treatment for electrolytic zinc-coated steel sheet, galvanized sheet, aluminium sheet or hot dipping zine plate

Also Published As

Publication number Publication date
CN102500523B (en) 2013-11-20

Similar Documents

Publication Publication Date Title
CN201799369U (en) Surface joint pre-treatment spray cleaning device
CN107199168A (en) A kind of handware baking finish process method
CN106111435A (en) A kind of rustless steel anti-fingerprint paint line
WO2013082477A3 (en) Process for making of glass articles with optical and easy-to-clean coatings
CN109926295A (en) A kind of workmanship of spraying plastics of high adhesion force coating
CN102500523B (en) Low-friction spraying process for escalator skirt board
CN106000818A (en) Vehicle fitting surface treatment process
ATE332986T1 (en) PREPARATION OF STEEL SURFACES FOR GALVANIZING IN ALUMINUM-RICH ZINC BATH
CN104275293A (en) Paint-spraying treatment process of electric vehicle metal plate
CN108787396A (en) Long-lived stainless steel surface nylon coating
CN109590193A (en) A kind of technique of powder metallurgy product antirust Dacroment
CN101205704A (en) Reforming technique for old coated express-way guard-rail plates
CN102114466B (en) Environment-friendly coating system for panel of power cabinet
CN106076788A (en) The processing technology of shop metallic door
CN104313535B (en) A kind of production method of stainproof chromium plated article
CN107447188A (en) A kind of multi-component alloy co-cementation zinc technology
CN215586938U (en) Rust-proof spraying equipment for metal products
CN108940772A (en) A kind of aluminum alloy bodywork is without coating process
CN109499821A (en) A kind of cable testing bridge plastic-spraying process for upsetting
KR20130118414A (en) White type electrodeposition coating method
CN201410459Y (en) Shot blasting machine steel pretreating line spray painting trolley light sensation structure
JP2003290705A (en) Method of coating elevator designed article
JP6065458B2 (en) Metal grating for use in reactor containment
CN101214126A (en) Production technology of aluminium non-stick pan
EP2527494B1 (en) A method of making a compact layer of enamel coatings on moulded products

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: Xie hang Qingxi Town 523000 Guangdong city of Dongguan Province Jinlong Industrial Zone

Applicant after: IFE Elevators Co., Ltd.

Address before: Xie hang Qingxi Town 523000 Guangdong city of Dongguan Province Jinlong Industrial Zone Fiat Elevator Co. Ltd.

Applicant before: IFE Elevator Co.,Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: IFE ELEVATOR CO., LTD. TO: IFE ELEVATORS CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant