CN102493915A - Fan utilizing method and fan utilizing system for wind power station - Google Patents

Fan utilizing method and fan utilizing system for wind power station Download PDF

Info

Publication number
CN102493915A
CN102493915A CN2011103636833A CN201110363683A CN102493915A CN 102493915 A CN102493915 A CN 102493915A CN 2011103636833 A CN2011103636833 A CN 2011103636833A CN 201110363683 A CN201110363683 A CN 201110363683A CN 102493915 A CN102493915 A CN 102493915A
Authority
CN
China
Prior art keywords
wind energy
energy turbine
turbine set
unit
blower fan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103636833A
Other languages
Chinese (zh)
Other versions
CN102493915B (en
Inventor
乔元
黄远彦
王磊品
张鹏飞
闫佳会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Goldwind Science and Creation Windpower Equipment Co Ltd
Original Assignee
Beijing Goldwind Science and Creation Windpower Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Goldwind Science and Creation Windpower Equipment Co Ltd filed Critical Beijing Goldwind Science and Creation Windpower Equipment Co Ltd
Priority to CN2011103636833A priority Critical patent/CN102493915B/en
Publication of CN102493915A publication Critical patent/CN102493915A/en
Application granted granted Critical
Publication of CN102493915B publication Critical patent/CN102493915B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Abstract

The invention belongs to the technical field of wind power generation, and particularly provides a fan utilizing method for a wind power station. The fan utilizing method mainly includes following steps: 1) acquiring status parameters of various fans in the wind power station in real time; 2) determining sequencing parameters according to the status parameters and determining fan utilizing sequence on the basis of the sequencing parameters; and 3) utilizing the corresponding fans in the wind power station on the basis of the fan utilizing sequence so that running conditions of the wind power station meet requirements of a power grid. In addition, the invention further provides a fan utilizing system of the wind power station. By the aid of the fan utilizing method and the fan utilizing system, the fans in the wind power station can be utilized reasonably, so that utilization rate, running stability and running safety of the fans are improved, and failure rate of the fans is reduced.

Description

The blower fan call method of wind energy turbine set and blower fan calling system
Technical field
The present invention relates to technical field of wind power generation, be specifically related to a kind of blower fan call method and blower fan calling system of wind energy turbine set.
Background technique
Along with the continuous development of wind-powered electricity generation, the wind energy turbine set with a large amount of wind power generating set is also more and more, and day by day becomes the important component part of mains supply system.In practical application; Wind energy turbine set often need be called an interior blower fan unit according to the requirement of electrical network, and for example, electrical network can be in real time to wind energy turbine set transmitted power demand; Wind energy turbine set can compare itself and whole wind electric field output power at this moment after receiving this power demand; And according to difference relatively the corresponding unit in the wind energy turbine set is called, that is, corresponding unit is carried out power adjustments or launches/stop using corresponding unit.
At present; Blower fan in the wind energy turbine set calls and shows as random call basically; That is, existing blower fan call method fails to consider the real work situation of each blower fan in the wind energy turbine set, but comparatively randomly blower fan is opened/stop the operation of operating or carrying out lifting/lowering power by operator.Therefore, above-mentioned wind electric field blower method of calling not only highly relies on the reliability of corresponding unit work; But also, possibly cause that some unit is moving for a long time always, the then long period standby always of other units, thereby increase the unit rate of fault because of having ignored blower fan real work situation such as temperature such as working time or its electric component.And blower fan opens/stops the stability and the Security that itself will influence blower fan continually at random, also can influence the working life of blower fan simultaneously.
For this reason, how the blower fan unit in the wind energy turbine set is rationally called and just become those skilled in the art's problem demanding prompt solution.
Summary of the invention
For solving the problems of the technologies described above, the present invention provides a kind of blower fan call method of wind energy turbine set, and it can rationally call the blower fan in the wind energy turbine set, with the utilization ratio of raising blower fan and the stability and the Security of operation, and reduces the fan trouble rate.
Similarly; For solving the problems of the technologies described above, the present invention also provides a kind of blower fan calling system of wind energy turbine set, and it can rationally call the blower fan in the wind energy turbine set equally; With the utilization ratio of raising blower fan and the stability and the Security of operation, and reduce the fan trouble rate.
For this reason, the present invention provides a kind of blower fan call method of wind energy turbine set, and it comprises the steps: 1) gather the status parameter of each blower fan in the wind energy turbine set in real time; 2) confirm the ordering parameter according to said status parameter, and confirm the blower fan calling sequence based on said ordering parameter; 3) call in the wind energy turbine set corresponding blower fan and adjust its running state based on said blower fan calling sequence, so that the working order of said wind energy turbine set satisfies the demand of electrical network.
Wherein, said status parameter comprise at least Cumulative Elapsed Time, this continuous working period, standby time, this lasting standby time, critical component temperature one of them.Said critical component can comprise generator, vane change device and current transformer.
Wherein, in said step 2) in, when adopting a status parameter to confirm the ordering parameter, said ordering parameter is a said status parameter itself.
Wherein, in said step 2) in, when adopting a plurality of status parameters to confirm the ordering parameter,, and calculate said ordering parameter based on this for each status parameter assigns weight.
Wherein, In said step 2) in, when adopting a plurality of status parameters to confirm the ordering parameter, for each status parameter is provided with priority; The status parameter that priority is high is set at the ordering parameter; And come the corresponding blower fan in the wind energy turbine set is sorted through the numerical value of the pairing ordering parameter of each blower fan relatively, and when the numerical value of the pairing ordering parameter of a plurality of blower fans equates, the status parameter that again priority is hanged down a grade is set at the ordering parameter; And come said a plurality of blower fans are further sorted with this, to form the blower fan calling sequence.
Wherein, said blower fan calling sequence comprises operation unit calling sequence and standby unit calling sequence.
Wherein, in said step 3), need power per liter and said standby unit calling sequence to exist under the situation of standby unit, call corresponding standby unit and adjust its running state based on said standby unit calling sequence in said wind energy turbine set; And after all calling, the standby unit in said standby unit calling sequence still is not enough to the output power of said wind energy turbine set is adjusted under the situation of target call; Further be invoked at the unit of operation and adjust its running state according to said operation unit calling sequence, so that the working order of said wind energy turbine set satisfies the demand of electrical network.Perhaps; In said step 3); Need power per liter and said standby unit calling sequence not to exist under the situation of standby unit in said wind energy turbine set; Be invoked at the unit of operation and adjust its running state based on said operation unit calling sequence, so that the working order of said wind energy turbine set satisfies the demand of electrical network.
Wherein, in said step 3), need fall in said wind energy turbine set under the situation of power, call corresponding unit and adjust its running state based on said operation unit calling sequence; And after all calling, the unit in said operation unit calling sequence still is not enough to the output power of said wind energy turbine set is adjusted under the situation of target call; Further make the corresponding compressor emergency shutdown in this sequence based on said operation unit calling sequence, so that the working order of said wind energy turbine set satisfies the demand of electrical network.
As another technological scheme, the present invention also provides a kind of blower fan calling system of wind energy turbine set, and it comprises that fan condition collecting unit, the calling sequence of electrical connection are confirmed unit and fan condition regulation unit successively.Wherein, said fan condition collecting unit is used for gathering in real time the status parameter of each blower fan in the wind energy turbine set, and transmits it to said calling sequence and confirm the unit; Said calling sequence is confirmed the unit according to the definite ordering of said status parameter parameter, and comes the blower fan in the said wind energy turbine set is sorted to confirm the blower fan calling sequence based on said ordering parameter; Said fan condition regulation unit calls in the wind energy turbine set corresponding blower fan and adjusts its running state based on said blower fan calling sequence, so that the output power in the said wind energy turbine set satisfies the power demand of electrical network.
Wherein, said status parameter comprise at least Cumulative Elapsed Time, this continuous working period, standby time, this lasting standby time, critical component temperature one of them.Said critical component can comprise generator, vane change device and current transformer.
Wherein, adopting a status parameter to confirm under the situation of said ordering parameter, said calling sequence confirms that the unit itself confirmed as said ordering parameter with said status parameter.
Wherein, adopting a plurality of status parameters to confirm that said calling sequence confirms that the unit assigns weight for each status parameter, and calculates said ordering parameter based on this under the situation of ordering parameter.
Wherein, Confirm under the situation of ordering parameter at a plurality of status parameters of employing; Said calling sequence confirms that the unit is provided with priority for each status parameter, and the status parameter that priority is high is set at the ordering parameter, and comes the corresponding blower fan in the wind energy turbine set is sorted through the numerical value that compares the pairing ordering parameter of each blower fan; And when the numerical value of the pairing ordering parameter of a plurality of blower fans equates; Status parameter with the low grade of priority is set at the ordering parameter again, and comes said a plurality of blower fans are further sorted with this, to form the blower fan calling sequence.
Wherein, said blower fan calling sequence comprises operation unit calling sequence and standby unit calling sequence.
Wherein, said fan condition regulation unit needs power per liter and said standby unit calling sequence to exist under the situation of standby unit in said wind energy turbine set, calls corresponding standby unit and adjusts its running state based on said standby unit calling sequence; And after all calling, the standby unit in said standby unit calling sequence still is not enough to the output power of said wind energy turbine set is adjusted under the situation of target call; Further be invoked at the unit of operation and adjust its running state according to said operation unit calling sequence, so that the working order of said wind energy turbine set satisfies the demand of electrical network.Perhaps; Said fan condition regulation unit needs power per liter and said standby unit calling sequence not to exist under the situation of standby unit in said wind energy turbine set; Be invoked at the unit of operation and adjust its running state based on said operation unit calling sequence, so that the working order of said wind energy turbine set satisfies the demand of electrical network.
Wherein, said fan condition regulation unit need fall in said wind energy turbine set under the situation of power, calls corresponding unit and adjusts its running state based on said operation unit calling sequence; And after all calling, the unit in said operation unit calling sequence still is not enough to the output power of said wind energy turbine set is adjusted under the situation of target call; Further make the corresponding compressor emergency shutdown in this sequence based on said operation unit calling sequence, so that the working order of said wind energy turbine set satisfies the demand of electrical network.
With respect to existing technology, the present invention has following beneficial effect:
Provide in the blower fan call method of wind energy turbine set in the present invention, gather the status parameter of each blower fan in the wind energy turbine set at first in real time and confirm the blower fan calling sequence, then call the corresponding blower fan in the wind energy turbine set based on this calling sequence again based on this.This shows that the present invention is based on the actual working state of each blower fan in the wind energy turbine set and blower fan is called, but not as existing technology random call.Therefore; When adopting the present invention that the blower fan call method of wind energy turbine set is provided; Can take into account the real work situation (such as working time or its electric component temperature etc.) of each blower fan comes blower fan is rationally called; Each blower fan unit wheel is changed jobs and improve the utilization ratio of blower fan, thereby can avoid some unit to open continually/stop, and avoid long-time tired other units of operation of some unit then blower fan such as long-time standby use unbalanced situation; And then reduce the rate of fault of blower fan unit, stability and the Security that improves the blower fan unit operation, and prolong the working life of blower fan unit.
Similarly; In the blower fan calling system of wind energy turbine set provided by the invention; Owing to its fan condition regulation unit that includes the fan condition collecting unit of the status parameter that can gather each blower fan in real time, confirms that the calling sequence of blower fan calling sequence is confirmed the unit and call corresponding blower fan based on this blower fan calling sequence based on above-mentioned status parameter; Therefore; The blower fan calling system of wind energy turbine set provided by the invention is based on the actual working state of each blower fan in the wind energy turbine set equally and comes blower fan is called, but not as existing technology random call.Thereby; The blower fan calling system of wind energy turbine set provided by the invention can be taken into account the real work situation (such as working time or its electric component temperature etc.) of each blower fan equally and come blower fan is rationally called; Can make each blower fan unit take turns the utilization ratio that changes jobs and improve blower fan as far as possible; Thereby can avoid some unit to open continually/stop; And avoid other units of the long-time tired operation of some unit then blower fan such as long-time standby use unbalanced situation, and then reduce the rate of fault of blower fan unit, stability and the Security that improves the blower fan unit operation, and prolong the working life of blower fan unit.
Description of drawings
The schematic flow sheet of the blower fan call method of the wind energy turbine set that Fig. 1 provides for specific embodiment of the present invention; And
The structured flowchart of the blower fan calling system of the wind energy turbine set that Fig. 2 provides for specific embodiment of the present invention.
Embodiment
For making those skilled in the art understand technological scheme of the present invention better, below in conjunction with accompanying drawing the blower fan call method of wind energy turbine set provided by the invention and blower fan being called is to be described in detail.
See also Fig. 1, wherein show the flow process of the blower fan call method of the wind energy turbine set that first embodiment of the invention provides.
In step 110, gather the status parameter of each blower fan in the wind energy turbine set in real time.So-called status parameter comprise at least following parameter one of them: the temperature of Cumulative Elapsed Time, this continuous working period, standby time, this lasting standby time, critical component.So-called critical component can comprise generator, vane change device and current transformer, and in this case, the temperature T 3 of the temperature T 1 of generator, the temperature T 2 of vane change device and current transformer also can be confirmed as the status parameter of blower fan.
In step 120, confirm the ordering parameter according to the aforesaid state parameter, and confirm the blower fan calling sequence based on this ordering parameter.Wherein, the blower fan calling sequence can comprise operation unit calling sequence and standby unit calling sequence.So-called operation unit calling sequence refer to in the wind energy turbine set all at the unit of operation according to the numerical values recited of the parameter that the sorts resulting unit calling sequence that sorts; So-called standby unit calling sequence refer to in the wind energy turbine set all the standby units according to the numerical values recited of the ordering parameter resulting unit calling sequence that sorts.
Particularly, in step 120, when adopting a status parameter to confirm the ordering parameter, this ordering parameter is this status parameter itself.When adopting a plurality of status parameters to confirm to sort parameter,, and calculate the ordering parameter according to each status parameter and weight thereof for each status parameter assigns weight.Alternatively; When adopting a plurality of status parameters to confirm the ordering parameter; For each status parameter is provided with priority, the status parameter that priority is high is set at the ordering parameter, comes the corresponding blower fan in the wind energy turbine set is sorted based on this ordering parameter; That is, come the corresponding blower fan in the wind energy turbine set is sorted through the numerical value that compares the pairing ordering parameter of each blower fan.In this sequencer procedure; If the numerical value of the pairing ordering parameter of a plurality of blower fans equates; Then earlier said a plurality of blower fans are arranged side by side; And the corresponding blower fan in wind energy turbine set is reset to the status parameter that priority is hanged down a grade with the ordering parameter, and comes said a plurality of blower fans are further sorted with this after all sorting and finishing.By that analogy, with the complete blower fan calling sequence of final formation.
In step 130, call in the wind energy turbine set corresponding blower fan and adjust its running state based on above-mentioned blower fan calling sequence, so that the working order of wind energy turbine set satisfies the demand of electrical network, for example, make the output power of wind energy turbine set satisfy the power demand of electrical network.
Particularly, in step 130, need power per liter and standby unit calling sequence to exist under the situation of standby unit, call corresponding standby unit and adjust its running state based on standby unit calling sequence in wind energy turbine set; And after all calling, the standby unit in standby unit calling sequence still is not enough to the output power of wind energy turbine set is adjusted under the situation of target call; Further be invoked at the unit of operation and adjust its running state according to operation unit calling sequence, so that the working order of wind energy turbine set satisfies the demand of electrical network.Perhaps, need power per liter and standby unit calling sequence not to exist under the situation of standby unit, be invoked at the unit of operation and adjust its running state based on operation unit calling sequence, so that the working order of wind energy turbine set satisfies the demand of electrical network in wind energy turbine set.
And, in said step 130, need fall in wind energy turbine set under the situation of power, call corresponding unit and adjust its running state based on operation unit calling sequence; And after all calling, the unit in operation unit calling sequence still is not enough to the output power of wind energy turbine set is adjusted under the situation of target call; Further make the corresponding compressor emergency shutdown in this sequence based on this operation unit calling sequence again, so that the working order of wind energy turbine set satisfies the demand of electrical network.
Instantiation below in conjunction with the wind energy turbine set power adjustments comes the blower fan call method of wind energy turbine set provided by the invention is elaborated.In this example, the false wind electric field have 10 typhoon machine unit G1, G2 ..., G10, and the specified output power of completely sending out of every unit is 1.5MW, then the total specified output power of completely sending out of this wind energy turbine set is 15MW.In wind energy turbine set real-world operation process; For satisfying the power demand of electrical network, need constantly call the corresponding unit in the wind energy turbine set and constantly change its running state, for example; For satisfying the requirement of wind energy turbine set power per liter, need launch the standby unit or raise generated output at the operation unit; Perhaps, fall the requirement of power, need to stop using or reduce generated output at the operation unit for satisfying wind energy turbine set.
In order reasonably to call the corresponding blower fan in the wind energy turbine set, the first step needs the status parameter of interior each blower fan of collection wind energy turbine set in real time.In this example, know through the status parameter of gathering each blower fan in the wind energy turbine set: the current total output power of this wind energy turbine set is 7.3MW, wherein has 3 unit G1, G2 and G3 to be in rated power and completely sends out state; 3 unit G4, G5 and G6 are in limit power generating state; 3 unit G7, G8 and G9 are in holding state; 1 unit G10 is in the shutdown maintenance state.Below table one shows the detailed status parameter information of each blower fan unit, and wherein, t1 is blower fan accumulated running time, and t2 is this continuous working period (being designated hereinafter simply as this continuous working period) after launching.
Table one:
Figure BDA0000109118000000081
In second step, confirm the ordering parameter according to the status parameter that collects, and come the blower fan in the wind energy turbine set is sorted, to confirm the blower fan calling sequence based on this ordering parameter and ordering rule.Wherein, so-called ordering rule can be meant according to ascending still descending ordering of sorting of the numerical value of ordering parameter; So-called blower fan calling sequence can comprise operation unit calling sequence and standby unit calling sequence.
In this example; With this continuous working period as the ordering parameter; And come sorting and obtain the blower fan calling sequence at the operation unit in the wind energy turbine set according to this continuous working period ordering rule from short to long: promptly, operation unit calling sequence is G5, G4, G6, G3, G2, G1; Standby unit calling sequence is G7, G8, G9.Wherein, this continuous working period of each blower fan in the standby unit calling sequence is zero, thereby these three standby units are arranged side by side.In fact; In practical application; When gathering the fan operation state; Can increase the status parameter of relevant standby time again, and with this parameter as the ordering parameter that produces standby unit calling sequence, then the standby unit in this wind energy turbine set is sorted and obtains standby unit calling sequence according to standby time ordering rule from long to short.
The 3rd step; Through relatively the power demand and the current gross output of wind energy turbine set of electrical network confirm whether wind energy turbine set needs lifting/lowering power; And call in the wind energy turbine set corresponding blower fan and adjust its running state according to power adjustment demand and above-mentioned blower fan calling sequence, so that the total output power of wind energy turbine set satisfies the power demand of electrical network.
Particularly; When electrical network needs power per liter; Generally speaking, preferentially launch the standby unit, and when launching the standby unit, preferentially launch the long unit of standby time; After launching, upgrade in time the states such as standby time of this unit are removed this unit and are recorded to operation unit calling sequence simultaneously from standby unit calling sequence.If there is not the standby unit that to launch in the standby unit calling sequence, then preferentially call in the operation unit calling sequence short unit working time.In order to describe clearlyer, divide two kinds of situation to come the power per liter process is elaborated below.
Situation one: only through calling the output power that the standby unit promotes wind energy turbine set.
For example, the current total output power of wind energy turbine set is 7.3MW, and the power demand of current electrical network is 10MW.Through relatively finding out that the current total output power of wind energy turbine set is lower than the current power demand to wind energy turbine set of electrical network.For this reason, wind energy turbine set need upwards promote 2.7MW with its gross output,, promotes 2.7MW through calling corresponding blower fan in the wind energy turbine set and adjusting its running state output power that wind energy turbine set is total that is.
Particularly, launch the standby unit in the standby unit calling sequence earlier, for example; Through each unit accumulated running time in the standby unit calling sequence relatively, select and call the shortest unit of accumulated running time (being G9), and it is adjusted to the state of completely sending out; Promote 1.5MW with the output power that wind energy turbine set is total; Then upgrade the running state of unit G9, and it is deleted from standby unit calling sequence, simultaneously it is charged to operation unit calling sequence; Then; In current standby unit calling sequence, select and call the shortest unit of accumulated running time (being G7) once more; And it is adjusted to the limit power generating state that output power is 1.2MW; Then upgrade the running state of unit G7, and it is deleted from standby unit calling sequence, simultaneously it is charged to operation unit calling sequence.Like this, only, can the output power that wind energy turbine set is total be promoted to 10MW, thereby make wind energy turbine set satisfy the power demand of electrical network by 7.3MW through calling G9 and G7 in the standby unit calling sequence.
Situation two: through calling the output power that standby unit and operation unit promote wind energy turbine set.
For example, the current total output power of wind energy turbine set is 7.3MW, and the power demand of current electrical network is 13MW.Through relatively finding out that the current total output power of wind energy turbine set is lower than the current power demand to wind energy turbine set of electrical network.For this reason, wind energy turbine set need upwards promote 5.7MW with its gross output,, promotes 5.7MW through calling corresponding blower fan in the wind energy turbine set and adjusting its running state output power that wind energy turbine set is total that is.
Particularly, call the standby unit in the standby unit calling sequence earlier, promptly; Call standby unit G7, G8 and G9 and it is adjusted to the state of completely sending out; Output power that can wind energy turbine set is total promotes 4.5MW, then upgrades the running state of unit G7, G8 and G9, and it is deleted from standby unit calling sequence; Simultaneously it is charged to operation unit calling sequence, do not had the standby unit in the standby this moment unit calling sequence.After this, call again in the operation unit calling sequence at the operation unit, that is, call unit G5 and G4 successively according to the ordering in the operation unit calling sequence, wherein, preferentially unit G5 is adjusted to and completely sends out state and make its output power promote 0.5MW; Again the output power of unit G4 is promoted 0.7MW subsequently.Like this, through calling G7, G8 and the G9 in the standby unit calling sequence and moving G5 and the G4 in the unit calling sequence, can the output power that wind energy turbine set is total be promoted to 13MW, thereby make wind energy turbine set satisfy the power demand of electrical network by 7.3MW.
Can find out through foregoing description, above-mentioned instance be with this continuous working period as the ordering parameter, and confirm the blower fan calling sequence based on this and carry out that blower fan calls.In practical application, adopt this mode can avoid causing the electric component temperature at its critical component place too high and cause fault because of the blower fan continuous working period is long.In other words, when adopting this continuous working period blower fan is sorted and when calling, can to reduce even avoid because of the too high fault that causes of electric component temperature as the ordering parameter and according to the length of working time.
It is understandable that, in practical application, also can accumulated running time sorted to blower fan and calls as the ordering parameter and according to the length of accumulated running time.When adopting accumulated running time blower fan is sorted and when calling, can to avoid unit the tired and initiating failure of equipment to occur because of accumulated running time is long as the ordering parameter and according to the length of accumulated running time.In other words, adopt accumulated running time to sort and when calling, can reduce even avoid fault tired because of equipment and that cause as the ordering parameter and according to the length of accumulated running time.
And when adopting accumulated running time as the ordering parameter, operation unit calling sequence is G5, G6, G4 in proper order.Like this,, can call unit G5, G6 and G4 successively, wherein, preferentially unit G5 is adjusted to and completely send out state and make its output power promote 0.5MW according to the ordering in the operation unit calling sequence for above-mentioned situation two; Again the output power of unit G6 is promoted 0.3MW subsequently; Last again with the output power lifting 0.4MW of unit G4, be promoted to 13MW with this output power that wind energy turbine set is total by 7.3MW, thereby satisfy the power demand of electrical network.
Being example with the situation of two kinds of power per liter above specifies the blower fan call method of wind energy turbine set provided by the invention.In practical application; Wind energy turbine set is fallen power and is satisfied the grid power demand if desired; Then preferentially make and fall power at the operation unit in the operation unit calling sequence, and in the time all after power falls in the operation unit, still can not satisfying the grid power demand, make again accordingly at the operation compressor emergency shutdown.Under this situation of falling power, can according to actual conditions with this continuous working period or accumulated running time as the ordering parameter, and preferentially call and adjust the unit of long operational time.
It will also be appreciated that; Previous embodiment is based on next definite ordering parameter working time (for example this continuous working period and/or accumulated running time); Yet the present invention is not limited thereto, but also can adopt status parameters such as temperature such as critical components such as generator, vane change device and/or the current transformers parameter that sorts.In this case, can adopt separately generator temperature T 1, vane change device temperature T 2 and current transformer temperature T 3 one of them confirm the ordering parameter, and the parameter that will sort is set at this status parameter itself; Also can adopt two or more status parameters in the temperature T 3 of temperature T 2 and current transformer of temperature T 1, vane change device of generator to confirm the ordering parameter; Assign weight for each status parameter simultaneously; And calculate the ordering parameter based on this; For example, adopt temperature T 2 and the temperature T 3 of current transformer of temperature T 1, the vane change device of generator to confirm the ordering parameters simultaneously, and to be respectively that these three status parameters assign weight be 50%, 40% and 10%; This ordering parameter is 50%T1+40%T2+10%T3 like this, then confirms the blower fan calling sequence according to the ordering parameter that calculates so again.
Further; In practical application; Also can be simultaneously based on working time (for example this continuous working period and/or accumulated running time) and critical component status parameters such as temperature confirm the parameter that sorts; And for each status parameter assigns weight, then calculate the ordering parameter, and confirm the blower fan calling sequence with this parameter that sorts based on mathematical model.Afterwards, when the wind energy turbine set power per liter, preferentially call the less unit of numeric ratio of ordering parameter; When power falls in wind energy turbine set, preferentially call the bigger unit of numeric ratio of ordering parameter.
As another technological scheme, the present invention also provides a kind of blower fan calling system of wind energy turbine set.Below in conjunction with Fig. 2 the blower fan calling system that specific embodiment of the present invention provides is described in detail.
As shown in Figure 2, the blower fan calling system of the wind energy turbine set that present embodiment provides comprises that fan condition collecting unit 210, the calling sequence of electrical connection are confirmed unit 220 and fan condition regulation unit 230 successively.
Wherein, fan condition collecting unit 210 is used for gathering in real time the status parameter of each blower fan in the wind energy turbine set, and transmits it to calling sequence and confirm unit 220.So-called status parameter comprise at least Cumulative Elapsed Time, this continuous working period, standby time, this lasting standby time, critical component temperature one of them.So-called critical component can comprise generator, vane change device and current transformer, and in this case, the temperature T 3 of the temperature T 1 of generator, the temperature T 2 of vane change device and current transformer also can be confirmed as the status parameter of blower fan.
Calling sequence is confirmed unit 220 according to the definite ordering of this status parameter parameter, and comes the blower fan in the wind energy turbine set is sorted to confirm the blower fan calling sequence based on the ordering parameter.Wherein, the blower fan calling sequence can comprise operation unit calling sequence and standby unit calling sequence.So-called operation unit calling sequence refer to in the wind energy turbine set all at the unit of operation according to the numerical values recited of the parameter that the sorts resulting unit calling sequence that sorts; So-called standby unit calling sequence refer to in the wind energy turbine set all the standby units according to the numerical values recited of the ordering parameter resulting unit calling sequence that sorts.
Particularly, adopting a status parameter to confirm under the situation of said ordering parameter, calling sequence confirms that unit 220 itself confirmed as the ordering parameter with this status parameter.Confirm that at a plurality of status parameters of employing calling sequence confirms that unit 220 assigns weight for each status parameter, and calculates the ordering parameter based on this under the situation of ordering parameter.Alternatively; Confirm under the situation of ordering parameter at a plurality of status parameters of employing; Calling sequence confirms that unit 220 is provided with priority for each status parameter, and the status parameter that priority is high is set at the ordering parameter, and comes the corresponding blower fan in the wind energy turbine set is sorted through the numerical value that compares the pairing ordering parameter of each blower fan; And when the numerical value of the pairing ordering parameter of a plurality of blower fans equates; Status parameter with the low grade of priority is set at the ordering parameter again, and comes said a plurality of blower fans are further sorted with this, to form the blower fan calling sequence.
Fan condition regulation unit 230 calls in the wind energy turbine set corresponding blower fan and adjusts its running state based on the blower fan calling sequence, so that the output power in the wind energy turbine set satisfies the power demand of electrical network.
Particularly, need power per liter and standby unit calling sequence to exist under the situation of standby unit in wind energy turbine set, fan condition regulation unit 230 calls corresponding standby unit and adjusts its running state based on standby unit calling sequence; And after all calling, the standby unit in standby unit calling sequence still is not enough to the output power of wind energy turbine set is adjusted under the situation of target call; Then further be invoked at the unit of operation and adjust its running state, so that the working order of wind energy turbine set satisfies the demand of electrical network according to operation unit calling sequence.Perhaps; Need power per liter and standby unit calling sequence not to exist under the situation of standby unit in wind energy turbine set; Fan condition regulation unit 230 is invoked at the unit of operation and adjusts its running state based on operation unit calling sequence, so that the working order of wind energy turbine set satisfies the demand of electrical network.
And, need fall in wind energy turbine set under the situation of power, fan condition regulation unit 230 calls corresponding unit and adjusts its running state based on operation unit calling sequence; And after all calling, the unit in operation unit calling sequence still is not enough to the output power of wind energy turbine set is adjusted under the situation of target call; Then further make the corresponding compressor emergency shutdown in this sequence, so that the working order of wind energy turbine set satisfies the demand of electrical network based on operation unit calling sequence.
It is understandable that above mode of execution only is the illustrative embodiments that adopts for principle of the present invention is described, yet the present invention is not limited thereto.For the one of ordinary skilled in the art, under the situation that does not break away from spirit of the present invention and essence, can make various modification and improvement, these modification also are regarded as protection scope of the present invention with improving.

Claims (18)

1. the blower fan call method of a wind energy turbine set is characterized in that comprising the steps:
1) gathers the status parameter of each blower fan in the wind energy turbine set in real time;
2) confirm the ordering parameter according to said status parameter, and confirm the blower fan calling sequence based on said ordering parameter;
3) call in the wind energy turbine set corresponding blower fan and adjust its running state based on said blower fan calling sequence, so that the working order of said wind energy turbine set satisfies the demand of electrical network.
2. the blower fan call method of wind energy turbine set according to claim 1; It is characterized in that, said status parameter comprise at least Cumulative Elapsed Time, this continuous working period, standby time, this lasting standby time, critical component temperature one of them.
3. the blower fan call method of wind energy turbine set according to claim 2 is characterized in that, said critical component comprises generator, vane change device and current transformer.
4. the blower fan call method of wind energy turbine set according to claim 1 is characterized in that, in said step 2) in, when adopting a status parameter to confirm the ordering parameter, said ordering parameter is a said status parameter itself.
5. the blower fan call method of wind energy turbine set according to claim 1; It is characterized in that, in said step 2) in, when adopting a plurality of status parameters to confirm the ordering parameter; For each status parameter assigns weight, and calculate said ordering parameter based on this.
6. the blower fan call method of wind energy turbine set according to claim 1 is characterized in that, in said step 2) in; When adopting a plurality of status parameters to confirm the ordering parameter; For each status parameter is provided with priority, the status parameter that priority is high is set at the ordering parameter, and comes the corresponding blower fan in the wind energy turbine set is sorted through the numerical value that compares the pairing ordering parameter of each blower fan; And when the numerical value of the pairing ordering parameter of a plurality of blower fans equates; Status parameter with the low grade of priority is set at the ordering parameter again, and comes said a plurality of blower fans are further sorted with this, to form the blower fan calling sequence.
7. the blower fan call method of wind energy turbine set according to claim 1 is characterized in that, said blower fan calling sequence comprises operation unit calling sequence and standby unit calling sequence.
8. the blower fan call method of wind energy turbine set according to claim 7; It is characterized in that; In said step 3); Need power per liter and said standby unit calling sequence to exist under the situation of standby unit in said wind energy turbine set, call corresponding standby unit and adjust its running state based on said standby unit calling sequence; And after all calling, the standby unit in said standby unit calling sequence still is not enough to the output power of said wind energy turbine set is adjusted under the situation of target call; Further be invoked at the unit of operation and adjust its running state according to said operation unit calling sequence; So that the working order of said wind energy turbine set satisfies the demand of electrical network, perhaps
In said step 3); Need power per liter and said standby unit calling sequence not to exist under the situation of standby unit in said wind energy turbine set; Be invoked at the unit of operation and adjust its running state based on said operation unit calling sequence, so that the working order of said wind energy turbine set satisfies the demand of electrical network.
9. the blower fan call method of wind energy turbine set according to claim 7 is characterized in that, in said step 3), need fall in said wind energy turbine set under the situation of power, calls corresponding unit and adjusts its running state based on said operation unit calling sequence; And after all calling, the unit in said operation unit calling sequence still is not enough to the output power of said wind energy turbine set is adjusted under the situation of target call; Further make the corresponding compressor emergency shutdown in this sequence based on said operation unit calling sequence, so that the working order of said wind energy turbine set satisfies the demand of electrical network.
10. the blower fan calling system of a wind energy turbine set is characterized in that, comprises that fan condition collecting unit, the calling sequence of electrical connection are confirmed unit and fan condition regulation unit successively, wherein
Said fan condition collecting unit is used for gathering in real time the status parameter of each blower fan in the wind energy turbine set, and transmits it to said calling sequence and confirm the unit;
Said calling sequence is confirmed the unit according to the definite ordering of said status parameter parameter, and comes the blower fan in the said wind energy turbine set is sorted to confirm the blower fan calling sequence based on said ordering parameter;
Said fan condition regulation unit calls in the wind energy turbine set corresponding blower fan and adjusts its running state based on said blower fan calling sequence, so that the output power in the said wind energy turbine set satisfies the power demand of electrical network.
11. the blower fan calling system of wind energy turbine set according to claim 10; It is characterized in that, said status parameter comprise at least Cumulative Elapsed Time, this continuous working period, standby time, this lasting standby time, critical component temperature one of them.
12. the blower fan calling system of wind energy turbine set according to claim 11 is characterized in that said critical component comprises generator, vane change device and current transformer.
13. the blower fan calling system of wind energy turbine set according to claim 10 is characterized in that, is adopting a status parameter to confirm under the situation of said ordering parameter, said calling sequence confirms that the unit itself confirmed as said ordering parameter with said status parameter.
14. the blower fan calling system of wind energy turbine set according to claim 10; It is characterized in that; Confirm that at a plurality of status parameters of employing said calling sequence confirms that the unit assigns weight for each status parameter, and calculates said ordering parameter based on this under the situation of ordering parameter.
15. the blower fan calling system of wind energy turbine set according to claim 10; It is characterized in that, adopting a plurality of status parameters to confirm that said calling sequence confirms that the unit is provided with priority for each status parameter under the situation of ordering parameter; The status parameter that priority is high is set at the ordering parameter; And come the corresponding blower fan in the wind energy turbine set is sorted through the numerical value of the pairing ordering parameter of each blower fan relatively, and when the numerical value of the pairing ordering parameter of a plurality of blower fans equates, the status parameter that again priority is hanged down a grade is set at the ordering parameter; And come said a plurality of blower fans are further sorted with this, to form the blower fan calling sequence.
16. the blower fan calling system of wind energy turbine set according to claim 10 is characterized in that, said blower fan calling sequence comprises operation unit calling sequence and standby unit calling sequence.
17. the blower fan calling system of wind energy turbine set according to claim 16; It is characterized in that; Said fan condition regulation unit needs power per liter and said standby unit calling sequence to exist under the situation of standby unit in said wind energy turbine set, calls corresponding standby unit and adjusts its running state based on said standby unit calling sequence; And after all calling, the standby unit in said standby unit calling sequence still is not enough to the output power of said wind energy turbine set is adjusted under the situation of target call; Further be invoked at the unit of operation and adjust its running state according to said operation unit calling sequence; So that the working order of said wind energy turbine set satisfies the demand of electrical network, perhaps
Said fan condition regulation unit needs power per liter and said standby unit calling sequence not to exist under the situation of standby unit in said wind energy turbine set; Be invoked at the unit of operation and adjust its running state based on said operation unit calling sequence, so that the working order of said wind energy turbine set satisfies the demand of electrical network.
18. the blower fan calling system of wind energy turbine set according to claim 16; It is characterized in that; Said fan condition regulation unit need fall in said wind energy turbine set under the situation of power, calls corresponding unit and adjusts its running state based on said operation unit calling sequence; And after all calling, the unit in said operation unit calling sequence still is not enough to the output power of said wind energy turbine set is adjusted under the situation of target call; Further make the corresponding compressor emergency shutdown in this sequence based on said operation unit calling sequence, so that the working order of said wind energy turbine set satisfies the demand of electrical network.
CN2011103636833A 2011-11-16 2011-11-16 Fan utilizing method and fan utilizing system for wind power station Active CN102493915B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103636833A CN102493915B (en) 2011-11-16 2011-11-16 Fan utilizing method and fan utilizing system for wind power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103636833A CN102493915B (en) 2011-11-16 2011-11-16 Fan utilizing method and fan utilizing system for wind power station

Publications (2)

Publication Number Publication Date
CN102493915A true CN102493915A (en) 2012-06-13
CN102493915B CN102493915B (en) 2013-12-04

Family

ID=46185767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103636833A Active CN102493915B (en) 2011-11-16 2011-11-16 Fan utilizing method and fan utilizing system for wind power station

Country Status (1)

Country Link
CN (1) CN102493915B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102856931A (en) * 2012-06-15 2013-01-02 中国电力科学研究院 Wind power plant active power dynamic grouping control method
CN102891489A (en) * 2012-09-24 2013-01-23 华北电力大学 Wind power plant power optimal control method based on genetic algorithm
CN103219750A (en) * 2013-03-14 2013-07-24 华北电力科学研究院有限责任公司 Method and system for controlling wind turbine generator unit to operate in limited power mode
CN104712498A (en) * 2015-01-19 2015-06-17 北京金风科创风电设备有限公司 Control system and method of wind generating set
CN105244906A (en) * 2015-09-14 2016-01-13 北京天诚同创电气有限公司 Standby state control method, device and system for wind driven generator converter
CN105515061A (en) * 2016-01-25 2016-04-20 云南电网有限责任公司电力科学研究院 Method and system for active power control of wind turbines
CN106288220A (en) * 2016-08-26 2017-01-04 蚌埠依爱电子科技有限责任公司 The control method that in a kind of breeding house, blower fan circulation industrial is made
CN107634548A (en) * 2017-11-13 2018-01-26 国电联合动力技术有限公司 A kind of active power of wind power field rate of change intelligent control method
CN107762726A (en) * 2016-08-15 2018-03-06 北京金风科创风电设备有限公司 Wind-driven generator cluster pitch control method and system
CN108397349A (en) * 2018-04-08 2018-08-14 上海电气风电集团有限公司 A kind of wind power plant low temperature standby controlling method
CN109089895A (en) * 2018-09-19 2018-12-28 广州市华南畜牧设备有限公司 Livestock and poultry cultivation house impeller of blower replacement method and system
CN110500232A (en) * 2018-05-18 2019-11-26 北京金风科创风电设备有限公司 control method and device of wind generating set
CN111189230A (en) * 2018-11-15 2020-05-22 青岛经济技术开发区海尔热水器有限公司 Automatic control method of gas water heater and gas water heater

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003030329A1 (en) * 2001-09-28 2003-04-10 Aloys Wobben Method for operating a wind park
CN1894837A (en) * 2003-04-09 2007-01-10 通用电气公司 Wind farm and method for operating same
CN1975155A (en) * 2005-11-29 2007-06-06 通用电气公司 Windpark turbine control system and method for wind condition estimation and performance optimization
CN101542117A (en) * 2006-11-08 2009-09-23 维斯塔斯风力系统有限公司 Method for controlling a cluster of wind turbines connected to a utility grid, method for planning the strategy of a utility grid including a wind turbine cluster connected to the grid and wind turbin
CN101608599A (en) * 2008-06-16 2009-12-23 诺德克斯能源有限公司 Be used to control the method for wind power generating set
CN102144093A (en) * 2008-08-23 2011-08-03 德风公司 Method for controlling a wind farm
CN102222906A (en) * 2010-04-14 2011-10-19 河南省电力公司 Laminated and partitioned automatic current control method applicable to multi-target power grid

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003030329A1 (en) * 2001-09-28 2003-04-10 Aloys Wobben Method for operating a wind park
CN1894837A (en) * 2003-04-09 2007-01-10 通用电气公司 Wind farm and method for operating same
CN1975155A (en) * 2005-11-29 2007-06-06 通用电气公司 Windpark turbine control system and method for wind condition estimation and performance optimization
CN101542117A (en) * 2006-11-08 2009-09-23 维斯塔斯风力系统有限公司 Method for controlling a cluster of wind turbines connected to a utility grid, method for planning the strategy of a utility grid including a wind turbine cluster connected to the grid and wind turbin
CN101608599A (en) * 2008-06-16 2009-12-23 诺德克斯能源有限公司 Be used to control the method for wind power generating set
CN102144093A (en) * 2008-08-23 2011-08-03 德风公司 Method for controlling a wind farm
CN102222906A (en) * 2010-04-14 2011-10-19 河南省电力公司 Laminated and partitioned automatic current control method applicable to multi-target power grid

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102856931A (en) * 2012-06-15 2013-01-02 中国电力科学研究院 Wind power plant active power dynamic grouping control method
CN102856931B (en) * 2012-06-15 2014-03-12 国家电网公司 Wind power plant active power dynamic grouping control method
CN102891489A (en) * 2012-09-24 2013-01-23 华北电力大学 Wind power plant power optimal control method based on genetic algorithm
CN102891489B (en) * 2012-09-24 2014-07-16 华北电力大学 Wind power plant power optimal control method based on genetic algorithm
CN103219750A (en) * 2013-03-14 2013-07-24 华北电力科学研究院有限责任公司 Method and system for controlling wind turbine generator unit to operate in limited power mode
CN103219750B (en) * 2013-03-14 2015-05-13 华北电力科学研究院有限责任公司 Method and system for controlling wind turbine generator unit to operate in limited power mode
CN104712498B (en) * 2015-01-19 2017-09-15 北京金风科创风电设备有限公司 Control system and method of wind generating set
CN104712498A (en) * 2015-01-19 2015-06-17 北京金风科创风电设备有限公司 Control system and method of wind generating set
CN105244906B (en) * 2015-09-14 2019-04-19 北京天诚同创电气有限公司 Standby state control method, device and system for wind driven generator converter
CN105244906A (en) * 2015-09-14 2016-01-13 北京天诚同创电气有限公司 Standby state control method, device and system for wind driven generator converter
CN105515061A (en) * 2016-01-25 2016-04-20 云南电网有限责任公司电力科学研究院 Method and system for active power control of wind turbines
CN105515061B (en) * 2016-01-25 2018-05-25 云南电网有限责任公司电力科学研究院 A kind of Wind turbines active power controller method and system
CN107762726A (en) * 2016-08-15 2018-03-06 北京金风科创风电设备有限公司 Wind-driven generator cluster pitch control method and system
CN107762726B (en) * 2016-08-15 2019-04-02 北京金风科创风电设备有限公司 Wind-driven generator cluster pitch control method and system
CN106288220A (en) * 2016-08-26 2017-01-04 蚌埠依爱电子科技有限责任公司 The control method that in a kind of breeding house, blower fan circulation industrial is made
CN107634548A (en) * 2017-11-13 2018-01-26 国电联合动力技术有限公司 A kind of active power of wind power field rate of change intelligent control method
CN107634548B (en) * 2017-11-13 2021-08-06 国电联合动力技术有限公司 Intelligent control method for active power change rate of wind power plant
CN108397349B (en) * 2018-04-08 2020-05-05 上海电气风电集团有限公司 Low-temperature standby control method for wind power plant
CN108397349A (en) * 2018-04-08 2018-08-14 上海电气风电集团有限公司 A kind of wind power plant low temperature standby controlling method
CN110500232A (en) * 2018-05-18 2019-11-26 北京金风科创风电设备有限公司 control method and device of wind generating set
CN110500232B (en) * 2018-05-18 2020-07-28 北京金风科创风电设备有限公司 Control method and device of wind generating set
CN109089895A (en) * 2018-09-19 2018-12-28 广州市华南畜牧设备有限公司 Livestock and poultry cultivation house impeller of blower replacement method and system
CN111189230A (en) * 2018-11-15 2020-05-22 青岛经济技术开发区海尔热水器有限公司 Automatic control method of gas water heater and gas water heater

Also Published As

Publication number Publication date
CN102493915B (en) 2013-12-04

Similar Documents

Publication Publication Date Title
CN102493915B (en) Fan utilizing method and fan utilizing system for wind power station
CN102044880B (en) power production control system and method
CN102400855B (en) Power adjusting method and device in wind farm
CN101542117B (en) Method for controlling a cluster of wind turbines connected to a utility grid, method for planning the strategy of a utility grid including a wind turbine cluster connected to the grid and wind turbine
CN105006846A (en) Station level active power optimization method of wind power station
CN105515061B (en) A kind of Wind turbines active power controller method and system
CN104184171B (en) A kind of wind energy turbine set layer active power controller system and method
CN109494811B (en) Power control method and system for wind power plant unit participating in frequency modulation and voltage regulation
EP3080887B1 (en) A wind power plant, and a method for increasing the reactive power capability of a wind power plant
CN104795846A (en) Optimized operation method of pumped-storage power station and wind power combined system
CN104134994B (en) A kind of AGC of utilization carries out the out-of-limit Corrective control method of stable cross section trend
EP2863513B1 (en) Compensation of frequency deviations in grids with high turbine penetration
CN104410094B (en) A kind of active power distribution method of battery energy storage power station
CN104037774A (en) Method and system for controlling devices in micro grid based on priority
CN104124714B (en) A kind of grid-connected Poewr control method of distributed power source, Apparatus and system
CN104037805A (en) Power generation margin distribution method for photovoltaic power station based on power grid security constraints
CN104037817A (en) Method for controlling automatic starting and automatic stopping of wind turbine generators by using wind power plant with minimum hourage deviation
CN105391050A (en) Checking method and system of high-cycle cutting machine configuration scheme
CN109728590A (en) The self-adaptation control method of Wind turbines participation primary frequency modulation
CN104333049B (en) A kind of active power for wind power controls distribution method and system
CN106549418A (en) A kind of wind power station active power control method
CN107732984B (en) Power control method for multi-model wind turbine generator mixed wind power plant
US11262713B2 (en) Method for calculating control parameters of heating supply power of heating network
CN104050533B (en) Electric power system wind power plant fair-share scheduling method based on minimum wind curtailment control
CN104035475A (en) Automatic active-power control method with both safety of power grid and minimum light waste considered for photovoltaic power stations

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant