CN102493828A - Ventilation system and method for tunnel construction - Google Patents

Ventilation system and method for tunnel construction Download PDF

Info

Publication number
CN102493828A
CN102493828A CN2011104584963A CN201110458496A CN102493828A CN 102493828 A CN102493828 A CN 102493828A CN 2011104584963 A CN2011104584963 A CN 2011104584963A CN 201110458496 A CN201110458496 A CN 201110458496A CN 102493828 A CN102493828 A CN 102493828A
Authority
CN
China
Prior art keywords
ventilation
air
construction
tunnel
threeway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104584963A
Other languages
Chinese (zh)
Inventor
马永峰
张洪生
臧筑华
刘小强
魏德立
杨永安
姚凯
臧今楠
曹福虹
鲁成浩
陈胜强
王叙武
张贤锐
陈中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG CAIZHI LIFE ENERGY-SAVING TECHNOLOGY DESIGN INSTITUTE
TIANJIN BINHAI INSTITUTE OF MANAGEMENT SCIENCE
TIANJIN SHENQIONG ENERGY-SAVING ENGINEERING DESIGN OFFICE
TIANJIN JISHI TECHNOLOGY SERVICE Co Ltd
Original Assignee
SHENYANG CAIZHI LIFE ENERGY-SAVING TECHNOLOGY DESIGN INSTITUTE
TIANJIN BINHAI INSTITUTE OF MANAGEMENT SCIENCE
TIANJIN SHENQIONG ENERGY-SAVING ENGINEERING DESIGN OFFICE
TIANJIN JISHI TECHNOLOGY SERVICE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG CAIZHI LIFE ENERGY-SAVING TECHNOLOGY DESIGN INSTITUTE, TIANJIN BINHAI INSTITUTE OF MANAGEMENT SCIENCE, TIANJIN SHENQIONG ENERGY-SAVING ENGINEERING DESIGN OFFICE, TIANJIN JISHI TECHNOLOGY SERVICE Co Ltd filed Critical SHENYANG CAIZHI LIFE ENERGY-SAVING TECHNOLOGY DESIGN INSTITUTE
Priority to CN2011104584963A priority Critical patent/CN102493828A/en
Publication of CN102493828A publication Critical patent/CN102493828A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Ventilation (AREA)

Abstract

The invention relates to a ventilation system and a ventilation method for tunnel construction. The system consists of a wind turbine, an air exhaust vertical shaft, a jet flow tee joint, an exhaust duct, a filter connection tee joint, a fresh air duct, a tee joint purification foundation, a separation air duct, a fan, and a fresh air filter; a ventilation vertical shaft is constructed outside a tunnel before construction, and during construction, air feeding is adopted on an upper part, and exhausted air on a lower part is directly filtered and removed; a fresh air machine can drive fresh air and exhausted air synchronously, wind energy is fully utilized, and energy is saved and emission is reduced; and the system can be industrially designed, and produced in the standardized, generalized and serialized mode, can be widely applied to tunnel construction industry, mining industry, dust operation industry and other industry, and belongs to the field of tunnel construction and ventilation and purification.

Description

Construction ventilation of tunnel system and method for ventilation
Technical field
The present invention relates to a kind of construction ventilation of tunnel system and method for ventilation, system is made up of wind turbine, exhaust air shaft, jet threeway, exhast duct, filtration connection threeway, fresh flue, threeway purification pedestal, partition air channel, blower fan, new wind filter; Build airshaft in the outside, tunnel before the construction, adopt the top air-supply in the construction, air draft Direct Filtration in bottom is got rid of; New wind of new blower fan driven in synchronism and air draft make full use of wind energy, energy-saving and emission-reduction; Can industrialization design, standardization, generalization, producing in serial form; Can be widely used in constructing tunnel, mining, the multiple industry of dust work belong to tunnel construction construction and ventilation cleaning field.
Background technology
Present constructing tunnel, on-the-spot dust fills the air, the method for top air draft, cause the muddy air-flow that pollutes spread in the human body respiration ventilation around, the constructing tunnel personnel are in muddy air for a long time and work, and cause anthraco-silicosis and uncomfortable.
Construction ventilation of tunnel system of the present invention and method of ventilation are built exhaust air shaft before the construction, utilize the wind energy air draft; In the construction, new new wind of blower fan driven in synchronism and increase air draft form in the tunnel and go up air-supply; Following air draft air-flow, site operation air cleaner, dust filter under the downward air exhaust device effect and sink; Conveniently remove small investment, instant effect through filtering the connection threeway.
Summary of the invention
A kind of construction ventilation of tunnel system and method for ventilation; System is made up of wind turbine, exhaust air shaft, jet threeway, exhast duct, filtration connection threeway, fresh flue, threeway purification pedestal, partition air channel, blower fan, new wind filter; Build airshaft in the outside, tunnel before the construction; Adopt the top air-supply in the construction, air draft Direct Filtration in bottom is got rid of; New wind of new blower fan driven in synchronism and air draft.
The present invention has following characteristic:
1 filters the connection threeway is made up of filter group, three-way body, flow tank, dedusting door, and the output area is greater than the input area.
2. threeway purification pedestal is identical with partition air channel input airflow direction, and air draft water conservancy diversion bend input cross-sectional area is less than the output cross-sectional area.
Description of drawings
Fig. 1: construction ventilation of tunnel system and device overall schematic
Fig. 2: three ventilation stack sketch mapes
Fig. 3: jet three-way device sketch map
Fig. 4: filter connection three-way device sketch map
Fig. 1 explains as follows:
Flange 1, flange 2, exhaust air shaft 3, flange 4, wind turbine 5, exhaust duct 6, plate 7, filter 8, dedusting mouth 9, wind wheel bracing frame 10, wind wheel 11, flange 12 cuts off air channel 13, partition panel 14, flange 15, basic pedestal 16, flange 17, fresh wind tube road 18.
Flange 1, flange 2 and exhaust duct 6 common composition jet threeways; Exhaust air shaft 3 through wind turbine 5 is housed enters atmosphere with tail gas; Be provided with at interval on the exhaust duct by plate 7, filter 8 and the filtration that dedusting mouth 9 is formed jointly and be connected threeway; The wind wheel 11 that wind wheel bracing frame 10 supports is the new wind of input in cutting off air channel 13, and partition panel 14 is at fresh wind tube spaced intermediate road and exhaust duct.Flange 15, basic pedestal 16 and the flange 17 common threeway purification pedestals of forming, new wind gets into tunnel internal through fresh wind tube road 18 after purifying.
Fig. 2 explains as follows:
Cut off air channel 13, partition panel 14.
Partition panel 14 cuts off new wind on entering and cuts off air channel 13.
Fig. 3 explains as follows:
Input channel caliber 19, jet pipe diameter 20.
Input channel caliber 19 is less than jet pipe diameter 20, and input channel oral area down wind arc is installed.
Fig. 4 explains as follows:
Plate 7, filter 8, dedusting mouth 9.
Filter the connection three-way device and install and fix through plate 7 and exhaust duct, filter 8 causes particulate contamination and other hazardous substancess to drop into bottom dedusting mouth 9 against the wind to installing obliquely.
The specific embodiment
Vertical shaft construction principle:
Vertical shaft can be crouched down perhaps mountain top or near the vertically construction tunnel face on the hillside after massif the preceding paragraph distance, and shaft main body is constructed according to general civil construction method, and the tunnel is long, and then the ventilation demand is big; Height and caliber that vertical shaft will be set up are thick; General wind turbine is installed at the vertical shaft top, and flange connects, the silo bottom opening; The jet three-way device is installed, is connected exhaust duct.
The air draft principle:
In the tunnel, a wind turbine is set, unified exhaust duct and the fresh wind tube road of carrying new wind to partition panel to separate; The new wind of sending into exhaust duct provides wind energy to exhaust duct, and forming the bottom has the combination air draft mode that wind energy drives, the common formation of vertical shaft effect is arranged at top, effectively improves the air draft effect; Reduced cost of equipment; Tail gas connects threeway through the inner filtration of exhaust duct and purifies, and enters atmosphere through exhaust air shaft then, and filtration connects threeway and is provided with at interval.
The air-supply principle:
New wind purifies pedestal through the threeway that is connected with vertical shaft and purifies the fresh wind tube road that the back gets into tunnel internal through the fresh wind tube road, guarantees the oxygen content and the human comfort of tunnel internal.
Cleaning principle:
Tail gas directly sucks air outlet, and general filter reduces hazardous emission; New wind is delivered to the human perception zone through filtration, also is the motor vehicle intake region simultaneously, increases the air oxygen content, further reduces the generation of hazardous substances, improves the human comfort parameter.
Principle is installed:
Tunnel internal, the air channel is airtight.Filter the connection threeway and be provided with at interval, filter is against the wind to oblique installation, and particulate contamination and other hazardous substancess drop into bottom dedusting mouth, adopt and change cleaning way, regularly replace recycling.
The component processing method:
Exhaust duct 6 cuts off air channel 13, and fresh wind tube road 18 adopts general processing of ventilation air channel and mounting method; Cut off air channel 13, cut off airtightly by partition panel 14, fresh wind tube road 6 and fresh wind tube road 18 are with the installation that extends internally of tunnel excavation progress, and the mouth of pipe flexibly connects.
Basis pedestal 16 civil engineerings, permanent construction is connected with flange 17 with flange 15 and fixes, according to parameters for tunnel, vehicle flowrate parameter, direct proportion designed size.
Exhaust air shaft 3, main body is according to general shaft construction method construction, and the top is provided with the wind turbine 5 that is connected by flange 4.
Wind turbine 5, wind wheel 11 adopts general wind turbine.
New wind is closed in breaking out of fire, opens air draft.
Exhaust duct 6 is done reducing and is handled according to general draft type processing and installation; Fresh wind tube road 18 is according to general draft type processing and installation.
Filter and connect the three-way device processing method: filter the connection three-way device and insert exhaust duct through plate 7; Adopt general drawer type inserting mode fixed installation between exhaust duct and the plate 7; Filter 8 is installed in dedusting mouth 9 edges, against the wind guarantees the nuisance mass-energy dedusting mouth 9 that drops to installing obliquely;
Three ventilation stack processing methods: airtight installation when partition panel 14 is installed.
Jet three-way device processing method: input channel oral area cross-sectional area is less than jet pipeline cross-sectional area, and input channel oral area down wind arc is installed, the airtight installation of pipeline.

Claims (3)

1. construction ventilation of tunnel system and method for ventilation; System is made up of wind turbine, exhaust air shaft, jet threeway, exhast duct, filtration connection threeway, fresh flue, threeway purification pedestal, partition air channel, blower fan, new wind filter; Build airshaft in the outside, tunnel before the construction; Adopt the top air-supply in the construction, air draft Direct Filtration in bottom is got rid of; New wind of new blower fan driven in synchronism and air draft.
2. construction ventilation of tunnel system according to claim 1 and method of ventilation is characterized in that: filter the connection threeway and be made up of filter group, three-way body, flow tank, dedusting door, the output area is greater than the input area.
3. construction ventilation of tunnel system according to claim 1 and method of ventilation is characterized in that: it is identical with partition air channel input airflow direction that threeway purifies pedestal, and air draft water conservancy diversion bend input cross-sectional area is less than the output cross-sectional area.
CN2011104584963A 2011-12-31 2011-12-31 Ventilation system and method for tunnel construction Pending CN102493828A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104584963A CN102493828A (en) 2011-12-31 2011-12-31 Ventilation system and method for tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104584963A CN102493828A (en) 2011-12-31 2011-12-31 Ventilation system and method for tunnel construction

Publications (1)

Publication Number Publication Date
CN102493828A true CN102493828A (en) 2012-06-13

Family

ID=46185681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104584963A Pending CN102493828A (en) 2011-12-31 2011-12-31 Ventilation system and method for tunnel construction

Country Status (1)

Country Link
CN (1) CN102493828A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013086850A1 (en) * 2011-12-15 2013-06-20 天津建院建筑设计有限公司 Downward air extraction system and method for tunnel air
WO2013097249A1 (en) * 2011-12-31 2013-07-04 天津基石科技服务有限公司 Ventilation system and ventilation method for tunnel construction
CN104453973A (en) * 2014-12-12 2015-03-25 中铁十九局集团有限公司 Tunnel ventilation system
CN105986832A (en) * 2015-01-28 2016-10-05 西南交通大学 Air duct design method used for natural wind energy conservation and utilization in tunnel
CN106089280A (en) * 2016-07-14 2016-11-09 西南交通大学 A kind of underground large-scale cave depot group network laneway type construction ventilation method
CN106761880A (en) * 2017-01-09 2017-05-31 河北工程大学 A kind of tunnel ventilation filtration system
CN109057849A (en) * 2018-08-09 2018-12-21 湖南科技大学 Downstream tunnels length bounding method for Extra-long Highway Tunnel open-circuit ventilation system
CN109057848A (en) * 2018-08-09 2018-12-21 湖南科技大学 The ventilation of Extra-long Highway Tunnel closed cycle divides wind to determine method than number maximum
CN109186031A (en) * 2018-09-18 2019-01-11 聂莉萍 A kind of subway work ventilation refrigerating plant
CN110617098A (en) * 2019-11-01 2019-12-27 中交一公局桥隧工程有限公司 Inclined shaft ventilation process for tunnel construction
CN112963190A (en) * 2021-02-23 2021-06-15 重庆交通大学 Air exhaust device for tunnel

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013086850A1 (en) * 2011-12-15 2013-06-20 天津建院建筑设计有限公司 Downward air extraction system and method for tunnel air
WO2013086852A1 (en) * 2011-12-15 2013-06-20 天津建华工程咨询管理公司 Downward air extraction system and method for tunnel air
WO2013097249A1 (en) * 2011-12-31 2013-07-04 天津基石科技服务有限公司 Ventilation system and ventilation method for tunnel construction
CN104453973A (en) * 2014-12-12 2015-03-25 中铁十九局集团有限公司 Tunnel ventilation system
CN104453973B (en) * 2014-12-12 2016-07-27 中铁十九局集团有限公司 A kind of Tunnel Ventilation System
CN105986832A (en) * 2015-01-28 2016-10-05 西南交通大学 Air duct design method used for natural wind energy conservation and utilization in tunnel
CN106089280A (en) * 2016-07-14 2016-11-09 西南交通大学 A kind of underground large-scale cave depot group network laneway type construction ventilation method
CN106761880A (en) * 2017-01-09 2017-05-31 河北工程大学 A kind of tunnel ventilation filtration system
CN109057849A (en) * 2018-08-09 2018-12-21 湖南科技大学 Downstream tunnels length bounding method for Extra-long Highway Tunnel open-circuit ventilation system
CN109057848A (en) * 2018-08-09 2018-12-21 湖南科技大学 The ventilation of Extra-long Highway Tunnel closed cycle divides wind to determine method than number maximum
CN109057848B (en) * 2018-08-09 2019-12-06 湖南科技大学 method for determining maximum value of wind ratio number of closed type circulation ventilation of extra-long road tunnel
CN109057849B (en) * 2018-08-09 2020-02-07 湖南科技大学 Downstream tunnel length extreme value determination method for open ventilation system of extra-long highway tunnel
CN109186031A (en) * 2018-09-18 2019-01-11 聂莉萍 A kind of subway work ventilation refrigerating plant
CN109186031B (en) * 2018-09-18 2020-07-28 聂莉萍 Ventilation and refrigeration device for subway construction
CN110617098A (en) * 2019-11-01 2019-12-27 中交一公局桥隧工程有限公司 Inclined shaft ventilation process for tunnel construction
CN112963190A (en) * 2021-02-23 2021-06-15 重庆交通大学 Air exhaust device for tunnel

Similar Documents

Publication Publication Date Title
CN102493828A (en) Ventilation system and method for tunnel construction
CN206406730U (en) A kind of vehicular air purifier
CN203939735U (en) A kind of novel fire control smoke exhausting filtrating equipment
WO2013086852A1 (en) Downward air extraction system and method for tunnel air
CN203939558U (en) Moisture film filter net type automobile exhaust gas purifying installation
CN106731434A (en) A kind of combined ultra-fine grain coalescence case
CN102619545A (en) Lower exhaust system and method for tunnel air
CN106731435A (en) A kind of angle-style ultra-fine grain coalescence case
CN205073884U (en) Tunnel ventilation purification structure
CN106823664A (en) A kind of horizontal anchor type ultra-fine grain coalescence case
CN204709989U (en) Saving low pulse dust collector
CN106512634A (en) Streamline ultrafine particle coagulation box
CN204637982U (en) Ventilation depositing dust ionic catalysis oxidation gaseous effluent cleaning equipment
CN206420103U (en) A kind of city New-air purifying system
CN203329540U (en) Novel welding smoke purifier
CN209246111U (en) A kind of structural fire protection smoke control system
CN202751908U (en) Dust collection device of slagging system of boiler
CN202467887U (en) Tunnel air lower exhaust system
CN210345770U (en) Air purification system suitable for subway station platform layer
CN204006308U (en) For the purifying fresh air system of toll booth
CN209362054U (en) A kind of cleaner in Flour production workshop
CN207838490U (en) A kind of mute fume purifier
CN202613997U (en) Smoke removal dusting machine of fire curve furnace
CN201569101U (en) Moveable suction system
CN205743598U (en) The rainproof sound-absorbing of generating set multi-functional air feed shutter window

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120613