CN102493750A - Adjustable connecting device and construction method of PC (Poly Carbonate) louver boards - Google Patents

Adjustable connecting device and construction method of PC (Poly Carbonate) louver boards Download PDF

Info

Publication number
CN102493750A
CN102493750A CN2011104325545A CN201110432554A CN102493750A CN 102493750 A CN102493750 A CN 102493750A CN 2011104325545 A CN2011104325545 A CN 2011104325545A CN 201110432554 A CN201110432554 A CN 201110432554A CN 102493750 A CN102493750 A CN 102493750A
Authority
CN
China
Prior art keywords
adjustable
temporary fixed
plate
bolt
agent structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104325545A
Other languages
Chinese (zh)
Other versions
CN102493750B (en
Inventor
张治军
尉家鑫
赵小平
马杰
梁羽
方家福
王蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCDI (Beijing) International Architectural Design Consultants Co., Ltd.
China State Construction Engineering Corp Ltd CSCEC
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN 201110432554 priority Critical patent/CN102493750B/en
Publication of CN102493750A publication Critical patent/CN102493750A/en
Application granted granted Critical
Publication of CN102493750B publication Critical patent/CN102493750B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses an adjustable connecting device and construction method of PC (Poly Carbonate) louver boards. The adjustable connecting device comprises the PC louver boards, primary keels, secondary keels, a main structure connecting assembly and a louver connecting assembly, wherein the primary keels are connected with the main structure connecting assembly; the secondary keels are welded between the two primary keels and connected with the louver connecting assembly; the louver connecting assembly is connected with the PC louver boards; the main structure connecting assembly comprises temporary fixed round steel and temporary fixed angle steel which are hooped at the outer side of a main structure as well as a two-way adjustable connecting composite slab for connecting the main structure and the primary keels of the PC louver boards; and the louver connecting assembly comprises an adjustable clamping plate, a rotating arm and connecting bolts, wherein the adjusting clamping plate is connected with the secondary keels and is capable of clamping the rotating arm, and the rotating arm is connected with the PC louver boards. The adjustable connecting device is simple in construction method; an adjustable connecting way is adopted for the connection of the main structure connecting assembly and the louver connecting assembly so that installing PC louvers at one step is conveniently realized, the reworking rate is reduced, the work efficiency is increased, and the adjustable connecting device can be widely applied to the installation of a curtain wall with the PC louver boards.

Description

The adjustable linkage and the job practices thereof of PC shutter board
Technical field
The present invention relates to a kind of connection device and job practices thereof of blinds curtain wall.
Background technology
Current, facade is tending towards development in pluralism, and architectural image is done things creatively, and has brought new challenge for the construction of the outer curtain wall of building.The PC plate is a kind of new material of present extensive use building field, and a series of advantages such as intensity height, plasticity are strong, light, corrosion-resistant, environmental protection that it has are applicable to the blinds solar protection devices of the outer facade of curtain wall that the daylighting requirement is high, moulding is complicated.But PC shutter board curtain wall solar protection devices is difficult for installing, and its mounting technique and construction technology are still immature; Rework rate is high; Especially be directed against the installation of the PC shutter board of bending, need the connector of a large amount of machine-shapings and carry out large-scale welding engineering, so just delayed the construction period; Greatly reduce operating efficiency, but still can not guarantee workmanship.
Summary of the invention
The adjustable linkage and the job practices thereof that the purpose of this invention is to provide a kind of PC shutter board will solve that PC shutter board curtain wall be difficult for to be installed, welding capacity is big, rework rate is high, ineffective technical problem.
For realizing above-mentioned purpose, the present invention adopts following technical scheme:
A kind of adjustable linkage of PC shutter board; Comprise PC shutter board, main joist, secondary joist, agent structure coupling assembling and blinds coupling assembling; Said main joist is connected with the agent structure coupling assembling; Said secondary joist is welded between two main joists, and secondary joist is connected with the blinds coupling assembling, and the blinds coupling assembling is connected with the PC shutter board.
Said agent structure coupling assembling comprises the two-way adjustable group plate that is connected that encloses temporary fixed round steel, temporary fixed angle steel and connection agent structure and the PC plate main joist of hoop outside agent structure; Said adjustable connection group plate is that two block plates are formed with interim bolt; A wherein block plate and PC plate main joist welding; Another block plate is connected with agent structure with temporary fixed angle steel through temporary fixed round steel 1, and two block plates are plugged into and overlapped part and have at least two cross bolt hole slots.
But said blinds coupling assembling comprises the adjustable splint of the clamping pivoted arm that is connected with secondary joist, pivoted arm and the connecting bolt that is connected with the PC shutter board.
Said temporary fixed round steel embowment can be connected with temporary fixed angle steel by bolt, and said temporary fixed angle steel can connect with the adjustable group plate that is connected through bolt.
Said pivoted arm can be big arm and the hinged shape of forearm, and its big arm is clamped between two plates of adjustable splint, and its forearm is connected with that [ shape is embraced plate, this armful plate and PC shutter board amplexis.
Said secondary joist can be square steel or channel-section steel, and said adjustable splint is connected with the secondary joist bolt through U type frid, perhaps welds with secondary joist.
A kind of job practices of adjustable linkage of PC shutter board, construction sequence is following:
Step 1, the agent structure anchor ear is got up with temporary fixed round steel; Agent structure is fixed in the curved arc of temporary fixed round steel; Temporary fixed round steel is connected with temporary fixed angle steel with bolt; Temporary fixed angle steel connects with bolt with an adjustable wherein block plate that is connected the group plate, another block plate of adjustable connection group plate and main joist welding, and two block plates are through interim bolt.
The relative position of step 2, the adjustable connection group plate of adjustment and agent structure; With adjustable connection group plate and agent structure welding; Dismantle temporary fixed round steel and temporary fixed angle steel, utilize interim bolt to two block plates of adjustable connection group plate angle and overlapping width finely tune, remove interim bolt after mixing up; Two block plates are welded together, accomplish the connection of agent structure coupling assembling this moment.
Step 3, secondary joist and main joist are welded by angle and required precision.
Step 4, with the welding of adjustable splint and U type frid, through two bolts U type frid and secondary joist are fixed, angle on request is clamped and connected the big arm and the adjustable splint of pivoted arm, and connecting bolt is tightened.
Step 5, the forearm of pivoted arm is fixedly connected with the PC shutter board.
Step 6, repetition above-mentioned steps are accomplished the installation of all blinds, so far, and the installation of blinds curtain wall.
Compared with prior art the present invention has following characteristics and beneficial effect: the present invention has overcome the shortcoming of conventional P C shutter board curtain wall difficult installation, compares with original technology, has reduced a large amount of member welding jobs, and security performance is high; Construction technology of the present invention is simple, convenient; On-the-spot workable, reduced workman's difficulty of construction, the present invention is directed to the agent structure coupling assembling and connect and the blinds coupling assembling adjustable connected mode that has been connected designing two portions; The connector and the high defective of rework rate that need a large amount of machine-shapings when being rigidly connected construction have been eliminated; Can carry out accurate localization to blinds and install, be convenient to the one-shot forming of PC blinds installing and locating, reduce rework rate; Improve operating efficiency thus, can be widely used in the installation of PC shutter board curtain wall.
Description of drawings
Below in conjunction with accompanying drawing the present invention is done further detailed explanation.
Fig. 1 is a structural representation of the present invention.
Fig. 2 is the structural representation of agent structure coupling assembling of the present invention.
Fig. 3 is the structural representation of two-way adjustable connection group plate of the present invention.
Fig. 4 is the structural representation that keel of the present invention connect.
Fig. 5 is the structural representation of pivoted arm of the present invention.
Fig. 6 is the structural representation of the blinds coupling assembling of the embodiment of the invention one.
Fig. 7 is the structural representation of the blinds coupling assembling of the embodiment of the invention two.
Fig. 8 is an overall structure sketch map of the present invention.
Reference numeral: Reference numeral: 1-temporary fixed round steel, 2-temporary fixed angle steel, 3-agent structure, 4-main joist, 5-secondary joist, 6-pivoted arm, 7-PC shutter board, 8-interim bolt, 9-two-way adjustable connection group plate, 10-connecting bolt, 11-adjustable splint, 12-U type frid.
The specific embodiment
Embodiment is referring to shown in Figure 1; The adjustable linkage of this PC shutter board comprises PC shutter board 7, main joist 4, secondary joist 5, agent structure coupling assembling and blinds coupling assembling, and said main joist 4 is connected with the agent structure coupling assembling; Said secondary joist 5 is welded between two main joists; Secondary joist 5 is connected with the blinds coupling assembling, and the blinds coupling assembling is connected with PC shutter board 7, and said secondary joist 5 is square steel or channel-section steel.
Referring to shown in Figure 2; Said agent structure coupling assembling comprises and encloses hoop at the temporary fixed round steel 1 in agent structure 3 outsides, temporary fixed angle steel 2 and the two-way adjustable group plate 9 that is connected that connects agent structure 3 and PC plate main joist 4; Said adjustable connection group plate 9 is that two block plates are formed with interim bolt 8; A wherein block plate and 4 welding of PC plate main joist; Another block plate is connected with agent structure 3 with temporary fixed angle steel 2 through temporary fixed round steel 1, and two block plates are plugged into and overlapped part and have at least two cross bolt hole slots, said temporary fixed round steel 1 embowment; And be connected with temporary fixed angle steel 2 by bolt, said temporary fixed angle steel 2 connects with the adjustable group plate 9 that is connected through bolt.
Referring to Fig. 3, shown in Figure 4; But said blinds coupling assembling comprises the adjustable splint 11 of the clamping pivoted arm 6 that is connected with secondary joist 5, the pivoted arm 6 that is connected with PC shutter board 7 and connecting bolt 10; Said pivoted arm 6 is big arm and the hinged shape of forearm, and its big arm is clamped between two plates of adjustable splint 11, and above-mentioned big arm is connected through connecting bolt 10 with adjustable splint 11; Adjustable angle between the two; Its forearm be connected with shape is embraced plate, this armful plate and PC shutter board 7 amplexis, said adjustable splint 11 is connected with secondary joist 5 bolts through U type frid 12.
The concrete construction sequence of job practices of the present invention is following:
Step 1, participation like that is shown in Figure 2; With temporary fixed round steel 1 agent structure 3 anchor ears are got up, agent structure 3 is fixed in the curved arc of temporary fixed round steel 1, and temporary fixed round steel 1 usefulness bolt is connected with temporary fixed angle steel 2; Referring to shown in Figure 3; Temporary fixed angle steel 2 connects with bolt with an adjustable wherein block plate that is connected group plate 9, another block plate of adjustable connection group plate 9 and main joist 4 welding, and two block plates are fixed through interim bolt 8;
The relative position of step 2, adjustment adjustable connection group plate 9 and agent structure 3 is with adjustable connection group plate 9 and agent structure 3 welding, dismantle temporary fixed round steel 1 and temporary fixed angle steel 2; Because PC shutter board 7 is very long; So utilize 8 pairs of adjustable connection group plates 9 of interim bolt two block plates angle and overlapping width finely tune, to guarantee installation quality, remove interim bolt 8 after mixing up; Two block plates are welded together, accomplish the connection of agent structure coupling assembling this moment;
Step 3, referring to shown in Figure 4, by angle and required precision with secondary joist 5 and main joist 4 welding;
Step 4, referring to shown in Figure 5, with adjustable splint 11 and 12 welding of U type frid, through two bolts that U type frid 12 is fixing with secondary joist 5, angle on request is clamped and connected the big arm and the adjustable splint 11 of pivoted arm 6, and connecting bolt 10 is tightened.
Step 5, referring to shown in Figure 6, the forearm of pivoted arm 6 is fixedly connected with PC shutter board 7.
Step 6, referring to shown in Figure 8, repeat above-mentioned steps, through several pivoted arms that are arranged in parallel 6 that a slice PC shutter board 7 is fixing, accomplish the installation of all blinds, so far, the installation of blinds curtain wall.
Embodiment two is referring to shown in Figure 7, with embodiment one unique different be that said adjustable splint 11 is to be weldingly fixed on the secondary joist 5.

Claims (5)

1. the adjustable linkage of a PC shutter board; Comprise PC shutter board (7), main joist (4), secondary joist (5), agent structure coupling assembling and blinds coupling assembling; Said main joist (4) is connected with the agent structure coupling assembling, and said secondary joist (5) is welded between two main joists, and secondary joist (5) is connected with the blinds coupling assembling; The blinds coupling assembling is connected with PC shutter board (7), it is characterized in that:
Said agent structure coupling assembling comprises the two-way adjustable group plate (9) that is connected that encloses temporary fixed round steel (1), temporary fixed angle steel (2) and connection agent structure (3) and the PC plate main joist (4) of hoop outside agent structure (3); Said adjustable connection group plate (9) is that two block plates are formed with interim bolt (8); A wherein block plate and PC plate main joist (4) welding; Another block plate is connected with agent structure (3) with temporary fixed angle steel (2) through temporary fixed round steel (1), and two block plates are plugged into and overlapped part and have at least two cross bolt hole slots;
Said blinds coupling assembling comprises with secondary joist (5) but the adjustable splint (11) of the clamping pivoted arm (6) that is connected, the pivoted arm (6) that is connected with PC shutter board (7) and connecting bolt (10).
2. the adjustable linkage of PC shutter board according to claim 1; It is characterized in that: said temporary fixed round steel (1) embowment; And be connected with temporary fixed angle steel (2) by bolt, said temporary fixed angle steel (2) connects with the adjustable group plate (9) that is connected through bolt.
3. the adjustable linkage of PC shutter board according to claim 1; It is characterized in that: said pivoted arm (6) is big arm and the hinged shape of forearm; Its big arm is clamped between two plates of adjustable splint (11), and its forearm is connected with that [ shape is embraced plate, this armful plate and PC shutter board (7) amplexis.
4. the adjustable linkage of PC shutter board according to claim 1; It is characterized in that: said secondary joist (5) is square steel or channel-section steel; Said adjustable splint (11) is connected with secondary joist (5) bolt through U type frid (12), perhaps welds with secondary joist (5).
5. job practices like the adjustable linkage of the described PC shutter board of claim 1-4 is characterized in that construction sequence is following:
Step 1, agent structure (3) anchor ear is got up with temporary fixed round steel (1); Agent structure (3) is fixed in the curved arc of temporary fixed round steel 1; Temporary fixed round steel (1) is connected (2) with bolt with temporary fixed angle steel; Temporary fixed angle steel (2) connects with bolt with an adjustable wherein block plate that is connected group plate (9), another block plate of adjustable connection group plate (9) and main joist (4) welding, and two block plates are fixing through interim bolt (8);
The relative position of step 2, the adjustable connection group plate of adjustment (9) and agent structure (3); With adjustable connection group plate (9) and agent structure (3) welding; Dismantle temporary fixed round steel (1) and temporary fixed angle steel (2), utilize interim bolt (8) to two block plates of adjustable connection group plate (9) angle and overlapping width finely tune, remove interim bolt after mixing up; Two block plates are welded together, accomplish the connection of agent structure coupling assembling this moment;
Step 3, by angle and required precision with secondary joist (5) and main joist (4) welding;
Step 4, with the welding of adjustable splint (11) and U type frid (12); Through two bolts that U type frid (12) and secondary joist (5) is fixing; Angle on request is clamped and connected the big arm and the adjustable splint (11) of pivoted arm (6), and connecting bolt (10) is tightened;
Step 5, the forearm of pivoted arm (6) is fixedly connected with PC blinds (7) plate;
Step 6, repetition above-mentioned steps are accomplished the installation of all PC blinds, so far, and the installation of blinds curtain wall.
CN 201110432554 2011-12-21 2011-12-21 Adjustable connecting device and construction method of PC (Poly Carbonate) louver boards Expired - Fee Related CN102493750B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110432554 CN102493750B (en) 2011-12-21 2011-12-21 Adjustable connecting device and construction method of PC (Poly Carbonate) louver boards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110432554 CN102493750B (en) 2011-12-21 2011-12-21 Adjustable connecting device and construction method of PC (Poly Carbonate) louver boards

Publications (2)

Publication Number Publication Date
CN102493750A true CN102493750A (en) 2012-06-13
CN102493750B CN102493750B (en) 2013-09-18

Family

ID=46185603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110432554 Expired - Fee Related CN102493750B (en) 2011-12-21 2011-12-21 Adjustable connecting device and construction method of PC (Poly Carbonate) louver boards

Country Status (1)

Country Link
CN (1) CN102493750B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161243A (en) * 2013-03-07 2013-06-19 悉地(北京)国际建筑设计顾问有限公司 Louver curtain wall

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001248253A (en) * 2000-03-02 2001-09-14 Sankyo Alum Ind Co Ltd Blind panel body
CN200946442Y (en) * 2006-08-08 2007-09-12 广州市荔湾区金霸装饰材料厂 Improved structure of shutter for air intake
CN201050183Y (en) * 2007-05-31 2008-04-23 南通建工集团股份有限公司 Inclination-proof device of scaffold
CN201062389Y (en) * 2007-06-08 2008-05-21 杜金泽 Latch hook type curtain wall column mounting regulating structure
CN202500484U (en) * 2011-12-21 2012-10-24 中建城市建设发展有限公司 Adjustable connecting device of PC louver boards

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001248253A (en) * 2000-03-02 2001-09-14 Sankyo Alum Ind Co Ltd Blind panel body
CN200946442Y (en) * 2006-08-08 2007-09-12 广州市荔湾区金霸装饰材料厂 Improved structure of shutter for air intake
CN201050183Y (en) * 2007-05-31 2008-04-23 南通建工集团股份有限公司 Inclination-proof device of scaffold
CN201062389Y (en) * 2007-06-08 2008-05-21 杜金泽 Latch hook type curtain wall column mounting regulating structure
CN202500484U (en) * 2011-12-21 2012-10-24 中建城市建设发展有限公司 Adjustable connecting device of PC louver boards

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161243A (en) * 2013-03-07 2013-06-19 悉地(北京)国际建筑设计顾问有限公司 Louver curtain wall
CN103161243B (en) * 2013-03-07 2015-11-25 悉地(北京)国际建筑设计顾问有限公司 A kind of louver curtain wall

Also Published As

Publication number Publication date
CN102493750B (en) 2013-09-18

Similar Documents

Publication Publication Date Title
CN102383526A (en) Shockproof external wall panel with prefabricated structure and positioning method thereof
CN102493750B (en) Adjustable connecting device and construction method of PC (Poly Carbonate) louver boards
CN202500484U (en) Adjustable connecting device of PC louver boards
CN111088863A (en) Pendant structure and precast concrete wallboard system
WO2022127539A1 (en) Integrated cold-formed thin-wall steel and lightweight concrete composite wallboard structure
CN113931340B (en) Assembled semi-embedded external wall panel and building
CN211597204U (en) Connection structure and precast concrete wallboard system
CN214941113U (en) Connecting joint for connecting C-shaped steel primary and secondary purlines through T-shaped connecting plates
CN209799109U (en) Curtain wall mounting structure capable of achieving different angles
CN221441978U (en) Assembled steel construction wall installation wall leveling coupling assembling
CN105490222A (en) Bridge frame elbow
CN111305420A (en) Connection structure and precast concrete wallboard system
CN111706088A (en) Detachable wallboard connecting piece and rapid installation process thereof
CN219773294U (en) Connection structure and building structure
CN205776803U (en) A kind of double dovetail assembled architecture antidetonation attachment structure
CN215407446U (en) L type angle aluminium alloy template integrated configuration
CN212295684U (en) Detachable wallboard connecting piece
CN211923116U (en) Pendant structure and precast concrete wallboard system
CN213144987U (en) Plane fastener for fixing sound barrier keel on screen frame
CN212169455U (en) Auxiliary tool for welding steel structure in air
CN221314597U (en) Precast beam template mosaic structure
CN221168343U (en) Cross connection structure of ceiling joist
CN215670442U (en) Butt-plug type honeycomb stainless steel dense seamless splicing ceiling system
CN219753657U (en) Suspended ceiling connecting component of steel structure house
CN214460324U (en) Prefabricated building monomer assembly structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CCDI (BEIJING) INTERNATIONAL CONSTRUCTION DESIGN C

Effective date: 20130802

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Zhijun

Inventor after: Wei Jiaxin

Inventor after: Zhao Xiaoping

Inventor after: Lv Qiang

Inventor after: Ma Jie

Inventor after: Liang Yu

Inventor after: Fang Jiafu

Inventor after: Wang Lei

Inventor before: Zhang Zhijun

Inventor before: Wei Jiaxin

Inventor before: Zhao Xiaoping

Inventor before: Ma Jie

Inventor before: Liang Yu

Inventor before: Fang Jiafu

Inventor before: Wang Lei

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG ZHIJUN WEI JIAXIN ZHAO XIAOPING MA JIE LIANG YU FANG JIAFU WANG LEI TO: ZHANG ZHIJUN WEI JIAXIN ZHAO XIAOPING LV QIANG MA JIE LIANG YU FANG JIAFU WANG LEI

TA01 Transfer of patent application right

Effective date of registration: 20130802

Address after: 100037, Haidian District, China, three Li River, 13, China building materials building, 11, Beijing

Applicant after: China State Construction Eng. Corp. Ltd.

Applicant after: CCDI (Beijing) International Architectural Design Consultants Co., Ltd.

Address before: 100037, Haidian District, China, three Li River, 13, China building materials building, 11, Beijing

Applicant before: China State Construction Eng. Corp. Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130918

Termination date: 20141221