CN102493427B - 一种使用固化土作为堆载的堆场淤泥快速排水-快速固结施工方法 - Google Patents

一种使用固化土作为堆载的堆场淤泥快速排水-快速固结施工方法 Download PDF

Info

Publication number
CN102493427B
CN102493427B CN201110363068.2A CN201110363068A CN102493427B CN 102493427 B CN102493427 B CN 102493427B CN 201110363068 A CN201110363068 A CN 201110363068A CN 102493427 B CN102493427 B CN 102493427B
Authority
CN
China
Prior art keywords
yard
silt
stockyard
preloading
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110363068.2A
Other languages
English (en)
Other versions
CN102493427A (zh
Inventor
朱伟
张春雷
刘青松
包建平
张楠
吕一彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201110363068.2A priority Critical patent/CN102493427B/zh
Publication of CN102493427A publication Critical patent/CN102493427A/zh
Application granted granted Critical
Publication of CN102493427B publication Critical patent/CN102493427B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Treatment Of Sludge (AREA)

Abstract

本发明涉及的是利用固化土作为堆载的堆场淤泥快速排水-快速固结施工方法,其特征是利用轻型作业船在堆场表面设置排水盲沟、铺设垂向和水平向排水板,垂向排水板弯折90°后与水平向排水板之间连接构成立体排水体系;最后利用现场固化土作为堆载预压的材料,促进堆场淤泥后期的排水固结,缩短堆场淤泥的处理周期。本发明将轻型作业船和堆场淤泥处理用轻型开口楔快速插板机相结合,使施工人员和设备可以在高含水率、低强度的淤泥堆场表面铺设排水盲沟和排水板;垂向和水平向排水板相互柔性、紧贴连接,可保证垂向和水平向排水通道之间的畅通;利用现场固化土作为堆载预压的材料,不仅提高施工效率,而且节约堆载材料的运输成本。

Description

一种使用固化土作为堆载的堆场淤泥快速排水-快速固结施工方法
技术领域
本发明涉及一种堆场淤泥快速排水-快速固结的施工方法,属于资源环境领域。
背景技术
为了改善湖泊的水质问题我国的太湖、西湖、巢湖、滇池、东山湖、麓湖等湖泊正在开展大规模的清淤工程。同时,一些城市河道、通航河道和农村小河道也根据水质改善、航道畅通、泄洪输水能力保障等目的开展疏浚工程。目前,国内湖泊清淤、河道疏浚淤泥的处理方法主要先在堆场内进行存放,然后进行以提高承载力为目的的堆场地基处理,或者以改性作为土材料使用的固化处理。
在堆场处理方法中真空预压法是较为便宜又易于实施的方法,在海岸吹填工程中有较为广泛的使用经验。这一方法一般在堆场表面铺设2m左右的中粗砂垫层作为水平排水通道,然后在砂垫层具有一定承载力的基础上使用插板设备进行垂直排水板的设置施工,最后使用真空或堆载进行固结排水施工。但这一方法在河湖吹填淤泥堆场实施时经常会遇到一些问题,主要是:河湖清淤淤泥粘土颗粒含量高表面非常软弱,长期为泥沼状态施工设备不能进入;城市周围缺少砂垫层材料或者砂材料较为昂贵在表面铺设造价较高;真空预压会遇到闭气困难及真空度不足的问题;处理需要的时间长且承载力偏低(6T/m2)。
发明内容
本发明针对的是淤泥堆场短时间内无法进入、水平排水体系布置烦琐、土石方材料紧缺问题。
本发明的目的是通过以下技术方案实现的:
一种使用固化土作为堆载的堆场淤泥快速排水-快速固结施工方法,其特征在于,包括以下步骤:
(1) 利用轻型作业船,通过导锁牵引进场布设排水盲沟,排除堆场表层积水,排水盲沟间距为10-15m;
(2) 轻型作业船与快速插板机结合,插设堆场淤泥垂向排水板;
(3) 利用轻型作业船铺设水平排水板,在与垂向排水板相交的位置进行连接;水平排水板在堆场表面形成格子状排列并超过地基处理边界一定长度;具体而言,垂向排水板弯折90°后与水平排水板连接;水平排水板间距为0.8-1.2m,水平排水板长度超过地基边界0.5-0.8m;
(4) 对堆场内的部分淤泥进行固化后作为堆载材料分层分级加载;固化土作为堆载使用时的无侧限抗压强度大于150kPa。
本发明的优点在于:
(1) 在不铺设垫层的条件下进行插板作业。利用轻型作业船在堆场表面布设排水盲沟,加速堆场表面的排水,同时利用堆场淤泥处理用轻型开口楔快速插板机进行垂向排水通道的设置,解决了普通施工设备短时间无法进入堆场施工和施工困难的难题。
(2) 垂向排水板和水平铺设的排水板之间进行丁字型连接,不管堆场表面发生怎样的变化,立体的排水通道始终是连通的。
(3) 就地取材使用淤泥进行固化后作为堆载材料使用,不但节省了堆载材料,由于表层硬壳层的存在,堆场承载力大大提高。具体而言,堆场承载力的提高由两部分组成: 1)促进堆场淤泥的排水固结提高淤泥本身的强度; 2)表层以固化淤泥形成的硬壳层。由于两个方面的效果堆场的承载力远远大于一般真空预压的效果,处理后的堆场具有10T/m2以上的承载力。
附图说明
图1为本发明的工艺流程图。
图1中:1、围堰;2、轻型作业船;3、排水盲沟;4、堆场淤泥;5、堆场淤泥处理用轻型开口楔快速插板机;6、垂向排水板;7、水平排水板;8、固化淤泥。
具体实施方式
实施例
以无锡太湖某淤泥堆场地基加固工程为例,再结合上述附图对本发明作进一步说明:
使用固化土作为堆载的堆场淤泥快速排水-快速固结施工方法,首先采用轻型作业船2在导锁牵引下进入堆场表面作业,铺设排水盲沟3,沟槽宽0.5m,深0.3-0.5m,间距10-15m,同时在堆场四周设置抽水泵协助排水,保证堆场表面积水及时排干。
堆场表层水排干后,轻型作业船2与堆场淤泥处理用轻型开口楔快速插板机5结合使用,在堆场表面插设垂向排水板6和铺设水平向排水板7,垂向排水板6插设深度6m,垂向排水板6和水平排水板7横向间距1m,纵向间距1m。垂向排水板6弯折90°后和水平排水板7用大型订书钉固定,则水平排水板6在堆场表面形成矩形格子状排列并预留足够的长度,伸出地基处理边界0.5-0.8m。垂向和水平向排水板相互柔性、紧贴连接,保证垂向和水平向排水通道之间的畅通。排水板铺设结束后,在排水板上堆载固化淤泥,利用固化淤泥进行堆载预压,不仅提高施工效率,而且节约堆载材料的运输成本。要求固化土作为堆载使用时的无侧限抗压强度大于150kPa。固化淤泥分两级堆载,第一级层厚1.5m;第二级层厚1.5m,堆载总厚度为3~4m。
将轻型作业船和堆场淤泥处理用轻型开口楔快速插板机相结合,使施工人员和设备可以在高含水率、低强度的淤泥堆场表面铺设排水盲沟和排水板。 
堆载预压90天时,经沉降资料计算显示,处理区域地基固结度达到85%的设计要求,后经静载试验验证,处理区域地基承载力达到100kPa的设计要求。

Claims (1)

1.一种使用固化土作为堆载的堆场淤泥快速排水-快速固结施工方法,其特征在于,包括以下步骤:
(1) 利用轻型作业船,通过导锁牵引进场布设排水盲沟,排除堆场表层积水;排水盲沟间距为10-15m;
(2) 轻型作业船与快速插板机结合,插设堆场淤泥垂向排水板;
(3) 利用轻型作业船铺设水平排水板,在与垂向排水板相交的位置进行连接;水平排水板在堆场表面形成格子状排列并超过地基处理边界一定长度;垂向排水板弯折90°后与水平排水板连接;水平排水板间距为0.8-1.2m,水平排水板长度超过地基处理边界0.5-0.8m;
(4) 对堆场内的部分淤泥进行固化后作为堆载材料分层分级加载,堆载在排水板的上面,固化土作为堆载使用时的无侧限抗压强度大于150kPa。
CN201110363068.2A 2011-11-16 2011-11-16 一种使用固化土作为堆载的堆场淤泥快速排水-快速固结施工方法 Active CN102493427B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110363068.2A CN102493427B (zh) 2011-11-16 2011-11-16 一种使用固化土作为堆载的堆场淤泥快速排水-快速固结施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110363068.2A CN102493427B (zh) 2011-11-16 2011-11-16 一种使用固化土作为堆载的堆场淤泥快速排水-快速固结施工方法

Publications (2)

Publication Number Publication Date
CN102493427A CN102493427A (zh) 2012-06-13
CN102493427B true CN102493427B (zh) 2014-09-10

Family

ID=46185283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110363068.2A Active CN102493427B (zh) 2011-11-16 2011-11-16 一种使用固化土作为堆载的堆场淤泥快速排水-快速固结施工方法

Country Status (1)

Country Link
CN (1) CN102493427B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103091471B (zh) * 2013-01-25 2016-08-03 同济大学 一种加速冲填土固结的模型及其试验方法
CN104912053A (zh) * 2014-04-23 2015-09-16 朱平 采用矿石作为堆载料进行堆载预压的方法
CN104775414B (zh) * 2015-03-24 2017-05-03 华中科技大学 超软吹填土表层固化结壳及地基处理方法
CN105149316B (zh) * 2015-07-03 2016-05-18 浙江理工大学 一种用固化的市政污泥构建储库的填埋场堆高增容方法
CN107338783B (zh) * 2017-08-24 2019-01-29 武汉大学 降低粘性土料场土料含水量的方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1184188A (zh) * 1997-07-29 1998-06-10 浙江省围海工程公司 水下塑料排水板加固软基方法及设备
CN201024417Y (zh) * 2007-04-13 2008-02-20 中交四航工程研究院有限公司 一种超软弱土浅表层快速加固系统
CN101148872A (zh) * 2007-10-12 2008-03-26 河海大学 堆场淤泥处理用轻型开口楔快速插板机

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1023555C2 (nl) * 2003-05-28 2004-12-03 Bos & Kalis Baggermaatsch Werkwijze en samenstel voor het onttrekken of toevoeren van stoffen uit/aan een bodemlichaam.
KR100679601B1 (ko) * 2005-12-16 2007-02-06 김수삼 초 연약 지반내의 간극수를 배수하기 위한 석션드레인 공법
CN1793520A (zh) * 2006-01-05 2006-06-28 江苏南水土建工程公司 排水固结加固软基新型水平排水体的结构及其施工方法
CN101130953B (zh) * 2007-07-26 2010-12-08 武亚军 一种软土地基深层真空振击处理方法
CN100584426C (zh) * 2007-09-11 2010-01-27 东南大学 高含水量疏浚淤泥堆场透气真空快速泥水分离方法
CN102226335A (zh) * 2011-04-18 2011-10-26 中交四航工程研究院有限公司 一种控制软土工后沉降变形的地基处理方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1184188A (zh) * 1997-07-29 1998-06-10 浙江省围海工程公司 水下塑料排水板加固软基方法及设备
CN201024417Y (zh) * 2007-04-13 2008-02-20 中交四航工程研究院有限公司 一种超软弱土浅表层快速加固系统
CN101148872A (zh) * 2007-10-12 2008-03-26 河海大学 堆场淤泥处理用轻型开口楔快速插板机

Also Published As

Publication number Publication date
CN102493427A (zh) 2012-06-13

Similar Documents

Publication Publication Date Title
CN102587352B (zh) 一种软土地基的热排水固结处理装置及其处理方法
CN103031836B (zh) 一种在新吹填淤泥地基上快速修筑道路的方法
CN102493427B (zh) 一种使用固化土作为堆载的堆场淤泥快速排水-快速固结施工方法
CN108468325B (zh) 一种大面积临海滩涂海泥快速固化施工方法
CN100480472C (zh) 超软弱土快速加固方法及其加固装置
CN2911010Y (zh) 吹填淤泥土地基快速加固装置
CN104120710B (zh) 一种真空预压联合吹填泥浆的软基加固处理方法
CN107761670B (zh) 基于疏浚泥初始状态控制的堆场有效容积最优控制方法
CN102220757A (zh) 超软弱土浅表层空间排水固结快速处理方法
CN105019425B (zh) 一种排水体和固化层组合地基结构的施工方法
CN104878739A (zh) 可横向连接塑料排水板的排水体组件及其施工方法
CN104412751A (zh) 一种盐碱滩地黏质滨海盐土改良方法
CN102322054B (zh) 超软土浅表层间歇性强抽排水结合短期晾晒的处理方法
CN1807773A (zh) 一种深厚湿陷性黄土地基的处理方法
CN105002884A (zh) 一种河湖底淤泥先固化后开挖的方法
CN202595725U (zh) 真空预压软土地基处理用的排水结构
CN102767174A (zh) 动静排水振击法
CN106884427A (zh) 水下沉管隧道以及沉管隧道过渡段软土地基加固方法
CN201785743U (zh) 砂井和排水板相结合的真空预压加固软土地基结构
CN204875755U (zh) 一种排水体和固化层组合地基结构
CN103276717B (zh) 复合土工合成材料加筋垫层处理软土地基的方法
CN105484229B (zh) 适用于水域软基的上覆泥层密封真空预压方法
CN104746506A (zh) 软土联合预压结构和施工方法
CN105002883A (zh) 软弱地基间接分级接力式排水固结法
CN103046534A (zh) 一种提高地基承载力的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant