CN102489984B - Method for quickly replacing crane beam without using hoist for construction - Google Patents

Method for quickly replacing crane beam without using hoist for construction Download PDF

Info

Publication number
CN102489984B
CN102489984B CN201110444324.0A CN201110444324A CN102489984B CN 102489984 B CN102489984 B CN 102489984B CN 201110444324 A CN201110444324 A CN 201110444324A CN 102489984 B CN102489984 B CN 102489984B
Authority
CN
China
Prior art keywords
crane beam
new
crane
old
tripod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110444324.0A
Other languages
Chinese (zh)
Other versions
CN102489984A (en
Inventor
李四建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201110444324.0A priority Critical patent/CN102489984B/en
Publication of CN102489984A publication Critical patent/CN102489984A/en
Application granted granted Critical
Publication of CN102489984B publication Critical patent/CN102489984B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a method for quickly replacing a crane beam without using a hoist for construction. The method comprises the following steps of: 1) arranging a temporary platform on a crane, hoisting a new crane beam to the temporary platform for fixing at a hoist position in a workshop, and horizontally transporting the new crane beam to a position over an old crane beam which is needed to be replaced by running the crane; 2) arranging a hanging point and a first temporary tripod on a column at two ends of the old crane beam, lifting the new crane beam and moving the new crane beam away from the crane by using a chain block, putting the new crane beam on the first temporary tripod for fixing, and removing the hanging point of the lower end of the chain block and the new crane beam; 3) removing the old crane beam and descending the old crane beam to the lower side of a mounting position of the new crane beam by using the chain block, and fixing the old crane beam on a second temporary tripod of the column; 4) arranging the new crane beam in place by using the chain block; and 5) after a rail is recovered, hoisting the old crane beam by using the crane. By the method, operation difficulty is reduced, and the construction progress is accelerated; and the whole method is simple, practical, safe and reliable.

Description

Can not use the quick-replaceable crane beam method of crane construction
Technical field
The present invention relates to a kind of construction work method, relate in particular to a kind of quick-replaceable crane beam method that can not use crane construction.
Background technology
In the maintenance engineering of workshop; often can run into and only change local crane beam; and this crane beam below is production equipment, can not remove or be shifted, the roofing of top can not be removed because producing; cause crane directly to lift; it has caused changing crane beam in the short time, on producing the impact that has caused very large impact, and as only adopted manual operation; waste time and energy, have again very large potential safety hazard.
Summary of the invention
The object of the present invention is to provide a kind of quick-replaceable crane beam method that can not use crane construction, its practicality simple to operate, safe and efficient.
The technical solution used in the present invention:
A kind of quick-replaceable crane beam method that can not use crane construction, it comprises the steps 1) first in driving, temporary platform is set, in workshop, can place crane place, new crane beam is lifted in temporary platform and is fixed, utilize driving walking new crane beam horizontal transport to be arrived directly over the old crane beam that need to change; 2) hanging point and the first interim tripod are set on the pillar of old crane beam two ends, utilize jack that new crane beam is mentioned and remove driving, newer crane beam is placed on the first interim tripod and is fixed, extract the hanging point of jack lower end and new crane beam; 3) then utilize jack that old crane beam is removed and dropped to the below that new crane beam is installed, and old crane beam is fixed on the second interim tripod of pillar; 4) recycling jack is in place new crane beam; 5) track forming until new crane beam recovers to use after function, with driving, old crane beam is hung away, completes the replacing of new and old crane beam.
The above-mentioned position that on old crane beam, plane declines in step 3) is lower than pillar bracket face more than 1 meter.
The technique effect that the present invention obtains:
The present invention relies on original production driving, factory building pillar in workshop, has reduced operation easier, accelerating construction progress; Whole method simple practical, safe and reliable.
Accompanying drawing explanation
Fig. 1 is the top view of horizontal transport of the present invention;
Fig. 2 is horizontal transport process front view of the present invention;
Fig. 3 is Renewal process midplane layout drawing of the present invention;
Fig. 4 is front view in Renewal process of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing, embodiments of the present invention are described further.
Referring to Fig. 1-4, a kind of quick-replaceable crane beam method that can not use crane construction, it comprises the steps 1) first in driving 1, temporary platform is set, in workshop, can place crane place, new crane beam 2 is lifted in temporary platform and is fixed, utilize driving walking new crane beam horizontal transport to be arrived directly over the old crane beam 4 that need to change; 2) hanging point and the first interim tripod 6 are set on old crane beam two ends pillar 3, utilize jack that new crane beam is mentioned and remove driving, newer crane beam is placed on the first interim tripod and is fixed, extract the hanging point of jack lower end and new crane beam; 3) then utilize jack that old crane beam is removed and dropped to the below that new crane beam is installed, and old crane beam is fixed on the second interim tripod of pillar, the position that on old crane beam, plane declines need be lower than pillar bracket face more than 1 meter; 4) recycling jack is in place new crane beam; 5) track forming until new crane beam recovers to use after function, with driving, old crane beam is hung away, completes the replacing of new and old crane beam.
Protection scope of the present invention is not limited to the above embodiments, and obviously, those skilled in the art can carry out various changes and distortion and not depart from the scope of the present invention and spirit the present invention.If these changes and distortion belong in the scope of the claims in the present invention and equivalent technologies thereof, the intent of the present invention also comprises these changes and is out of shape interior.

Claims (2)

1. the quick-replaceable crane beam method that can not use crane construction, it is characterized in that: it comprises the steps 1) first in driving (1), temporary platform is set, in workshop, can place crane place, new crane beam (2) is lifted in temporary platform and is fixed, utilize driving walking new crane beam horizontal transport to be arrived directly over the old crane beam (4) that need to change; 2) hanging point and the first interim tripod (6) are set on old crane beam two ends pillars (3), utilize jack that new crane beam is mentioned and remove driving, again new crane beam is placed on the first interim tripod and fixes, extract the hanging point of jack lower end and new crane beam; 3) then utilize jack that old crane beam is removed and dropped to the below that new crane beam is installed, and old crane beam is fixed on the second interim tripod of pillar; 4) recycling jack is in place new crane beam; 5) track forming until new crane beam recovers to use after function, with driving, old crane beam is hung away, completes the replacing of new and old crane beam.
2. the quick-replaceable crane beam method that can not use according to claim 1 crane construction, is characterized in that: the position that on old crane beam, plane declines in step 3) is lower than pillar bracket face more than 1 meter.
CN201110444324.0A 2011-12-23 2011-12-23 Method for quickly replacing crane beam without using hoist for construction Active CN102489984B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110444324.0A CN102489984B (en) 2011-12-23 2011-12-23 Method for quickly replacing crane beam without using hoist for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110444324.0A CN102489984B (en) 2011-12-23 2011-12-23 Method for quickly replacing crane beam without using hoist for construction

Publications (2)

Publication Number Publication Date
CN102489984A CN102489984A (en) 2012-06-13
CN102489984B true CN102489984B (en) 2014-02-12

Family

ID=46181867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110444324.0A Active CN102489984B (en) 2011-12-23 2011-12-23 Method for quickly replacing crane beam without using hoist for construction

Country Status (1)

Country Link
CN (1) CN102489984B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109850765B (en) * 2017-11-30 2022-07-05 中国二十冶集团有限公司 In-beam medium pipeline protection device for crane beam replacement and use method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5356091B2 (en) * 2008-11-18 2013-12-04 Jfeシビル株式会社 Crane girder exchanging method and crane girder exchanging apparatus
CN101486091A (en) * 2009-02-20 2009-07-22 中冶实久建设有限公司南京分公司 Integral replacing method of ladle turret with limited upper lifting space
CN101723252B (en) * 2009-11-11 2012-09-05 甘肃省电力公司刘家峡水电厂 Overhead-traveling installation method of 400t overhead travelling crane replacement equipment
CN102101159A (en) * 2009-12-17 2011-06-22 中冶天工建设有限公司 Mounting method for exchanging guide rail at fan-shaped section of continuous casting machine
CN102267664B (en) * 2011-05-27 2013-07-03 中国一冶集团有限公司 Method for installing bridge crane using load-supporting roof beam for hoisting and usage thereof

Also Published As

Publication number Publication date
CN102489984A (en) 2012-06-13

Similar Documents

Publication Publication Date Title
CN104131519B (en) A kind of bridging toughening equipment construction method
CN105442865A (en) Piecewise dismounting method and equipment thereof for towering chimney
CN105019664B (en) High-altitude sliding installation method for box room type electric room
KR101060598B1 (en) Horizontal movable up-down type supporting post and rapid replacing method of the bridge using the same
CN203320425U (en) Cast-in-situ box girder construction apparatus with slidingly movable side mold
CN102489984B (en) Method for quickly replacing crane beam without using hoist for construction
CN103419279A (en) T-beam formwork integral dismantling and longitudinal sliding construction method
KR101234090B1 (en) Method for changing girder of railway plate girder bridge
JP5977216B2 (en) Demolition method of tower-supported chimney
CN205314590U (en) Special mechanism of main equipment dismouting in factory building and frame
CN104675114A (en) Method and device for removing template in narrow space
CN105984821B (en) Boom hoisting in a kind of Wind turbines cabin used on demand
CN206800228U (en) Remove the frame mounting of arch bridge
CN203715086U (en) Quick changing device for wheel parts of crane
CN206769343U (en) It is a kind of to be used for the travelling bridge that guardrail is constructed that builds a bridge
CN203855324U (en) Lifting device for installing and removing underground coal mine working face
CN106121254A (en) Heavy component transportation system after disassembly by reverse construction method and construction method
CN203452362U (en) Lifting material platform
CN203402829U (en) Frame of lifting machine for portable transformer
CN205688822U (en) Heavy component transportation system after reverse construction method disassembly
CN203782579U (en) Anti-pull dismantling device of large-span supporting system
CN103882810B (en) A kind of anti-dilatory detaching device of large span support system and method
CN204783856U (en) Husky device is taken out in special use on water
CN203959675U (en) Crane shaped rail coaster
CN103074849B (en) Bridge inspection vehicle with automatically detached and replaced frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant