CN102479284A - 一种用于电能质量的单次暂降特征量的计算方法 - Google Patents
一种用于电能质量的单次暂降特征量的计算方法 Download PDFInfo
- Publication number
- CN102479284A CN102479284A CN2010105554918A CN201010555491A CN102479284A CN 102479284 A CN102479284 A CN 102479284A CN 2010105554918 A CN2010105554918 A CN 2010105554918A CN 201010555491 A CN201010555491 A CN 201010555491A CN 102479284 A CN102479284 A CN 102479284A
- Authority
- CN
- China
- Prior art keywords
- duration
- temporarily
- fall
- data
- decrease value
- Prior art date
Links
- 238000004364 calculation method Methods 0.000 title claims abstract description 25
- 238000006116 polymerization reaction Methods 0.000 claims description 7
- 230000000875 corresponding Effects 0.000 claims description 6
- 125000004122 cyclic group Chemical group 0.000 abstract 1
- 230000001052 transient Effects 0.000 description 2
- 241001489523 Coregonus artedi Species 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105554918A CN102479284A (zh) | 2010-11-23 | 2010-11-23 | 一种用于电能质量的单次暂降特征量的计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105554918A CN102479284A (zh) | 2010-11-23 | 2010-11-23 | 一种用于电能质量的单次暂降特征量的计算方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102479284A true CN102479284A (zh) | 2012-05-30 |
Family
ID=46091927
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105554918A CN102479284A (zh) | 2010-11-23 | 2010-11-23 | 一种用于电能质量的单次暂降特征量的计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102479284A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103886518A (zh) * | 2014-03-21 | 2014-06-25 | 国家电网公司 | 一种基于监测点电能质量数据挖掘的电压暂降预警方法 |
CN104376403A (zh) * | 2014-10-30 | 2015-02-25 | 广东电网有限责任公司东莞供电局 | 一种基于下级用户行业特性的变电站暂降敏感度分级方法 |
CN106324320A (zh) * | 2016-08-11 | 2017-01-11 | 国网浙江省电力公司宁波供电公司 | 多次电压暂降的持续时间曲线拟合方法及电压暂降严重程度评估方法 |
CN106370913A (zh) * | 2016-09-18 | 2017-02-01 | 浙江群力电气有限公司 | 一种节点电压暂降严重性评估系统及评估方法 |
CN109001577A (zh) * | 2018-08-24 | 2018-12-14 | 国网山东省电力公司济南供电公司 | 一种电能计量现场数据分析方法及系统 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101534008A (zh) * | 2008-12-01 | 2009-09-16 | 华南理工大学 | 减少电压暂降对用电设备影响的方法 |
-
2010
- 2010-11-23 CN CN2010105554918A patent/CN102479284A/zh not_active Application Discontinuation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101534008A (zh) * | 2008-12-01 | 2009-09-16 | 华南理工大学 | 减少电压暂降对用电设备影响的方法 |
Non-Patent Citations (1)
Title |
---|
华北电力科学院有限责任公司: "《华北电网电能质量数字化分析平台》", 8 May 2009, article "华北电网电能质量数字化分析平台" * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103886518A (zh) * | 2014-03-21 | 2014-06-25 | 国家电网公司 | 一种基于监测点电能质量数据挖掘的电压暂降预警方法 |
CN104376403A (zh) * | 2014-10-30 | 2015-02-25 | 广东电网有限责任公司东莞供电局 | 一种基于下级用户行业特性的变电站暂降敏感度分级方法 |
CN104376403B (zh) * | 2014-10-30 | 2017-11-03 | 广东电网有限责任公司东莞供电局 | 一种基于下级用户行业特性的变电站暂降敏感度分级方法 |
CN106324320A (zh) * | 2016-08-11 | 2017-01-11 | 国网浙江省电力公司宁波供电公司 | 多次电压暂降的持续时间曲线拟合方法及电压暂降严重程度评估方法 |
CN106324320B (zh) * | 2016-08-11 | 2018-11-27 | 国网浙江省电力公司宁波供电公司 | 多次电压暂降的持续时间曲线拟合方法及电压暂降严重程度评估方法 |
CN106370913A (zh) * | 2016-09-18 | 2017-02-01 | 浙江群力电气有限公司 | 一种节点电压暂降严重性评估系统及评估方法 |
CN109001577A (zh) * | 2018-08-24 | 2018-12-14 | 国网山东省电力公司济南供电公司 | 一种电能计量现场数据分析方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Arif et al. | Load modeling—A review | |
Lucas et al. | Grid harmonic impact of multiple electric vehicle fast charging | |
Rönnberg et al. | Power quality issues in the electric power system of the future | |
Milanovic et al. | Modeling of FACTS devices for voltage sag mitigation studies in large power systems | |
Bollen et al. | Power quality concerns in implementing smart distribution-grid applications | |
Emanuel | On the assessment of harmonic pollution [of power systems] | |
Singh et al. | Power quality: problems and mitigation techniques | |
Stones et al. | Power quality | |
He et al. | Design and experiment of wide area HVDC supplementary damping controller considering time delay in China southern power grid | |
Cheng et al. | Reactance scan crossover-based approach for investigating SSCI concerns for DFIG-based wind turbines | |
Liu et al. | Wide-area-measurement system development at the distribution level: An FNET/GridEye example | |
De Almeida et al. | Power quality problems and new solutions | |
Ribeiro et al. | Power systems signal processing for smart grids | |
Alam et al. | Characterizing voltage sags and swells using three-phase voltage ellipse parameters | |
CN102208801B (zh) | 一种将线路保护装置安全用于风电场的做法 | |
Patsalides et al. | Towards the establishment of maximum PV generation limits due to power quality constraints | |
CN201637791U (zh) | 高压并联电容器在线监测系统 | |
CN103217579B (zh) | 变压器绕组在线监测系统 | |
Wang et al. | Voltage sag state estimation for power distribution systems | |
Kumar et al. | A simple modular multilevel inverter topology for the power quality improvement in renewable energy based green building microgrids | |
CN101571563A (zh) | 综合电能质量监控终端 | |
Farhoodnea et al. | Power quality impacts of high-penetration electric vehicle stations and renewable energy-based generators on power distribution systems | |
CN103823144A (zh) | 一种高压并联电力电容器运行监测系统及方法 | |
Bollen et al. | Trends, challenges and opportunities in power quality research | |
Zheng et al. | Harmonic resonances due to a grid-connected wind farm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20120620 Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant after: Shanghai Electric Power Corporation Co-applicant after: Shanghai Electric Power Communication Co., Ltd. Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant before: Shanghai Electric Power Corporation Co-applicant before: Shanghai Jiulong Electric Power Co., Ltd. |
|
ASS | Succession or assignment of patent right |
Owner name: SHANGHAI ELECTRIC COMMUNICATION CO., LTD. Free format text: FORMER OWNER: SHANGHAI JIULONG ELECTRIC SCIENCE + TECHNOLOGY CO., LTD. Effective date: 20120620 |
|
ASS | Succession or assignment of patent right |
Owner name: SHANGHAI ELECTRIC COMMUNICATION CO., LTD. STATE EL Free format text: FORMER OWNER: SHANGHAI ELECTRIC COMMUNICATION CO., LTD. Effective date: 20120910 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20120910 Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant after: Shanghai Electric Power Corporation Applicant after: Shanghai Electric Power Communication Co., Ltd. Applicant after: State Grid Corporation of China Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant before: Shanghai Electric Power Corporation Applicant before: Shanghai Electric Power Communication Co., Ltd. |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120530 |