CN102469599A - Channel resource determination method of ACK/NACK feedback information and equipment - Google Patents

Channel resource determination method of ACK/NACK feedback information and equipment Download PDF

Info

Publication number
CN102469599A
CN102469599A CN2010105328279A CN201010532827A CN102469599A CN 102469599 A CN102469599 A CN 102469599A CN 2010105328279 A CN2010105328279 A CN 2010105328279A CN 201010532827 A CN201010532827 A CN 201010532827A CN 102469599 A CN102469599 A CN 102469599A
Authority
CN
China
Prior art keywords
pdcch
descending
sub frame
channel resource
pdsch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105328279A
Other languages
Chinese (zh)
Other versions
CN102469599B (en
Inventor
高雪娟
沈祖康
林亚男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN201010532827.9A priority Critical patent/CN102469599B/en
Publication of CN102469599A publication Critical patent/CN102469599A/en
Application granted granted Critical
Publication of CN102469599B publication Critical patent/CN102469599B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

An embodiment of the invention discloses a channel resource determination method of ACK/NACK feedback information and equipment. Through applying a technical scheme of the embodiment, alternative channel resource can be determined in an application scene employing a PUCCH format 1b with channel selection scheme. A determination problem of channel resource needed by channel selection is solved when a terminal device employs the PUCCH format 1b with channel selection scheme to transmit ACK/NACK feedback information which is subjected to configuration downlink intercarrier merging. A situation that the alternative channel resource can not be determined according to present implicit channel resource which is determined by a PDCCH which is transmitted only through a downlink main carrier is avoided. To a scene that the ACK/NACK feedback information is larger than 4 bits, transmission of the ACK/NACK feedback information through the PUCCH format 1b with channel selection scheme is realized. The method and the equipment are mainly suitable for a TDD system.

Description

The channel resource of ACK/NACK feedback information is confirmed method and apparatus
Technical field
The present invention relates to communication technical field, particularly a kind of channel resource of ACK/NACK feedback information is confirmed method and apparatus.
Background technology
For long-term evolution multi-carrier system, for supporting that such as 100MHz, a kind of possibly be the frequency spectrum that directly distributes the 100M bandwidth, as shown in Figure 1 than LTE (Long Term Evolution, Long Term Evolution) the wideer system bandwidth of system; A kind of possibly be with distributing to some spectrum aggregatings of existing systems; Gather into big bandwidth and supply with the long-term evolution multi-carrier system use; The up-downgoing carrier wave can asymmetricly dispose in the system at this moment; Be that the user may take N >=1 carrier wave and carries out downlink transfer, M >=1 carrier wave carries out uplink, and is as shown in Figure 2.
LTE-A (Long Term Evolution Advanced; Senior Long Term Evolution) system confirms to support 5 carrier waves to carry out polymerization at most at present; A LTE-A UE (User Equipment; Subscriber equipment) need be at ACK (Acknowledgement, positive acknowledgement)/NACK (Negative Acknowledgement, the NACK) feedback information of corresponding a plurality of descending carriers of same sub-frame of uplink internal feedback and descending sub frame.Confirm in the LTE-A system at present; The ACK/NACK information bit of UE feedback is confirmed based on the descending carrier of configuration and the transmission mode of each descending carrier; Promptly in FDD (Frequency Division Duplex, FDD) system, UE needs feedback at a sub-frame of uplink
Figure BSA00000334542800011
Bit ACK/NACK, wherein C iBe the code word number (C=1 during the single codeword transmission, C=2 during many codeword transmission) of each descending carrier, the transmission mode of different descending carriers (being the code word number) can be different, and N is a UE configurating downlink carrier number; In TDD (Time Division Duplex, time division duplex) system, UE needs feeding back ACK/NACK feedback at a sub-frame of uplink Bit ACK/NACK, wherein M is the descending sub frame quantity that UE need carry out the ACK/NACK feedback at same sub-frame of uplink, for different uplink-downlink configuration and sub-frame of uplink, the value of M is different, i.e. the quantity of each hurdle K in the table 1.Corresponding same sub-frame of uplink carries out a plurality of descending sub frames of ACK/NACK feedback, abbreviates " feedback window " hereinafter as.
Table 1Downlink association set index K:{k 0, k 1... K M-1For TDD
Figure BSA00000334542800021
In the LTE-A system; Confirmed can adopt PUCCH (Physical Uplink Control Channel for being no more than 4 bit ACK/nack message; Physical Uplink Control Channel) format 1b with channelselection transmission plan; This scheme is carried out channel through UE at a plurality of channel resources and is selected transmission to distinguish different ACK/NACK feedback information states; Wherein, ACK/NACK mapping form is exactly the mapping that is used for realizing ACK/NACK information to be feedback and actual channel transmission information (being 4 constellation point of PUCCH format 1b QPSK modulation) and transmission channel.For 2,3,4 bit ACK/NACK feedback information, need 2,3,4 PUCCH format 1a/1b uplink control channel resources respectively.
In LTE-A TDD system; Because PUCCH Format 1b with channel selection transmission plan is supported 4 bit ACK/NACK feedback at most; When UE needs the ACK/NACK bit number of feedback to surpass 4 in a sub-frame of uplink, need carry out ACK/NACK information and merge (bundling) to reduce the bit number of ACK/NACK feedback information.Merge (claiming frequency domain combination again) between the descending carrier that UE can be configured the ACK/NACK feedback information; Promptly as shown in Figure 3; Sketch map for the ACK/NACK of TDD system feedback information frequency domain combination; The ACK/NACK information of the packet that receives on the descending carrier of UE to each configuration in the current descending sub frame in the feedback window merges, and generates the ACK/NACK feedback information that 1 bit merges, if the descending carrier of configuration is many codeword transmission pattern; Also need the ACK/NACK feedback information of a plurality of code words of receiving on this descending carrier be merged (claiming that again the space merges spatial bundling).The feedback information state comprises ACK (the correct packet that receives), NACK (packet that mistake receives) and DTX (packet of losing or not dispatching).For judging packet loss; 2 bit DAI (Downlink Assignment Index in the LTETDD system among the DL grant; Descending allocation index) sum of the PDCCH that PDCCH with corresponding PDSCH that transmits on the descending carrier that can be used to represent to dispose in the same descending sub frame in the feedback window and indication semi-continuous scheduling (SPS, Semi-Persistent Scheduling) PDSCH discharge.
In the merging process; If UE can judge in the current descending sub frame in the feedback window; Downlink data packet loss on the descending carrier of configuration, depositing (can judge through DAI by losing of the PDSCH of PDCCH that the indication semi-continuous scheduling discharges and PDCCH scheduling; Losing of SPS packet can be judged through the SPS service period), or UE descending carrier in all configurations in current descending sub frame all do not receive downlink data packet, then this descending sub frame generated DTX as the feedback information that merges; If UE judges in the current descending sub frame in the feedback window; On the descending carrier of configuration, there is not the downlink data packet loss; And the feedback information of at least one packet that receives on the descending carrier of a plurality of configurations in this descending sub frame is NACK, then this descending sub frame is generated NACK as the feedback information that merges; If UE judges in the current descending sub frame in the feedback window; On the descending carrier of configuration, there is not the downlink data packet loss; And the feedback information of all packets that receive on the descending carrier that disposes in this descending sub frame all is ACK, then this descending sub frame is generated ACK as the feedback information that merges.
Be configured when being operated in a plurality of descending carrier as UE like this; ACK/NACK number of bits of feedback after can guaranteeing to merge is M; M≤4; Wherein M is the descending sub frame quantity that UE need carry out the ACK/NACK feedback at same sub-frame of uplink, is confirmed with different sub-frame of uplink positions by the uplink-downlink configuration of TDD system.
In the LTE-A system, the reservation of implicit information channel resource is all only reserved to the PDCCH (Physical Downlink Control Channel, Physical Downlink Control Channel) on the descending carrier of pairing with it on each up-link carrier.So-called implicit information channel resource; It is exactly the uplink control channel resource of the control information zone reservation of a corresponding fixing descending carrier on the up-link carrier; Control information zone wherein is CCE (Control Channel Element, control channel unit), and UE is through the minimum CCE numbering of the descending control signaling (PDCCH) that on this descending carrier, sends; All can calculate and obtain an available uplink control channel resource, abbreviate " implicit information channel resource " or " dynamic channel resource " as.In addition, downlink data transmission also possibly be the business that does not have corresponding PDCCH, i.e. SPS packet.Descending SPS transmission only occurs on the downlink main carrier to carry, by the PDCCH triggering that indication SPS transmission activates, can transmit according to fixing cycle and resource distribution after the triggering, and behind the PDCCH that receives indication SPS transmission release, this SPS end of transmission.Therefore; There is not corresponding PDCCH in the transmission course after SPS is triggered; Therefore do not have the implicit information channel resource, each pairing channel resource of SPS data packet transmission is all identical, is the indicated semi-static channel resource of TPC territory among the PDCCH of indication SPS transmission activation.If the base station need change the SPS transmission configuration, as changing transmission bandwidth etc., then can send a dynamic PDCCH of corresponding SPS transmission, if UE receives this PDCCH, then definite this descending SPS transmission will be transmitted according to the configuration of this PDCCH indication.
In the process that realizes the embodiment of the invention, the applicant finds that there is following problem at least in prior art:
Consider that PUCCH can only be at up main member carrier (UL PCC in the LTE-A system; UplinkPrimary Component Carrier) sends; And UL PCC is only to descending main member carrier (DL PCC; Downlink Primary Component Carrier) carries out resource reservation, so UE can only go up the implicit information channel resource of reserving on the PDCCH acquisition UL PCC of transmission through DLPCC; In addition; If there is the SPS transmission on the downlink main carrier to carry; UE can not obtain the implicit information channel resource; Need to use the semi-static channel resource of SPS data correspondence, therefore, the required channel resource of PUCCH format 1b with channel selection not necessarily can obtain from the implicit information channel resource.
In addition; UE possibly obtain a plurality of implicit information channel resources according to the PDCCH of a plurality of descending carriers of the scheduling configuration of transmission on the inherent DL PCC of a descending sub frame; Then UE needs also further to confirm which channel resource the pairing channel resource of this descending sub frame is specially; When on downlink main carrier to carry, not having the PDCCH transmission; The pairing channel resource of this descending sub frame also can be the indicated semi-static channel resource in resource indication territory (ARI) of RRC (Radio Resource Control, radio resource control) configuration or PDCCH.
At present, in existing technology, also there is not corresponding solution.
Summary of the invention
The embodiment of the invention provides a kind of channel resource of ACK/NACK feedback information to confirm method and apparatus, solves definite problem of the required channel resource of PUCCH format 1b with channel selection in the prior art.
For achieving the above object, the embodiment of the invention provides a kind of channel resource of ACK/NACK feedback information to confirm method on the one hand, comprising:
M the descending sub frame of terminal equipment in the descending carrier of C configuration receives data, wherein, C >=1, M >=1, the ACK/NACK information of the data in the said M descending sub frame is transmitted in same sub-frame of uplink;
Said terminal equipment is confirmed a channel resource to the descending sub frame that in the said M descending sub frame each receives downlink data, is determined to many M channel resource;
Said terminal equipment is that each descending sub frame in the said M descending sub frame generates an ACK/NACK feedback information, produces M bit feedback bit;
Said terminal equipment is according to the said M bit feedback bit that generates; In the said channel resource of confirming of M at the most, select a channel resource; And the qam constellation point of a definite correspondence, through the channel resource of said selection, send said definite qam constellation point.
On the other hand, the embodiment of the invention also provides a kind of terminal equipment, comprising:
Receiver module is used for M descending sub frame reception data at the descending carrier of C configuration, wherein, C >=1, M >=1, the ACK/NACK information of the data in the said M descending sub frame is transmitted in same sub-frame of uplink;
Determination module, the descending sub frame that is used for each of the pairing said M descending sub frame of said receiver module received downlink data is confirmed a channel resource, is determined to many M channel resource;
Generation module, each descending sub frame that is used in the said M descending sub frame generates an ACK/NACK feedback information, produces M bit feedback bit;
Sending module; Be used for the said M bit feedback bit that generates according to said generation module; In the determined said channel resource of M at the most of said determination module, select a channel resource; And the qam constellation point of a definite correspondence, through the channel resource of said selection, send said definite qam constellation point.
On the other hand, the embodiment of the invention also provides a kind of channel resource of ACK/NACK feedback information to confirm method, comprising:
M the descending sub frame of base station in the descending carrier of C configuration sends data to terminal equipment, wherein, C >=1, M >=1, the ACK/NACK information of the data in the said M descending sub frame is transmitted in same sub-frame of uplink;
A channel resource is confirmed to the descending sub frame of each the transmission downlink data in the said M descending sub frame in said base station, is determined to many M channel resource;
Said definite channel resource of M is at the most detected in said base station, receives the information that said terminal equipment sends.
On the other hand, the embodiment of the invention also provides a kind of base station, comprising:
Sending module is used for sending data at M descending sub frame of C descending carrier that disposes to terminal equipment, wherein, C >=1, M >=1, the ACK/NACK information of the data in the said M descending sub frame is transmitted in same sub-frame of uplink;
Determination module, the descending sub frame that is used for each of the pairing said M descending sub frame of said sending module sent downlink data is confirmed a channel resource, is determined to many M channel resource;
Receiver module is used to detect the determined channel resource of M at the most of said determination module, receives the information that said terminal equipment sends.
Compared with prior art, the embodiment of the invention has the following advantages:
Through using the technical scheme of the embodiment of the invention; Can in the application scenarios that adopts PUCCH format 1b withchannel selection scheme, confirm alternative channel resource; When having solved terminal equipment and adopting PUCCH format 1b with channel selection scheme transmission to carry out ACK/NACK feedback information that the configurating downlink intercarrier merges; Channel is selected definite problem of required channel resource; Avoided being not sure of the situation of alternative channel resource according to existing the determined implicit information channel resource of PDCCH through the downlink main carrier to carry transmission; Realized for the scene of ACK/NACK feedback information,, mainly be applicable to the TDD system through of the transmission of PUCCH format 1b with channel selection scheme to the ACK/NACK feedback information greater than 4 bits.
Description of drawings
Fig. 1 is a single-frequency spectral system schematic in the prior art;
Fig. 2 is a prior art intermediate frequency spectrum paradigmatic system sketch map;
Fig. 3 is the sketch map of the ACK/NACK of TDD system feedback information frequency domain combination in the prior art;
Fig. 4 confirms the schematic flow sheet of method for the channel resource of a kind of ACK/NACK feedback information of embodiment of the invention proposition;
Fig. 5 confirms the schematic flow sheet of method for the channel resource of a kind of ACK/NACK feedback information among the embodiment 1 of embodiment of the invention proposition;
Fig. 6 confirms the schematic flow sheet of method for the channel resource of a kind of ACK/NACK feedback information among the embodiment 2 of embodiment of the invention proposition;
Fig. 7 confirms the schematic flow sheet of method for the channel resource of a kind of ACK/NACK feedback information among the embodiment 3 of embodiment of the invention proposition;
Fig. 8 confirms the schematic flow sheet of method for the channel resource of a kind of ACK/NACK feedback information among the embodiment 4 of embodiment of the invention proposition;
Fig. 9 confirms the schematic flow sheet of method for the channel resource of a kind of ACK/NACK feedback information among the embodiment 5 of embodiment of the invention proposition;
Figure 10 confirms the schematic flow sheet of method for the channel resource of a kind of ACK/NACK feedback information among the embodiment 6 of embodiment of the invention proposition;
Figure 11 confirms the schematic flow sheet of method for the channel resource of a kind of ACK/NACK feedback information among the embodiment 7 of embodiment of the invention proposition;
Figure 12 is the structural representation of a kind of terminal equipment of embodiment of the invention proposition;
Figure 13 is the structural representation of a kind of base station of embodiment of the invention proposition.
Embodiment
Of background technology; At LTE-A carrier aggregation (CA; Carrier aggregation) in the system, the base station polymerization a plurality of descending carriers when the user sends data, UE will feed back the ACK/NACK feedback information of corresponding a plurality of descending carriers and descending sub frame in a sub-frame of uplink.Confirmed a kind of scheme of PUCCHFormat 1b with channel selection at present as ACK/NACK multiplexing (Multiplexing) transmission.
The ACK/NACK feedback information bits number that need feed back at a sub-frame of uplink as UE is during greater than 4 bits; Need merge the ACK/NACK feedback information (bundling); Make ACK/NACK feedback information number after the merging smaller or equal to 4 bits, to adopt the transmission of PUCCH Format 1b with channel selection scheme.
But at present, the pairing channel resource of ACK/NACK feedback information after how confirming to merge does not also have definite scheme.
Based on above reason, the embodiment of the invention has provided under a kind of scene of the PUCCH of employing format 1b withchannel selection scheme, confirms the method for the channel resource of ACK/NACK feedback information.
In LTE-A TDD system, when UE adopts PUCCH Format 1b with channel selection feedback M bit ACK/nack message, 2≤M≤4, M is a positive integer, expression UE carries out the descending sub frame quantity of ACK/NACK feedback at same sub-frame of uplink; If UE needs the bit number of the ACK/NACK feedback information of feedback to surpass 4 bits in a sub-frame of uplink; Then UE need carry out the ACK/NACK feedback information merging between descending carrier; Descending carrier for many codeword transmission pattern; The space that also need carry out between many code words merges, and obtains the ACK/NACK feedback information that the M bit merges, and confirms the every bit ACK/pairing channel resource of NACK feedback information of each descending sub frame or merging; The ACK/NACK feedback information that is combined based on ACK/NACK mapping form is then selected corresponding channel resource and modulation symbol, and on the channel resource of selecting, sends corresponding modulation symbol.
As shown in Figure 4, the channel resource of a kind of ACK/NACK feedback information that proposes for the embodiment of the invention is confirmed the schematic flow sheet of method, and this method specifically may further comprise the steps:
Step S401, terminal equipment M descending sub frame in the descending carrier of C configuration receives data.
Wherein, C >=1, M >=1, the ACK/NACK information of the data in M descending sub frame is transmitted in same sub-frame of uplink.
Step S402, terminal equipment confirm a channel resource to the descending sub frame that in M the descending sub frame each receives downlink data, are determined to many M channel resource.
In practical application, the channel resource deterministic process of this step can be divided into following two types of resource determining method according to the content difference of definite foundation of channel resource:
If in the descending sub frame of terminal equipment in M descending sub frame; On downlink main carrier to carry, there is not semi-continuous PDSCH transmission; Or on downlink main carrier to carry, have the PDCCH that dispatches semi-continuous PDSCH, then terminal equipment adopts first kind resource determining method to confirm channel resource;
If in the descending sub frame of terminal equipment in M descending sub frame; Have semi-continuous PDSCH transmission on the downlink main carrier to carry and in descending sub frame, do not having the PDCCH that dispatches semi-continuous PDSCH, then terminal equipment adopts second type of resource determining method to confirm channel resource.
Wherein, in first kind resource determining method, further comprise method one and two kinds of situation of method two, specify as follows;
Method one, be definite foundation of channel resource with received PDCCH on downlink main carrier to carry or the descending auxilliary carrier wave.
Accordingly, this method is divided into two kinds of situation in actual applications:
If in the descending sub frame of situation one terminal equipment in M descending sub frame; On downlink main carrier to carry, receive at least one PDCCH; And PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or be used to transmit the descending scheduling indication of dynamic PDSCH on the descending auxilliary carrier wave of downlink main carrier to carry and/or at least one configuration; Then terminal equipment is confirmed a channel resource through the minimum CCE numbering of a PDCCH, as the pairing channel resource of descending sub frame.
In such cases, select at least one PDCCH that a PDCCH's is regular specific as follows:
(1) if the PDCCH of the descending scheduling indication that comprises the PDCCH that dispatches semi-continuous PDSCH among at least one PDCCH that terminal equipment receives or transmit dynamic PDSCH on the downlink main carrier to carry on downlink main carrier to carry; The PDCCH of the descending scheduling indication of dynamic PDSCH on the PDCCH of the semi-continuous PDSCH of terminal equipment selection scheduling or the transmission downlink main carrier to carry then, and confirm channel resource through the minimum CCE numbering of the PDCCH that selects;
If do not comprise the PDCCH of the PDSCH that scheduling is semi-continuous and the PDCCH of the descending scheduling indication of transmitting dynamic PDSCH on the downlink main carrier to carry among at least one PDCCH that terminal equipment receives on downlink main carrier to carry; Then terminal equipment is according to carrier index or the information in the indication of the carrier wave among at least one PDCCH territory or the precedence information of the descending carrier that at least one PDCCH dispatched of the descending carrier that at least one PDCCH dispatched; In at least one PDCCH, select a PDCCH, and pass through the definite channel resource of minimum CCE numbering of the PDCCH of selection.
(2) terminal equipment is according to carrier index or the information in the indication of the carrier wave among at least one PDCCH territory or the precedence information of the descending carrier that at least one PDCCH dispatched of the descending carrier that at least one PDCCH dispatched; In at least one PDCCH, select a PDCCH; And confirm channel resource through the minimum CCE numbering of the PDCCH that selects, whether need not distinguish PDCCH is the PDCCH of dispatching downlink main carrier.
In conjunction with concrete application scenarios; According to carrier index or the information in the indication of the carrier wave among at least one PDCCH territory or the precedence information of the descending carrier that at least one PDCCH dispatched of the descending carrier that at least one PDCCH dispatched, at least one PDCCH, select the processing of a PDCCH can specifically be refined as following three kinds of rules in above-mentioned (1) and (2):
Rule 1, based on the carrier index of UE configurating downlink carrier wave, as select in the current descending sub frame, the scheduling of transmitting on the downlink main carrier to carry has the PDCCH of transfer of data on the descending carrier of minimum or maximum downstream carrier index, is used for confirming the dynamic channel resource.
Rule 2, based on the carrier wave among PDCCH indication territory (CIF), as when supporting to stride carrier dispatching, select in the current descending sub frame the determined dynamic channel resource of the PDCCH that transmits on the downlink main carrier to carry with minimum or maximum CIF; When not supporting to stride carrier dispatching, select in the current descending sub frame, the PDCCH of transfer of data on the dispatching downlink main carrier that transmits on the downlink main carrier to carry is used for confirming the dynamic channel resource.
Rule 3, based on the priority of the descending carrier of predefined configuration, as select in the current descending sub frame, the scheduling of transmitting on the downlink main carrier to carry has the PDCCH of transfer of data on the descending carrier of the highest carrier wave priority, is used for confirming the dynamic channel resource.
And further; The proposition rule 4 that can optimize; The scheme of being set forth in promptly aforesaid (1) is if in the current descending sub frame of UE, receive data at downlink main carrier to carry; Then should preferentially be chosen in the PDCCH of data on the dispatching downlink main carrier that transmits on the downlink main carrier to carry, be used for confirming the dynamic channel resource; If UE does not receive data on downlink main carrier to carry, then can be based on above 3 kinds of selective rules, select one among at least one PDCCH of the descending auxilliary carrier wave of the scheduling of on downlink main carrier to carry, transmitting configuration, be used for confirming the dynamic channel resource.
In actual applications, can confirm to use which kind of above-mentioned rule according to actual needs, the content change of concrete institute application rule can't influence protection scope of the present invention.
If in the descending sub frame of situation two terminal equipments in M descending sub frame; On downlink main carrier to carry, do not receive PDCCH; But on the descending auxilliary carrier wave of at least one configuration, receive PDCCH; And PDCCH is used for the descending scheduling indication of the PDSCH on the descending auxilliary carrier wave of transmission configuration, and then terminal equipment is confirmed a channel resource through the ACK/NACK resource indication bit among the PDCCH, as the pairing channel resource of descending sub frame.
ACK/NACK resource indication bit among the PDCCH is indicated at least one pre-configured channel resource of high-level signaling;
Wherein, if terminal equipment receives at least two PDCCH on the descending auxilliary carrier wave of at least two configurations, the ACK/NACK resource indication bit among at least two PDCCH is indicated same channel resource
Method two, the PDCCH that transmits the descending scheduling indication of the PDSCH on the downlink main carrier to carry with received being used on downlink main carrier to carry or the descending auxilliary carrier wave are definite foundation of channel resource.
Accordingly, this method is divided into two kinds of situation in actual applications:
If in the descending sub frame of situation one terminal equipment in M descending sub frame; Receiving the PDCCH that is used to dispatch the PDCCH of semi-continuous PDSCH or is used to transmit the descending scheduling indication of dynamic PDSCH on the downlink main carrier to carry on the downlink main carrier to carry; Then terminal equipment is confirmed a channel resource through the minimum CCE numbering of PDCCH that is used to dispatch the PDCCH of semi-continuous PDSCH or is used to transmit on the downlink main carrier to carry descending scheduling indication of dynamic PDSCH, as the pairing channel resource of descending sub frame.
If in the descending sub frame of situation two terminal equipments in M descending sub frame; Do not receiving the PDCCH and the PDCCH that is used to transmit the descending scheduling of PDSCH indication dynamically on the downlink main carrier to carry that is used to dispatch semi-continuous PDSCH on the downlink main carrier to carry; But at the PDCCH that receives the descending scheduling indication that is used to transmit the PDSCH on the descending auxilliary carrier wave on the downlink main carrier to carry and/or on the descending auxilliary carrier wave of at least one configuration; Then the ACK/NACK resource indication bit of the PDCCH of the descending scheduling indication of terminal equipment through being used for transmitting the PDSCH on the descending auxilliary carrier wave is confirmed a channel resource, as the pairing channel resource of descending sub frame.
Wherein, the ACK/NACK resource indication bit among the PDCCH is indicated at least one pre-configured channel resource of high-level signaling;
If terminal equipment is at least two PDCCH that receive the descending scheduling indication that is used to transmit the PDSCH on the descending auxilliary carrier wave on the descending auxilliary carrier wave of downlink main carrier to carry and/or configuration, the ACK/NACK resource indication bit among at least two PDCCH is indicated same channel resource.
Need further be pointed out that; No matter use above-mentioned which kind of method; In order to make the processing procedure in the terminal equipment obtain simplifying, when a descending sub frame in M descending sub frame of terminal equipment judgement existed PDSCH to lose, terminal equipment all can be abandoned confirming channel resource for this descending sub frame; Thereby economize the process that this descending sub frame is slightly confirmed channel resource, practiced thrift corresponding processing resource.
On the other hand, second type of resource determining method for above-mentioned specifies as follows:
If in the descending sub frame of terminal equipment in M descending sub frame; At the PDCCH that receives the descending scheduling indication that is used to transmit dynamic PDSCH on the downlink main carrier to carry on the downlink main carrier to carry; Then terminal equipment is numbered definite channel resource through the minimum CCE that is used to transmit the PDCCH of the descending scheduling of PDSCH indication dynamically on the downlink main carrier to carry, as the pairing channel resource of descending sub frame;
If in the descending sub frame of terminal equipment in M descending sub frame; At the PDCCH that does not receive the descending scheduling indication that is used to transmit dynamic PDSCH on the downlink main carrier to carry on the downlink main carrier to carry; Then terminal equipment is confirmed the pairing channel resource of PDSCH semi-continuous in the descending sub frame as the pairing channel resource of descending sub frame, and the pairing channel resource of semi-continuous PDSCH is one in the indicated high-rise pre-configured a plurality of channel resources of the TPC among the PDCCH that activates semi-continuous PDSCH.
It is pointed out that in above-mentioned declarative procedure, dispatch the PDCCH of semi-continuous PDSCH, specifically comprise the PDCCH that is used to activate semi-continuous PDSCH, or be used to discharge the PDCCH of semi-continuous PDSCH, PDCCH adopts the SPS-RNTI scrambling; The PDCCH that transmits the descending scheduling indication of dynamic PDSCH adopts C-RNTI or Temporary C-RNTI scrambling.
Step S403, terminal equipment are that each descending sub frame in M the descending sub frame generates an ACK/NACK feedback information, produce M bit feedback bit.
In this step, UE produces the ACK/NACK feedback information of the pairing merging of each descending sub frame in the feedback window, obtains the ACK/NACK feedback information that the M bit merges, and wherein M representes that UE carries out the descending sub frame quantity of ACK/NACK feedback at same sub-frame of uplink;
In practical application; Concrete merging method makes the descending carrier ACK/NACK feedback information that only corresponding 1 bit merges in a descending sub frame of all configurations of UE for the ACK/NACK feedback information that receives packet on the descending carrier to each configuration in the descending sub frame carries out the merging between descending carrier.
Wherein, be the configurating downlink carrier wave of many code words to transmission mode, UE needs at first the ACK/NACK feedback information of a plurality of code words that receive in the same descending sub frame on this descending carrier is merged, and promptly the space merges.
Need to prove that concrete merging is regular as follows:
This descending sub frame is not produced DTX as the ACK/NACK feedback information that merges when all receiving downlink data packet on the descending carrier of all configurations of UE in current descending sub frame or judging when having the downlink data packet loss on the descending carrier of at least one configuration;
When judging, UE do not have data-bag lost in the current descending sub frame; And when the feedback information of the packet of receiving on the descending carrier of at least one configuration in this descending sub frame is NACK (being that the packet reception is incorrect), this descending sub frame is produced NACK as the ACK/NACK feedback information that merges;
When judging, UE do not have data-bag lost in the current descending sub frame; And when the feedback information of all packets that receive on the descending carrier of the configuration in this descending sub frame all is ACK (being that packet correctly receives), this descending sub frame is produced ACK as the ACK/NACK feedback information that merges;
Wherein, current descending sub frame is that UE need carry out in the descending sub frame of ACK/NACK feedback in a sub-frame of uplink.
Step S404, terminal device are selected a channel resource based on the M bit feedback bit that generates in the channel resource of confirming of M at the most, and confirm the qam constellation point of a correspondence, through the channel resource of selecting, send the qam constellation point of confirming.
In practical application, the implementation procedure of this step promptly adopts PUCCH format 1b with channelselection scheme to carry out the selection of channel resource.
Then, according to ACK/NACK mapping form, the ACK/NACK feedback information that is combined is selected corresponding channel resource and modulation symbol (4 QPSK constellation point of PUCCH format 1b), and on the channel resource of selecting, sends corresponding modulation symbol;
Wherein, ACK/NACK mapping form is used for representing the corresponding relation of the channel resource of ACK/NACK feedback information and actual transmissions and the modulation symbol of transmission (being 4 constellation point of PUCCH format 1b QPSK modulation);
Further, the ACK in the ACK/NACK mapping form representes correctly to receive packet, and NACK representes that mistake receives packet, and DTX representes data-bag lost or free of data packet scheduling.
Corresponding, in base station side, the above-mentioned identical rule of base station applies is carried out confirming of channel resource; And select corresponding channel resources to carry out the reception of ACK/NACK feedback information; It is pointed out that because base station side can not be confirmed the situation of the data-bag lost of UE end, so; Confirm difference to occur at channel resource in such cases with the processing procedure of aforesaid terminal equipment side; But, because terminal equipment side can not select the pairing channel resource of descending sub frame of data-bag lost (corresponding ACK/NACK feedback information is DTX) to carry out the transmission of ACK/NACK feedback information, so; Even terminal equipment and base station there are differences for the determined channel resource of the descending sub frame of data-bag lost, can not occur the ACK/NACK feedback information yet and receive wrong situation.
At this, for the no longer repeat specification of processing procedure of base station side.
Compared with prior art, the embodiment of the invention has the following advantages:
Through using the technical scheme of the embodiment of the invention; Can in the application scenarios that adopts PUCCH format 1b withchannel selection scheme, confirm alternative channel resource; When having solved terminal equipment and adopting PUCCH format 1b with channel selection scheme transmission to carry out ACK/NACK feedback information that the configurating downlink intercarrier merges; Channel is selected definite problem of required channel resource; Avoided being not sure of the situation of alternative channel resource according to existing the determined implicit information channel resource of PDCCH through the downlink main carrier to carry transmission; Realized for the scene of ACK/NACK feedback information,, mainly be applicable to the TDD system through of the transmission of PUCCH format 1b with channel selection scheme to the ACK/NACK feedback information greater than 4 bits.
Below, the application scenarios in conjunction with concrete describes the technical scheme that the embodiment of the invention proposed.
Embodiment 1
Method one in the first kind resource determining method among the corresponding step S402.
UE has disposed 2 descending carriers, and descending carrier 1 is a downlink main carrier to carry, and descending carrier 1 adopts many codeword transmission pattern; No SPS transmission subframe on the downlink main carrier to carry, descending carrier 2 adopts single codeword transmission mode, M=4; It is UE need feed back 4 descending sub frames at a sub-frame of uplink ACK/NACK feedback information; Do not support to stride carrier dispatching, as shown in Figure 5, then the flow process of transferring ACK/NACK is following:
The UE end:
UE need to confirm feedback 12 bit ACK/NACK according to the transmission mode of 2 descending carrier configurations and each descending carrier, greater than 4 bits, therefore need carry out ACK/NACK and merge.
Because downlink main carrier to carry (descending carrier 1) is many codeword transmission pattern, need its space of carrying out between many code words is merged.
Then, carry out the merging of the ACK/NACK feedback information in each descending sub frame, the processing procedure of merging is following:
In descending sub frame 1, UE has received data on two descending carriers, produces the feedback information of the ACK of 1 bit merging as descending sub frame 1; Owing to have transfer of data on the downlink main carrier to carry; According to the selective rule 4 of the method one of first kind resource determining method, UE confirms that descending sub frame 1 pairing channel resource is 1 dynamic channel resource that the minimum CCE numbering of the PDCCH of dispatching downlink main carrier is confirmed;
In descending sub frame 2; UE is through the configurating downlink carrier number of the current descending sub frame scheduling of frequency domain DAI indication; Can judge downlink main carrier to carry packet loss (the corresponding feedback states of the downlink data packet of this position is DTX), and then descending sub frame 2 is produced 1 bit DTX as feedback information; Because UE has only received data at descending carrier 2; And this packet is dispatched by the PDCCH on the descending carrier 2; Based on the method one of first kind resource determining method, UE confirms that descending sub frame 2 pairing channel resources are 1 indicated semi-static channel resource of ARI among the PDCCH of dispatching downlink carrier wave 2;
In descending sub frame 3, UE can judge that descending carrier 1 does not have scheduling (this position does not have feedback states) through DAI, produces NACK that 1 bit the merges feedback information as descending sub frame 3 based on the ACK/NACK feedback information of the packet that receives on the descending carrier 2; Because UE has only received packet at descending carrier 2; And this packet is dispatched by the PDCCH on the descending carrier 2; According to the method one of first kind resource determining method, UE confirms that descending sub frame 3 pairing channel resources are 1 indicated semi-static channel resource of ARI among the PDCCH of dispatching downlink carrier wave 2;
In descending sub frame 4, UE does not receive any data, produces 1 bit DTX as its feedback information.
Through above-mentioned processing procedure, UE finally generates ACK/NACK feedback information [ACK, the DTX that 4 bits merge; NACK; DTX], adopt PUCCH format 1b with channel selection transmission plan, according to ACK/NACK mapping form; Pairing transmission channel resources of ACK/NACK feedback information and modulation symbol after confirming to merge, and on selected channel resource, send corresponding modulation symbol;
Base station end:
The base station confirms that according to the transmission mode of 2 descending carrier configurations and each descending carrier UE need feed back 12 bit ACK/NACK, greater than 4 bits, therefore, confirms that UE merges the ACK/NACK feedback information;
The base station adopts the method consistent with UE need to confirm the channel resource that channel is selected that is used for of detection according to actual schedule; For the descending sub frame that does not have packet loss, the determined channel resource in base station is consistent with UE; For the descending sub frame that has packet loss; Like descending subframe 2; Packet has been dispatched in the base station on downlink main carrier to carry; Therefore the base station thinks that the pairing channel resource of this descending sub frame is that the minimum CCE of the PDCCH of dispatching downlink main carrier numbers determined 1 dynamic channel resource, and is inconsistent with the determined channel resource of UE; But because there is packet loss in this descending sub frame; The feedback information of pairing merging is DTX; According to ACK/NACK mapping form, UE can not be chosen in the pairing channel resource of DTX state and transmit, therefore; When the base station correctly received, it is consistent that the ACK/NACK feedback information that detects resulting merging and UE send;
Embodiment 2
The method one of the first kind resource determining method among the corresponding step S402.
UE has disposed 4 descending carriers, and descending carrier 1 is a downlink main carrier to carry, no SPS transmission subframe on the downlink main carrier to carry; Descending carrier 1 and 4 all adopts the single codeword transmission mode; Descending carrier 2 and 3 all adopts many codeword transmission pattern, M=4, and promptly UE need feed back the ACK/NACK feedback information of 4 descending sub frames at a sub-frame of uplink; Carrier dispatching is striden in support; The data packet transmission of descending carrier 2 and descending carrier 3 is dispatched by the PDCCH on the descending carrier 1, and as shown in Figure 6, then the flow process of transferring ACK/NACK is following:
The UE end:
UE need to confirm feedback 24 bit ACK/NACK according to the transmission mode of 4 descending carrier configurations and each descending carrier, greater than 4 bits, therefore need carry out ACK/NACK and merge;
Because descending carrier 2 is many codeword transmission pattern with descending carrier 3, need its space of carrying out between many code words is merged.
Then, carry out the merging of the ACK/NACK feedback information in each descending sub frame, the processing procedure of merging is following:
In descending sub frame 1, UE has received data on 4 descending carriers, produces the feedback information of the ACK of 1 bit merging as descending sub frame 1; Because UE has received packet at descending carrier 1,2 and 3; And the packet on descending carrier 1,2 and 3 is all striden carrier dispatching by the PDCCH on the downlink main carrier to carry; Selective rule 1 or 2 or 3 according to the method one of first kind resource determining method; For example selection scheduling has the PDCCH (priority of supposing downlink main carrier to carry is the highest) of limit priority descending carrier or PDCCH or selection scheduling that selection scheduling has the lowest number descending carrier have the PDCCH that minimum is striden the descending carrier of carrier dispatching CIF value, and UE selects the minimum CCE of the PDCCH of scheduling downlink main carrier to carry on the downlink main carrier to carry to number pairing dynamic channel resource as descending sub frame 1 pairing channel resource;
In descending sub frame 2; UE is through the configurating downlink carrier number of the current descending sub frame scheduling of frequency domain DAI indication; Can judge downlink main carrier to carry packet loss (the corresponding feedback states of the downlink data packet of this position is DTX), and then descending sub frame 2 is produced 1 bit DTX as feedback information; UE has received data at descending carrier 2,3 and 4; And the packet on descending carrier 2 and 3 is striden carrier dispatching by the PDCCH on the downlink main carrier to carry (descending carrier 1); Selective rule 1 or 2 or 3 according to the method one of first kind resource determining method; For example selection scheduling has the PDCCH (priority of supposing descending carrier 2 is higher than descending carrier 3) of limit priority descending carrier or PDCCH or selection scheduling that selection scheduling has the lowest number descending carrier have the PDCCH that minimum is striden the descending carrier of carrier dispatching CIF value, and UE selects the minimum CCE of the PDCCH of scheduling descending carrier 2 on the downlink main carrier to carry to number pairing dynamic channel resource as descending sub frame 2 pairing channel resources;
In descending sub frame 3; UE can judge that downlink main carrier to carry does not have scheduling (this position does not have feedback states) through DAI, produces NACK that 1 bit the merges feedback information as descending sub frame 3 based on the ACK/NACK feedback information of the packet that receives on descending carrier 2,3 and 4; Because UE has received packet at descending carrier 2 and 3; And the packet on descending carrier 2 and 3 is striden carrier dispatching by the PDCCH on the downlink main carrier to carry; Selective rule 1 or 2 or 3 based on the method one of first kind resource determining method; For example selection scheduling has the PDCCH (priority of supposing descending carrier 2 is higher than descending carrier 3) of limit priority descending carrier or PDCCH or selection scheduling that selection scheduling has the lowest number descending carrier have the PDCCH that minimum is striden the descending carrier of carrier dispatching CIF value, and UE selects the minimum CCE of the PDCCH of scheduling descending carrier 2 on the downlink main carrier to carry to number pairing dynamic channel resource as descending sub frame 3 pairing channel resources;
In descending sub frame 4; UE can judge not have on downlink main carrier to carry and descending carrier 2 and 3 through DAI dispatch (this position does not have feedback states), produces the feedback information of the ACK of 1 bit merging as descending sub frame 4 based on the ACK/NACK feedback information of the packet that receives on the descending carrier 4; Because UE has only received data at descending carrier 4; And this packet is dispatched by the PDCCH on the descending carrier 4; Based on the method one of first kind resource determining method, UE confirms that descending sub frame 4 pairing channel resources are 1 indicated semi-static channel resource of ARI among the PDCCH of dispatching downlink carrier wave 4;
Through above-mentioned processing procedure, UE finally generates ACK/NACK feedback information [ACK, the DTX that 4 bits merge; NACK; ACK], adopt PUCCH format 1b with channel selection transmission plan, according to ACK/NACK mapping form; Pairing transmission channel resources of ACK/NACK feedback information and modulation symbol after confirming to merge, and on selected channel resource, send corresponding modulation symbol;
Base station end:
The base station confirms that according to the transmission mode of 4 descending carrier configurations and each descending carrier UE need feed back 24 bit ACK/NACK, greater than 4 bits, confirms that therefore UE merges the ACK/NACK feedback information;
The base station adopts the method consistent with UE need to confirm the channel resource that channel is selected that is used for of detection according to actual schedule; For the descending sub frame that does not have packet loss, the determined channel resource in base station is consistent with UE; For the descending sub frame that has packet loss; Like descending subframe 2; Packet has been dispatched in the base station on downlink main carrier to carry; Therefore the base station thinks that the pairing channel resource of this descending sub frame is that the minimum CCE of the PDCCH of dispatching downlink main carrier numbers determined 1 dynamic channel resource, and is inconsistent with the determined channel resource of UE; But because there is packet loss in this descending sub frame; The feedback information of pairing merging is DTX; According to ACK/NACK mapping form, UE can not be chosen in the pairing channel resource of DTX state and transmit, therefore; When the base station correctly received, it is consistent that the ACK/NACK feedback information that detects resulting merging and UE send.
Embodiment 3
The method one of the first kind resource determining method among the corresponding step S402.
UE has disposed 3 descending carriers, and descending carrier 1 is a downlink main carrier to carry, no SPS transmission on the downlink main carrier to carry; All descending carriers all adopt the single codeword transmission mode; M=3, promptly UE need feed back the ACK/NACK of 3 descending sub frames at a sub-frame of uplink, does not support to stride carrier dispatching; As shown in Figure 7, then the flow process of transferring ACK/NACK is following:
The UE end:
UE need to confirm feedback 9 bit ACK/NACK according to the transmission mode of 3 descending carrier configurations and each descending carrier, greater than 4 bits, therefore need carry out ACK/NACK and merge;
Then, carry out the merging of the ACK/NACK feedback information in each descending sub frame, the processing procedure of merging is following:
In descending sub frame 1, UE has received data on 3 descending carriers, produces the feedback information of the ACK of 1 bit merging as descending sub frame 1; Owing to have transfer of data on the downlink main carrier to carry; According to the selective rule 4 of the method one of first kind resource determining method, UE confirms that descending sub frame 1 pairing channel resource is 1 dynamic channel resource that the minimum CCE numbering of the PDCCH of dispatching downlink main carrier is confirmed;
In descending sub frame 2; UE is through the configurating downlink carrier number of the current descending sub frame scheduling of frequency domain DAI indication; Can judge downlink main carrier to carry packet loss (the corresponding feedback states of the downlink data packet of this position is DTX), and then descending sub frame 2 is produced 1 bit DTX as feedback information; Because the feedback information of the merging of this descending sub frame is DTX, UE can not select the pairing channel resource of this descending sub frame to transmit when channel is selected, and therefore can this descending sub frame not confirmed channel resource;
In descending sub frame 3, UE can judge that descending carrier 1 does not have scheduling (this position does not have feedback states) through DAI, produces the feedback information of the NACK of 1 bit merging as descending sub frame 3 based on the ACK/NACK feedback information of the packet that receives on descending carrier 2 and 3; Because UE has only received packet at descending carrier 2 and 3; And descending carrier 2 packets are dispatched by the PDCCH on the descending carrier 2; Descending carrier 3 packets are dispatched by the PDCCH on the descending carrier 3; And ARI indicates same semi-static channel resource among two PDCCH, and according to the method one of first kind resource determining method, UE confirms that descending sub frame 3 pairing channel resources are 1 indicated semi-static channel resource of ARI among the PDCCH of dispatching downlink carrier wave 2 or 3;
Through above-mentioned processing procedure; The final ACK/NACK feedback information [ACK, DTX, NACK] that generates the merging of 3 bits of UE; Adopt PUCCH format 1b with channel selection transmission plan; Based on ACK/NACK mapping form, pairing transmission channel resources of ACK/NACK feedback information and modulation symbol after confirming to merge, and on selected channel resource, send corresponding modulation symbol;
Base station end:
The base station confirms that according to the transmission mode of 3 descending carrier configurations and each descending carrier UE need feed back 9 bit ACK/NACK, greater than 4 bits, confirms that therefore UE merges the ACK/NACK feedback information;
The base station adopts the method consistent with UE need to confirm the channel resource that channel is selected that is used for of detection according to actual schedule; For the descending sub frame that does not have packet loss, the determined channel resource in base station is consistent with UE; For the descending sub frame that has packet loss; Like descending subframe 2; Packet has been dispatched in the base station on downlink main carrier to carry; Therefore the base station thinks that the pairing channel resource of ACK/NACK feedback information of merging of this descending sub frame is that the minimum CCE of the PDCCH of dispatching downlink main carrier numbers determined 1 dynamic channel resource, and understanding differently with UE causes (UE confirms the pairing channel resource of this descending sub frame); But because there is packet loss in this descending sub frame; The feedback information of pairing merging is DTX; According to ACK/NACK mapping form, UE can not be chosen in the pairing channel resource of DTX state and transmit, therefore; When the base station correctly received, it is consistent that the ACK/NACK feedback information that detects resulting merging and UE send.
Embodiment 4
The method one of the first kind resource determining method among the corresponding step S402.
UE has disposed 4 descending carriers, and descending carrier 1 is a downlink main carrier to carry, and subframe 3 is the SPS subframe on the downlink main carrier to carry; And transmitted the PDCCH that indication SPS PDSCH discharges, descending sub frame 1,2 and 4 is non-SPS subframe (no SPS PDSCH), and descending carrier 1 and 4 all adopts the single codeword transmission mode; Descending carrier 2 and 3 all adopts many codeword transmission pattern, M=4, and promptly UE need feed back the ACK/NACK feedback information of 4 descending sub frames at a sub-frame of uplink; Carrier dispatching is striden in support; The data packet transmission of descending carrier 2 and descending carrier 3 is dispatched by the PDCCH on the descending carrier 1, and as shown in Figure 8, then the flow process of transferring ACK/NACK is following:
The UE end:
UE need to confirm feedback 24 bit ACK/NACK according to the transmission mode of 4 descending carrier configurations and each descending carrier, greater than 4 bits, therefore need carry out ACK/NACK and merge;
Because descending carrier 2 is many codeword transmission pattern with descending carrier 3, need its space of carrying out between many code words is merged.
Then, carry out the merging of the ACK/NACK feedback information in each descending sub frame, the processing procedure of merging is following:
In descending sub frame 1, on the downlink main carrier to carry non-SPS subframe, promptly there is not the SPS business, UE has received data on 4 descending carriers, produce the feedback information of the ACK of 1 bit merging as descending sub frame 1; Because UE has received packet at descending carrier 1,2 and 3; And the packet on descending carrier 1,2 and 3 is all striden carrier dispatching by the PDCCH on the downlink main carrier to carry; According to the selective rule 4 of the method one of first kind resource determining method, UE selects the minimum CCE of the PDCCH of scheduling downlink main carrier to carry on the downlink main carrier to carry to number pairing dynamic channel resource as descending sub frame 1 pairing channel resource;
In descending sub frame 2; It on the downlink main carrier to carry non-SPS subframe; Promptly there is not the SPS business; UE can judge downlink main carrier to carry packet loss (the corresponding feedback states of the downlink data packet of this position is DTX) through the configurating downlink carrier number of the current descending sub frame scheduling of frequency domain DAI indication, and then descending sub frame 2 is produced 1 bit DTX as feedback information; UE has received data at descending carrier 2,3 and 4; And the packet on descending carrier 2 and 3 is striden carrier dispatching by the PDCCH on the downlink main carrier to carry (descending carrier 1); Selective rule 1 or 2 or 3 according to the method one of first kind resource determining method; For example selection scheduling has the PDCCH (priority of supposing descending carrier 2 is higher than descending carrier 3) of limit priority descending carrier or PDCCH or selection scheduling that selection scheduling has the lowest number descending carrier have the PDCCH that minimum is striden the descending carrier of carrier dispatching CIF value, and UE selects the minimum CCE of the PDCCH of scheduling descending carrier 2 on the downlink main carrier to carry to number pairing dynamic channel resource as descending sub frame 2 pairing channel resources;
In descending sub frame 3; UE has received the PDCCH that indication SPS discharges on downlink main carrier to carry; But there is not transfer of data on the downlink main carrier to carry; UE correctly receives this PDCCH, produces ACK, and the ACK/NACK feedback information based on the packet that receives on descending carrier 2,3 and 4 produces the feedback information of the NACK of 1 bit merging as descending sub frame 3 then; Because UE has received the PDCCH (having the dynamic channel resource) that indication SPS discharges on downlink main carrier to carry; Though the packet on descending carrier 2 and 3 is striden carrier dispatching by the PDCCH on the downlink main carrier to carry; But based on the selective rule 4 of the method one of first kind resource determining method, UE selects the minimum CCE of the PDCCH (PDCCH that promptly indicates SPS PDSCH to discharge) of the PDSCH of scheduling SPS on the downlink main carrier to carry to number pairing dynamic channel resource as descending sub frame 3 pairing channel resources;
In descending sub frame 4; It on the downlink main carrier to carry non-SPS subframe; Promptly there is not the SPS business; UE can judge not have on downlink main carrier to carry and descending carrier 2 and 3 through DAI dispatch (this position does not have feedback states), produces the feedback information of the ACK of 1 bit merging as descending sub frame 4 based on the ACK/NACK feedback information of the packet that receives on the descending carrier 4; Because UE has only received data at descending carrier 4; And this packet is dispatched by the PDCCH on the descending carrier 4; Based on the method one of first kind resource determining method, UE confirms that descending sub frame 4 pairing channel resources are 1 indicated semi-static channel resource of ARI among the PDCCH of dispatching downlink carrier wave 4;
Through above-mentioned processing procedure, UE finally generates ACK/NACK feedback information [ACK, the DTX that 4 bits merge; NACK; ACK], adopt PUCCH format 1b with channel selection transmission plan, according to ACK/NACK mapping form; Pairing transmission channel resources of ACK/NACK feedback information and modulation symbol after confirming to merge, and on selected channel resource, send corresponding modulation symbol;
Base station end:
The base station confirms that according to the transmission mode of 4 descending carrier configurations and each descending carrier UE need feed back 24 bit ACK/NACK, greater than 4 bits, confirms that therefore UE merges the ACK/NACK feedback information;
The base station adopts the method consistent with UE need to confirm the channel resource that channel is selected that is used for of detection according to actual schedule; For the descending sub frame that does not have packet loss, the determined channel resource in base station is consistent with UE; For the descending sub frame that has packet loss; Like descending subframe 2; Packet has been dispatched in the base station on downlink main carrier to carry; Therefore the base station thinks that the pairing channel resource of this descending sub frame is that the minimum CCE of the PDCCH of dispatching downlink main carrier numbers determined 1 dynamic channel resource, and is inconsistent with the determined channel resource of UE; But because there is packet loss in this descending sub frame; The feedback information of pairing merging is DTX; According to ACK/NACK mapping form, UE can not be chosen in the pairing channel resource of DTX state and transmit, therefore; When the base station correctly received, it is consistent that the ACK/NACK feedback information that detects resulting merging and UE send.
Embodiment 5
The method two of the first kind resource determining method among the corresponding step S402.
UE has disposed 2 descending carriers, and descending carrier 1 is a downlink main carrier to carry, and no SPS passes on the downlink main carrier to carry; All descending carriers all adopt dicode word transmission mode, M=3, and promptly UE need feed back the ACK/NACK of 3 descending sub frames at a sub-frame of uplink; Carrier dispatching is striden in support; Descending carrier 2 is by the scheduling of the PDCCH on the downlink main carrier to carry, and as shown in Figure 9, then the flow process of transferring ACK/NACK is following:
The UE end:
UE need to confirm feedback 12 bit ACK/NACK according to the transmission mode of 2 descending carrier configurations and each descending carrier, greater than 4 bits, therefore need carry out ACK/NACK and merge.
Because descending carrier 1 and 2 is many codeword transmission pattern, need its space of carrying out between many code words is merged.
Then, carry out the merging of the ACK/NACK feedback information in each descending sub frame, the processing procedure of merging is following:
In descending sub frame 1, UE has received data on 2 descending carriers, produces the feedback information of the ACK of 1 bit merging as descending sub frame 1; Owing to have transfer of data on the downlink main carrier to carry, according to the method two of first kind resource determining method, UE confirms that descending sub frame 1 pairing channel resource is 1 definite dynamic channel resource of minimum CCE numbering of the PDCCH of dispatching downlink main carrier;
In descending sub frame 2; UE is through the configurating downlink carrier number of the current descending sub frame scheduling of frequency domain DAI indication; Can judge downlink main carrier to carry packet loss (the corresponding feedback states of the downlink data packet of this position is DTX), and then descending sub frame 2 is produced 1 bit DTX as feedback information; Because UE does not receive data at downlink main carrier to carry; Only data have been received at descending auxilliary carrier wave (descending carrier 2); Although the PDCCH that dispatches this descending carrier is in downlink main carrier to carry transmission (having the dynamic channel resource); Based on the method two of first kind resource determining method, UE confirms that descending sub frame 2 pairing channel resources are 1 indicated semi-static channel resource of ARI among the PDCCH of dispatching downlink carrier wave 2;
In descending sub frame 3, UE can judge that descending carrier 1 does not have scheduling (this position does not have feedback states) through DAI, produces NACK that 1 bit the merges feedback information as descending sub frame 3 based on the ACK/NACK feedback information of the packet that receives on the descending carrier 2; Because UE does not receive data at downlink main carrier to carry; Only received packet at descending carrier 2; Although the PDCCH that dispatches this descending carrier is in downlink main carrier to carry transmission (having the dynamic channel resource); According to the method two of first kind resource determining method, UE confirms that descending sub frame 3 pairing channel resources are 1 indicated semi-static channel resource of ARI among the PDCCH of dispatching downlink carrier wave 2;
Through above-mentioned processing procedure; The final ACK/NACK feedback information [ACK, DTX, NACK] that generates the merging of 3 bits of UE; Adopt PUCCH format 1b with channel selection transmission plan; According to ACK/NACK mapping form, pairing transmission channel resources of ACK/NACK feedback information and modulation symbol after confirming to merge, and on selected channel resource, send corresponding modulation symbol.
Base station end:
The base station confirms that according to the transmission mode of 2 descending carrier configurations and each descending carrier UE need feed back 12 bit ACK/NACK, greater than 4 bits, confirms that therefore UE merges the ACK/NACK feedback information;
The base station adopts the method consistent with UE need to confirm the channel resource that channel is selected that is used for of detection according to actual schedule; For the descending sub frame that does not have packet loss, the determined channel resource in base station is consistent with UE; For the descending sub frame that has packet loss; Like descending subframe 2; Packet has been dispatched in the base station on downlink main carrier to carry; Therefore the base station thinks that the pairing channel resource of ACK/NACK feedback information of merging of this descending sub frame is that the minimum CCE of the PDCCH of dispatching downlink main carrier numbers determined 1 dynamic channel resource, and to understand the channel resource of confirming inconsistent with UE; But because there is packet loss in this descending sub frame; The feedback information of pairing merging is DTX; According to ACK/NACK mapping form, UE can not be chosen in the pairing channel resource of DTX state and transmit, therefore; When the base station correctly received, it is consistent that the ACK/NACK feedback information that detects resulting merging and UE send.
Embodiment 6
Second type of resource determining method among the corresponding step S402.
UE has disposed 2 descending carriers, and descending carrier 1 is a downlink main carrier to carry, exists SPS transfer of data and descending sub frame 1 to be the SPS subframe on the downlink main carrier to carry; Descending sub frame 2,3,4 is non-SPS subframe, and downlink main carrier to carry adopts the single codeword transmission mode, and descending carrier 2 adopts dicode word transmission mode; M=4, promptly UE need feed back the ACK/NACK of 4 descending sub frames at a sub-frame of uplink, does not support to stride carrier dispatching; Shown in figure 10, then the flow process of transferring ACK/NACK is following:
The UE end:
UE need to confirm feedback 12 bit ACK/NACK according to the transmission mode of 2 descending carrier configurations and each descending carrier, greater than 4 bits, therefore need carry out ACK/NACK and merge.
Because descending carrier 2 is many codeword transmission pattern, need its space of carrying out between many code words is merged.
Then, carry out the merging of the ACK/NACK feedback information in each descending sub frame, the processing procedure of merging is following:
In descending sub frame 1, UE has received data on 2 descending carriers, produces the feedback information of the ACK of 1 bit merging as descending sub frame 1; Because the downlink data on the downlink main carrier to carry is the transfer of data of SPS; According to second type of resource determining method; UE confirms that descending sub frame 1 pairing channel resource is the pairing channel resource of packet of this semi-continuous scheduling, is the channel resource of an indicated high level semi-static configuration in advance of TPC territory among the PDCCH that activates this semi-continuous scheduling data packet transmission;
In descending sub frame 2; It on the downlink main carrier to carry non-SPS subframe; Promptly there is not the SPS business; UE can judge downlink main carrier to carry packet loss (the corresponding feedback states of the downlink data packet of this position is DTX) through the configurating downlink carrier number of the current descending sub frame scheduling of frequency domain DAI indication, and then descending sub frame 2 is produced 1 bit DTX as feedback information; Because UE does not receive data at downlink main carrier to carry; Only data have been received at descending auxilliary carrier wave (descending carrier 2); And the PDCCH that dispatches this descending carrier is in descending 2 carrier transmission; According to the method two of first kind resource determining method, UE confirms that descending sub frame 2 pairing channel resources are 1 indicated semi-static channel resource of ARI among the PDCCH of dispatching downlink carrier wave 2;
In descending sub frame 3, on the downlink main carrier to carry non-SPS subframe, promptly there is not the SPS business, UE has received data on 2 descending carriers, produce 1 bit NACK as feedback information; Because UE receives data at downlink main carrier to carry, according to the method two of first kind resource determining method, UE confirms that descending sub frame 3 pairing channel resources are 1 definite dynamic channel resource of minimum CCE numbering of the PDCCH of dispatching downlink main carrier;
In descending sub frame 4; It on the downlink main carrier to carry non-SPS subframe; Promptly there is not the SPS business; UE can judge that descending carrier 1 does not have scheduling (this position does not have feedback states) through DAI, produces NACK that 1 bit the merges feedback information as descending sub frame 4 based on the ACK/NACK feedback information of the packet that receives on the descending carrier 2; Because UE does not receive data at downlink main carrier to carry; Only received packet at descending carrier 2; And the PDCCH that dispatches this descending carrier is in descending carrier 2 transmission; According to the method two of first kind resource determining method, UE confirms that descending sub frame 2 pairing channel resources are 1 indicated semi-static channel resource of ARI among the PDCCH of dispatching downlink carrier wave 2;
Through above-mentioned processing procedure, UE finally generates ACK/NACK feedback information [ACK, the DTX that 4 bits merge; NACK; NACK], adopt PUCCH format 1b with channel selection transmission plan, according to ACK/NACK mapping form; Pairing transmission channel resources of ACK/NACK feedback information and modulation symbol after confirming to merge, and on selected channel resource, send corresponding modulation symbol.
Base station end:
The base station confirms that according to the transmission mode of 2 descending carrier configurations and each descending carrier UE need feed back 12 bit ACK/NACK, greater than 4 bits, confirms that therefore UE merges the ACK/NACK feedback information;
The base station adopts the method consistent with UE need to confirm the channel resource that channel is selected that is used for of detection according to actual schedule; For the descending sub frame that does not have packet loss, the determined channel resource in base station is consistent with UE; For the descending sub frame that has packet loss; Like descending subframe 2; Packet has been dispatched in the base station on downlink main carrier to carry; Therefore the base station thinks that the pairing channel resource of ACK/NACK feedback information of merging of this descending sub frame is that the minimum CCE of the PDCCH of dispatching downlink main carrier numbers determined 1 dynamic channel resource, and is inconsistent with the channel resource that UE confirms; But because there is packet loss in this descending sub frame; The feedback information of pairing merging is DTX; According to ACK/NACK mapping form, UE can not be chosen in the pairing channel resource of DTX state and transmit, therefore; When the base station correctly received, it is consistent that the ACK/NACK feedback information that detects resulting merging and UE send.
Embodiment 7
Second type of resource determining method among the corresponding step S402.
UE has disposed 2 descending carriers, and descending carrier 1 is a downlink main carrier to carry, has the SPS transfer of data at descending sub frame 1 on the downlink main carrier to carry; And the PDCCH that does not have scheduling SPS data in the descending sub frame 1, and the base station in descending sub frame 1 on downlink main carrier to carry, have the dynamic PDSCH of scheduling simultaneously PDCCH, descending sub frame 2,3,4 is non-SPS subframe; Descending carrier all adopts the single codeword transmission mode; M=3, promptly UE need feed back the ACK/NACK of 3 descending sub frames at a sub-frame of uplink, does not support to stride carrier dispatching; Shown in figure 11, then the flow process of transferring ACK/NACK is following:
The UE end:
UE need to confirm feedback 6 bit ACK/NACK according to the transmission mode of 2 descending carrier configurations and each descending carrier, greater than 4 bits, therefore need carry out ACK/NACK and merge.
Then, carry out the merging of the ACK/NACK feedback information in each descending sub frame, the processing procedure of merging is following:
In descending sub frame 1, UE has received data on 2 descending carriers, produces the feedback information of the ACK of 1 bit merging as descending sub frame 1; Because the downlink data on the downlink main carrier to carry is the transfer of data of SPS and does not have corresponding PDCCH; And UE has received the dynamically PDCCH of (non-SPS) PDSCH of scheduling on downlink main carrier to carry; According to second type of resource determining method, UE confirms that descending sub frame 1 pairing channel resource is 1 definite dynamic channel resource of minimum CCE numbering of the PDCCH of dynamic data bag on the dispatching downlink main carrier;
In descending sub frame 2; It on the downlink main carrier to carry non-SPS subframe; Promptly there is not the SPS business; UE can judge downlink main carrier to carry packet loss (the corresponding feedback states of the downlink data packet of this position is DTX) through the configurating downlink carrier number of the current descending sub frame scheduling of frequency domain DAI indication, and then descending sub frame 2 is produced 1 bit DTX as feedback information; Because UE does not receive data at downlink main carrier to carry; Only data have been received at descending auxilliary carrier wave (descending carrier 2); And the PDCCH that dispatches this descending carrier is in descending 2 carrier transmission; According to the method one or 2 of first kind resource determining method, UE confirms that descending sub frame 2 pairing channel resources are 1 indicated semi-static channel resource of ARI among the PDCCH of dispatching downlink carrier wave 2;
In descending sub frame 3, on the downlink main carrier to carry non-SPS subframe, promptly there is not the SPS business, UE has received data on 2 descending carriers, produce 1 bit NACK as feedback information; Because UE receives data at downlink main carrier to carry; According to the rule 4 or the method two of the method one of first kind resource determining method, UE confirms that descending sub frame 3 pairing channel resources are 1 dynamic channel resource that the minimum CCE numbering of the PDCCH of dispatching downlink main carrier is confirmed;
Through above-mentioned processing procedure; The final ACK/NACK feedback information [ACK, DTX, NACK] that generates the merging of 3 bits of UE; Adopt PUCCH format 1b with channel selection transmission plan; According to ACK/NACK mapping form, pairing transmission channel resources of ACK/NACK feedback information and modulation symbol after confirming to merge, and on selected channel resource, send corresponding modulation symbol.
Base station end:
The base station confirms that according to the transmission mode of 2 descending carrier configurations and each descending carrier UE need feed back 6 bit ACK/NACK, greater than 4 bits, confirms that therefore UE merges the ACK/NACK feedback information;
The base station adopts the method consistent with UE need to confirm the channel resource that channel is selected that is used for of detection according to actual schedule; For the descending sub frame that does not have packet loss, the determined channel resource in base station is consistent with UE; For the descending sub frame that has packet loss; Like descending subframe 2; Packet has been dispatched in the base station on downlink main carrier to carry; Therefore the base station thinks that the pairing channel resource of ACK/NACK feedback information of merging of this descending sub frame is that the minimum CCE of the PDCCH of dispatching downlink main carrier numbers determined 1 dynamic channel resource, and is inconsistent with the channel resource that UE confirms; But because there is packet loss in this descending sub frame; The feedback information of pairing merging is DTX; According to ACK/NACK mapping form, UE can not be chosen in the pairing channel resource of DTX state and transmit, therefore; When the base station correctly received, it is consistent that the ACK/NACK feedback information that detects resulting merging and UE send.
Compared with prior art, the embodiment of the invention has the following advantages:
Through using the technical scheme of the embodiment of the invention; Can in the application scenarios that adopts PUCCH format 1b withchannel selection scheme, confirm alternative channel resource; When having solved terminal equipment and adopting PUCCH format 1b with channel selection scheme transmission to carry out ACK/NACK feedback information that the configurating downlink intercarrier merges; Channel is selected definite problem of required channel resource; Avoided being not sure of the situation of alternative channel resource according to existing the determined implicit information channel resource of PDCCH through the downlink main carrier to carry transmission; Realized for the scene of ACK/NACK feedback information,, mainly be applicable to the TDD system through of the transmission of PUCCH format 1b with channel selection scheme to the ACK/NACK feedback information greater than 4 bits.
In order to realize the technical scheme of the embodiment of the invention, the embodiment of the invention also provides a kind of terminal equipment, and its structural representation is shown in figure 12, specifically comprises:
Receiver module 121 is used for M descending sub frame reception data at the descending carrier of C configuration, wherein, C >=1, M >=1, the ACK/NACK information of the data in M descending sub frame is transmitted in same sub-frame of uplink;
Determination module 122, the descending sub frame that is used for each of receiver module 121 a pairing M descending sub frame received downlink data is confirmed a channel resource, is determined to many M channel resource;
Generation module 123, each descending sub frame that is used in M the descending sub frame generates an ACK/NACK feedback information, produces M bit feedback bit;
Sending module 124; Be used for the M bit feedback bit that generated according to generation module 123, in the determination module 122 determined channel resource of M at the most, select a channel resource, and confirm the qam constellation point of a correspondence; Through the channel resource of selecting, send the qam constellation point of confirming.
In practical application, determination module 122 specifically is used for:
If in the descending sub frame of receiver module 121 in M descending sub frame; On downlink main carrier to carry, there is not semi-continuous PDSCH transmission; Or on downlink main carrier to carry, have the PDCCH that dispatches semi-continuous PDSCH, then determination module 122 adopts first kind resource determining method to confirm channel resource;
If in the descending sub frame of receiver module 121 in M descending sub frame; Have semi-continuous PDSCH transmission on the downlink main carrier to carry and in descending sub frame, do not having the PDCCH that dispatches semi-continuous PDSCH, then determination module 122 adopts second type of resource determining method to confirm channel resource.
Wherein, determination module 122 adopts first kind resource determining method to confirm channel resource, is specially:
If in the descending sub frame of receiver module 121 in M descending sub frame; On downlink main carrier to carry, receive at least one PDCCH; And PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or be used to transmit the descending scheduling indication of dynamic PDSCH on the descending auxilliary carrier wave of downlink main carrier to carry and/or at least one configuration; Then determination module 122 is confirmed a channel resource through the minimum CCE numbering of a PDCCH, as the pairing channel resource of descending sub frame;
If in the descending sub frame of receiver module 121 in M descending sub frame; On downlink main carrier to carry, do not receive PDCCH; But on the descending auxilliary carrier wave of at least one configuration, receive PDCCH; And PDCCH is used for the descending scheduling indication of the PDSCH on the descending auxilliary carrier wave of transmission configuration, and then determination module 122 is confirmed a channel resource through the ACK/NACK resource indication bit among the PDCCH.
Further; In such cases, this terminal equipment also comprises selects module 125, be used for when receiver module 121 in a descending sub frame of M descending sub frame; On downlink main carrier to carry, receive at least one PDCCH; And PDCCH selects one to be used for confirming channel resource at least one PDCCH for the PDCCH of the semi-continuous PDSCH of scheduling or when being used to transmit the descending scheduling indication of dynamic PDSCH on the descending auxilliary carrier wave of downlink main carrier to carry and/or at least one configuration, specifically comprises:
If the PDCCH of the descending scheduling indication that comprises the PDCCH that dispatches semi-continuous PDSCH among at least one PDCCH that receiver module 121 receives or transmit dynamic PDSCH on the downlink main carrier to carry on downlink main carrier to carry; Then select the PDCCH of the descending scheduling indication of dynamic PDSCH on PDCCH or the transmission downlink main carrier to carry of the semi-continuous PDSCH of module 125 selection schedulings, and confirm channel resource based on the minimum CCE numbering of the PDCCH that selects;
If do not comprise the PDCCH of the PDSCH that scheduling is semi-continuous and the PDCCH of the descending scheduling indication of transmitting dynamic PDSCH on the downlink main carrier to carry among at least one PDCCH that receiver module 121 receives on downlink main carrier to carry; Then select carrier index or information in carrier wave at least one PDCCH indication territory or the precedence information of descending carrier that at least one PDCCH dispatched of module 125 according to the descending carrier that at least one PDCCH dispatched; In at least one PDCCH, select a PDCCH, and pass through the definite channel resource of minimum CCE numbering of the PDCCH of selection.
Under another kind of scene; This terminal equipment also comprises selects module 125; Be used for when receiver module 121 in a descending sub frame of M descending sub frame, on downlink main carrier to carry, receive at least one PDCCH, and PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or the descending scheduling that is used to transmit dynamic PDSCH on the descending auxilliary carrier wave of downlink main carrier to carry and/or at least one configuration when indicating; In at least one PDCCH, select one to be used for confirming channel resource, specifically comprise:
Select carrier index or information in carrier wave at least one PDCCH indication territory or the precedence information of descending carrier that at least one PDCCH dispatched of module 125 according to the descending carrier that at least one PDCCH dispatched; In at least one PDCCH, select a PDCCH, and pass through the definite channel resource of minimum CCE numbering of the PDCCH of selection.
On the other hand, determination module 122 adopts first kind resource determining method to confirm channel resource, specifically comprises:
If in the descending sub frame of receiver module 121 in M descending sub frame; Receiving the PDCCH that is used to dispatch the PDCCH of semi-continuous PDSCH or is used to transmit the descending scheduling indication of dynamic PDSCH on the downlink main carrier to carry on the downlink main carrier to carry; Then determination module 122 is confirmed a channel resource through the minimum CCE numbering of PDCCH that is used to dispatch the PDCCH of semi-continuous PDSCH or is used to transmit on the downlink main carrier to carry descending scheduling indication of dynamic PDSCH, as the pairing channel resource of descending sub frame;
If in the descending sub frame of receiver module 121 in M descending sub frame; Do not receiving the PDCCH and the PDCCH that is used to transmit the descending scheduling of PDSCH indication dynamically on the downlink main carrier to carry that is used to dispatch semi-continuous PDSCH on the downlink main carrier to carry; But at the PDCCH that receives the descending scheduling indication that is used to transmit the PDSCH on the descending auxilliary carrier wave on the downlink main carrier to carry and/or on the descending auxilliary carrier wave of at least one configuration; Then the ACK/NACK resource indication bit of the PDCCH of the descending scheduling indication of determination module 122 through being used for transmitting the PDSCH on the descending auxilliary carrier wave is confirmed a channel resource, as the pairing channel resource of descending sub frame.
On the other hand, determination module 122 adopts second type of resource determining method to confirm channel resource, specifically comprises:
If in the descending sub frame of receiver module 121 in M descending sub frame; At the PDCCH that receives the descending scheduling indication that is used to transmit dynamic PDSCH on the downlink main carrier to carry on the downlink main carrier to carry; Then determination module 122 is numbered definite channel resource through the minimum CCE that is used to transmit the PDCCH of the descending scheduling of PDSCH indication dynamically on the downlink main carrier to carry, as the pairing channel resource of descending sub frame;
If in the descending sub frame of receiver module 121 in M descending sub frame; At the PDCCH that does not receive the descending scheduling indication that is used to transmit dynamic PDSCH on the downlink main carrier to carry on the downlink main carrier to carry; Then determination module 122 is confirmed the pairing channel resource of PDSCH semi-continuous in the descending sub frames as the pairing channel resource of descending sub frame, and the pairing channel resource of semi-continuous PDSCH is one in the indicated high-rise pre-configured a plurality of channel resources of the TPC among the PDCCH that activates semi-continuous PDSCH.
In the practical application scene, this terminal equipment also comprises judge module 126, is used for judging whether receiver module 121 exists PDSCH to lose at M descending sub frame:
Determination module 122 also is used for judging receiver module 121 when judge module 126 and when a descending sub frame of M descending sub frame exists PDSCH to lose, abandons confirming channel resource for descending sub frame.
On the other hand, the embodiment of the invention also provides a kind of base station, and its structural representation is shown in figure 13, comprising:
Sending module 131 is used for sending data at M the descending sub frame of descending carrier of C configuration to terminal equipment, wherein, C >=1, M >=1, the ACK/NACK information of the data in M descending sub frame is transmitted in same sub-frame of uplink;
Determination module 132, the descending sub frame that is used for each of sending module 131 a pairing M descending sub frame sent downlink data is confirmed a channel resource, is determined to many M channel resource;
Receiver module 133 is used to detect the determination module 132 determined channel resource of M at the most, the information that receiving terminal apparatus sends.
Concrete, determination module 132 specifically is used for:
If in the descending sub frame of sending module 131 in M descending sub frame; On downlink main carrier to carry, do not send semi-continuous PDSCH transmission; Or on downlink main carrier to carry, sent the PDCCH that dispatches semi-continuous PDSCH, then determination module 132 adopts first kind resource determining method to confirm channel resource;
If in the descending sub frame of sending module 131 in M descending sub frame; Sending semi-continuous PDSCH transmission on the downlink main carrier to carry and in descending sub frame, sending the PDCCH that dispatches semi-continuous PDSCH, then determination module 132 adopts second type of resource determining method to confirm channel resource.
Wherein, determination module 132 adopts first kind resource determining method to confirm channel resource, specifically comprises:
If in the descending sub frame of sending module 131 in M descending sub frame; On downlink main carrier to carry, send at least one PDCCH; And PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or be used to transmit the descending scheduling indication of dynamic PDSCH on the descending auxilliary carrier wave of downlink main carrier to carry and/or at least one configuration; Then determination module 132 is confirmed a channel resource through the minimum CCE numbering of a PDCCH, as the pairing channel resource of descending sub frame;
If in the descending sub frame of sending module 131 in M descending sub frame; On downlink main carrier to carry, do not send PDCCH; But on the descending auxilliary carrier wave of at least one configuration, send PDCCH; And PDCCH is used for the descending scheduling indication of the PDSCH on the descending auxilliary carrier wave of transmission configuration, and then determination module 132 is confirmed a channel resource through the ACK/NACK resource indication bit among the PDCCH, as the pairing channel resource of descending sub frame.
In such cases; This base station also comprises selects module 134; Be used for when sending module 131 in a descending sub frame of M descending sub frame, on downlink main carrier to carry, sent at least one PDCCH, and PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or the descending scheduling that is used to transmit dynamic PDSCH on the descending auxilliary carrier wave of downlink main carrier to carry and/or at least one configuration when indicating; In at least one PDCCH, select one to be used for confirming channel resource, specifically comprise:
If the PDCCH of the descending scheduling indication that comprises the PDCCH that dispatches semi-continuous PDSCH among at least one PDCCH that sending module 131 sends or transmit dynamic PDSCH on the downlink main carrier to carry on downlink main carrier to carry; Then select the PDCCH of the descending scheduling indication of dynamic PDSCH on PDCCH or the transmission downlink main carrier to carry of the semi-continuous PDSCH of module 134 selection schedulings, and confirm channel resource through the minimum CCE numbering of the PDCCH that selects;
If do not comprise the PDCCH of the PDSCH that scheduling is semi-continuous and the PDCCH of the descending scheduling indication of transmitting dynamic PDSCH on the downlink main carrier to carry among at least one PDCCH that sending module 131 sends on downlink main carrier to carry; Then select carrier index or information in carrier wave at least one PDCCH indication territory or the precedence information of descending carrier that at least one PDCCH dispatched of module 134 according to the descending carrier that at least one PDCCH dispatched; In at least one PDCCH, select a PDCCH, and pass through the definite channel resource of minimum CCE numbering of the PDCCH of selection.
On the other hand; This base station also comprises selects module 134; Be used for when sending module 131 in a descending sub frame of M descending sub frame, on downlink main carrier to carry, sent at least one PDCCH, and PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or the descending scheduling that is used to transmit dynamic PDSCH on the descending auxilliary carrier wave of downlink main carrier to carry and/or at least one configuration when indicating; In at least one PDCCH, select one to be used for confirming channel resource, specifically comprise:
Select carrier index or information in carrier wave at least one PDCCH indication territory or the precedence information of descending carrier that at least one PDCCH dispatched of module 134 according to the descending carrier that at least one PDCCH dispatched; In at least one PDCCH, select a PDCCH, and pass through the definite channel resource of minimum CCE numbering of the PDCCH of selection.
In another kind of actual application scenarios, determination module 132 adopts first kind resource determining method to confirm channel resource, specifically comprises:
If in the descending sub frame of sending module 131 in M descending sub frame; Sending the PDCCH that is used to dispatch the PDCCH of semi-continuous PDSCH or is used to transmit the descending scheduling indication of dynamic PDSCH on the downlink main carrier to carry on the downlink main carrier to carry; Then determination module 132 is confirmed a channel resource through the minimum CCE numbering of PDCCH that is used to dispatch the PDCCH of semi-continuous PDSCH or is used to transmit on the downlink main carrier to carry descending scheduling indication of dynamic PDSCH, as the pairing channel resource of descending sub frame;
If in the descending sub frame of sending module 131 in M descending sub frame; There is not to send the PDCCH and the PDCCH that is used to transmit the descending scheduling of PDSCH indication dynamically on the downlink main carrier to carry that is used to dispatch semi-continuous PDSCH on the downlink main carrier to carry; But at the PDCCH that sends the descending scheduling indication that is used to transmit the PDSCH on the descending auxilliary carrier wave on the downlink main carrier to carry and/or on the descending auxilliary carrier wave of at least one configuration; Then the ACK/NACK resource indication bit of the PDCCH of the descending scheduling indication of determination module 132 through being used for transmitting the PDSCH on the descending auxilliary carrier wave is confirmed a channel resource, as the pairing channel resource of descending sub frame.
Moreover, determination module 132 adopts second type of resource determining method to confirm channel resource, specifically comprises:
If in the descending sub frame of sending module 131 in M descending sub frame; At the PDCCH that has sent the descending scheduling indication that is used to transmit dynamic PDSCH on the downlink main carrier to carry on the downlink main carrier to carry; Then determination module 132 is numbered definite channel resource through the minimum CCE that is used to transmit the PDCCH of the descending scheduling of PDSCH indication dynamically on the downlink main carrier to carry, as the pairing channel resource of descending sub frame;
If in the descending sub frame of sending module 131 in M descending sub frame; At the PDCCH that does not have to send the descending scheduling indication that is used to transmit dynamic PDSCH on the downlink main carrier to carry on the downlink main carrier to carry; Then determination module 132 is confirmed the pairing channel resource of PDSCH semi-continuous in the descending sub frames as the pairing channel resource of descending sub frame, and the pairing channel resource of semi-continuous PDSCH is one in the indicated high-rise pre-configured a plurality of channel resources of the TPC among the PDCCH that activates semi-continuous PDSCH.
Compared with prior art, the embodiment of the invention has the following advantages:
Through using the technical scheme of the embodiment of the invention; Can in the application scenarios that adopts PUCCH format 1b withchannel selection scheme, confirm alternative channel resource; When having solved terminal equipment and adopting PUCCH format 1b with channel selection scheme transmission to carry out ACK/NACK feedback information that the configurating downlink intercarrier merges; Channel is selected definite problem of required channel resource; Avoided being not sure of the situation of alternative channel resource according to existing the determined implicit information channel resource of PDCCH through the downlink main carrier to carry transmission; Realized for the scene of ACK/NACK feedback information,, mainly be applicable to the TDD system through of the transmission of PUCCH format 1b with channel selection scheme to the ACK/NACK feedback information greater than 4 bits.
Through the description of above execution mode, those skilled in the art can be well understood to the embodiment of the invention and can realize through hardware, also can realize by the mode that software adds necessary general hardware platform.Based on such understanding; The technical scheme of the embodiment of the invention can be come out with the embodied of software product, this software product can be stored in a non-volatile memory medium (can be CD-ROM, USB flash disk; Portable hard drive etc.) in; Comprise some instructions with so that computer equipment (can be personal computer, server, or the network equipment etc.) each implements the described method of scene to carry out the embodiment of the invention.
It will be appreciated by those skilled in the art that accompanying drawing is a preferred sketch map of implementing scene, module in the accompanying drawing or flow process might not be that embodiment of the present invention embodiment is necessary.
It will be appreciated by those skilled in the art that the module in the device of implementing in the scene can be distributed in the device of implementing scene according to implementing scene description, also can carry out respective change and be arranged in the one or more devices that are different from this enforcement scene.The module of above-mentioned enforcement scene can be merged into a module, also can further split into a plurality of submodules.
The invention described above embodiment sequence number is not represented the quality of implementing scene just to description.
More than the disclosed several practical implementation scenes that are merely the embodiment of the invention, still, the embodiment of the invention is not limited thereto, any those skilled in the art can think variation all should fall into the traffic limits scope of the embodiment of the invention.

Claims (36)

1. the channel resource of an ACK/NACK feedback information is confirmed method, it is characterized in that, comprising:
M the descending sub frame of terminal equipment in the descending carrier of C configuration receives data, wherein, C >=1, M >=1, the ACK/NACK information of the data in the said M descending sub frame is transmitted in same sub-frame of uplink;
Said terminal equipment is confirmed a channel resource to the descending sub frame that in the said M descending sub frame each receives downlink data, is determined to many M channel resource;
Said terminal equipment is that each descending sub frame in the said M descending sub frame generates an ACK/NACK feedback information, produces M bit feedback bit;
Said terminal equipment is according to the said M bit feedback bit that generates; In the said channel resource of confirming of M at the most, select a channel resource; And the qam constellation point of a definite correspondence, through the channel resource of said selection, send said definite qam constellation point.
2. the method for claim 1 is characterized in that, said terminal equipment is confirmed a channel resource to the descending sub frame that in the said M descending sub frame each receives downlink data, specifically comprises:
If in the descending sub frame of said terminal equipment in a said M descending sub frame; On downlink main carrier to carry, there is not semi-continuous PDSCH transmission; Or on downlink main carrier to carry, having the PDCCH that dispatches semi-continuous PDSCH, then said terminal equipment adopts first kind resource determining method to confirm channel resource;
If in the descending sub frame of said terminal equipment in a said M descending sub frame; Have semi-continuous PDSCH transmission on the downlink main carrier to carry and in said descending sub frame, do not having the PDCCH of the said semi-continuous PDSCH of scheduling, then said terminal equipment adopts second type of resource determining method to confirm channel resource.
3. method as claimed in claim 2 is characterized in that, said first kind resource determining method specifically comprises:
If in the descending sub frame of said terminal equipment in a said M descending sub frame; On downlink main carrier to carry, receive at least one PDCCH; And said PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or be used to transmit the descending scheduling indication of dynamic PDSCH on the descending auxilliary carrier wave of said downlink main carrier to carry and/or at least one configuration; Then said terminal equipment is confirmed a channel resource through the minimum CCE numbering of a said PDCCH, as the pairing channel resource of said descending sub frame;
If in the descending sub frame of said terminal equipment in a said M descending sub frame; On downlink main carrier to carry, do not receive PDCCH; But on the descending auxilliary carrier wave of at least one configuration, receive PDCCH; And said PDCCH is used for the descending scheduling indication of the PDSCH on the descending auxilliary carrier wave of transmission configuration, and then said terminal equipment is confirmed a channel resource through the ACK/NACK resource indication bit among the said PDCCH, as the pairing channel resource of said descending sub frame.
4. method as claimed in claim 3; It is characterized in that; In the descending sub frame of said terminal equipment in a said M descending sub frame; On downlink main carrier to carry, receive at least one PDCCH, and said PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or when being used to transmit the descending scheduling indication of dynamic PDSCH on the descending auxilliary carrier wave of said downlink main carrier to carry and/or at least one configuration, said terminal equipment is confirmed channel resource through following rule:
If the PDCCH of the descending scheduling indication that comprises the PDCCH that dispatches semi-continuous PDSCH among at least one PDCCH that said terminal equipment receives or transmit dynamic PDSCH on the downlink main carrier to carry on downlink main carrier to carry; The said PDCCH of the descending scheduling indication of dynamic PDSCH on the said PDCCH of the PDSCH that then said terminal equipment selection scheduling is semi-continuous or the transmission downlink main carrier to carry, and the definite channel resource of minimum CCE numbering of the PDCCH through said selection;
If do not comprise the PDCCH of the PDSCH that scheduling is semi-continuous and the PDCCH of the descending scheduling indication of transmitting dynamic PDSCH on the downlink main carrier to carry among at least one PDCCH that said terminal equipment receives on downlink main carrier to carry; Then said terminal equipment is according to carrier index or the information in the indication of the carrier wave among said at least one PDCCH territory or the precedence information of the descending carrier that said at least one PDCCH dispatched of the descending carrier that said at least one PDCCH dispatched; In said at least one PDCCH, select a PDCCH, and the definite channel resource of minimum CCE numbering of the PDCCH through said selection.
5. method as claimed in claim 3; It is characterized in that; In the descending sub frame of said terminal equipment in a said M descending sub frame; On downlink main carrier to carry, receive at least one PDCCH, and said PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or when being used to transmit the descending scheduling indication of dynamic PDSCH on the descending auxilliary carrier wave of said downlink main carrier to carry and/or at least one configuration, said terminal equipment is confirmed channel resource through following rule:
Said terminal equipment is according to carrier index or the information in the indication of the carrier wave among said at least one PDCCH territory or the precedence information of the descending carrier that said at least one PDCCH dispatched of the descending carrier that said at least one PDCCH dispatched; In said at least one PDCCH, select a PDCCH, and the definite channel resource of minimum CCE numbering of the PDCCH through said selection.
6. method as claimed in claim 3; It is characterized in that; In the descending sub frame of said terminal equipment in a said M descending sub frame, on downlink main carrier to carry, do not receive PDCCH, but on the descending auxilliary carrier wave of at least one configuration, receive PDCCH; And said PDCCH is used for the descending scheduling indication of the PDSCH on the descending auxilliary carrier wave of transmission configuration; Then said terminal equipment is confirmed a channel resource through the ACK/NACK resource indication bit among the said PDCCH, as the pairing channel resource of said descending sub frame, specifically comprises:
ACK/NACK resource indication bit among the said PDCCH is indicated at least one pre-configured channel resource of high-level signaling;
If said terminal equipment receives at least two PDCCH on the descending auxilliary carrier wave of at least two configurations, the ACK/NACK resource indication bit among said at least two PDCCH is indicated same channel resource.
7. method as claimed in claim 2 is characterized in that, said first kind resource determining method specifically comprises:
If in the descending sub frame of said terminal equipment in a said M descending sub frame; Receiving the PDCCH that is used to dispatch the PDCCH of semi-continuous PDSCH or is used to transmit the descending scheduling indication of dynamic PDSCH on the said downlink main carrier to carry on the downlink main carrier to carry; Then said terminal equipment is confirmed a channel resource through the minimum CCE numbering of said PDCCH that is used to dispatch the said PDCCH of semi-continuous PDSCH or is used to transmit on the said downlink main carrier to carry descending scheduling indication of dynamic PDSCH, as the pairing channel resource of said descending sub frame;
If in the descending sub frame of said terminal equipment in a said M descending sub frame; Do not receiving the PDCCH and the PDCCH that is used to transmit the descending scheduling of PDSCH indication dynamically on the said downlink main carrier to carry that is used to dispatch semi-continuous PDSCH on the downlink main carrier to carry; But at the PDCCH that receives the descending scheduling indication that is used to transmit the PDSCH on the descending auxilliary carrier wave on the said downlink main carrier to carry and/or on the descending auxilliary carrier wave of at least one configuration; Then said terminal equipment is confirmed a channel resource through the ACK/NACK resource indication bit of the PDCCH of the said descending scheduling indication that is used for transmitting the PDSCH on the descending auxilliary carrier wave, as the pairing channel resource of said descending sub frame.
8. method as claimed in claim 7; It is characterized in that; In the descending sub frame of said terminal equipment in a said M descending sub frame; Do not receiving the PDCCH and the PDCCH that is used to transmit the descending scheduling of PDSCH indication dynamically on the said downlink main carrier to carry that is used to dispatch semi-continuous PDSCH on the downlink main carrier to carry; But at the PDCCH that receives the descending scheduling indication that is used to transmit the PDSCH on the descending auxilliary carrier wave on the said downlink main carrier to carry and/or on the descending auxilliary carrier wave of at least one configuration; Then said terminal equipment is confirmed a channel resource through the ACK/NACK resource indication bit of the PDCCH of the said descending scheduling indication that is used for transmitting the PDSCH on the descending auxilliary carrier wave, as the pairing channel resource of said descending sub frame, specifically comprises:
ACK/NACK resource indication bit among the said PDCCH is indicated at least one pre-configured channel resource of high-level signaling;
If said terminal equipment is at least two PDCCH that receive the descending scheduling indication that is used to transmit the PDSCH on the descending auxilliary carrier wave on the descending auxilliary carrier wave of said downlink main carrier to carry and/or configuration, the ACK/NACK resource indication bit among said at least two PDCCH is indicated same channel resource.
9. method as claimed in claim 2 is characterized in that, said end second type of resource determining method, specifically comprise:
If in the descending sub frame of said terminal equipment in a said M descending sub frame; At the PDCCH that receives the descending scheduling indication that is used to transmit dynamic PDSCH on the said downlink main carrier to carry on the downlink main carrier to carry; Then said terminal equipment is confirmed a channel resource through the minimum CCE numbering of the PDCCH that the said descending scheduling that is used to transmit dynamic PDSCH on the downlink main carrier to carry is indicated, as the pairing channel resource of said descending sub frame;
If in the descending sub frame of said terminal equipment in a said M descending sub frame; At the PDCCH that does not receive the descending scheduling indication that is used to transmit dynamic PDSCH on the said downlink main carrier to carry on the downlink main carrier to carry; Then said terminal equipment is confirmed the pairing channel resource of PDSCH semi-continuous in the said descending sub frame as the pairing channel resource of said descending sub frame, and the said semi-continuous pairing channel resource of PDSCH is one in the indicated high-rise pre-configured a plurality of channel resources of the TPC among the PDCCH that activates said semi-continuous PDSCH.
10. like any described method in the claim 2 to 8, it is characterized in that the PDCCH of the PDSCH that said scheduling is semi-continuous specifically comprises:
Be used to activate the PDCCH of semi-continuous PDSCH, or be used to discharge the PDCCH of semi-continuous PDSCH, said PDCCH adopts the SPS-RNTI scrambling.
11. like any described method in the claim 1 to 9, it is characterized in that, also comprise:
When said terminal equipment judged that a descending sub frame in the said M descending sub frame exists PDSCH to lose, said terminal equipment was abandoned confirming channel resource for said descending sub frame.
12. a terminal equipment is characterized in that, comprising:
Receiver module is used for M descending sub frame reception data at the descending carrier of C configuration, wherein, C >=1, M >=1, the ACK/NACK information of the data in the said M descending sub frame is transmitted in same sub-frame of uplink;
Determination module, the descending sub frame that is used for each of the pairing said M descending sub frame of said receiver module received downlink data is confirmed a channel resource, is determined to many M channel resource;
Generation module, each descending sub frame that is used in the said M descending sub frame generates an ACK/NACK feedback information, produces M bit feedback bit;
Sending module; Be used for the said M bit feedback bit that generates according to said generation module; In the determined said channel resource of M at the most of said determination module, select a channel resource; And the qam constellation point of a definite correspondence, through the channel resource of said selection, send said definite qam constellation point.
13. terminal equipment as claimed in claim 12 is characterized in that, said determination module specifically is used for:
If in the descending sub frame of said receiver module in a said M descending sub frame; On downlink main carrier to carry, there is not semi-continuous PDSCH transmission; Or on downlink main carrier to carry, having the PDCCH that dispatches semi-continuous PDSCH, then said determination module adopts first kind resource determining method to confirm channel resource;
If in the descending sub frame of said receiver module in a said M descending sub frame; Have semi-continuous PDSCH transmission on the downlink main carrier to carry and in said descending sub frame, do not having the PDCCH of the said semi-continuous PDSCH of scheduling, then said determination module adopts second type of resource determining method to confirm channel resource.
14. terminal equipment as claimed in claim 13 is characterized in that, said determination module adopts first kind resource determining method to confirm channel resource, is specially:
If in the descending sub frame of said receiver module in a said M descending sub frame; On downlink main carrier to carry, receive at least one PDCCH; And said PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or be used to transmit the descending scheduling indication of dynamic PDSCH on the descending auxilliary carrier wave of said downlink main carrier to carry and/or at least one configuration; Then said determination module is confirmed a channel resource through the minimum CCE numbering of a said PDCCH, as the pairing channel resource of said descending sub frame;
If in the descending sub frame of said receiver module in a said M descending sub frame; On downlink main carrier to carry, do not receive PDCCH; But on the descending auxilliary carrier wave of at least one configuration, receive PDCCH; And said PDCCH is used for the descending scheduling indication of the PDSCH on the descending auxilliary carrier wave of transmission configuration, and then said determination module is confirmed a channel resource through the ACK/NACK resource indication bit among the said PDCCH.
15. terminal equipment as claimed in claim 14; It is characterized in that; Also comprise the selection module; Be used for when said receiver module in a descending sub frame of a said M descending sub frame, on downlink main carrier to carry, receive at least one PDCCH, and said PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or the descending scheduling that is used to transmit dynamic PDSCH on the descending auxilliary carrier wave of said downlink main carrier to carry and/or at least one configuration when indicating; In said at least one PDCCH, select one to be used for confirming channel resource, specifically comprise:
If the PDCCH of the descending scheduling indication that comprises the PDCCH that dispatches semi-continuous PDSCH among at least one PDCCH that said receiver module receives or transmit dynamic PDSCH on the downlink main carrier to carry on downlink main carrier to carry; The said PDCCH of the descending scheduling indication of dynamic PDSCH on the said PDCCH of the PDSCH that then said selection module selection scheduling is semi-continuous or the transmission downlink main carrier to carry, and confirm channel resource based on the minimum CCE numbering of the PDCCH of said selection;
If do not comprise the PDCCH of the PDSCH that scheduling is semi-continuous and the PDCCH of the descending scheduling indication of transmitting dynamic PDSCH on the downlink main carrier to carry among at least one PDCCH that said receiver module receives on downlink main carrier to carry; Then said selection module is according to carrier index or the information in the indication of the carrier wave among said at least one PDCCH territory or the precedence information of the descending carrier that said at least one PDCCH dispatched of the descending carrier that said at least one PDCCH dispatched; In said at least one PDCCH, select a PDCCH, and the definite channel resource of minimum CCE numbering of the PDCCH through said selection.
16. terminal equipment as claimed in claim 14; It is characterized in that; Also comprise the selection module; Be used for when said receiver module in a descending sub frame of a said M descending sub frame, on downlink main carrier to carry, receive at least one PDCCH, and said PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or the descending scheduling that is used to transmit dynamic PDSCH on the descending auxilliary carrier wave of said downlink main carrier to carry and/or at least one configuration when indicating; In said at least one PDCCH, select one to be used for confirming channel resource, specifically comprise:
Said selection module is according to carrier index or the information in the indication of the carrier wave among said at least one PDCCH territory or the precedence information of the descending carrier that said at least one PDCCH dispatched of the descending carrier that said at least one PDCCH dispatched; In said at least one PDCCH, select a PDCCH, and the definite channel resource of minimum CCE numbering of the PDCCH through said selection.
17. terminal equipment as claimed in claim 13 is characterized in that, said determination module adopts first kind resource determining method to confirm channel resource, specifically comprises:
If in the descending sub frame of said receiver module in a said M descending sub frame; Receiving the PDCCH that is used to dispatch the PDCCH of semi-continuous PDSCH or is used to transmit the descending scheduling indication of dynamic PDSCH on the said downlink main carrier to carry on the downlink main carrier to carry; Then said determination module is confirmed a channel resource through the minimum CCE numbering of said PDCCH that is used to dispatch the said PDCCH of semi-continuous PDSCH or is used to transmit on the said downlink main carrier to carry descending scheduling indication of dynamic PDSCH, as the pairing channel resource of said descending sub frame;
If in the descending sub frame of said receiver module in a said M descending sub frame; Do not receiving the PDCCH and the PDCCH that is used to transmit the descending scheduling of PDSCH indication dynamically on the said downlink main carrier to carry that is used to dispatch semi-continuous PDSCH on the downlink main carrier to carry; But at the PDCCH that receives the descending scheduling indication that is used to transmit the PDSCH on the descending auxilliary carrier wave on the said downlink main carrier to carry and/or on the descending auxilliary carrier wave of at least one configuration; Then said determination module is confirmed a channel resource through the ACK/NACK resource indication bit of the PDCCH of the said descending scheduling indication that is used for transmitting the PDSCH on the descending auxilliary carrier wave, as the pairing channel resource of said descending sub frame.
18. terminal equipment as claimed in claim 13 is characterized in that, said determination module adopts second type of resource determining method to confirm channel resource, specifically comprises:
If in the descending sub frame of said receiver module in a said M descending sub frame; At the PDCCH that receives the descending scheduling indication that is used to transmit dynamic PDSCH on the said downlink main carrier to carry on the downlink main carrier to carry; Then said determination module is confirmed a channel resource through the minimum CCE numbering of the PDCCH that the said descending scheduling that is used to transmit dynamic PDSCH on the downlink main carrier to carry is indicated, as the pairing channel resource of said descending sub frame;
If in the descending sub frame of said receiver module in a said M descending sub frame; At the PDCCH that does not receive the descending scheduling indication that is used to transmit dynamic PDSCH on the said downlink main carrier to carry on the downlink main carrier to carry; Then said determination module is confirmed the pairing channel resource of PDSCH semi-continuous in the said descending sub frame as the pairing channel resource of said descending sub frame, and the said semi-continuous pairing channel resource of PDSCH is one in the indicated high-rise pre-configured a plurality of channel resources of the TPC among the PDCCH that activates said semi-continuous PDSCH.
19. terminal equipment as claimed in claim 12 is characterized in that, also comprises judge module, is used for judging whether said receiver module exists PDSCH to lose at a said M descending sub frame:
Said determination module also is used for judging said receiver module when said judge module and when a descending sub frame of a said M descending sub frame exists PDSCH to lose, abandons confirming channel resource for said descending sub frame.
20. the channel resource of an ACK/NACK feedback information is confirmed method, it is characterized in that, comprising:
M the descending sub frame of base station in the descending carrier of C configuration sends data to terminal equipment, wherein, C >=1, M >=1, the ACK/NACK information of the data in the said M descending sub frame is transmitted in same sub-frame of uplink;
A channel resource is confirmed to the descending sub frame of each the transmission downlink data in the said M descending sub frame in said base station, is determined to many M channel resource;
Said definite channel resource of M is at the most detected in said base station, receives the information that said terminal equipment sends.
21. method as claimed in claim 20 is characterized in that, a channel resource is confirmed to the descending sub frame of each the transmission downlink data in the said M descending sub frame in said base station, is determined to many M channel resource, specifically comprises:
If in the descending sub frame of said base station in a said M descending sub frame; On downlink main carrier to carry, there is not semi-continuous PDSCH transmission; Or on downlink main carrier to carry, having the PDCCH that dispatches semi-continuous PDSCH, then said base station adopts first kind resource determining method to confirm channel resource;
If in the descending sub frame of said base station in a said M descending sub frame; Have semi-continuous PDSCH transmission on the downlink main carrier to carry and in said descending sub frame, do not having the PDCCH of the said semi-continuous PDSCH of scheduling, then said base station adopts second type of resource determining method to confirm channel resource.
22. method as claimed in claim 21 is characterized in that, said first kind resource determining method specifically comprises:
If in the descending sub frame of said base station in a said M descending sub frame; On downlink main carrier to carry, send at least one PDCCH; And said PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or be used to transmit the descending scheduling indication of dynamic PDSCH on the descending auxilliary carrier wave of said downlink main carrier to carry and/or at least one configuration; A channel resource is confirmed through the minimum CCE numbering of a said PDCCH in then said base station, as the pairing channel resource of said descending sub frame;
If in the descending sub frame of said base station in a said M descending sub frame; On downlink main carrier to carry, do not send PDCCH; But on the descending auxilliary carrier wave of at least one configuration, send PDCCH; And said PDCCH is used for the descending scheduling indication of the PDSCH on the descending auxilliary carrier wave of transmission configuration, and a channel resource is confirmed through the ACK/NACK resource indication bit among the said PDCCH in then said base station, as the pairing channel resource of said descending sub frame.
23. method as claimed in claim 22; It is characterized in that; In the descending sub frame of said base station in a said M descending sub frame; On downlink main carrier to carry, send at least one PDCCH, and said PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or when being used to transmit the descending scheduling indication of dynamic PDSCH on the descending auxilliary carrier wave of said downlink main carrier to carry and/or at least one configuration, channel resource is confirmed through following rule in said base station:
If the PDCCH of the descending scheduling indication that comprises the PDCCH that dispatches semi-continuous PDSCH among at least one PDCCH that send said base station or transmit dynamic PDSCH on the downlink main carrier to carry on downlink main carrier to carry; The said PDCCH of the descending scheduling indication of dynamic PDSCH on the said PDCCH of the PDSCH that then said base station selected scheduling is semi-continuous or the transmission downlink main carrier to carry, and the definite channel resource of minimum CCE numbering of the PDCCH through said selection;
If do not comprise the PDCCH of the PDSCH that scheduling is semi-continuous and the PDCCH of the descending scheduling indication of transmitting dynamic PDSCH on the downlink main carrier to carry among at least one PDCCH that send said base station on downlink main carrier to carry; Then said base station is according to carrier index or the information in the indication of the carrier wave among said at least one PDCCH territory or the precedence information of the descending carrier that said at least one PDCCH dispatched of the descending carrier that said at least one PDCCH dispatched; In said at least one PDCCH, select a PDCCH, and the definite channel resource of minimum CCE numbering of the PDCCH through said selection.
24. method as claimed in claim 22; It is characterized in that; In the descending sub frame of said base station in a said M descending sub frame; On downlink main carrier to carry, send at least one PDCCH, and said PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or when being used to transmit the descending scheduling indication of dynamic PDSCH on the descending auxilliary carrier wave of said downlink main carrier to carry and/or at least one configuration, channel resource is confirmed through following rule in said base station:
Said base station is according to carrier index or the information in the indication of the carrier wave among said at least one PDCCH territory or the precedence information of the descending carrier that said at least one PDCCH dispatched of the descending carrier that said at least one PDCCH dispatched; In said at least one PDCCH, select a PDCCH, and the definite channel resource of minimum CCE numbering of the PDCCH through said selection.
25. method as claimed in claim 22; It is characterized in that; In the descending sub frame of said base station in a said M descending sub frame, on downlink main carrier to carry, do not send PDCCH, but send PDCCH on the descending auxilliary carrier wave of at least one configuration in said a plurality of descending carriers; And said PDCCH is used for the descending scheduling indication of the PDSCH on the descending auxilliary carrier wave of transmission configuration; A channel resource is confirmed through the ACK/NACK resource indication bit among the said PDCCH in then said base station, as the pairing channel resource of said descending sub frame, specifically comprises:
ACK/NACK resource indication bit among the said PDCCH is indicated at least one pre-configured channel resource of high-level signaling;
If at least two PDCCH have been sent in said base station on the descending auxilliary carrier wave of at least two configurations, the ACK/NACK resource indication bit among said at least two PDCCH is indicated same channel resource.
26. method as claimed in claim 21 is characterized in that, said first kind resource determining method specifically comprises:
If in the descending sub frame of said base station in a said M descending sub frame; Sending the PDCCH that is used to dispatch the PDCCH of semi-continuous PDSCH or is used to transmit the descending scheduling indication of dynamic PDSCH on the said downlink main carrier to carry on the downlink main carrier to carry; A channel resource is confirmed through the minimum CCE numbering of said PDCCH that is used to dispatch the said PDCCH of semi-continuous PDSCH or is used to transmit on the said downlink main carrier to carry descending scheduling indication of dynamic PDSCH in then said base station, as the pairing channel resource of said descending sub frame;
If in the descending sub frame of said base station in a said M descending sub frame; There is not to send the PDCCH and the PDCCH that is used to transmit the descending scheduling of PDSCH indication dynamically on the said downlink main carrier to carry that is used to dispatch semi-continuous PDSCH on the downlink main carrier to carry; But at the PDCCH that sends the descending scheduling indication that is used to transmit the PDSCH on the descending auxilliary carrier wave on the said downlink main carrier to carry and/or on the descending auxilliary carrier wave of at least one configuration; A channel resource is confirmed through the ACK/NACK resource indication bit of the PDCCH of the said descending scheduling indication that is used for transmitting the PDSCH on the descending auxilliary carrier wave in then said base station, as the pairing channel resource of said descending sub frame.
27. method as claimed in claim 26; It is characterized in that; In the descending sub frame of said base station in a said M descending sub frame; There is not to send the PDCCH that is used to dispatch the PDCCH of semi-continuous PDSCH and is used to transmit the descending scheduling indication of the PDSCH on the said downlink main carrier to carry on the downlink main carrier to carry; But at the PDCCH that sends the descending scheduling indication that is used to transmit the PDSCH on the descending auxilliary carrier wave on the said downlink main carrier to carry and/or on the descending auxilliary carrier wave of at least one configuration; A channel resource is confirmed through the ACK/NACK resource indication bit of the PDCCH of the said descending scheduling indication that is used for transmitting the PDSCH on the descending auxilliary carrier wave in then said base station, as the pairing channel resource of said descending sub frame, specifically comprises:
ACK/NACK resource indication bit among the said PDCCH is indicated at least one pre-configured channel resource of high-level signaling;
If said base station is at least two PDCCH that sent the descending scheduling indication that is used to transmit the PDSCH on the descending auxilliary carrier wave on the descending auxilliary carrier wave of said downlink main carrier to carry and/or configuration, the ACK/NACK resource indication bit among said at least two PDCCH is indicated same channel resource.
28. method as claimed in claim 21 is characterized in that, said end second type of resource determining method, specifically comprise:
If in the descending sub frame of said base station in a said M descending sub frame; At the PDCCH that has sent the descending scheduling indication that is used to transmit dynamic PDSCH on the said downlink main carrier to carry on the downlink main carrier to carry; A channel resource is confirmed through the minimum CCE numbering of the PDCCH that the said descending scheduling that is used to transmit dynamic PDSCH on the downlink main carrier to carry is indicated in then said base station, as the pairing channel resource of said descending sub frame;
If in the descending sub frame of said base station in a said M descending sub frame; At the PDCCH that does not have to send the descending scheduling indication that is used to transmit dynamic PDSCH on the said downlink main carrier to carry on the downlink main carrier to carry; The pairing channel resource of PDSCH semi-continuous in the said descending sub frame is confirmed as the pairing channel resource of said descending sub frame in then said base station, and the said semi-continuous pairing channel resource of PDSCH is one in the indicated high-rise pre-configured a plurality of channel resources of the TPC among the PDCCH that activates said semi-continuous PDSCH.
29., it is characterized in that the PDCCH of the PDSCH that said scheduling is semi-continuous specifically comprises like any described method in the claim 21 to 27:
Be used to activate the PDCCH of semi-continuous PDSCH, or be used to discharge the PDCCH of semi-continuous PDSCH, said PDCCH adopts the SPS-RNTI scrambling.
30. a base station is characterized in that, comprising:
Sending module is used for sending data at M descending sub frame of C descending carrier that disposes to terminal equipment, wherein, C >=1, M >=1, the ACK/NACK information of the data in the said M descending sub frame is transmitted in same sub-frame of uplink;
Determination module, the descending sub frame that is used for each of the pairing said M descending sub frame of said sending module sent downlink data is confirmed a channel resource, is determined to many M channel resource;
Receiver module is used to detect the determined channel resource of M at the most of said determination module, receives the information that said terminal equipment sends.
31. base station as claimed in claim 30 is characterized in that, said determination module specifically is used for:
If in the descending sub frame of said sending module in a said M descending sub frame; On downlink main carrier to carry, do not send semi-continuous PDSCH transmission; Or on downlink main carrier to carry, having sent the PDCCH that dispatches semi-continuous PDSCH, then said determination module adopts first kind resource determining method to confirm channel resource;
If in the descending sub frame of said sending module in a said M descending sub frame; Sending semi-continuous PDSCH transmission on the downlink main carrier to carry and in said descending sub frame, sending the PDCCH of the said semi-continuous PDSCH of scheduling, then said determination module adopts second type of resource determining method to confirm channel resource.
32. base station as claimed in claim 31 is characterized in that, said determination module adopts first kind resource determining method to confirm channel resource, specifically comprises:
If in the descending sub frame of said sending module in a said M descending sub frame; On downlink main carrier to carry, send at least one PDCCH; And said PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or be used to transmit the descending scheduling indication of dynamic PDSCH on the descending auxilliary carrier wave of said downlink main carrier to carry and/or at least one configuration; Then said determination module is confirmed a channel resource through the minimum CCE numbering of a said PDCCH, as the pairing channel resource of said descending sub frame;
If in the descending sub frame of said sending module in a said M descending sub frame; On downlink main carrier to carry, do not send PDCCH; But on the descending auxilliary carrier wave of at least one configuration, send PDCCH; And said PDCCH is used for the descending scheduling indication of the PDSCH on the descending auxilliary carrier wave of transmission configuration, and then said determination module is confirmed a channel resource through the ACK/NACK resource indication bit among the said PDCCH, as the pairing channel resource of said descending sub frame.
33. base station as claimed in claim 32; It is characterized in that; Also comprise the selection module; Be used for when said sending module in a descending sub frame of a said M descending sub frame, on downlink main carrier to carry, sent at least one PDCCH, and said PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or the descending scheduling that is used to transmit dynamic PDSCH on the descending auxilliary carrier wave of said downlink main carrier to carry and/or at least one configuration when indicating; In said at least one PDCCH, select one to be used for confirming channel resource, specifically comprise:
If the PDCCH of the descending scheduling indication that comprises the PDCCH that dispatches semi-continuous PDSCH among at least one PDCCH that said sending module receives and sends or transmit dynamic PDSCH on the downlink main carrier to carry on downlink main carrier to carry; The said PDCCH of the descending scheduling indication of dynamic PDSCH on the said PDCCH of the PDSCH that then said selection module selection scheduling is semi-continuous or the transmission downlink main carrier to carry, and the definite channel resource of minimum CCE numbering of the PDCCH through said selection;
If do not comprise the PDCCH of the PDSCH that scheduling is semi-continuous and the PDCCH of the descending scheduling indication of transmitting dynamic PDSCH on the downlink main carrier to carry among at least one PDCCH that said sending module sends on downlink main carrier to carry; Then said selection module is according to carrier index or the information in the indication of the carrier wave among said at least one PDCCH territory or the precedence information of the descending carrier that said at least one PDCCH dispatched of the descending carrier that said at least one PDCCH dispatched; In said at least one PDCCH, select a PDCCH, and the definite channel resource of minimum CCE numbering of the PDCCH through said selection.
34. base station as claimed in claim 32; It is characterized in that; Also comprise the selection module; Be used for when said sending module in a descending sub frame of a said M descending sub frame, on downlink main carrier to carry, sent at least one PDCCH, and said PDCCH is for the PDCCH of the semi-continuous PDSCH of scheduling or the descending scheduling that is used to transmit dynamic PDSCH on the descending auxilliary carrier wave of said downlink main carrier to carry and/or at least one configuration when indicating; In said at least one PDCCH, select one to be used for confirming channel resource, specifically comprise:
Said selection module is according to carrier index or the information in the indication of the carrier wave among said at least one PDCCH territory or the precedence information of the descending carrier that said at least one PDCCH dispatched of the descending carrier that said at least one PDCCH dispatched; In said at least one PDCCH, select a PDCCH, and the definite channel resource of minimum CCE numbering of the PDCCH through said selection.
35. base station as claimed in claim 31 is characterized in that, said determination module adopts first kind resource determining method to confirm channel resource, specifically comprises::
If in the descending sub frame of said sending module in a said M descending sub frame; Sending the PDCCH that is used to dispatch the PDCCH of semi-continuous PDSCH or is used to transmit the descending scheduling indication of dynamic PDSCH on the said downlink main carrier to carry on the downlink main carrier to carry; Then said determination module is confirmed a channel resource through the minimum CCE numbering of said PDCCH that is used to dispatch the said PDCCH of semi-continuous PDSCH or is used to transmit on the said downlink main carrier to carry descending scheduling indication of dynamic PDSCH, as the pairing channel resource of said descending sub frame;
If in the descending sub frame of said sending module in a said M descending sub frame; There is not to send the PDCCH and the PDCCH that is used to transmit the descending scheduling of PDSCH indication dynamically on the said downlink main carrier to carry that is used to dispatch semi-continuous PDSCH on the downlink main carrier to carry; But at the PDCCH that has sent the descending scheduling indication that is used to transmit the PDSCH on the descending auxilliary carrier wave on the downlink main carrier to carry and/or on the descending auxilliary carrier wave of at least one configuration; Then said determination module is confirmed a channel resource through the ACK/NACK resource indication bit of the PDCCH of the said descending scheduling indication that is used for transmitting the PDSCH on the descending auxilliary carrier wave, as the pairing channel resource of said descending sub frame.
36. base station as claimed in claim 31 is characterized in that, said determination module adopts second type of resource determining method to confirm channel resource, specifically comprises:
If in the descending sub frame of said sending module in a said M descending sub frame; At the PDCCH that has sent the descending scheduling indication that is used to transmit dynamic PDSCH on the said downlink main carrier to carry on the downlink main carrier to carry; Then said determination module is confirmed a channel resource through the minimum CCE numbering of the PDCCH that the said descending scheduling that is used to transmit dynamic PDSCH on the downlink main carrier to carry is indicated, as the pairing channel resource of said descending sub frame;
If in the descending sub frame of said sending module in a said M descending sub frame; At the PDCCH that does not have to send the descending scheduling indication that is used to transmit dynamic PDSCH on the said downlink main carrier to carry on the downlink main carrier to carry; Then said determination module is confirmed the pairing channel resource of PDSCH semi-continuous in the said descending sub frame as the pairing channel resource of said descending sub frame, and the said semi-continuous pairing channel resource of PDSCH is one in the indicated high-rise pre-configured a plurality of channel resources of the TPC among the PDCCH that activates said semi-continuous PDSCH.
CN201010532827.9A 2010-11-01 2010-11-01 Channel resource determination method of ACK/NACK feedback information and equipment Active CN102469599B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010532827.9A CN102469599B (en) 2010-11-01 2010-11-01 Channel resource determination method of ACK/NACK feedback information and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010532827.9A CN102469599B (en) 2010-11-01 2010-11-01 Channel resource determination method of ACK/NACK feedback information and equipment

Publications (2)

Publication Number Publication Date
CN102469599A true CN102469599A (en) 2012-05-23
CN102469599B CN102469599B (en) 2015-07-15

Family

ID=46072579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010532827.9A Active CN102469599B (en) 2010-11-01 2010-11-01 Channel resource determination method of ACK/NACK feedback information and equipment

Country Status (1)

Country Link
CN (1) CN102469599B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103905165A (en) * 2012-12-28 2014-07-02 电信科学技术研究院 Method and device for sending and receiving response feedback information
CN104683087A (en) * 2015-02-27 2015-06-03 大唐移动通信设备有限公司 Method and device for distributing channel selection resources based on PUCCH format 1B
WO2015113280A1 (en) * 2014-01-29 2015-08-06 华为技术有限公司 Data transmission method, device, and system
CN105071903A (en) * 2015-07-01 2015-11-18 大唐移动通信设备有限公司 Method and device for confirming feedback information
CN106797283A (en) * 2016-11-11 2017-05-31 北京小米移动软件有限公司 Transmission, the method and device for obtaining upward HARQ feedback information
CN109586852A (en) * 2017-09-28 2019-04-05 中兴通讯股份有限公司 Improve method, apparatus, equipment and the storage medium of downlink transfer feedback accuracy
CN111756484A (en) * 2017-11-16 2020-10-09 展讯通信(上海)有限公司 Feedback method and device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101686113A (en) * 2008-09-22 2010-03-31 中兴通讯股份有限公司 Realizing method, dividing method and multiplexing method of feedback channel
CN101873706A (en) * 2009-04-24 2010-10-27 北京三星通信技术研究有限公司 Method for feeding back identified/unidentified message in multi-carrier system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101686113A (en) * 2008-09-22 2010-03-31 中兴通讯股份有限公司 Realizing method, dividing method and multiplexing method of feedback channel
CN101873706A (en) * 2009-04-24 2010-10-27 北京三星通信技术研究有限公司 Method for feeding back identified/unidentified message in multi-carrier system

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103905165B (en) * 2012-12-28 2017-10-31 电信科学技术研究院 The method of sending and receiving and equipment of response feedback information
WO2014101796A1 (en) * 2012-12-28 2014-07-03 电信科学技术研究院 Method and device for sending and receiving acknowledgement feedback information
CN103905165A (en) * 2012-12-28 2014-07-02 电信科学技术研究院 Method and device for sending and receiving response feedback information
US9819450B2 (en) 2012-12-28 2017-11-14 China Academy Of Telecommunications Technology Method and device for sending and receiving acknowledgement feedback information
US10314032B2 (en) 2014-01-29 2019-06-04 Huawei Technologies Co., Ltd. Method and base station identifying PUCCH for processing feedback of user equipment
WO2015113280A1 (en) * 2014-01-29 2015-08-06 华为技术有限公司 Data transmission method, device, and system
CN104683087B (en) * 2015-02-27 2017-10-27 大唐移动通信设备有限公司 A kind of distribution method and equipment of the Channel assignment resource based on PUCCH format 1B
CN104683087A (en) * 2015-02-27 2015-06-03 大唐移动通信设备有限公司 Method and device for distributing channel selection resources based on PUCCH format 1B
CN105071903B (en) * 2015-07-01 2018-06-26 大唐移动通信设备有限公司 The confirmation method and device of a kind of feedback information
CN105071903A (en) * 2015-07-01 2015-11-18 大唐移动通信设备有限公司 Method and device for confirming feedback information
CN106797283B (en) * 2016-11-11 2020-11-13 北京小米移动软件有限公司 Method and device for transmitting and acquiring uplink HARQ feedback information
WO2018086071A1 (en) * 2016-11-11 2018-05-17 北京小米移动软件有限公司 Method and apparatus for transmitting uplink harq feedback information, and method and apparatus for acquiring uplink harq feedback information
CN106797283A (en) * 2016-11-11 2017-05-31 北京小米移动软件有限公司 Transmission, the method and device for obtaining upward HARQ feedback information
US11038657B2 (en) 2016-11-11 2021-06-15 Beijing Xiaomi Mobile Software Co., Ltd. Method and apparatus for transmitting and obtaining uplink HARQ feedback
CN109586852A (en) * 2017-09-28 2019-04-05 中兴通讯股份有限公司 Improve method, apparatus, equipment and the storage medium of downlink transfer feedback accuracy
CN109586852B (en) * 2017-09-28 2021-05-18 中兴通讯股份有限公司 Method, device, equipment and storage medium for improving downlink transmission feedback precision
CN111756484A (en) * 2017-11-16 2020-10-09 展讯通信(上海)有限公司 Feedback method and device
CN111756484B (en) * 2017-11-16 2022-11-29 展讯通信(上海)有限公司 Feedback method and device

Also Published As

Publication number Publication date
CN102469599B (en) 2015-07-15

Similar Documents

Publication Publication Date Title
US11546119B2 (en) Method for transmitting uplink control information and apparatus therefor
US11082994B2 (en) Method for V2X communication performed by means of terminal in wireless communication system and terminal using same
CN102656831B (en) Uplink control information transmission method and apparatus in multi-carrier system
CN101795492B (en) Method for determining physical uplink control channel resources in multi-carrier system
US9351289B2 (en) Method for transmitting uplink control information and user equipment, and method for receiving uplink control information and base station
CN101998539B (en) ACK/NACK resource reservation method, system and device
EP2894806B1 (en) Method and apparatus for allocating resources and processing confirmation information
EP3139531A1 (en) Hybrid automatic repeat request process indication method, apparatus and system
CN102017504B (en) Method and arrangement in a telecommunication system with signalling of assigned data packets in a bundling window
CN101841398B (en) A kind of uplink control signaling transmission method and subscriber equipment
CN102347825B (en) Method, system and equipment for transmitting feedback information
CN102647261B (en) Scheduling signaling sending and response feedback method, system and equipment
CN102447538A (en) Transmission method of downlink control information and system thereof
CN101989898A (en) Method and device for transmitting response message
CN102714569A (en) Carrier aggregation in wireless communication system
CN102083211A (en) Determining method and equipment of uplink control channel resources
CN103370970A (en) Generation of HARQ-ACK information and power control of HARQ-ACK signals in TDD systems with downlink of carrier aggregation
MX2011009200A (en) Method and apparatus for transmitting harq ack/nack signal in multi-antenna system.
CN102469599B (en) Channel resource determination method of ACK/NACK feedback information and equipment
CN102136896A (en) Method and equipment for transmitting ACK (acknowledgement)/NACK (Negative Acknowledgement) information
CN102355339A (en) Feedback information sending method and terminal thereof
CN102468950A (en) Information transmission method, terminal, base station and communication system
CN102082647A (en) Method and equipment for indicating channel resource of feedback information
CN102394685A (en) Sending method and system of multi-aerial system up control channel
CN102237982B (en) Acknowledgement/negative acknowledgement (ACK/NACK) transmission method and equipment for carrier aggregation system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant