CN102467695A - Method for editing part information - Google Patents

Method for editing part information Download PDF

Info

Publication number
CN102467695A
CN102467695A CN2010105517016A CN201010551701A CN102467695A CN 102467695 A CN102467695 A CN 102467695A CN 2010105517016 A CN2010105517016 A CN 2010105517016A CN 201010551701 A CN201010551701 A CN 201010551701A CN 102467695 A CN102467695 A CN 102467695A
Authority
CN
China
Prior art keywords
platform
parts information
goods
handling
materials
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105517016A
Other languages
Chinese (zh)
Inventor
魏智斌
邱俊华
高智原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inventec Corp
Original Assignee
Inventec Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inventec Corp filed Critical Inventec Corp
Priority to CN2010105517016A priority Critical patent/CN102467695A/en
Publication of CN102467695A publication Critical patent/CN102467695A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a method for editing part information, which is suitable for an integrated platform. The method is as follows: downloading the part information from a material management platform to the integrated platform; executing an editing action on the part information through the integrated platform; then, sending the edited part information in the integrated platform to a material drawing platform, and updating the edited part information to the integrated platform through the material drawing platform.

Description

The edit methods of parts information
Technical field
The present invention designs a kind of data integration mechanism, relates in particular to a kind of edit methods of parts information of handling of goods and materials platform.
Background technology
Along with the arriving of information age, for more effectively management enterprise resource and shorten the research and development of products cycle, each enterprise all is devoted to electronic enterprise one after another to promote the competitive power of industry.In general, (it mainly is the arrangement that focuses on chart file data to product data management for Product Data Management, PDM) can be used to the to assist management related data of product of all enterprise production.For instance, the mechanism design slip-stick artist of parts supplier or enterprises utilizes material drawing platform such as Pro/E to come the drafting 3 D engineering drawing, and through the instrument of handling of goods and materials platforms such as Intralink as file management.Under the situation that combines multiple list foundation and management system,, and provide a kind of administrative mechanism more easily to reduce the chance of wrong generation with the time-histories of ability compression design cycle with the shortening launch.
Intralink platform and Pro/E platform generally all are used for BOM on the engineering (Bill of materials, management BOM).If user's desire editor BOM then will be edited through the Pro/E platform, the Intralink platform does not provide editor's function.In addition, Intralink platform and Pro/E platform are in the employed platform of exploitation end, and can't offer the client and bring in use.That is to say that client also can't be to BOM executive editor action, so the practice is for quite inconvenience of the interactive communication between exploitation end and the client.
Summary of the invention
The present invention provides a kind of edit methods of parts information, utilizes an integration platform to edit the part of material management platform (part) information.
The present invention proposes a kind of edit methods of parts information, is applicable in the integration platform to edit parts information.At this, download parts information to integration platform from the handling of goods and materials platform.And, the parts information executive editor is moved through integration platform.Afterwards, the parts information after in integration platform, will editing is sent to the material drawing platform, and the parts information after will editing through the material drawing platform is updated to integration platform.
It is in one embodiment of this invention, above-mentioned that to download parts information from the handling of goods and materials platform be to utilize the open type data storehouse to connect that (Open Database Connectivity, ODBC) mode is downloaded first parts information from the handling of goods and materials platform.
In one embodiment of this invention, above-mentioned parts information after in integration platform, will editing is sent in the step of material drawing platform, is to utilize the parts information of network service (web service) after function will be edited to be sent to the material drawing platform.
In one embodiment of this invention, above-mentioned parts information after in integration platform, will editing is sent in the step of material drawing platform, can convert the parts information behind the editor into the tentative calculation file, again the tentative calculation file is sent to the material drawing platform.
In one embodiment of this invention, above-mentioned parts information after will editing through the material drawing platform is updated in the step of handling of goods and materials platform, can be after the text file with the tentative calculation file conversion, again text file is updated to the handling of goods and materials platform.
In one embodiment of this invention, above-mentioned parts information be BOM (Bill of materials, BOM).
Based on above-mentioned, the present invention utilizes integration platform to edit the parts information of being downloaded from the handling of goods and materials platform, provides complete sum effectively to manage the integration platform of BOM and part.In view of the above, can produce price list fast offers.
For letting the above-mentioned feature and advantage of the present invention can be more obviously understandable, hereinafter is special lifts embodiment, and cooperates appended graphic elaborating as follows.
Description of drawings
Fig. 1 is the process flow diagram according to the edit methods of the parts information shown in one embodiment of the invention.
Fig. 2 is the synoptic diagram according to the preview form shown in one embodiment of the invention.
Fig. 3 is the synoptic diagram according to the parts information editing system shown in one embodiment of the invention.
Reference numeral:
The 310:Intralink platform;
320: integration platform;
The 330:Pro/E platform;
S105~S120: each step of the edit methods of the parts information of one embodiment of the invention.
Embodiment
Generally speaking, the user also can't edit parts information on the handling of goods and materials platform.In view of the above, manage parts information for the convenience of the users, the present invention proposes a kind of edit methods of parts information so that manage effectively BOM (Bill of materials, BOM) and part (part).In order to make content of the present invention more clear, below specially lift the example that embodiment can implement as the present invention really according to this.
Fig. 1 is the process flow diagram according to the edit methods of the parts information shown in one embodiment of the invention.Please, in step S105, parts information is downloaded to integration platform from the handling of goods and materials platform with reference to Fig. 1.Then, in step S110, the parts information executive editor is moved through integration platform.At this, the database of supposing integration platform is SQL (Structured Query Language, a SQL) database, and the database of handling of goods and materials platform is an oracle database.Integration platform and the data transfer between the handling of goods and materials platform then can utilize the open type data storehouse to be connected that (Open Database Connectivity, mode ODBC) is transmitted.
For example, open type data capable of using storehouse connected mode is downloaded to integration system from the handling of goods and materials platform with parts information (the for example structure of BOM), to carry out the processing on some data, for example, length, the isoparametric maintenance of material.
Then, in step S115, the parts information after in integration platform, will editing is sent to the material drawing platform.Afterwards, in step S120, the parts information after will editing through the material drawing platform is updated to the handling of goods and materials platform.Generally speaking, employed program language is C++ to material drawing platform (for example Pro/E platform), and the employed program language of handling of goods and materials platform (for example Intralink platform) is C#.In the present embodiment, in order to integrate two kinds of different programs language, used network service (Web Service) function of C# at integration platform.In view of the above, integration platform just can utilize network service function and application programming interfaces set of tools (API Toolkit) function of the C++ of material drawing platform to link up.
For example, the API Toolkit function in the material drawing platform goes to call the Web Service function of integration platform, and the parts information after integration platform will be edited is directed in the material drawing platform.Say that at length the parts information after integration platform will be edited earlier converts text file into.Afterwards, (HyperText Markup Language HTML), (for example: Excel) converts the tentative calculation file into by HTML again to convert text file into HTML.Then, go to call the Web Service function of integration platform through the API Toolkit function in the material drawing platform, and read the tentative calculation file from integration platform.After the material drawing platform reads this tentative calculation file, again the tentative calculation file conversion is become text file, again text file is updated to the handling of goods and materials platform.
Wherein, an identification code capable of using handling of goods and materials platform that comes identification to desire to upgrade.For example, can directly go to the database the inside of handling of goods and materials platform, the identification code (can be based upon in advance and set up an identification code in the handling of goods and materials platform, do communication) of inquiry handling of goods and materials platform to utilize this identification code.When beginning to carry out more new element; The user can select the handling of goods and materials platform desiring to upgrade; And according to selected handling of goods and materials platform identification code separately; Go to check whether corresponding handling of goods and materials platform is arranged, be directed into selected handling of goods and materials platform with the text file of the parts information after will editing.Thus, just can have editor's parts information later in the handling of goods and materials platform.And had these parts informations just can conveniently to offer, and the data that can derive complete BOM are done quotation to manufacturer.
In addition, in the material drawing platform, more can compare to obtain a comparison result to parts information and the parts information of himself obtained from integration platform.For example, in the material drawing platform, set up comparison sheet, and in comparison sheet the parts information of parts information (obtaining) and the material drawing platform of preview handling of goods and materials platform by integration platform.
For instance, Fig. 2 is the synoptic diagram according to the preview form shown in one embodiment of the invention.In Fig. 2, the handling of goods and materials platform is to be example with the Intralink platform.The left block in order to display element title, rights manager, whether be the Intralink part, whether be new parts and whether design alteration etc. arranged.And right-hand block is in order to show comparison sheet.The parts information of the parts information of preview handling of goods and materials platform and material drawing platform in comparison sheet (for example dimension and weight of part etc.).
That is to say, before the material drawing platform upgrades, can show that which part is arranged in the present special project, upgrade which part through a preview form.Though this action is on the material drawing platform, to carry out, yet be to do action to the database of handling of goods and materials platform.And comparison result also can exported comparison result to integration platform synchronously, for example output becomes a form.
Beneath is the Intralink platform with the handling of goods and materials platform, is that the Pro/E platform is an example with the material drawing platform, lifts an embodiment again and explains.Fig. 3 is the synoptic diagram according to the parts information editing system shown in one embodiment of the invention.Please with reference to Fig. 3, this system comprises Intralink platform 310, integration platform 320 and Pro/E platform 330.
Integration platform 320 can be downloaded parts information from Intralink platform 310.For example, integration platform 320 utilize the ODBC mode from Intralink platform 310 download parts informations (for example: the structure of BOM), to carry out the processing on some data, for example, length, the isoparametric maintenance of material.Afterwards, the parts information after integration platform 320 can will be edited is sent to Pro/E platform 330, and the parts information after will editing through Pro/E platform 330 is updated to Intralink platform 310.For example, the parts information after integration platform 320 can will be edited converts the tentative calculation file into, afterwards the tentative calculation file is sent to Pro/E platform 330.And Pro/E platform 330 becomes text file with the tentative calculation file conversion after reading this tentative calculation file, just can text file be updated to Intralink platform 310.
In sum, integrate handling of goods and materials platform and material drawing platform in the foregoing description, provide complete sum effectively to manage the integration platform of BOM and part.In view of the above, can produce price list fast offers.In other words, can produce price list fast through the foregoing description and offer to the mould factory, and set up the appraisal form of part and mould, the price list that has the cost competitive edge with generation is striven for order.
Though the present invention discloses as above with embodiment; Right its is not that any person of ordinary skill in the field is not breaking away from the spirit and scope of the present invention in order to qualification the present invention; When doing a little change and retouching, so protection scope of the present invention is as the criterion when defining with claim.

Claims (6)

1. the edit methods of a parts information is applicable to integration platform, and this edit methods comprises:
Download parts information to this integration platform from the handling of goods and materials platform;
Through this integration platform this parts information executive editor is moved;
This parts information after in this integration platform, will editing is sent to the material drawing platform;
This parts information after will editing through this material drawing platform is updated to this handling of goods and materials platform.
2. the edit methods of parts information according to claim 1 wherein comprises from the step that this handling of goods and materials platform is downloaded this parts information:
Utilize open type data storehouse connected mode to download this parts information from this handling of goods and materials platform.
3. the edit methods of parts information according to claim 1, the step that this parts information after wherein in this integration platform, will editing is sent to this material drawing platform comprises:
This parts information after utilizing network service function to edit is sent to this material drawing platform.
4. the edit methods of parts information according to claim 1, the step that this parts information after wherein in this integration platform, will editing is sent to this material drawing platform comprises:
Convert this parts information behind the editor into the tentative calculation file; And
This tentative calculation file is sent to this material drawing platform.
5. the edit methods of parts information according to claim 4, the step that this parts information after wherein will editing through this material drawing platform is updated to this handling of goods and materials platform comprises:
Changing this tentative calculation file is text file; And
Upgrade this literal file to this handling of goods and materials platform.
6. the edit methods of parts information according to claim 1, wherein this parts information is a BOM.
CN2010105517016A 2010-11-17 2010-11-17 Method for editing part information Pending CN102467695A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105517016A CN102467695A (en) 2010-11-17 2010-11-17 Method for editing part information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105517016A CN102467695A (en) 2010-11-17 2010-11-17 Method for editing part information

Publications (1)

Publication Number Publication Date
CN102467695A true CN102467695A (en) 2012-05-23

Family

ID=46071312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105517016A Pending CN102467695A (en) 2010-11-17 2010-11-17 Method for editing part information

Country Status (1)

Country Link
CN (1) CN102467695A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1432948A (en) * 2002-01-18 2003-07-30 陈金元 Material list conforming method via computer software
US20050083328A1 (en) * 2003-10-15 2005-04-21 Fujitsu Limited, Mesh dividing device, computer-readable recording medium in which mesh dividing program is recoded, and method for setting maximum number of cuboids and parameters for mesh-division
CN1963849A (en) * 2005-11-08 2007-05-16 陈金元 Conformity method of managing system of data of product
CN101344885A (en) * 2007-07-11 2009-01-14 英业达股份有限公司 Product drafting method and system
CN101645011A (en) * 2009-07-16 2010-02-10 唐山轨道客车有限责任公司 Integration scheme and platform between heterogeneous workgroup collaborative design system and PLM system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1432948A (en) * 2002-01-18 2003-07-30 陈金元 Material list conforming method via computer software
US20050083328A1 (en) * 2003-10-15 2005-04-21 Fujitsu Limited, Mesh dividing device, computer-readable recording medium in which mesh dividing program is recoded, and method for setting maximum number of cuboids and parameters for mesh-division
CN1963849A (en) * 2005-11-08 2007-05-16 陈金元 Conformity method of managing system of data of product
CN101344885A (en) * 2007-07-11 2009-01-14 英业达股份有限公司 Product drafting method and system
CN101645011A (en) * 2009-07-16 2010-02-10 唐山轨道客车有限责任公司 Integration scheme and platform between heterogeneous workgroup collaborative design system and PLM system

Similar Documents

Publication Publication Date Title
CN108984895B (en) Model automatic identification method based on XML heterogeneous platform
Chen et al. Standards on enterprise integration and engineering—state of the art
CN102339314A (en) Cross-terminal data form description and presentation method based on extensive makeup language (XML)
CN105447122A (en) Implementation method for autonomously creating file system based on multi-table association
CN103077185A (en) Object-based user-defined information-expanding method
CN102402559A (en) Database upgrade script generating method and device
CN101877080A (en) Method for automatically generating configuration of bill of material (BOM)
CN102004954A (en) Product information system and information integration method of product design system
CN102393889A (en) Permissions configuration management system
CN101127102A (en) Contracted life cycle supervision system and method
CN103164573B (en) PDM managing and designing system
CN102023859B (en) Digital development environment-oriented software integration method with reliability, maintainability and supportability
CN102541535A (en) Method and system for publishing industry business architecture model
CN103455516A (en) Operation platform and maintaining method for database
Lucky et al. Product data management for sustainability: an interoperable approach for sharing product data in a BIM environment
CN100416565C (en) Self-adaptive program calling method for information interchange in heterochronous environments
CN104199928A (en) Method for describing and analyzing semi-structured pages
CN101076027B (en) Method and system for transporting data between MIME accessory and corresponding database
CN101763419A (en) Method for synchronously updating remote rss data by local database
Lee et al. A dynamic information schema for supporting product lifecycle management
CN104573053A (en) Configuration item template dynamic customizing method based on XML
CN102004640B (en) Method and device for rapidly providing customized software package
CN102467695A (en) Method for editing part information
CN106951399B (en) Method and device for quickly generating ONIX standard file
CN111753348B (en) Method and device for deepening building data model component and readable storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120523