CN102448104A - Control method and system for recording and reporting drive test measurement - Google Patents

Control method and system for recording and reporting drive test measurement Download PDF

Info

Publication number
CN102448104A
CN102448104A CN2010105033253A CN201010503325A CN102448104A CN 102448104 A CN102448104 A CN 102448104A CN 2010105033253 A CN2010105033253 A CN 2010105033253A CN 201010503325 A CN201010503325 A CN 201010503325A CN 102448104 A CN102448104 A CN 102448104A
Authority
CN
China
Prior art keywords
drive test
information
base station
ability need
configuration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105033253A
Other languages
Chinese (zh)
Other versions
CN102448104B (en
Inventor
任龙涛
韩立锋
高音
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201010503325.3A priority Critical patent/CN102448104B/en
Priority to PCT/CN2011/076758 priority patent/WO2012041106A1/en
Publication of CN102448104A publication Critical patent/CN102448104A/en
Application granted granted Critical
Publication of CN102448104B publication Critical patent/CN102448104B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/10Scheduling measurement reports ; Arrangements for measurement reports
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/18Network planning tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a control method for recording and reporting drive test measurement. The control method comprises the following steps of: after a base station receives UE (User Equipment) capability requirement information for executing the drive test, which is configured by a network management side, distributing the UE capability requirement information to UE of a cell where the base station is positioned; and executing the drive test and reporting a drive test result by the UE meeting the capability requirement of the drive test. The invention also discloses a control system for recording and reporting the drive test measurement. The control system comprises a receiving unit, a distributing unit and a drive test executing and reporting unit, wherein the drive test executing and reporting unit is arranged in the UE meeting the capability requirement of the drive test; the receiving unit is used for receiving the UE capability requirement information for executing the drive test, which is configured by the network management side; the distributing unit is used for transmitting the UE capability requirement information for executing the drive test, which is configured by the network management side, to the UE of the cell where the base station is positioned; and the drive test executing and reporting unit is used for executing the drive test and reporting the drive test result. According to the control method and system disclosed by the invention, the UE carries out drive test measurement without influencing normal business of the UE, so that the phenomenon that the change of equipment capability of the UE is frequently informed to the base station and information interaction of an empty port is reduced.

Description

Drive test measurement record and the control method and the system that report
Technical field
The control technology that the present invention relates to a kind of drive test measurement record and report, the control method and the system that relate in particular to a kind of drive test measurement record and report.
Background technology
Long Term Evolution (LTE, Long Term Evolution) network is made up of the UMTS Terrestrial radio access network (E-UTRAN, Evolved UTRAN) and the evolution packet switching center (EPC, Evolved Packet Core) of evolution.Wherein EUTRAN comprises the set of the evolution base station (eNB, Evolved NodeB) that is connected through the S1 interface with EPC, can connect through X2 between the eNB.S1, X2 are logic interfacing.An EPC can manage one or more eNB, and an eNB also can be controlled by a plurality of EPC, and an eNU can manage one or more sub-districts.EPC is made up of mobile management unit (MME, Mobility Management Entity) and gateway (SGW, Serving Gateway), grouped data network gateway (PGW, Packet Data Network Gateway).Universal Mobile Telecommunications System (UMTS; Universal Mobile Telecommunications System) be by land radio access web (UTRAN; UMTS Terrestrial Radio Access Network) and core net (CN; Core Network) form, wherein UTRAN is made up of radio network controller (RNC, Radio Network Controller) and base station (NodeB).
Radio network optimization is an important link, especially the networking initial stage during mobile communications network is built, and through means such as Frequency Distribution, site parameter adjustment further being optimized wireless network performance, improves communication quality.The basic procedure of radio network optimization roughly is divided into five stages: optimizes and prepares, and data acquisition, data analysis is implemented to optimize, and optimizes assessment.Wireless network performance is generally reflected by indexs such as wireless coverage, call completing rate, cutting off rate, speech quality, power system capacities.Therefore, the actual value of these indexs being measured and collected is the basis of radio network optimization.Usually the measurement and the collection of these indexs are through the carrying out of drive test (DT, Drive Test), and promptly network are detected by manual work through road detector or subscriber equipment.The method of testing of DT is generally following; At first need select the zone and the route of test; This route can be that the demand according to the statistics of network performance or operator draws, and the zone of emphasis can be compact district, city center, urban district main trunk road, residential block, highway, railway etc.Test carriage is equipped with testing mobile phone or drive test instrument, wherein will have the writing function of global positioning system (GPS, Global Positioning System) function and test log.Test carriage is according to the route running of test, and subscriber equipment or drive test instrument are initiated miscellaneous service, the test index of needs is tested, as: transmitting power, radio signal quality, handover success rate, cutting off rate etc.And the result of record test.The planning of wireless network and optimize and to be optimized based on the interpretation of result of Drive Test.DT can well test and assess the mobile network, but it exists waste great amount of manpower and material resources and the shortcoming of time.Utilizing user device in network to carry out drive test so, is a kind of reasonable method, can carry out drive test on a large scale as required, and need not waste great amount of manpower and material resources.A kind of method of utilizing subscriber equipment to carry out drive test in mobile radio system is; Wireless access network (RAN; Radio Access Network) lateral root issues the measurement configuration and the reporting information of drive test for subscriber equipment (UE, User Equipment) according to the demand of webmaster through chain of command (CP, Control Plane); After subscriber equipment carries out drive test; After having satisfied drive test result's report condition, through the chain of command signaling drive test result is reported RAN, RAN self is handling or is issuing webmaster with the drive test object information of collecting then.The mode of this drive test is called as minimum road test (MDT, Minimizing Drive Test).The measurement of MDT comprises the mode (Immediate MDT) that the surveying record mode (Logged MDT) that reports again and the measurement that is connected the CONN attitude of idle IDLE attitude report immediately.
Follow the tracks of (Trace) flow process and can be used to carry out the UE selection of drive test and issuing of measurement configuration.The mode of following the tracks of is divided into based on tracking (the Management Based Trace) flow process of management with based on tracking (the Signaling Based Trace) flow process of signaling.In trace flow based on management; The webmaster side will be carried out the zone of drive test measurement; Capacity of equipment demand information and drive test measurement configuration information are notified to eNB; ENU obtains the device capability information of the UE of all connected states in the sub-district, and the suitable UE of other prescribed informations selections that combines the webmaster side to issue, and carries out drive test measurement.Based on the trace flow of signaling, the webmaster side notifies the demand configuration information to home subscriber server (HSS, Home Subscriber Server), and HSS selects configuration to the UE of registration.Obtain the measurement configuration of MDT as UE after; Carry out periodically surveying record, UE is in the surveying record process, and change has taken place the ability of UE; Proceeding MDT measures; Other business (as: speech business, data service etc.) to UE have produced influence, should carry out certain regulation and constraint with reporting to the surveying record of UE to this.
Summary of the invention
In view of this; Control method and system that main purpose of the present invention is to provide a kind of drive test measurement record and reports; Can realize timely configuration, can not influence the business of self when UE carries out drive test, and reduce the Signalling exchange that unnecessary ability information reports UE drive test measurement condition.
For achieving the above object, technical scheme of the present invention is achieved in that
A kind of drive test measurement record and the control method that reports comprise:
The UE that gives in the affiliated subdistrict of said base station is allotted after receiving the UE ability need information of execution drive test of webmaster side configuration in the base station;
The UE that satisfies the drive test ability need carries out drive test and reports the drive test result.
The UE ability need information of the execution drive test that preferably, is disposed includes the state of charge information of at least one of following information: UE, the memory usage information of UE, the mobile status information of UE.
Wherein, state of charge information refers to the dump energy of UE or the percentage that dump energy accounts for total electric weight, the perhaps maximum operating time that can support of battery capacity, also can refer to the overall status of the electric weight remaining information or the information of use, such as high, medium and low state; Storaging state information refers to the free memory amount of UE or the percentage that the free memory amount accounts for total memory space, also can refer to the overall status of the internal memory remaining information or the information of use, such as high, medium and low state; Mobile status information refers to the translational speed information of UE, as fast, and middling speed, at a slow speed etc.
Preferably, said base station receives and allots the UE that gives in the affiliated subdistrict of said base station after the UE ability need information of execution drive test of webmaster side configuration and be specially:
Said base station is through public broadcasting message or special-purpose configuration messages or newly establish specific messages the UE ability need information of the execution drive test of webmaster side configuration is sent to the UE in the affiliated subdistrict of said base station.
Preferably, said public broadcasting message is system information block (SIB, System Information Block), such as being SIB2 or SIB3;
The configuration messages of said special use is that wireless resource control connection reconfiguration message (RRC Connection Reconfiguration), Radio Resource control connection are set up message (RRC Connection Setup) or idle minimum road test (MDT) configuration messages (IdleMDTConfiguration/IdleLoggingConfiguration).
Preferably, said base station sends to the UE that is in connection status in the affiliated subdistrict of said base station with the UE ability need information of the execution drive test of webmaster side configuration.
A kind of drive test measurement record and the control system that reports are applied in the wireless communication system; Said system comprises the receiving element of being located in the base station and allocation unit, and, be located at the drive test execution among the UE that satisfies the drive test ability need and report the unit, wherein,
Receiving element is used to receive the UE ability need information of the execution drive test of webmaster side configuration;
Allot the unit, be used for the UE ability need information of the execution drive test of webmaster side configuration is issued the upright UE that accounts for affiliated subdistrict of said base;
Drive test is carried out and is reported the unit, is used to carry out drive test and reports the drive test result.
The UE ability need information of the execution drive test that preferably, is disposed includes state of charge information, the memory usage information of UE, the mobile status information of at least one of following information: UE.
Preferably, said allocation unit is further through public broadcasting message or special-purpose configuration messages or newly establish specific messages the UE ability need information of the execution drive test of webmaster side configuration is sent to the UE in the affiliated subdistrict of said base station.
Preferably, said public broadcasting message is system information block, such as being SIB2 or SIB3;
The configuration messages of said special use is that wireless resource control connection reconfiguration message (RRC Connection Reconfiguration), Radio Resource control connection are set up message (RRC Connection Setup) or idle minimum road test (MDT) configuration messages (Idle MDT Configuration).
Preferably, said allocation unit further sends to the UE that is in connection status in the affiliated subdistrict of said base station with the UE ability need information of the execution drive test of webmaster side configuration.
Among the present invention; Drive test condition through setting up UE electric weight, internal memory and mobile status etc.; The current UE that is under the regular traffic state is got rid of outside the execution drive test measurement, thereby make UE when carrying out drive test measurement, can not have influence on the carrying out of UE regular traffic; Like this, UE can carry out this locality judgement after getting access to the UE capability demand information; In the time can't supporting, report the current device ability information to eNB; Requirement stops drive test measurement, and does not need the periodic report device capability information, has reduced the Signalling exchange of eating dishes without rice or wine.
Description of drawings
Fig. 1 is the flow chart of the drive test measurement record of the embodiment of the invention one and the control method that reports;
Fig. 2 is the flow chart of the drive test measurement record of the embodiment of the invention two and the control method that reports;
Fig. 3 is the flow chart of the drive test measurement record of the embodiment of the invention three and the control method that reports;
Fig. 4 is the composition structural representation of the control system of drive test measurement of the present invention.
Embodiment
Basic thought of the present invention is in the UE ability need information of the execution drive test of webmaster side configuration, to include the drive test condition of UE electric weight, internal memory and mobile status etc.; Like this, be in that internal memory is very low, current electric quantity is lower, or currently be in high-speed moving state and the not good state of link-quality if be in UE in the regular traffic; Like this; To no longer be fit to carry out drive test measurement, and the present invention is in the UE that is not suitable for carrying out drive test under the regular traffic state with these to get rid of outside drive test measurement, avoids UE under the situation that ability reduces; To base station reporting ability information, reduced the Signalling exchange of eating dishes without rice or wine.
For making the object of the invention, technical scheme and advantage clearer, below lift embodiment and with reference to accompanying drawing, to further explain of the present invention.
Embodiment one
Fig. 1 is the flow chart of the drive test measurement record of the embodiment of the invention one and the control method that reports, and as shown in Figure 1, in this example, the base station issues the capacity of equipment demand information through the public broadcasting message arrangement and gives subscriber equipment; This example drive test measurement record and the control method that reports specifically may further comprise the steps:
Step 101, webmaster (Element management system (EMS, Element Management System)) side group is handed down to base station through trace session activation message (Trace Session Activation) with the configuration information of drive test in the trace flow mode of management; Configuration information has comprised the drive test measurement zone; The capacity of equipment demand information, surveying record cycle, measurement and report cycle; Dispose effective time, track reference sign (Trace Reference) etc.The base station is in state of activation in the sub-district subscriber equipment carries out device capability information and obtains; The base station is connected the ability information of the support drive test that reports when setting up with subscriber equipment according to the area configurations of webmaster side then; Select qualified subscriber equipment; Carry out the drive test measurement configuration, so that subscriber equipment carries out drive test measurement.
Step 102, the capacity of equipment demand information of drive test is carried out through public broadcasting message (like SIB2, also can use the SIB of SIB3 or other types) notifying user equipment in the base station, and the subscriber equipment with drive test ability receives broadcast and preservation.
Include in the broadcast and follow the tracks of sign (Trace Reference) and track record sign (Trace Record Reference), and the capacity of equipment demand information.Described capacity of equipment demand information has comprised the state of charge information of subscriber equipment, and/or the memory usage information of subscriber equipment, and/or the mobile status information of subscriber equipment.State of charge information refers to the dump energy of subscriber equipment or the percentage that dump energy accounts for total electric weight; As be lower than when the UE dump energy total electric weight 10% the time, UE will not carry out drive test measurement, perhaps the maximum operating time that can support of battery capacity; The maximum operating time that can support like battery capacity is less than 1 hour; UE just temporarily stops drive test measurement, also can refer to the overall status of the electric weight remaining information or the information of use, (such as high, medium and low state); Like the current user mode of electric weight is that height or residual state are low, and UE just can stop drive test measurement; The UE storaging state information refers to the free memory amount of subscriber equipment or the percentage that the free memory amount accounts for total memory space, also can represent with rough mode, such as high, medium and low state; As be lower than when the current free memory of UE total amount 15% the time, UE will not carry out drive test measurement; The UE mobile status information refers to moving user equipment information, as fast, and middling speed, at a slow speed etc.; For example, when moving user equipment reaches 50km/h, will not carry out drive test measurement.
Why above-mentioned capacity of equipment demand information is set, and mainly is to consider that drive test can not influence the carrying out of UE regular traffic.For example, when the UE electric weight not for a long time, if carry out proper communication business (like voice calling service, data transmission service etc.) and drive test simultaneously, can make UE power consumption surge undoubtedly, like this, may have influence on the regular traffic of UE.Same, carry out the UE of regular traffic, when its internal memory not for a long time, carry out drive test again, will certainly influence the processing speed of UE to business datum, cause user experience to descend, this UE also is not suitable for carrying out drive test.And,,, also can have influence on carrying out of UE regular traffic if carry out drive test again because channel fading can cause current channel condition to descend for the higher UE of translational speed.The present invention's for these reasons consideration has just just been set up the capacity of equipment demand information of above-mentioned execution drive test, promptly to carrying out the raising requirement of drive test UE, with the regular traffic of preferred assurance UE.
Step 103; After subscriber equipment receives the drive test measurement configuration information of allotting the base station; For Logged MDT mode, subscriber equipment begins to carry out drive test measurement after entering into the IDLE attitude, and according to the capacity of equipment demand information that arrives through the public broadcasting message sink in the step 102; The condition if the dump energy information of subscriber equipment or free memory spatial information can not satisfy the demands, subscriber equipment stops current drive test measurement record; When the electric weight of subscriber equipment returns to not only demand condition or memory headroom but also returns to demand condition, and configuration do not have overtimely effective time, and subscriber equipment continues the surveying record of drive test; For Immediate MDT mode, after subscriber equipment receives the drive test configuration information, just begin to carry out drive test measurement and report; When subscriber equipment according to capacity of equipment demand information in the step 102; When not satisfying the demands, subscriber equipment just suspends drive test measurement, when the electric weight of subscriber equipment returns to not only demand condition or memory headroom but also returns to demand condition; And subscriber equipment also is in connected state, and subscriber equipment just continues drive test measurement and reports.
Step 104, subscriber equipment carry the indication of drive test measurement record in RRC Connection Setup Complete message after entering into connected state, the base station can obtain the drive test measurement record of subscriber equipment through specific messages.
Embodiment two
Fig. 2 is the flow chart of the drive test measurement record of the embodiment of the invention two and the control method that reports, and as shown in Figure 2, in this example, the base station issues the capacity of equipment demand information through specialized configuration message and gives subscriber equipment; This example drive test measurement record and the control method that reports specifically may further comprise the steps:
Step 201, the webmaster side group is handed down to HSS through Trace Session Activation with the configuration information of drive test in the trace flow mode of signaling, and configuration information has comprised the drive test measurement zone; The capacity of equipment demand information; In the surveying record cycle, in the measurement and report cycle, dispose effective time; Customer equipment identification information (IMSI/IMEI (SV), International Mobile Subscriber/Equipment Identity) Trace Reference etc.HSS selects subscriber equipment to carry out drive test measurement according to the log-on message of subscriber equipment, and issuing of configuration surveyed in the walking along the street of going forward side by side.HHS gives mobile management entity (MME, Mobility Management Entity) with the drive test measurement configuration distributing, and MME sets up (InitialContextSetup) through initial context or follows the tracks of initiation message (Trace Start) and issues configuration again to the base station.
Step 202, the base station carries the drive test measurement configuration messages through specialized configuration message RRC connection reallocation message (RRCConnection Reconfiguration) and the capacity of equipment demand information is given subscriber equipment.Be in the reporting immediately of connected state (Immediate MDT) for subscriber equipment, comprised the drive test measurement amount in the drive test measurement configuration messages, trigger condition, configuration effective time, and capacity of equipment demand information.
Described capacity of equipment demand information has comprised the state of charge information of subscriber equipment, and/or the memory usage information of subscriber equipment, and/or the mobile status information of subscriber equipment.State of charge information refers to the dump energy of subscriber equipment or the percentage that dump energy accounts for total electric weight; As be lower than when the UE dump energy total electric weight 10% the time, UE will not carry out drive test measurement, perhaps the maximum operating time that can support of battery capacity; The maximum operating time that can support like battery capacity is less than 1 hour; UE just temporarily stops drive test measurement, also can refer to the overall status of the electric weight remaining information or the information of use, (such as high, medium and low state); Like the current user mode of electric weight is that height or residual state are low, and UE just can stop drive test measurement; The UE storaging state information refers to the free memory amount of subscriber equipment or the percentage that the free memory amount accounts for total memory space, also can represent with rough mode, such as high, medium and low state; As be lower than when the current free memory of UE total amount 15% the time, UE will not carry out drive test measurement; The UE mobile status information refers to moving user equipment information, as fast, and middling speed, at a slow speed etc.; For example, when moving user equipment reaches 50km/h, will not carry out drive test measurement.Why above-mentioned capacity of equipment demand information is set, and mainly is to consider that drive test can not influence the carrying out of UE regular traffic.For example, when the UE electric weight not for a long time, if carry out proper communication business and drive test simultaneously, can make UE power consumption surge undoubtedly, like this, may have influence on the regular traffic of UE.Same, carry out the UE of regular traffic, when its internal memory not for a long time, carry out drive test again, will certainly influence the processing speed of UE to business datum, cause user experience to descend, this UE also is not suitable for carrying out drive test.And,,, also can have influence on carrying out of UE regular traffic if carry out drive test again because channel fading can cause current channel condition to descend for the higher UE of translational speed.The present invention's for these reasons consideration has just just been set up the capacity of equipment demand information of above-mentioned execution drive test, promptly to carrying out the raising requirement of drive test UE, with the regular traffic of preferred assurance UE.
Step 203; After subscriber equipment received the drive test measurement configuration information of allotting the base station, for Immediate MDT mode, subscriber equipment just began the measurement of drive test; If being periodic pilot, the measurement type of configuration measures; Subscriber equipment just periodically reports the drive test measurement result to give the base station, carries out in the drive test measurement process at subscriber equipment, if other professional unlatchings are arranged again; Cause ability such as dump energy or free memory space or the mobile status of subscriber equipment not to satisfy the capacity of equipment demand in the drive test configuration, subscriber equipment can temporarily stop drive test measurement and report; When the electric weight of subscriber equipment returns to not only demand condition or memory headroom but also returns to demand condition, subscriber equipment continues the measurement and report of drive test; For Logged MDT mode; Subscriber equipment begins to carry out drive test measurement after entering into the IDLE attitude; The condition if the dump energy information of subscriber equipment or free memory spatial information or mobile status can not satisfy the demands, subscriber equipment stops current drive test measurement record; When the electric weight of subscriber equipment returns to not only demand condition or memory headroom but also returns to demand condition, and configuration do not have overtimely effective time, and subscriber equipment continues the surveying record of drive test.
The drive test measurement result that step 204, base station receive user equipment to report preserves processing, perhaps reports to follow the tracks of to collect entity (TCE, Trace Collection Entity).
Embodiment three
Fig. 3 is the flow chart of the drive test measurement record of the embodiment of the invention three and the control method that reports, and is as shown in Figure 3, and in this example, the base station issues the capacity of equipment demand information to subscriber equipment through configuration messages (configuration messages of promptly newly establishing) independently; This example drive test measurement record and the control method that reports specifically may further comprise the steps:
Step 301; The webmaster side group is handed down to base station through trace session activation message (Trace Session Activation) with the configuration information of drive test in the trace flow mode of management, and it is regional that configuration information has comprised drive test measurement, the capacity of equipment demand information; The surveying record cycle; In the measurement and report cycle, dispose effective time, track reference sign (Trace Reference) etc.The base station is in state of activation in the sub-district subscriber equipment carries out device capability information and obtains; The base station is connected the ability information of the support drive test that reports when setting up with subscriber equipment according to the area configurations of webmaster side then; Select qualified subscriber equipment; Subscriber equipment to being in connected state carries out the drive test measurement configuration through Idle state drive test configuration messages (IdleMDTConfiguration/IdleLoggingConfiguration), lets it carry out drive test measurement.
Step 302; Subscriber equipment is before getting into the IDLE attitude; The capacity of equipment demand information of drive test is carried out through configuration messages (like capacity of equipment demand Indication message (Device Capability Indicate), the present invention does not limit message name and the form to UE transmitting apparatus ability need information) notifying user equipment independently in the base station.
Include in the capacity of equipment demand Indication message and follow the tracks of sign (Trace Reference) and track record sign (Trace Record Reference), and the capacity of equipment demand information.
Described capacity of equipment demand information has comprised the state of charge information of subscriber equipment, and/or the memory usage information of subscriber equipment, and/or the mobile status information of subscriber equipment.State of charge information refers to the dump energy of subscriber equipment or the percentage that dump energy accounts for total electric weight; As be lower than when the UE dump energy total electric weight 10% the time, UE will not carry out drive test measurement, perhaps the maximum operating time that can support of battery capacity; The maximum operating time that can support like battery capacity is less than 1 hour; UE just temporarily stops drive test measurement, also can refer to the overall status of the electric weight remaining information or the information of use, (such as high, medium and low state); Like the current user mode of electric weight is that height or residual state are low, and UE just can stop drive test measurement; The UE storaging state information refers to the free memory amount of subscriber equipment or the percentage that the free memory amount accounts for total memory space, also can represent with rough mode, such as high, medium and low state; As be lower than when the current free memory of UE total amount 15% the time, UE will not carry out drive test measurement; The UE mobile status information refers to moving user equipment information, as fast, and middling speed, at a slow speed etc.; For example, when moving user equipment reaches 50km/h, will not carry out drive test measurement.Why above-mentioned capacity of equipment demand information is set, and mainly is to consider that drive test can not influence the carrying out of UE regular traffic.For example, when the UE electric weight not for a long time, if carry out proper communication business and drive test simultaneously, can make UE power consumption surge undoubtedly, like this, may have influence on the regular traffic of UE.Same, carry out the UE of regular traffic, when its internal memory not for a long time, carry out drive test again, will certainly influence the processing speed of UE to business datum, cause user experience to descend, this UE also is not suitable for carrying out drive test.And,,, also can have influence on carrying out of UE regular traffic if carry out drive test again because channel fading can cause current channel condition to descend for the higher UE of translational speed.The present invention's for these reasons consideration has just just been set up the capacity of equipment demand information of above-mentioned execution drive test, promptly to carrying out the raising requirement of drive test UE, with the regular traffic of preferred assurance UE.
Step 303; After subscriber equipment receives the drive test measurement configuration information of allotting the base station; For Logged MDT mode, subscriber equipment begins to carry out drive test measurement after entering into the IDLE attitude, and according to the capacity of equipment demand information of receiving through capacity of equipment demand Indication message in the step 302; The condition if the dump energy information of subscriber equipment or free memory spatial information can not satisfy the demands, subscriber equipment stops current drive test measurement record; When the electric weight of subscriber equipment returns to not only demand condition or memory headroom but also returns to demand condition, and configuration do not have overtimely effective time, and subscriber equipment continues the surveying record of drive test; For Immediate MDT mode, after subscriber equipment receives the drive test configuration information, just begin to carry out drive test measurement and report; When subscriber equipment according to capacity of equipment demand information in the step 302; When not satisfying the demands, subscriber equipment just suspends drive test measurement, when the electric weight of subscriber equipment returns to not only demand condition or memory headroom but also returns to demand condition; And subscriber equipment also is in connected state, and subscriber equipment just continues drive test measurement and reports.
Step 304, subscriber equipment carry the indication of drive test measurement record in RRC Connection Setup Complete message after entering into connected state, the base station can obtain the drive test measurement record of subscriber equipment through specific messages.
Fig. 4 is the composition structural representation of drive test measurement of the present invention record and the control system that reports; As shown in Figure 4; Drive test measurement record of the present invention and the control system that reports comprise the receiving element of being located in the base station 40 and allocation unit 41, and unit 42 is carried out and reported to the drive test of being located among the UE that satisfies the drive test ability need; Wherein
Receiving element 40 is used to receive the UE ability need information of the execution drive test of webmaster side configuration;
Allot unit 41, be used for the UE ability need information of the execution drive test of webmaster side configuration is issued the UE of said base station affiliated subdistrict; The UE ability need information of the execution drive test that is disposed does not influence the carrying out of UE regular traffic;
Drive test is carried out and is reported unit 42, is used to carry out drive test and reports the drive test result.
The UE ability need information of the execution drive test that is disposed includes state of charge information, the memory usage information of UE, the mobile status information of at least one of following information: UE.
Above-mentioned allocation unit 41 is further through public broadcasting message or special-purpose configuration messages or newly establish specific messages the UE ability need information of the execution drive test of webmaster side configuration is sent to the UE in the affiliated subdistrict of said base station.
Said public broadcasting message is system information block (SIB), is SIB2 or SIB3; The configuration messages of said special use is that wireless resource control connection reconfiguration message (RRC Connection Reconfiguration), Radio Resource control connection are set up message (RRC Connection Setup) or idle minimum road test (MDT) configuration messages (IdleMDTConfiguration/IdleLoggingConfiguration).
Above-mentioned allocation unit 41 further sends to the UE that is in connection status in the affiliated subdistrict of said base station with the UE ability need information of the execution drive test of webmaster side configuration.
Those skilled in the art are to be understood that; Drive test measurement record that the present invention is shown in Figure 4 and the control system that reports are for realizing that aforesaid drive test measurement record of the present invention and the control method that reports design; The realization function of above-mentioned each processing unit can be with reference to the associated description of preceding method and is understood, and specifically can understand referring to the description of previous embodiment one to embodiment three.The function of each processing unit among the figure can realize through the program that runs on the processor, also can realize through concrete logical circuit.
The above is merely preferred embodiment of the present invention, is not to be used to limit protection scope of the present invention.

Claims (11)

1. drive test measurement record and the control method that reports is characterized in that said method comprises:
The UE that gives in the affiliated subdistrict of said base station is allotted after receiving subscriber equipment (UE) the ability need information of execution drive test of webmaster side configuration in the base station;
The UE that satisfies the drive test ability need carries out drive test and reports the drive test result.
2. method according to claim 1 is characterized in that, the UE ability need information of the execution drive test that is disposed includes the state of charge information of at least one of following information: UE, the memory usage information of UE, the mobile status information of UE.
3. method according to claim 1 is characterized in that, the percentage that dump energy that said state of charge information is UE or dump energy account for total electric weight, or the maximum operating time of the battery capacity of UE support, or electric weight uses the state of information; Said storaging state information is the free memory amount of UE, or free memory accounts for the percentage of total memory space, or the overall status of memory usage information; Said mobile status information is the translational speed information of UE.
4. method according to claim 1 is characterized in that, said base station receives to be allotted the UE that gives in the affiliated subdistrict of said base station after the UE ability need information of execution drive test of webmaster side configuration and be specially:
Said base station is through public broadcasting message or special-purpose configuration messages or newly establish specific messages the UE ability need information of the execution drive test of webmaster side configuration is sent to the UE in the affiliated subdistrict of said base station.
5. method according to claim 3 is characterized in that, said public broadcasting message is system information block (SIB);
The configuration messages of said special use is that wireless resource control connection reconfiguration message (RRCConnection Reconfiguration), Radio Resource control connection are set up message (RRCConnectionSetup) or idle minimum road test (MDT) configuration messages (IdleMDTConfiguration/IdleLoggingConfiguration).
6. method according to claim 5 is characterized in that, said public broadcasting message is SIB2 or SIB3;
Said base station sends to the UE that is in connection status in the affiliated subdistrict of said base station with the UE ability need information of the execution drive test of webmaster side configuration.
7. the control system that drive test measurement writes down and reports is applied in the wireless communication system; It is characterized in that said system comprises the receiving element of being located in the base station and allocation unit, and, be located at the drive test execution among the UE that satisfies the drive test ability need and report the unit, wherein,
Receiving element is used to receive the UE ability need information of the execution drive test of webmaster side configuration;
Allot the unit, be used for the UE ability need information of the execution drive test of webmaster side configuration is issued the UE of said base station affiliated subdistrict;
Drive test is carried out and is reported the unit, is used to carry out drive test and reports the drive test result.
8. system according to claim 7 is characterized in that, the UE ability need information of the execution drive test that is disposed includes state of charge information, the memory usage information of UE, the mobile status information of at least one of following information: UE.
9. system according to claim 7; It is characterized in that said allocation unit is further through public broadcasting message or special-purpose configuration messages or newly establish specific messages the UE ability need information of the execution drive test of webmaster side configuration is sent to the UE in the affiliated subdistrict of said base station.
10. system according to claim 8 is characterized in that, said public broadcasting message is SIB;
The configuration messages of said special use is that wireless resource control connection reconfiguration message (RRC Connection Reconfiguration), Radio Resource control connection are set up message (RRC Connection Setup) or idle minimum road test (MDT) configuration messages (IdleMDTConfiguration/IdleLoggingConfiguration).
11., it is characterized in that said public broadcasting message is SIB2 or SIB3 according to each described system of claim 7 to 10;
Said allocation unit further sends to the UE that is in connection status in the affiliated subdistrict of said base station with the UE ability need information of the execution drive test of webmaster side configuration.
CN201010503325.3A 2010-09-30 2010-09-30 Drive test measurement record and the control method reported and system Active CN102448104B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201010503325.3A CN102448104B (en) 2010-09-30 2010-09-30 Drive test measurement record and the control method reported and system
PCT/CN2011/076758 WO2012041106A1 (en) 2010-09-30 2011-07-01 Control method and system for drive test measurement recording and reporting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010503325.3A CN102448104B (en) 2010-09-30 2010-09-30 Drive test measurement record and the control method reported and system

Publications (2)

Publication Number Publication Date
CN102448104A true CN102448104A (en) 2012-05-09
CN102448104B CN102448104B (en) 2016-06-15

Family

ID=45891888

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010503325.3A Active CN102448104B (en) 2010-09-30 2010-09-30 Drive test measurement record and the control method reported and system

Country Status (2)

Country Link
CN (1) CN102448104B (en)
WO (1) WO2012041106A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013181893A1 (en) * 2012-06-05 2013-12-12 中兴通讯股份有限公司 Method and terminal for performing mdt measurement at terminal
CN103686823A (en) * 2012-09-06 2014-03-26 华为技术有限公司 Measuring method and device
CN103716830A (en) * 2012-09-28 2014-04-09 中国移动通信集团上海有限公司 Cell data service capability test method, cell data service capability test device, cell data service capability test system and related equipment
CN104113874A (en) * 2013-04-16 2014-10-22 电信科学技术研究院 Method of measurement report, and device of measurement report
WO2022032633A1 (en) * 2020-08-14 2022-02-17 Zte Corporation A system and method for drx configuration

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101299860A (en) * 2007-04-30 2008-11-05 华为技术有限公司 Measurement control method, subscriber terminal, network side equipment and system
WO2008136415A1 (en) * 2007-04-27 2008-11-13 Ntt Docomo, Inc. Mobile communication system, base station controller, base station apparatus, mobile station apparatus, and base station wireless parameter control method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1531365A (en) * 2003-03-14 2004-09-22 洁 徐 Network performance measuring method based on customer terminal measuring data, signalling and mobile positioning technology
CN100499896C (en) * 2005-07-29 2009-06-10 华为技术有限公司 Measuring method based on different measuring purposes for user terminal and user terminal thereof
CN101043708B (en) * 2006-03-24 2011-01-26 大唐移动通信设备有限公司 Method and apparatus for measurement in wireless network

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008136415A1 (en) * 2007-04-27 2008-11-13 Ntt Docomo, Inc. Mobile communication system, base station controller, base station apparatus, mobile station apparatus, and base station wireless parameter control method
CN101299860A (en) * 2007-04-30 2008-11-05 华为技术有限公司 Measurement control method, subscriber terminal, network side equipment and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
3GPP: "《3GPP TR 32.827 V1.1.0,Telecommunication management,Integration of device management information with Itf-N(Release 10)》", 24 March 2010 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013181893A1 (en) * 2012-06-05 2013-12-12 中兴通讯股份有限公司 Method and terminal for performing mdt measurement at terminal
CN103458437A (en) * 2012-06-05 2013-12-18 中兴通讯股份有限公司 Method for achieving MDT measurement through terminal and terminal
CN103686823A (en) * 2012-09-06 2014-03-26 华为技术有限公司 Measuring method and device
CN103686823B (en) * 2012-09-06 2017-12-05 华为技术有限公司 The method and apparatus of measurement
CN103716830A (en) * 2012-09-28 2014-04-09 中国移动通信集团上海有限公司 Cell data service capability test method, cell data service capability test device, cell data service capability test system and related equipment
CN103716830B (en) * 2012-09-28 2017-05-03 中国移动通信集团上海有限公司 Cell data service capability test method, cell data service capability test device, cell data service capability test system and related equipment
CN104113874A (en) * 2013-04-16 2014-10-22 电信科学技术研究院 Method of measurement report, and device of measurement report
WO2022032633A1 (en) * 2020-08-14 2022-02-17 Zte Corporation A system and method for drx configuration

Also Published As

Publication number Publication date
WO2012041106A1 (en) 2012-04-05
CN102448104B (en) 2016-06-15

Similar Documents

Publication Publication Date Title
CN102281568B (en) Drive test measurement record control method, driver test system and drive test terminal
CN102752787B (en) Connection status minimizes road measuring method and system
CN101931984B (en) Method, user equipment and base station for drive test measurement
CN101448268B (en) Neighboring configuration method and device thereof and home base configuration method and device
CN102291751B (en) The optimization method that drive test measurement result reports, driver test system and drive test terminal
CN102209345B (en) A kind of method of wireless communication system and reporting drive test result thereof
CN102932848B (en) Network flow branching method based on grid assist
CN102215455A (en) Multimedia broadcast multicast service measurement and reporting method and system
CN102164375A (en) Method and system for collecting terminal measurement data
CN102754469A (en) Apparatus and method of reporting logged measurement in wireless communication system
CN102215516A (en) Method and system for drive test of terminal in radio system
CN102892129B (en) A kind of minimum drive test configuration information delivery method and network element based on management
CN104640148A (en) Measurement reporting method, device and system
CN103125131A (en) Method and device for performing logged measurement in wireless communication system
CN102948201A (en) Apparatus and method of reporting logged measurements in a wireless communication system
CN103369559A (en) Time-delay obtaining drive test minimization method and time-delay obtaining drive test minimization device
CN103260176A (en) Minimized drive test method, network element and system
CN103260175A (en) Quality of service (QOS) measuring method and system based on minimum drive test
CN102448104A (en) Control method and system for recording and reporting drive test measurement
CN101854679A (en) Processing method, base station and system for group switch
CN103024801A (en) Immediate minimization of drive test (MDT) configuration information transmitting method based on signaling and network equipment
CN103037412A (en) Sending method of minimization of drive test (MDT) related information and radio access network (RAN)
CN103249078A (en) Measurement method and node for throughput of minimization of drive test
CN102932772A (en) Terminal and method for checking logged minimization of drive test (MDT) configuration
CN105472646A (en) Method and equipment for reporting device-to-device resource acquisition failure information

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant