CN102447307A - Electric quantity computing device, electric quantity computing server, electric quantity computing system and electric quantity computing method - Google Patents

Electric quantity computing device, electric quantity computing server, electric quantity computing system and electric quantity computing method Download PDF

Info

Publication number
CN102447307A
CN102447307A CN2011102454185A CN201110245418A CN102447307A CN 102447307 A CN102447307 A CN 102447307A CN 2011102454185 A CN2011102454185 A CN 2011102454185A CN 201110245418 A CN201110245418 A CN 201110245418A CN 102447307 A CN102447307 A CN 102447307A
Authority
CN
China
Prior art keywords
electric weight
electric
opposite tide
power
renewable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102454185A
Other languages
Chinese (zh)
Other versions
CN102447307B (en
Inventor
富田民则
土屋和利
露崎正雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of CN102447307A publication Critical patent/CN102447307A/en
Application granted granted Critical
Publication of CN102447307B publication Critical patent/CN102447307B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y02E40/72
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources

Abstract

The present invention provides an electric quantity computing device, an electric quantity computing device, an electric quantity computing system and an electric quantity computing method. When solar distributed power supplies and an accumulator are equipped in a requirement user, whether the electric power of the distributed power supplies or the electric power of the accumulator is used as back-flow power can not be determined. The electric quantity computing device of the invention is provided with the following components: a unit which measures output electric quantity of the distributed power supplies, and a unit which measures charging/discharging electric quantity of the accumulator. Consumed electric quantity of the requirement user and the back-flow power are summarized. One smaller electric quantity in the electric quantity which is obtained through deducting the discharging electric quantity of the accumulator from the back-flow electric quantity and the electric quantity of the distributed power supplies is estimated as the electric quantity that is generated because of power generation of the distributed power supplies.

Description

Electric weight arithmetic unit, electric weight calculation server, electric weight arithmetic system and electric weight operation method
Technical field
The present invention relates to electric weight arithmetic unit, electric weight calculation server, electric weight arithmetic system and electric weight operation method.
Background technology
Because the raising of the protection of earth environment in recent years consciousness in not having the clean energy resource of environmental pollution, utilizes the solar power generation of solar cell to receive publicity.About solar power generation; Parallel running through with industrial electric power system comes electric; Keep the part of oneself required electric power or all through solar power generation; And under the remaining situation of the generation power of solar cell, carry out so-called opposite tide (inverse load flow) to industrial electric power system.
Utilities Electric Co. is considered to the encouragement of solar power system is set with the electric power of predetermined unit price purchase opposite tide.
When the generation power of solar cell is supplied with in industrial electric power system; In solar power generation; Generated output changes according to sunshine amount significantly, therefore in order to suppress influence to industrial electric power system, and the voltage of surveillance tie point for example in patent documentation 1, putting down in writing; The moment of the value outside it becomes prescribed limit, promptly moment of abnormal electrical power supply having taken place, has stopped the generating of solar power system.
In addition, for example record in patent documentation 2, the voltage of surveillance tie point makes generating output less than maximum near set upper limit voltage the time.
Through these technology, in protection system so that when electric power system do not break away from prescribed limit, implemented the purchase of electric power.
On the other hand; In the system of storage battery; Use storage battery to put aside night electricity and use by day, have the following advantages thus: the peak of for Utilities Electric Co., having realized electricity needs moves (peakshift), for the demand user, can utilize the cheap electric power at night.But, need make the electric power of putting aside cheap night in the electricity charge that opposite tide does not take place by day.
As technology to this problem; That kind of record in the known for example patent documentation 3; The control of the charging that in the opposite tide process, suppresses to export with the discharge of battery and solar energy from night electricity charging, the technology of the opposite tide of the electric power after preventing thus to charge with night electricity.
In addition, that kind that known for example patent documentation 4 is put down in writing is controlled when battery discharging and is purchased more than the ammeter vanishing, prevents the technology with the opposite tide of the electric power after the night electricity charging thus.
But, the technology that patent documentation 3 is put down in writing, because the mechanism that need be used to control, so the investment burden of demand user side equipment increases the weight of, and in addition, owing to do not allow the opposite tide from storage battery, therefore has the problem that can't be used for system stabilityization.
In addition, the technology that patent documentation 4 is put down in writing remains the thinking that does not allow from the opposite tide of storage battery, in addition, in its equipment investment burden, has the problem that can't be used for system stabilityization.
[patent documentation 1] japanese kokai publication hei 8-70533 communique
[patent documentation 2] japanese kokai publication hei 6-332553 communique
[patent documentation 3] TOHKEMY 2009-33797 communique
[patent documentation 4] TOHKEMY 2007-209133 communique
Summary of the invention
The present invention is based on permission and in the part of the electric power of opposite tide, comprise the thinking of the electric power of savings; Promptly; Even the object of the present invention is to provide the electric power that comprises savings in a kind of part of the electric power at opposite tide, electric weight arithmetic unit, electric weight calculation server, electric weight arithmetic system and the electric weight operation method of also can computing suitable electric weight with suitable opposite tide.
The present invention offers the opposite tide electric weight of electric power system, offers renewable electric weight and the accumulator electric-quantity that offers said demand user's power wiring from storage battery of said demand user's power wiring from the renewable energy power generation machine according to the power wiring from the demand user; When the said renewable electric weight of electricity ratio that calculates when from said opposite tide electric weight, deducting said accumulator electric-quantity was big, to connect renewable electric weight be the upper limit to said opposite tide electric weight with said.
In the present invention, even in the part of the electric power of opposite tide, comprise the electric power of savings, the electric weight of also can computing suitable opposite tide therefore can be with being used for system stabilityization from charging and discharging of accumulator.
Description of drawings
Fig. 1 is a system block diagram.
Fig. 2 is the block diagram of expression dwelling house with the structure of solar power system.
Fig. 3 is the figure of the list structure in expression electric quantity data storehouse.
Fig. 4 is the figure of an example of the calculation procedure of expression adjustment opposite tide electric weight.
Fig. 5 is the system block diagram of second embodiment.
Fig. 6 is the figure of list structure in the electric quantity data storehouse of expression second embodiment.
Symbol description
101 demand users 1 (the first demand user)
102 demand users 2 (the second demand user)
103 demand users 3 (the 3rd demand user)
104 electric power data relay stations
105 electric power datas gather the center
106,107 communication networks
108 pole type transformers
109 industrial electric power systems
Embodiment
Below, use description of drawings to be used for the mode of first embodiment of embodiment of the present invention.
Fig. 2 is that expression is with the figure of solar cell as an example of the decentralized power s system of energy source.In addition, as decentralized power s, also can use the generator of the renewable energy resources beyond the solar cell.In Fig. 2; In demand user 1 (101); The decentralized power s system possesses solar panel 1011 and the power converter unit 1012 that is built-in with inverter (inverter circuit), and this inverter (inverter circuit) is transformed to alternating current to the direct current from these solar panel 1011 outputs.From industrial electric power system 204 via transformer station 212, and then via the circuit breaker 206, pole type transformer 108 and the circuit breaker 205 that cut off industrial electric power system 204 based on frequency change or change in voltage, to these power converter unit 1012 supply capabilities.Comprise circuit breaker 205 that breaks off decentralized electric power and the individual operation detecting unit 207 that makes circuit breaker 205 off-the-lines.
Based on the output voltage and the output current of solar panel 1011, the generated output of computing solar panel 1011.
Through control power converter unit 1012, across certain time interval the output voltage of solar panel 1011 is changed intermittently, the power of exploring output reaches maximum magnitude of voltage.Be provided with electricity accumulating unit 1013, discharge and recharge by 1014 controls of power converter unit.And pole type transformer 108 between be provided with fair tide electrical measurement unit 1017 and opposite tide electrical measurement unit 1018.Display unit 211 is when energy output is unusual, show when discharging and recharging when unusual etc.
In Fig. 1, thick line is represented electric power system, and fine rule is represented information system.Demand user 1~3 is connected with electric power data relay station 104 through communication network 106, and electric power data relay station 104 gathers center 105 through communication network 107 and electric power data and is connected.In addition, become from pole type transformer 108, and give the structure of system side the dump power opposite tide of solar panel 1011 through 109 pairs of each demand user supply capabilities of industrial electric power system.
Demand user 1 (101) possesses solar panel 1011 as generator unit; To be transformed to the alternating current of industrial frequency from the direct current of solar panel 1011 outputs through power converter unit 1012; Supply oneself load 1010 to use, at this, except solar panel 1011; Solar panel can also be set constitute a plurality of solar panels; Also other wind-driven generator can be set together, they are referred to as the generator based on regenerative resource, their energy output is called renewable electric weight.In this case, the result who amounts to energy output separately and get is regarded as the energy output of following explanation.
In addition, measure the output electric weight of power converter unit 1012 through solar power generation electrical measurement unit 1015.
Electricity accumulating unit 1013 can discharge and recharge direct current.When power converter unit 1014 is charged state at electricity accumulating unit; Input is from power converter unit 1012 or the alternating current supplied with of industrial electric power system (perhaps abbreviating system as) 109; Offer electricity accumulating unit 1013 after being transformed to direct current; When electricity accumulating unit 1013 is discharge condition, offer oneself load 1010 after will being transformed to alternating current from the direct current that electricity accumulating unit 1013 is supplied with, perhaps offer industrial electric power system 109 as opposite tide.
The dump power that oneself load 1010 can't consume in the electric power of solar panel head tide flows to industrial electro power system 109; Perhaps offer electricity accumulating unit 1013 via power converter unit 1014, its electric weight is measured through electricity accumulating unit charge/discharge electricity amount measuring unit 1016 and opposite tide electrical measurement unit 1018 respectively.
If can't keep oneself load 1010 through the electric power of solar panel, during power shortage, accept the supply of electric power from industrial electric power system 109, its electric weight is measured through fair tide electrical measurement unit 1017.
Electric quantity data transmitting element 1019 sends to electric power data relay station 104 to each electric weight that records respectively through solar power generation electrical measurement unit 1015, electricity accumulating unit charge/discharge electricity amount measuring unit 1016, fair tide electrical measurement unit 1017, opposite tide electrical measurement unit 1018 via communication network 106.
In addition, demand user 2 (102), demand user 3 (103) also are the structures identical with demand user 1 (101).
In electric power data relay station (perhaps abbreviating server as) 104; Through electric quantity data receiving element 1041 receive with pole type transformer 108 under the demand user's that is connected of electric power system above-mentioned electric quantity data, each demand user's of preservation above-mentioned electric weight in DB1042 such as electric quantity data.
In electric quantity data transmitting element 1019; With measure said opposite tide electric weight during, the state information that is arranged on equipment (being designated hereinafter simply as " equipment ") such as solar panel 1011 in the demand user 101, power converter unit 1012, electricity accumulating unit 1013, power converter unit 1014, oneself load 1010 (following abbreviate these state informations as " state information ") associates record with consumes power and opposite tide electric weight, and sends to electric power data relay station 104.
At this, can comprise solar panel 1011 as decentralized power s, with consumes power and opposite tide electric weight explicitly recording and sending can comprise the generating electric weight of this decentralized power s (can be more than 1) in the data of electric power data relay station 104.
Certainly, in the data of this transmission, comprise the charge capacity and the discharge electricity amount of at least more than one storage battery, and then comprise the information about having or not the enforcement charging and having or not the enforcement discharge of at least more than one storage battery.
Particularly under the situation of decentralized power s and storage battery coexistence, the equipment that is arranged in the demand user 1 (101) comprises at least more than one decentralized power s and an above storage battery, sends to electric power data relay station 104 to such information.
Better situation is, handle in order only when opposite tide takes place, to implement, the state information record measure the opposite tide electric weight during information, send to electric power data relay station 104.Perhaps, can't obtain measure opposite tide during the situation of state information of equipment under, can the opposite tide electric weight not sent to electric power data relay station 104 yet.In addition, can't obtain measure opposite tide during the situation of state information of said equipment under, also can the opposite tide magnitude of current be made as 0 and send to electric power data relay station 104.
Fig. 3 (a) is illustrated in the table of the data of preserving among the DB1042 such as electric quantity data.Receive from demand user 1 (101), demand user 2 (102), demand user's 3 (103) demand IDs that send, that be used to discern each demand user, fair tide electric weight, opposite tide electric weight, solar power generation electric weight, accumulator cell charging and discharging electric weight and savings preservation via receiving elements such as electric quantity data 1041.In the table shown in Fig. 3 (a), represented, had 3 required users, put aside the data that measure in October, 2009 and in November, 2009 by the example of putting aside electric weight every month.
In adjustment electric weight computing unit 1043,, calculate adjustment opposite tide electric weight through predetermined algorithm with reference to the savings data of DB1042 such as electric quantity data.This result of calculation is stored as DB1042 such as electric quantity datas shown in Fig. 3 (b).Using adjustment electric weight transmitting element 1044 will adjust the opposite tide electric weight via communication network 107 sends to and is arranged on electric power data and gathers and gather server 1051 in the center 105.According to the electric weight that in gathering server 1051, gathers, calculate the electricity charge in the future and each demand user is asked this electricity charge.
Fig. 4 representes the example by the calculation procedure of the adjustment opposite tide electric weight of adjustment electric weight computing unit 1043 execution.
When calculate certain demand user certain during adjustment opposite tide electric weight the time, judge whether accumulator cell charging and discharging electric weight during this period is on the occasion of (the charge ratio discharge is many).At this, in Fig. 3 (a), when storage battery 1013 chargings,, when storage battery 1013 discharges, be negative such define symbol for just.For example at the demand ID 001 of Fig. 3 (b), measure under the situation of time on date 2009/10, the accumulator cell charging and discharging electric weight be-150kwh, therefore is to discharge, and becomes " being (YES) " (step 4001).
If the accumulator cell charging and discharging amount be on the occasion of, then in the opposite tide electric weight, comprise the battery discharging electric weight, therefore will from the opposite tide electric weight, deduct the battery discharging electric weight and value be made as and adjust the opposite tide electric weight.At this, in Fig. 3 (a), represent discharge with negative sign, therefore as computing, become " opposite tide electric weight "+" accumulator cell charging and discharging electric weight (negative value) ", that is, adjustment opposite tide electric weight is made as the value that on the opposite tide electric weight, adds battery discharging electric weight gained.For example at the demand ID 001 of Fig. 3 (a), measure under the situation of time on date 2009/10, adjust the opposite tide electric weight and be set to 200+ (150)=50 (step 4002).
If the accumulator cell charging and discharging amount be not on the occasion of, then in the opposite tide electric weight, do not comprise the battery discharging electric weight, therefore, adjust the opposite tide electric weight and be set to opposite tide electric weight (step 4003).
Then, judge whether the solar power generation electric weight lacks than adjustment opposite tide electric weight.This be because, for example is connected with demand user 1 (101) when electric automobile, to demand user 1 (101) supply capability, perhaps during the interim or inflow of the generation power of fuel cell, produce opposite tide electric power from electric automobile above the solar power generation electric weight with inducting.For example at the demand ID 001 of Fig. 3 (a), measure under the situation of time on date 2009/10,50kwh is littler than solar power generation electric weight 100kwh for adjustment opposite tide electric weight, therefore thinks not to be above-mentioned state, is judged to be " not (NO) " (step 4004).
If the solar power generation electric weight then will be adjusted the opposite tide electric weight and be made as the solar power generation electric weight less than adjustment opposite tide electric weight.For example at the demand ID 001 of Fig. 3 (a), measure under the situation of time on date 2009/10, be set to resulting adjustment opposite tide electric weight 50kwh.This operation result is stored in as Fig. 3 (b) among the DB1042 such as electric quantity data (step 4005).
As another example, explanation demand ID 003, the situation of measurement time on date 2009/11 in Fig. 3 (a).In step 4001, the accumulator cell charging and discharging electric weight is 100kwh, for just, representes charging, therefore advances to step 4003, as adjustment opposite tide electric weight opposite tide electric weight 350kwh is set.
In step 4004,350kwh is bigger than solar power generation electric weight 300kwh for adjustment opposite tide electric weight, and conditional becomes " being (YES) ", therefore advances to step 4005.
In step 4005, will adjust the opposite tide electric weight and be made as solar power generation electric weight 300kwh.This value is stored among the DB1042 such as electric quantity data as the data shown in Fig. 3 (b).
Through calculating adjustment opposite tide electric weight like this, can calculate the electric weight that produces through solar power generation in the opposite tide electric power.
Through adjustment opposite tide electric weight like this, and should adjust opposite tide electric power and send to electric power data and gather the center, can buy the generation power of solar energy with predetermined buying rate.
In addition, in this execution mode, in the electric power data relay station, calculate adjustment opposite tide electric power, but also can gather the calculating that central side is implemented adjustment sale of electricity electric power at electric power data.At this moment, demand sends to electric power data to each electric weight that sends from the demand user and gathers central side.
In addition, in this execution mode, communication network 106 becomes the various network structure with communication network 107, but also can constitute through common communication network.
In addition, in this execution mode, in the electric power data relay station, calculated adjustment opposite tide electric power, but also can be in demand with indoor enforcement computing.
In addition, in this execution mode, in the both sides of decentralized power s and storage battery, be provided with voltameter, but also can under the state that voltameter only is set in decentralized power s, use.In this case, the generating electric weight of the decentralized power s of interim savings also is regarded as the energy output of decentralized power s.
In addition, the charging and discharging of accumulator voltameter can be only to judge the transducer that has or not enforcement to discharge and recharge.Opposite tide when in this case, the discharge of storage battery being arranged during measuring all is regarded as the discharged power of storage battery.
In addition; In this execution mode; All the time generating electric weight and the charging and discharging of accumulator electric weight with decentralized power s sends to the electric power data relay station with fair tide electric weight and opposite tide electric weight; But, also can be only when measuring the opposite tide electric weight, send the generating electric weight and the charging and discharging of accumulator electric weight of decentralized power s.In this case, can cut down the data volume of being sent.
In addition, when the generating electric weight that can't obtain decentralized power s for a certain reason and charging and discharging of accumulator electric weight, can the opposite tide electric weight not sent to relay station, perhaps the opposite tide electric weight is made as 0 and sends to relay station.Can prevent demand user's devious conduct thus.
Second embodiment is described.The only explanation and the first embodiment different portions in a second embodiment.Other part is identical with first embodiment, therefore omits explanation.
In a second embodiment, as shown in Figure 5, in demand user 1 (101), be provided with DB5042 and adjustment electric weight computing units 5043 such as electric quantity data.DB1042 such as the electric quantity data of function separately and first embodiment and adjustment electric weight computing unit 1043 are identical.But data that kind as shown in Figure 6 is by temporary control and education, will adjust the opposite tide electric weight via the electric quantity data receiving element and send to electric power data and gather center 105.
Characteristic to above present embodiment is put in order, in the demand user, has: solar panel, the power converter unit that will be transformed to alternating current, electricity accumulating unit, the direct current that electricity accumulating unit is discharged and recharged from the direct current of solar panel output be transformed to alternating current the power converter unit, measure the electric weight that head tide flows to industrial electro power system opposite tide electrical measurement unit, measure fair tide electrical measurement unit, measure electric power storage value charge/discharge electricity amount measuring unit, measure the solar power generation measurement amount unit of the electric power of solar panel generating from the electric power of electricity accumulating unit from the electric weight of industrial electric power system fair tide, electric quantity data transmitting element that opposite tide electric weight, fair tide electric weight, accumulator cell charging and discharging electric weight and solar power generation electric weight that above-mentioned each measuring unit is measured send to the electric power data relay station.In the electric power data relay station, have: receive the electric quantity data DB of the received electric quantity data of electric quantity data receiving element, the record of the electric weight that sends from each demand user, according to the adjustment electric weight computing unit of the pre-arranged procedure change electric quantity data, will adjust electric weight and send to the adjustment electric weight transmitting element that electric power data gathers the center.Above-mentioned electric quantity data is sent to the electric power data relay station from the demand user, in the electric power data relay station, when calculating each demand user's opposite tide electric power; Calculating deducts the electric weight behind the battery discharging electric weight from the opposite tide electric weight; When this electricity ratio solar power generation amount for a long time, the solar power generation amount is made as adjustment opposite tide electric weight, after a little while in this electricity ratio solar power generation amount; The value of itself is made as adjustment opposite tide electric weight, sends to and gather server.
Adjustment opposite tide electric weight; It is the electric weight of buying by Utilities Electric Co. as by the electric power of solar energy generation; Discharge can be thought with the difference of original opposite tide electric weight, therefore the sale of electricity electric weight that in this demand user, produces can be grasped through solar energy from storage battery.
Like this, can learn the content of opposite tide electric power gathering server side, therefore, Utilities Electric Co. etc. can be provided with the Additional Services such as buying rate corresponding with content.
In addition, proposed to discharge and recharge the method for the change of output such as the natural energy resources that relaxes solar power generation, can make up the system that the storage battery that is utilized in the setting of demand user side is used for the charging of night electricity from storage battery.
The means of in addition, sending the measurement data of demand user side also can be utilized automatic look-up table system or AIM.
In this case,, send adjustment opposite tide electric weight as the opposite tide electric weight, do not change existing automatic look-up table system or AIM thus, just can carry out the dealing of reliable solar electric power in the computing of demand user side enforcement adjustment opposite tide electric weight.
Possess the energy output of measuring solar cell the unit, measure the charging and discharging of accumulator amount the unit, with the measurement data of demand user's fair tide, opposite tide electric weight send to the unit of electric power data relay station together, in the unit of electric power data relay station adjustment opposite tide electric weight; In order to infer the energy output of the solar cell in the opposite tide electric weight; Can deduct the discharge capacity of storage battery, and then the part that will not exceed the energy output of solar cell is judged as the energy output of solar cell.
Therefore, can grasp the energy output of the solar cell in the opposite tide electric weight simultaneously being used for system stabilityization from charging and discharging of accumulator.

Claims (14)

1. an electric weight arithmetic unit is characterized in that,
Have:
Input part, its input offers the opposite tide electric weight of electric power system, offers renewable electric weight and the accumulator electric-quantity that offers said demand user's power wiring from storage battery of said demand user's power wiring from the renewable energy power generation machine from demand user's power wiring; And
The electric weight operational part, when its said renewable electric weight of electricity ratio that calculates from said opposite tide electric weight, deducting said accumulator electric-quantity was big, making said opposite tide electric weight was the upper limit with said renewable electric weight.
2. electric weight arithmetic unit according to claim 1 is characterized in that,
The electric weight and the said renewable electric weight that will from said opposite tide electric weight, deduct said accumulator electric-quantity and get compare, and a less side is estimated as said opposite tide electric weight.
3. electric weight arithmetic unit according to claim 1 is characterized in that,
Said renewable energy power generation machine is a solar generator.
4. electric weight arithmetic unit according to claim 3 is characterized in that,
Have obtain measure said opposite tide electric weight during, be arranged on the unit of demand with the state information of indoor more than one equipment, the state information of said equipment and consumes power and opposite tide electric weight are write down explicitly and send.
5. electric weight arithmetic unit according to claim 4 is characterized in that,
In being arranged on the state information of said demand, comprise the generating electric weight of more than one decentralized power s at least with indoor more than one equipment.
6. electric weight arithmetic unit according to claim 5 is characterized in that,
Be arranged on said demand comprises more than one storage battery at least with the state information of indoor more than one equipment charge capacity and discharge electricity amount.
7. electric weight arithmetic unit according to claim 6 is characterized in that,
Being arranged on said demand comprises at least with the state information of indoor more than one equipment and implements charging with having or not of more than one storage battery and have or not the relevant information of discharge of implementing.
8. electric weight arithmetic unit according to claim 1 is characterized in that,
Be arranged on said demand and comprise more than one decentralized power s and more than one storage battery at least with indoor equipment.
9. electric weight arithmetic unit according to claim 1 is characterized in that,
About the state information of equipment, to measure said opposite tide electric weight during information carry out recording and sending.
10. electric weight arithmetic unit according to claim 1 is characterized in that,
Can't obtain measure opposite tide during the situation of state information of said equipment under, do not send the opposite tide electric weight to server.
11. electric weight arithmetic unit according to claim 6 is characterized in that,
Can't obtain measure opposite tide during, under the situation of the state information of said equipment, the opposite tide electric weight is made as 0, send to server.
12. an electric weight calculation server is characterized in that,
Has electric weight computing machine; This electric weight computing machine receives from demand user's power wiring via network and offers the opposite tide electric weight of electric power system, offers renewable electric weight and the accumulator electric-quantity that offers said demand user's power wiring from storage battery of said demand user's power wiring from the renewable energy power generation machine; When the said renewable electric weight that receives of electricity ratio that calculates when from the said opposite tide electric weight that receives, deducting the said accumulator electric-quantity that receives was big, the said opposite tide electric weight that receives was the upper limit with the said renewable electric weight that receives.
13. a power measurement system is characterized in that having:
The demand client server, it sends from demand user's power wiring and offers the opposite tide electric weight of electric power system, offers renewable electric weight and the accumulator electric-quantity that offers said demand user's power wiring from storage battery of said demand user's power wiring from the renewable energy power generation machine; And
The electric weight calculation server; It receives said opposite tide electric weight, said renewable electric weight and said accumulator electric-quantity via network; And when the said renewable electric weight that receives of electricity ratio that calculates when from the said opposite tide electric weight that receives, deducting the said accumulator electric-quantity that receives was big, the said opposite tide electric weight that receives was the upper limit with the said renewable electric weight that receives.
14. an electric weight operation method is characterized in that,
Offer the opposite tide electric weight of electric power system, offer renewable electric weight and the accumulator electric-quantity that offers said demand user's power wiring from storage battery of said demand user's power wiring from the renewable energy power generation machine according to power wiring from the demand user; When the said renewable electric weight of electricity ratio that calculates when from said opposite tide electric weight, deducting said accumulator electric-quantity was big, to connect renewable electric weight be the upper limit to said opposite tide electric weight with said.
CN201110245418.5A 2010-09-30 2011-08-22 Electricity arithmetic unit, electricity calculation server, electricity arithmetic system and electric quantity computing method Expired - Fee Related CN102447307B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2010-220246 2010-09-30
JP2010220246A JP5380413B2 (en) 2010-09-30 2010-09-30 Electric energy calculation device, electric energy calculation server, electric energy calculation system, and electric energy calculation method

Publications (2)

Publication Number Publication Date
CN102447307A true CN102447307A (en) 2012-05-09
CN102447307B CN102447307B (en) 2015-11-25

Family

ID=46009518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110245418.5A Expired - Fee Related CN102447307B (en) 2010-09-30 2011-08-22 Electricity arithmetic unit, electricity calculation server, electricity arithmetic system and electric quantity computing method

Country Status (2)

Country Link
JP (1) JP5380413B2 (en)
CN (1) CN102447307B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104144183A (en) * 2013-05-08 2014-11-12 株式会社日立制作所 Data center system and management method for data center system
CN104584358A (en) * 2012-11-19 2015-04-29 株式会社日立制作所 Storage battery control device and storage battery control method

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6082565B2 (en) * 2012-10-18 2017-02-15 株式会社アイケイエス Distributed power system
WO2014068738A1 (en) * 2012-10-31 2014-05-08 Jfeエンジニアリング株式会社 Quick charger
JP6372291B2 (en) * 2014-10-08 2018-08-15 株式会社明電舎 Grid interconnection system and method for controlling grid interconnection system
JP6447536B2 (en) * 2016-02-25 2019-01-09 オムロン株式会社 Reverse power flow management device, reverse power flow management system, reverse power flow management method, and reverse power flow management program
KR101796669B1 (en) * 2016-12-21 2017-11-10 재단법인 녹색에너지연구원 System and method for operating microgrid
JP6809306B2 (en) * 2017-03-13 2021-01-06 オムロン株式会社 Power conditioner and switch controller
JP6854703B2 (en) * 2017-05-24 2021-04-07 河村電器産業株式会社 Power metering device
CN110070230B (en) * 2019-04-25 2021-06-22 广东电网有限责任公司电力调度控制中心 Local power grid unit cell electric quantity evaluation calculation method and device and storage medium
JP7307645B2 (en) * 2019-09-26 2023-07-12 京セラ株式会社 Power management system and power management method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1742321A1 (en) * 2004-04-28 2007-01-10 Sharp Kabushiki Kaisha Generation facility management system
JP2010051117A (en) * 2008-08-22 2010-03-04 Japan Wind Development Co Ltd Wind power generation system
JP2010130836A (en) * 2008-11-28 2010-06-10 Seiko Electric Co Ltd Power supply system and power switching apparatus
CN101820175A (en) * 2009-02-26 2010-09-01 三洋电机株式会社 System's grid-connecting apparatus and electric power system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5410118B2 (en) * 2009-02-27 2014-02-05 旭化成ホームズ株式会社 Energy monitoring system
JP2012029414A (en) * 2010-07-21 2012-02-09 Toshiba Corp Power system interconnection monitoring device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1742321A1 (en) * 2004-04-28 2007-01-10 Sharp Kabushiki Kaisha Generation facility management system
JP2010051117A (en) * 2008-08-22 2010-03-04 Japan Wind Development Co Ltd Wind power generation system
JP2010130836A (en) * 2008-11-28 2010-06-10 Seiko Electric Co Ltd Power supply system and power switching apparatus
CN101820175A (en) * 2009-02-26 2010-09-01 三洋电机株式会社 System's grid-connecting apparatus and electric power system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104584358A (en) * 2012-11-19 2015-04-29 株式会社日立制作所 Storage battery control device and storage battery control method
CN104584358B (en) * 2012-11-19 2017-04-12 株式会社日立制作所 Storage battery control device and storage battery control method
CN104144183A (en) * 2013-05-08 2014-11-12 株式会社日立制作所 Data center system and management method for data center system
CN104144183B (en) * 2013-05-08 2018-11-02 株式会社日立制作所 The management method of data center systems and data center systems

Also Published As

Publication number Publication date
JP5380413B2 (en) 2014-01-08
CN102447307B (en) 2015-11-25
JP2012075297A (en) 2012-04-12

Similar Documents

Publication Publication Date Title
CN102447307B (en) Electricity arithmetic unit, electricity calculation server, electricity arithmetic system and electric quantity computing method
CN102104250B (en) Electricity generation system using natural energy, electric power arithmetic device and method
JP5811302B2 (en) Control device, power storage device, battery control system, battery control device, control method, battery control method, and recording medium
EP2605359B1 (en) Battery system and its control method
US8963499B2 (en) Battery pack, method of controlling the same, and energy storage system including the battery pack
JP5907753B2 (en) Regional power demand management system
WO2013031394A1 (en) Cell control system, cell control device, cell control method, and recording medium
US9356444B2 (en) Power control device
CN103855757A (en) Apparatus for managing battery, and energy storage system
CN103081282A (en) Power management system
CN104716693A (en) Energy management method, controller and system for distributed energy storage batteries
US20040257730A1 (en) Power supply method and power supply system
CN105990857A (en) Phosphoric acid iron lithium battery management system and system on chip (SOC) calibration method
US9804212B2 (en) Energy management system
CN102427239A (en) Charging and discharging system using electric automobile as mobile energy storage unit in power grid
WO2015001767A1 (en) Control device and power management system
CN209088603U (en) A kind of industrial energy-storage system of tou power price
CN206908304U (en) A kind of intelligent micro-grid energy-storage system
CN211790793U (en) Retired battery echelon utilization system
US9929571B1 (en) Integrated energy storage system
JP6037678B2 (en) Storage battery charge / discharge control device and storage battery charge / discharge control system
CN108432029A (en) System and method for controlling power storage device
CN201945674U (en) Recorder for battery discharge capacity
CN108242820A (en) Charge-discharge control method of grid-connected electricity storage system and rental service pricing system
CN207442461U (en) A kind of power consuming administrative system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125

Termination date: 20170822