CN102447224A - Disconnector maintenance hoisting bracket - Google Patents

Disconnector maintenance hoisting bracket Download PDF

Info

Publication number
CN102447224A
CN102447224A CN2011103525690A CN201110352569A CN102447224A CN 102447224 A CN102447224 A CN 102447224A CN 2011103525690 A CN2011103525690 A CN 2011103525690A CN 201110352569 A CN201110352569 A CN 201110352569A CN 102447224 A CN102447224 A CN 102447224A
Authority
CN
China
Prior art keywords
base
hoisting bracket
vertical rod
upright rod
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103525690A
Other languages
Chinese (zh)
Inventor
蔡志斌
施永刚
常振
曹琪
王立平
于建友
刘明
韩伟
刘伟
谢跃彬
刘家伟
于洪江
王佩成
孙云鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAISHAN POWER SUPPLY Co OF JILIN ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Original Assignee
BAISHAN POWER SUPPLY Co OF JILIN ELECTRIC POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAISHAN POWER SUPPLY Co OF JILIN ELECTRIC POWER Co Ltd filed Critical BAISHAN POWER SUPPLY Co OF JILIN ELECTRIC POWER Co Ltd
Priority to CN2011103525690A priority Critical patent/CN102447224A/en
Publication of CN102447224A publication Critical patent/CN102447224A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)

Abstract

The invention relates to a maintenance tool, namely a disconnector maintenance hoisting bracket. The disconnector maintenance hoisting bracket comprises an upright rod; and the upper end of the upright rod is provided with a hanging hole for hanging a pulley. A base is arranged below the upright rod; two screw rods are respectively arranged on the base at the two sides of the upright rod; a pressing plate capable of moving and adjusting up and down is arranged on the base and is provided with three holes, and the two screw rods and the upright rod correspondingly pass through the three holes; and each screw rod is provided with a locking nut. The invention has the advantages that through shortening the length of embracing rods and changing the fixed mode of the embracing rods, the weight is reduced, so that the disconnector maintenance hoisting bracket is convenient to fixedly connect on the site, is light and flexible, is quick and convenient to disassemble and is safe and reliable; the work intensity is reduced, the condition that a plurality of persons maintain a group of switches is eliminated, and the labor efficiency is improved; the labor output is reduced, the work efficiency is high, and the maintenance quality is ensured.

Description

Isolating switch maintenance hoisting bracket
Technical field
The present invention relates to a kind of maintenance frock, i.e. isolating switch maintenance hoisting bracket.
Background technology
In the prior art, in the electric power system 66kV isolating switch overhaul process, adopt aluminium alloy pole or inspection platform to carry out.Utilize the operation of aluminium alloy pole, pole is longer, and weight is big, needs 8 people usually, fixing armful of four backguys doing, and the also bad choosing in the position of backguy is not easy control, can't guarantee safe distance, causes electric shock easily.The pole height is not easy control, and the upright pole of group is abnormally dangerous, causes the phenomenon of falling the bar easily, and very near from charging equipment, and dangerous especially when moving pole, this method is not suitable in the nearer regional work of charging equipment (referring to Fig. 1).Use pole to lift, poor stability, dangerous big, work danger occurs often, and repair quality is qualified low, service kit complicated operation, inefficiency.The inspection platform volume is big, and weight is big, and complicacy is installed, and needs many people cooperate installation, and the time consuming time is long, and the eminence action is inconvenient.These two kinds of operational methods, the activity duration is long, needs personnel many, and is near with charging equipment, dangerous big, causes operating efficiency low, can not satisfy need of work.And because personnel are many, the activity duration is long, and the staff is prone to produce physical fatigue, causes danger easily, is unfavorable for safety in production.
Summary of the invention
The objective of the invention is provides a kind of quick-mounting soon to above-mentioned deficiency, tears open, improves the isolating switch maintenance hoisting bracket of service work efficient.
Technical solution of the present invention is: the vertical rod of isolating switch maintenance hoisting bracket, there is hanging hole or the hook of hanging pulley the vertical rod upper end.Base is arranged below the vertical rod, a screw rod is respectively arranged on the base of vertical rod both sides, the pressing plate that can move up and down adjustment is arranged on the base; Three holes are arranged on the pressing plate, and correspondence is passed two screw rods and vertical rod, and lock nut is arranged on the screw rod.
Advantage of the present invention is: 1, shorten pole length, weight reduction changes the pole fixed form, is convenient to fixed in place and connects, and light and flexible is torn open quick and convenient, safe and reliable.2, the saving personnel have alleviated working strength, have stopped the situation that many in the past people overhaul one group of switch, have improved efficiency, and safety also is guaranteed.3, shorten interruption duration, reduce the manpower expenditure, high efficiency has guaranteed repair quality.
To combine accompanying drawing that execution mode of the present invention is described in further detail below.
Description of drawings
Fig. 1 is a pole user mode structure diagram in the prior art.
Fig. 2 is a structure diagram of the present invention.
Fig. 3 is a user mode structure diagram of the present invention.
Embodiment
Referring to Fig. 2, isolating switch maintenance hoisting bracket comprises vertical rod, and vertical rod is made up of the following pillar 1 and the body of rod 2 that inserts in the pillar 1, and this two body structure is convenient to assembling.There is the hanging hole 3 of hanging sister block the body of rod 2 upper ends.The base 4 that has channel-section steel to make below the pillar 1 has the pressing plate 5 that can move up and down adjustment on the base 4; A screw rod 6 is respectively arranged on the base 4 of vertical rod both sides, three holes are arranged on the pressing plate 5, correspondence is passed two screw rods 6 and pillar 1, and lock nut 7 is arranged on the screw rod 6, is used for clamping between pressing plate 5 and the base 4.Pillar 1 upper end has group to prick the hanging ring 8 of maintainer's waist rope.
Referring to Fig. 3, utilize the channel-section steel of isolating switch base to fix the base 4 of hoisting bracket.Isolating switch maintenance hoisting bracket is clamped on the channel-section steel of equipment base angle through pressing plate 5, base 4.
Referring to Fig. 1,9-is a pole, and 10-is backguy, and 11-is the position of pole when moving for the second time.

Claims (3)

1. an isolating switch maintenance hoisting bracket comprises vertical rod, and there is hanging hole (3) or the hook of hanging pulley the vertical rod upper end, it is characterized in that below the vertical rod base (4) being arranged, and a screw rod (6) is respectively arranged on the base of vertical rod both sides (4); The pressing plate (5) that can move up and down adjustment is arranged on the base (4), three holes are arranged on the pressing plate (5), correspondence is passed two screw rods (6) and vertical rod, and lock nut (7) is arranged on the screw rod (6).
2. according to the described isolating switch of claim 1 maintenance hoisting bracket, it is characterized in that vertical rod is made up of following pillar (1) body of rod (2) interior with inserting pillar (1).
3. according to claim 1 or 2 described isolating switch maintenance hoisting brackets, it is characterized in that there is hanging ring (8) at the vertical rod middle part.
CN2011103525690A 2011-11-09 2011-11-09 Disconnector maintenance hoisting bracket Pending CN102447224A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103525690A CN102447224A (en) 2011-11-09 2011-11-09 Disconnector maintenance hoisting bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103525690A CN102447224A (en) 2011-11-09 2011-11-09 Disconnector maintenance hoisting bracket

Publications (1)

Publication Number Publication Date
CN102447224A true CN102447224A (en) 2012-05-09

Family

ID=46009452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103525690A Pending CN102447224A (en) 2011-11-09 2011-11-09 Disconnector maintenance hoisting bracket

Country Status (1)

Country Link
CN (1) CN102447224A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102826473A (en) * 2012-09-07 2012-12-19 鸡西电业局 Multi-functional electrical equipment lifting hold lever tool
CN105470839A (en) * 2015-11-25 2016-04-06 国网河南洛宁县供电公司 Support used for isolation switch overhauling
CN107777548A (en) * 2017-11-09 2018-03-09 中铁上海工程局集团有限公司 The hundred meters long rail lifting straddle truck fixing device of subway route and fixing means

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201307721Y (en) * 2008-11-19 2009-09-09 吉林省电力有限公司长春供电公司 Lifting frame for overhauling high-voltage isolator
CN101685945A (en) * 2008-09-26 2010-03-31 佳木斯电业局 Repair hoisting device and method for isolating switch
CN201458590U (en) * 2009-06-09 2010-05-12 吉林省电力有限公司辽源供电公司 Special hoisting tool of power transforming equipment
CN202333524U (en) * 2011-11-09 2012-07-11 吉林省电力有限公司白山供电公司 Hoisting support for overhaul of isolating switch

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101685945A (en) * 2008-09-26 2010-03-31 佳木斯电业局 Repair hoisting device and method for isolating switch
CN201307721Y (en) * 2008-11-19 2009-09-09 吉林省电力有限公司长春供电公司 Lifting frame for overhauling high-voltage isolator
CN201458590U (en) * 2009-06-09 2010-05-12 吉林省电力有限公司辽源供电公司 Special hoisting tool of power transforming equipment
CN202333524U (en) * 2011-11-09 2012-07-11 吉林省电力有限公司白山供电公司 Hoisting support for overhaul of isolating switch

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102826473A (en) * 2012-09-07 2012-12-19 鸡西电业局 Multi-functional electrical equipment lifting hold lever tool
CN102826473B (en) * 2012-09-07 2015-02-18 鸡西电业局 Multi-functional electrical equipment lifting hold lever tool
CN105470839A (en) * 2015-11-25 2016-04-06 国网河南洛宁县供电公司 Support used for isolation switch overhauling
CN107777548A (en) * 2017-11-09 2018-03-09 中铁上海工程局集团有限公司 The hundred meters long rail lifting straddle truck fixing device of subway route and fixing means
CN107777548B (en) * 2017-11-09 2023-09-26 中铁上海工程局集团有限公司 Fixing device and fixing method for hoisting gantry crane on hundred-meter long rail of subway operation line

Similar Documents

Publication Publication Date Title
CN103832932B (en) Prestressed stretch-draw hydraulic jack suspention mobile device
CN101672102A (en) Steel structural overhead ceiling construction platform
CN202333597U (en) Overhead-groundwire lifter
CN201565749U (en) Special maintenance platform for isolating switch
CN203039270U (en) Isolating switch repair protective frame
CN202967920U (en) Hanging overhaul device of load switch of transformer
CN102447224A (en) Disconnector maintenance hoisting bracket
CN205123112U (en) Supplementary device and mounting structure of changing of post insulators
CN201656340U (en) Tool for replacing supporting insulator of high-voltage tube bus
CN110947117A (en) Portable safety belt locking device
CN202333524U (en) Hoisting support for overhaul of isolating switch
CN101723286A (en) Large gas holder top lifting device and method
CN102064485A (en) Portable overhead hoisting device special for transformer substation
CN105226562A (en) A kind of post insulator auxiliary replacement device and mounting structure
CN103318745B (en) A kind of lightweight special hanger and installation method thereof
CN201580960U (en) Cabinet top lifting device of large-scale gas cabinet
CN201273134Y (en) Novel ladder used for high-voltage circuit-breaker maintenance
CN201893509U (en) Portable overhead hoisting device special for transformer substation
CN202602133U (en) Multifunctional portable climbing pole
CN201883932U (en) Hoop-type vertical insulating single ladder
CN104409994A (en) Combined safety belt suspension device
CN211226088U (en) Portable hoisting device for equipment on transformer station column
CN203345912U (en) Portable special suspension tool
CN200992805Y (en) Knife inspection scaffold
CN103326264B (en) Single-column vertical-telescopic-type outdoor high-voltage alternating replacing options

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: BAISHAN POWER SUPPLY COMPANY, JILIN ELECTRIC POWER CO., LTD.

Effective date: 20121121

Owner name: BAISHAN POWER SUPPLY COMPANY, JILIN ELECTRIC POWER

Effective date: 20121121

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 134300 BAISHAN, JILIN PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20121121

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Baishan Power Supply Company of Jilin Electric Power Company Limited

Address before: 134300 Changbai Mountain street, Jilin, No. 1601, No.

Applicant before: Baishan Power Supply Company of Jilin Electric Power Company Limited

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120509