CN102437639B - 110KV double back paired running circuit re-switching puts into method and puts into circuit - Google Patents
110KV double back paired running circuit re-switching puts into method and puts into circuit Download PDFInfo
- Publication number
- CN102437639B CN102437639B CN201110420645.7A CN201110420645A CN102437639B CN 102437639 B CN102437639 B CN 102437639B CN 201110420645 A CN201110420645 A CN 201110420645A CN 102437639 B CN102437639 B CN 102437639B
- Authority
- CN
- China
- Prior art keywords
- circuit
- reclosing
- chopper
- mode
- load side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005540 biological transmission Effects 0.000 claims abstract description 30
- 230000001360 synchronised Effects 0.000 claims abstract description 17
- 238000007689 inspection Methods 0.000 claims description 13
- 230000001052 transient Effects 0.000 claims description 12
- 230000005611 electricity Effects 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 4
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 2
- 240000002853 Nelumbo nucifera Species 0.000 description 2
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 2
- 230000003247 decreasing Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
Abstract
The present invention relates to power equipment running technology field, open a kind of 110KV double back paired running circuit re-switching puts into method and puts into circuit.Described method uses and changes its circuit power side switch reclosures investing method;Described input circuit, including: working line L1, working line L2, the mains side of described working line L1 and working line L2 is connected with bus 110KV M1, and the load side of described working line L1 and working line L2 is connected with bus 110KV M2;Circuit LI mains side chopper D1 is that checkout voltage mode W thrown by reclosing, and load side chopper D2 is that non-synchronous mode F thrown by reclosing;The mains side D3 of working line L2 is that checkout voltage mode W thrown by reclosing, and load side chopper D4 is that non-synchronous mode F thrown by reclosing.User can be recovered power transmission by the present invention in time, it is ensured that the reliable power supply to user, decreases loss, improves the power supply reliability of power system.
Description
[technical field]
The present invention relates to power equipment running technology field, particularly relate to a kind of 110KV double back paired running circuit and overlap
Lock puts into method and puts into circuit.
[background technology]
At present, electrical network 110KV single supply paired running double-circuit line refers to by same transformer station same electric pressure bus
On two return back out line paired running band customer charge.
110KV single supply paired running double-circuit line reclosing investing method, circuit LI mains side chopper D1, circuit L2
Checkout voltage mode W thrown by mains side chopper D3 reclosing, and circuit LI load side chopper D2 reclosing throws non-synchronous mode F, line
Inspection synchronizing mode T thrown by road L2 load side chopper D4 reclosing, such as Fig. 1.
Circuit L1, circuit L2 paired running, when there is transient fault in circuit L1, circuit L2 simultaneously, circuit L1 power supply
Side chopper D1, circuit LI load side chopper D2, circuit L2 mains side chopper D3, circuit L2 load side chopper D4 protect
Action is tripped.Now, circuit LI mains side chopper D1 reclosing mode is checkout voltage mode W, after inspection circuit is without pressure, and chopper
D1 reclosing action, because line fault is transient fault, on circuit, fault eliminates, and circuit possesses power transmission condition, therefore circuit
LI mains side chopper D1 reclosing action success is normal to circuit L1 power transmission;Circuit L2 mains side chopper D3 reclosing side
Formula is checkout voltage mode W, and after inspection circuit is without pressure, chopper D3 reclosing action, because line fault is transient fault, on circuit
Fault eliminates, and circuit possesses power transmission condition, therefore circuit L2 mains side chopper D3 reclosing action is successful, to circuit L2 power transmission
Normally.Now circuit LI load side chopper D2 reclosing mode is non-synchronous mode F, now meets reclosing mode F action
Condition, chopper D2 should overlap, but other are unrelated with reclosing mode due to the mechanism of short-circuiting device D2 own or secondary connection etc.
Factor, cause chopper D2 unsuccessful reclosing, circuit LI load side chopper D2 is at open position, and circuit L1 is to load side
Bus M2 power transmission is unsuccessful, load side bus M2 no-voltage;And circuit L2 load side chopper D4 reclosing is inspection synchronizing mode
Can T, chopper D4 one of the key factor of successful reclosing depend on that circuit L2 has voltage and load side bus M2 to have voltage two
Individual condition, because of circuit L1 load side chopper D2 unsuccessful reclosing, load side bus M2 no-voltage, does not meets circuit L2 load side
Chopper D4 reclosing inspection synchronizing mode T coincidence condition, therefore chopper D4 reclosing action is unsuccessful, causes circuit L2 to load
Side bus M2 power transmission is unsuccessful, load side bus M2 still no-voltage, causes user to have a power failure, load loss, reduces power system
Power supply reliability.
[summary of the invention]
In order to overcome the deficiency in background technology, the present invention provides a kind of 110KV double back paired running circuit re-switching to throw
Enter method and put into circuit, it is possible in time user being recovered power transmission, it is ensured that the reliable power supply to user, decrease loss, improving
The power supply reliability of power system.
In order to realize foregoing invention purpose, the present invention uses technical scheme as follows:
A kind of 110KV double back paired running circuit re-switching puts into circuit, including: working line L1, working line L2, institute
The mains side stating working line L1 and working line L2 is connected with bus 110KV M1, described working line L1 and working line L2
Load side be connected with bus 110KV M2;Described working line L1 is connected with load side chopper D2 by mains side chopper D1
Composition, described working line L2 is composed in series with load side chopper D4 by mains side chopper D3;
Wherein, circuit LI mains side chopper D1 is that checkout voltage mode W thrown by reclosing, and load side chopper D2 is reclosing
Throw non-synchronous mode F;
Wherein, the mains side D3 of working line L2 is that checkout voltage mode W thrown by reclosing, and load side chopper D4 is reclosing
Throw non-synchronous mode F.
A kind of 110KV double back paired running circuit re-switching puts into method, and its step is as follows;
1), for 110KV single supply paired running double-circuit line, its circuit power side switch reclosures input side is changed
Formula, circuit LI mains side chopper D1, circuit L2 mains side chopper D3 reclosing throw checkout voltage mode W, circuit LI load side
Non-synchronous mode F thrown by chopper D2, circuit L2 load side chopper D4 reclosing;
2), circuit L1, circuit L2 paired running, when there is transient fault in circuit L1, circuit L2 simultaneously, circuit L1 electricity
Source chopper D1, circuit LI load side chopper D2, circuit L2 mains side chopper D3, circuit L2 load side chopper D4 protect
Protect action tripping operation;
3), circuit LI mains side chopper D1 reclosing mode be checkout voltage mode W, inspection circuit without pressure after, chopper D1
Reclosing action, because line fault is transient fault, on circuit, fault eliminates, and circuit possesses power transmission condition, therefore circuit LI
Mains side chopper D1 reclosing action success is normal to circuit L1 power transmission;
4), circuit L2 mains side chopper D3 reclosing mode be checkout voltage mode W, inspection circuit without pressure after, chopper D3
Reclosing action, because line fault is transient fault, on circuit, fault eliminates, and circuit possesses power transmission condition, therefore circuit L2
Mains side chopper D3 reclosing action success is normal to circuit L2 power transmission;
5), circuit LI load side chopper D2 reclosing mode be non-synchronous mode F, now meet reclosing mode F move
Making condition, chopper D2 should overlap, and due to the factor of the mechanism of short-circuiting device D2 own or secondary connection with reclosing mode, causes breaking
Road device D2 unsuccessful reclosing, load side bus M2 power transmission is not become by circuit LI load side chopper D2 at open position, circuit L1
Merit, load side bus M2 no-voltage;
6), circuit L2 load side chopper D2 reclosing mode be non-synchronous mode F, the most do not examine and determine mode, it is not necessary to inspection
Alignment road L2 and bus M2 has voltage, meets reclosing mode F operation condition, and chopper D4 reclosing action success, to load
The success of side bus M2 power transmission, has recovered power transmission to user in time, it is ensured that the reliable power supply to user, has decreased loss, improves
The power supply reliability of power system.
Owing to using technical scheme as above, the present invention has a following superiority:
A kind of 110KV double back paired running circuit re-switching puts into method and puts into circuit, it is possible to recover user in time
Power transmission, it is ensured that the reliable power supply to user, decreases loss, improves the power supply reliability of power system.
[accompanying drawing explanation]
Fig. 1 is that 110KV double back paired running circuit re-switching puts into method and puts into conspectus;
Fig. 2 is the operating circuit block diagram of Fig. 1;
Fig. 3 is that 110KV double back paired running circuit re-switching puts into method and puts into conspectus;
Fig. 4 is the operating circuit block diagram of Fig. 3;
In figure: W: reclosing checkout voltage mode;F: reclosing non-synchronous mode;T: reclosing inspection synchronizing mode;H: open circuit
Device successful reclosing;Y: circuit or bus have voltage;M: bus;
D: chopper;L: circuit.
[detailed description of the invention]
As shown in Figure 1,2,3, 4, a kind of 110KV double back paired running circuit re-switching puts into circuit, including: working line
L1, working line L2, the mains side of described working line L1 and working line L2 is connected with bus 110KV M1, described travel line
The load side of road L1 and working line L2 is connected with bus 110KV M2;Described working line L1 is by mains side chopper D1 and bears
Lotus side chopper D2 is composed in series, and described working line L2 is composed in series with load side chopper D4 by mains side chopper D3;
It is characterized in that:
Wherein, circuit LI mains side chopper D1 is that checkout voltage mode W thrown by reclosing, and load side chopper D2 is reclosing
Throw non-synchronous mode F;
Wherein, the mains side D3 of working line L2 is that checkout voltage mode W thrown by reclosing, and load side chopper D4 is reclosing
Throw non-synchronous mode F.
During work, for 110KV single supply paired running double-circuit line, change its circuit power side switch reclosures and put into
Mode, circuit LI mains side chopper D1, circuit L2 mains side chopper D3 reclosing throw checkout voltage mode W, circuit LI load
Non-synchronous mode F thrown by side chopper D2, circuit L2 load side chopper D4 reclosing, such as Fig. 2.Circuit L1, circuit L2 transport side by side
OK, when there is transient fault in circuit L1, circuit L2 simultaneously, circuit L1 mains side chopper D1, circuit LI load side open circuit
Device D2, circuit L2 mains side chopper D3, circuit L2 load side chopper D4 protection act trip.Now, circuit LI mains side
Chopper D1 reclosing mode is checkout voltage mode W, and after inspection circuit is without pressure, chopper D1 reclosing action, because line fault is
Transient fault, on circuit, fault eliminates, and circuit possesses power transmission condition, therefore circuit LI mains side chopper D1 reclosing action
Success is normal to circuit L1 power transmission;Circuit L2 mains side chopper D3 reclosing mode is checkout voltage mode W, and inspection circuit is without pressure
After, chopper D3 reclosing action, because line fault is transient fault, on circuit, fault eliminates, and circuit possesses power transmission bar
Part, therefore circuit L2 mains side chopper D3 reclosing action success are normal to circuit L2 power transmission.Now circuit LI load side open circuit
Device D2 reclosing mode is non-synchronous mode F, now meets reclosing mode F operation condition, and chopper D2 should overlap, but due to
Other factors unrelated with reclosing mode of the mechanism of short-circuiting device D2 own or secondary connection etc., cause chopper D2 to overlap not become
Merit, circuit LI load side chopper D2 is at open position, and circuit L1 is unsuccessful to load side bus M2 power transmission, load side bus
M2 no-voltage;Now circuit L2 load side chopper D2 reclosing mode is non-synchronous mode F, does not the most examine and determine mode, it is not necessary to
Calibrating circuit L2 and bus M2 has voltage, meets reclosing mode F operation condition, and chopper D4 reclosing action success, to negative
The success of lotus side bus M2 power transmission, has recovered power transmission to user in time, it is ensured that the reliable power supply to user, has decreased loss, carry
The high power supply reliability of power system.
Claims (1)
1. 110kV double back paired running circuit re-switching puts into a method, a kind of 110kV double back paired running circuit of employing
Reclosing puts into circuit, including: working line L1, working line L2, the mains side of described working line L1 and working line L2
Being connected with bus 110kV M1, the load side of described working line L1 and working line L2 is connected with bus 110kV M2;Described
Working line L1 is composed in series with load side chopper D2 by mains side chopper D1, and described working line L2 is by mains side open circuit
Device D3 is composed in series with load side chopper D4;Wherein, circuit L1 mains side chopper D1 is that checkout voltage mode W thrown by reclosing,
Load side chopper D2 is that non-synchronous mode F thrown by reclosing;The mains side D3 of working line L2 is that checkout voltage mode thrown by reclosing
W, load side chopper D4 are that non-synchronous mode F thrown by reclosing;This reclosing puts into method, it is characterised in that: its step is as follows:
1), for 110kV double back paired running circuit, its circuit power side switch reclosures investing method, circuit L1 electricity are changed
Source chopper D1, circuit L2 mains side chopper D3 reclosing throw checkout voltage mode W, circuit L1 load side chopper D2, line
Non-synchronous mode F thrown by road L2 load side chopper D4 reclosing;
2), circuit L1, circuit L2 paired running, when there is transient fault in circuit L1, circuit L2 simultaneously, circuit L1 mains side
Chopper D1, circuit L1 load side chopper D2, circuit L2 mains side chopper D3, circuit L2 load side chopper D4 protection is dynamic
Trip;
3), circuit L1 mains side chopper D1 reclosing mode be checkout voltage mode W, inspection circuit without pressure after, chopper D1 overlap
Lock action, because line fault is transient fault, on circuit, fault eliminates, and circuit possesses power transmission condition, therefore circuit L1 power supply
Side chopper D1 reclosing action success is normal to circuit L1 power transmission;
4), circuit L2 mains side chopper D3 reclosing mode be checkout voltage mode W, inspection circuit without pressure after, chopper D3 overlap
Lock action, because line fault is transient fault, on circuit, fault eliminates, and circuit possesses power transmission condition, therefore circuit L2 power supply
Side chopper D3 reclosing action success is normal to circuit L2 power transmission;
5), circuit L1 load side chopper D2 reclosing mode be non-synchronous mode F, now meet reclosing mode F action bar
Part, chopper D2 should overlap, and due to the factor of the mechanism of short-circuiting device D2 own or secondary connection with reclosing mode, causes chopper
D2 unsuccessful reclosing, circuit L1 load side chopper D2 is at open position, and circuit L1 is unsuccessful to load side bus M2 power transmission,
Load side bus M2 no-voltage;
6), circuit L2 load side chopper D2 reclosing mode is non-synchronous mode F, it is not necessary to calibrating circuit L2 and bus M2 has
Voltage, meets reclosing mode F operation condition, and chopper D4 reclosing action is successful, to the success of load side bus M2 power transmission, and
Time user has been recovered power transmission, it is ensured that the reliable power supply to user, decrease loss, the power supply that improve power system is reliable
Property.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110420645.7A CN102437639B (en) | 2011-12-15 | 110KV double back paired running circuit re-switching puts into method and puts into circuit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110420645.7A CN102437639B (en) | 2011-12-15 | 110KV double back paired running circuit re-switching puts into method and puts into circuit |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102437639A CN102437639A (en) | 2012-05-02 |
CN102437639B true CN102437639B (en) | 2016-12-14 |
Family
ID=
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1588729A (en) * | 2004-10-14 | 2005-03-02 | 南京南瑞继保电气有限公司 | Re-switch on method for electric tansmission device |
CN202405853U (en) * | 2011-12-15 | 2012-08-29 | 河南省电力公司洛阳供电公司 | 110-KV double-circuit parallel running line reclosing input line |
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1588729A (en) * | 2004-10-14 | 2005-03-02 | 南京南瑞继保电气有限公司 | Re-switch on method for electric tansmission device |
CN202405853U (en) * | 2011-12-15 | 2012-08-29 | 河南省电力公司洛阳供电公司 | 110-KV double-circuit parallel running line reclosing input line |
Non-Patent Citations (1)
Title |
---|
《双电源平行双回线路重合闸的设置方式》;温武臣;《西北电力技术》;19980430(第2期);49-52 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105207178B (en) | A kind of based on the DG Distribution Network Failure accessed location and isolated island division methods | |
CN103746349A (en) | Circuit breaker failure protection mechanism of transformer substation and optimal configuration method for circuit breaker protection | |
CN101383504B (en) | Intelligent auto-reclosing valve suitable for bus of 220kV voltage grade or above | |
CN102629755B (en) | Power transmission line backup protection method based on wide area information | |
CN103595054A (en) | Fault power supplying recovering method applied to single busbar voltage failure | |
CN104062580B (en) | A kind of portable beaker three-phase non-three phase tester movement time | |
CN103746400B (en) | A kind of last circuit breaker of high voltage direct current transmission and last line protection method | |
CN202651770U (en) | Motor phase loss protection circuit | |
CN204651944U (en) | Based on the generator connecting in parallel with system state automatic discriminating gear of half as much again wiring | |
CN103311889A (en) | Manual switching protection circuit for dual power supplies | |
CN103384062B (en) | Isolation control system of grid power distribution fault detection | |
CN102437639B (en) | 110KV double back paired running circuit re-switching puts into method and puts into circuit | |
CN104092284A (en) | Working method for replacing 10kV transformer through spare power automatic switching technology in electrified mode | |
CN202405853U (en) | 110-KV double-circuit parallel running line reclosing input line | |
CN202103403U (en) | 630A mining flame-proof vacuum intelligent sub-feed switch | |
CN103311921B (en) | A kind of power supply entering line switch and bus connection switch interlock connection circuit | |
CN104734117B (en) | A kind of breaker fail protection method of substation | |
CN201877786U (en) | Undervoltage release protection device | |
CN103840553B (en) | Failure starting circuit and method for starting failure circuit | |
CN204304453U (en) | A kind of interlock protection structure of water-cooling type SVG equipment | |
CN103762716A (en) | Auto-putting-in and auto-recovering power supply system | |
CN203397962U (en) | Circuit break isolation linkage device | |
CN106786405B (en) | It can prevent the method that dead zone short circuit causes whole station to have a power failure in bridging line substation | |
CN203930006U (en) | Non-full phase tester actuation time of a kind of portable beaker three-phase | |
CN204947581U (en) | A kind of station service cuts decision logic circuit soon |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Yanping Inventor after: Zhao Gang Inventor after: Li Jian Inventor after: Song Xiaolong Inventor after: Huang Shizhe Inventor after: Fan Yuefu Inventor before: Chen Yanping Inventor before: Song Xiaolong Inventor before: Huang Shizhe |