CN102435071B - The bearing calibration of deformed fire path wall of roasting furnace - Google Patents

The bearing calibration of deformed fire path wall of roasting furnace Download PDF

Info

Publication number
CN102435071B
CN102435071B CN201110358037.8A CN201110358037A CN102435071B CN 102435071 B CN102435071 B CN 102435071B CN 201110358037 A CN201110358037 A CN 201110358037A CN 102435071 B CN102435071 B CN 102435071B
Authority
CN
China
Prior art keywords
wall
rectangle hopper
longitudinal
rectangle
hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110358037.8A
Other languages
Chinese (zh)
Other versions
CN102435071A (en
Inventor
王国强
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110358037.8A priority Critical patent/CN102435071B/en
Publication of CN102435071A publication Critical patent/CN102435071A/en
Application granted granted Critical
Publication of CN102435071B publication Critical patent/CN102435071B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carbon Steel Or Casting Steel Manufacturing (AREA)
  • Carbon And Carbon Compounds (AREA)

Abstract

A kind of bearing calibration of deformed fire path wall of roasting furnace, this bearing calibration implements overall correction to flue wall deformed region on designed wall telephone basis, school, and school wall telephone comprises cross wall push pedal (1), transverse hydraulic cylinder (2), hinged-support (3), frame (4), vertical wall push pedal (5), lower longitudinal hydraulic cylinder (6), upper longitudinal hydraulic cylinder (7), skirting (8) and balancing weight (9).The vertical wall push pedal of school wall telephone and cross wall push pedal will be aimed at the convex surface of deformed fire path wall and can not be aimed at the concave surface of deformed fire path wall, therefore the rectangle hopper at deformed fire path wall convex surface place is exactly the location of installing school wall telephone, must load onto two-layer carbon annode block and auxiliary material on layering uniform spreading in this rectangle hopper, and the rectangle hopper at deformed fire path wall concave surface place must be just empty van is corrected in order to deformed fire path wall.The present invention is simple and practical, effective, does not affect and normally produces work, can not cause damage to deformation fire path, can be user and obtains larger economic benefit.

Description

The bearing calibration of deformed fire path wall of roasting furnace
Technical field
The invention belongs to electrolytic aluminium anode roaster technical field, especially a kind of bearing calibration of deformed fire path wall of roasting furnace.
Background technology
Roaster is one of key equipment of electrolytic aluminium pre-roasting anode production.Longitudinal flue wall of roaster assembles into the equal rectangle hopper of volume one by one with horizontal flue wall by refractory brick, three layers of carbon annode block can be piled up in each rectangle hopper, one longitudinal quirk is left between the rectangle hopper that each transverse direction is adjacent, heating can be implemented to the carbon annode block in each rectangle hopper by longitudinal quirk, the temperature of heating can reach 1150 degrees Celsius, this is also say that flue wall will be raised to 1150 degrees Celsius to adapt to the work of roaster gradually from environment temperature, now flue wall makes body of wall bend by the thermal stress change of refractory brick and tilts, namely flue wall produces moderate finite deformation, especially the deflection that longitudinal flue wall produces is larger, when the deflection that longitudinal flue wall produces reaches about 110mm, just carbon annode block cannot be loaded in rectangle hopper, production is caused normally not carry out.
When there is flue wall distortion, or manual synchronizing is carried out to the flue wall of distortion, or the flue wall removing distortion is heavily built.Because flue wall needs the enormous amount of refractory brick, cost very high, need the maintenance that stops production in addition, generally can not implement heavily to build work in last resort situation, therefore the correction of deformed fire path wall just be seemed particularly important and urgent.
Chinese patent CN200520006473 describes a kind of static pressure type school wall device, carbon annode block and auxiliary material is filled in the rectangle hopper of deformed fire path wall, rectangle hopper corresponding for deformed fire path wall is set to empty van, then static pressure type school wall device is placed on the top of filling carbon annode block, relies on the Gravitative Loads of this static pressure type school wall device to carry out correcting deformed flue wall.This static pressure type school wall device correcting value is less, needs repeatedly to correct to deformed fire path wall, and labor intensity is large, and with low content of technology, customer acceptance degree is low, promotes and gets up to have larger difficulty.
Relevant report be yet there are no to other bearing calibration of deformed fire path wall of roasting furnace.
Summary of the invention
For solving the problem, the invention provides a kind of bearing calibration of deformed fire path wall of roasting furnace, this bearing calibration implements overall correction to flue wall deformed region on designed wall telephone basis, school, bearing calibration is simple and practical, effective, do not affect and normally produce work, damage can not be caused to deformation fire path, can be user and obtain larger economic benefit.
For achieving the above object, the present invention adopts following technical scheme:
A bearing calibration for deformed fire path wall of roasting furnace, the related terms first by involved in roaster before describing bearing calibration is self-defined as follows:
It is natural integer that roaster is provided with N(N) the equal and longitudinal flue wall be parallel to each other in bar interval, the spacing playing the longitudinal flue wall of Article 1 and the longitudinal flue wall of Article 2 is from left to right referred to as quirk, the longitudinal flue wall of Article 2 and the longitudinal flue wall of Article 3 are parallel to each other by two and the equal horizontal flue wall of length is divided into several equal rectangle hoppers of volume, the long limit of rectangle hopper is set as C rice, the minor face of rectangle hopper is set as K rice, the degree of depth of rectangle hopper or be highly set as G rice, three layers of carbon annode block can be piled up by auxiliary material in each rectangle hopper, under the effect of auxiliary material, carbon annode block is calcined by quirk, longitudinal flue wall and horizontal flue wall are assembled by refractory brick, the width of wall body of longitudinal flue wall and horizontal flue wall is substantially equal, the spacing of the longitudinal flue wall of Article 3 and the longitudinal flue wall of Article 4 forms quirk again, the longitudinal flue wall of Article 4 and the longitudinal flue wall of Article 5 are divided into again several equal rectangle hoppers of volume by horizontal flue wall, by that analogy to the spacing of (N-1) article longitudinal flue wall and N article of longitudinal flue wall forms quirk, by longitudinal flue wall and horizontal flue wall because the direction making body of wall bend in rectangle hopper by the change of refractory brick thermal stress and to tilt is referred to as internal strain, by longitudinal flue wall and horizontal flue wall because the direction making body of wall bend outside rectangle hopper by the change of refractory brick thermal stress and to tilt is referred to as outer distortion, rule of thumb there is enterolithic probability higher, no matter be internal strain or be out of shape outward, the just bad filling carbon annode block and need to implement to correct to deformed fire path wall in rectangle hopper when its deflection reaches 0.5 ~ 0.11 meter.
First this bearing calibration devises a set of school wall telephone, the basic comprising of school wall telephone comprises cross wall push pedal, transverse hydraulic cylinder, hinged-support, frame, vertical wall push pedal, lower longitudinal hydraulic cylinder, upper longitudinal hydraulic cylinder, skirting and balancing weight, the lower end of the cross wall push pedal of two pieces of area equation is separately fixed at arranged on left and right sides below frame by respective hinged-support, the upper end of two pieces of cross wall push pedals is separately fixed at arranged on left and right sides above frame by respective transverse hydraulic cylinder; The vertical wall push pedal of three pieces of area equation is fixed on the same side of frame side by side by upper longitudinal hydraulic cylinder of each self-configuring and lower longitudinal hydraulic cylinder, and each vertical wall push pedal not only structure is identical and surface area is also identical and be configured with longitudinal hydraulic cylinder and lower longitudinal hydraulic cylinder respectively; The area of skirting equals the gross area of the vertical wall push pedal of three pieces of area equation, and skirting is fixed on the another side of frame; Balancing weight is configured with at the bottom even of frame, under two transverse hydraulic cylinders, three upper longitudinal hydraulic cylinders and three, longitudinal hydraulic cylinder is by a hydraulic power unit fuel feeding, hydraulic power unit is fixed in frame, and under two transverse hydraulic cylinders, three upper longitudinal hydraulic cylinders and three, longitudinal hydraulic cylinder all implements control separately by respective gauge tap; Long limit and the minor face of the length in the wall telephone appearance and size of school and width reference rectangle hopper also deduct different surplus respectively, height in the wall telephone appearance and size of school is greater than the height of carbon annode block, and the height of cross wall push pedal and vertical wall push pedal and width and school wall telephone overall volume match.
Assuming that the horizontal flue wall of the longitudinal flue wall in the left side of a certain rectangle hopper and its both sides all there is internal strain and internal strain amount reaches 0.5 ~ 0.11 meter time, on the left side of this rectangle hopper, there is left rectangle hopper, on the right of this rectangle hopper, there is right rectangle hopper, rectangle hopper before the front of this rectangle hopper has, rectangle hopper after the back of this rectangle hopper has, now first in this rectangle hopper, load onto two-layer carbon annode block and auxiliary material on layering uniform spreading, described right rectangle hopper is set to empty van, auxiliary material is filled with by described left rectangle hopper, described front rectangle hopper and rear rectangle hopper are set to empty van equally, join suspender high-ranking officers wall telephone by overhead traveling crane with institute put into this rectangle hopper and make three pieces of vertical wall push pedals just to enterolithic longitudinal flue wall, skirting on the wall telephone of school is just to undeformed longitudinal flue wall, start the gauge tap of two transverse hydraulic cylinders, two pieces of cross wall push pedals act on two enterolithic horizontal flue walls on around hinged-support to external expansion by the thrust of respective transverse hydraulic cylinder, because described front rectangle hopper and rear rectangle hopper are set to empty van, therefore the horizontal flue wall of two internal strains can be restored respectively, when two enterolithic horizontal flue walls return to original position, two transverse hydraulic cylinders quit work and pressurize five to ten minutes, the correction just completing the horizontal flue wall of two internal strains behind the gap stayed because pushing away wall is filled up until auxiliary material, while startup two transverse hydraulic cylinder gauge taps, the gauge tap of longitudinal hydraulic cylinder under simultaneously starting three, the lower end of three pieces of vertical wall push pedals is made first to lean against the lower end of the longitudinal flue wall of internal strain, and then start the gauge tap of three upper longitudinal hydraulic cylinders, the upper end of three pieces of vertical wall push pedals is made to act on the end of enterolithic longitudinal flue wall to external expansion gradually, when the upper end of three pieces of vertical wall push pedals and its lower end are all in vertical configuration, three upper longitudinal hydraulic cylinders quit work and pressurize five to ten minutes, now school wall telephone can produce a propulsive thrust relatively, this propulsive thrust can act on skirting, and in left rectangle hopper, be filled with auxiliary material, injury can not be produced to longitudinal flue wall undeformed in this rectangle hopper, the correction just completing the longitudinal flue wall of internal strain behind the gap stayed because pushing away wall is filled up until auxiliary material, join suspender high-ranking officers wall telephone by overhead traveling crane with institute after above-mentioned correction work completes to hang out, carbon annode block is loaded onto again in this rectangle hopper He in other rectangle hopper, the internal strain stress that flue wall exists just can be eliminated, the physical dimension of basic this rectangle hopper of recovery through the sintering of a production cycle and cohesion.
When there is outer distortion in a certain rectangle hopper, under the above-mentioned assumption: this rectangle hopper is set to empty van, two-layer carbon annode block will be loaded onto and auxiliary material on layering uniform spreading in described right rectangle hopper, auxiliary material is filled with in the right rectangle hopper be close to described right rectangle hopper, described front rectangle hopper and rear rectangle hopper are all loaded onto two-layer carbon annode block and auxiliary material on layering uniform spreading, by overhead traveling crane and join suspender high-ranking officers wall telephone and put into described right rectangle hopper and make longitudinal flue wall that three pieces of vertical wall push pedals are just externally out of shape, skirting on the wall telephone of school is just to undeformed longitudinal flue wall, the gauge tap of longitudinal hydraulic cylinder under starting three, the lower end of three pieces of vertical wall push pedals is made first to lean against the lower end of the longitudinal flue wall of outer distortion, and then start the gauge tap of three upper longitudinal hydraulic cylinders, the upper end of three pieces of vertical wall push pedals is made to act on the end of longitudinal flue wall of outer distortion to external expansion gradually, when the upper end of three pieces of vertical wall push pedals and its lower end are all in vertical configuration, three upper longitudinal hydraulic cylinders quit work and pressurize five to ten minutes, now school wall telephone can produce a propulsive thrust relatively, this propulsive thrust can act on skirting, and in the rectangle hopper of described the right, be filled with auxiliary material, injury can not be produced to longitudinal flue wall undeformed in described right rectangle hopper, the correction just completing the longitudinal flue wall of outer distortion behind the gap stayed because pushing away wall is filled up until auxiliary material, then high-ranking officers' wall telephone hangs in described front rectangle hopper and rear rectangle hopper respectively, externally be out of shape horizontal flue wall by cross wall push pedal to carry out respectively correcting, join suspender high-ranking officers wall telephone by overhead traveling crane with institute after correction work completes to hang out, carbon annode block is loaded onto again in described right rectangle hopper rectangle hopper, in described front rectangle hopper and rear rectangle hopper, the outer distortional stress that flue wall exists just can be eliminated, the physical dimension of the described right rectangle hopper of basic recovery through the sintering of a production cycle and cohesion.
Owing to adopting technical scheme described above, the present invention produces following beneficial effect:
1, the correcting value of school wall telephone is determined by the stroke of hydraulic cylinder, and the correcting value of school of the present invention wall telephone can reach more than 120mm, once can complete the correction work of flue wall deflection when 50 ~ 110mm.In fact just correct when flue wall deflection reaches 50mm, now minimum to the damage of flue wall.
2, school wall telephone is utilized to carry out timing, auxiliary material can flow in the gap between flue wall and carbon annode block automatically to prevent the resilience of deformed fire path wall, just can eliminate through the sintering of a production cycle and cohesion the distortional stress that deformed fire path wall exists, reach flue wall correction without the object of internal injury.
3, wall telephone structure in school is simple, practical.
4, bearing calibration is simple and practical, effective, does not affect normal production, can not cause damage to deformation fire path, can be user and obtains larger economic benefit.
Accompanying drawing explanation
Fig. 1 is the structural representation sketch of school wall telephone;
Fig. 2 is that part sectioned view is looked on a left side of Fig. 1;
Simple and easy schematic diagram when Fig. 3 is flue wall generation internal strain;
Fig. 4 is the section simplified schematic diagram that rectangle hopper put into by school wall telephone.
In Fig. 1-2: the push pedal of 1-cross wall; 2-transverse hydraulic cylinder; 3-hinged-support; 4-frame; 5-indulges wall push pedal; Longitudinal hydraulic cylinder under 6-; The upper longitudinal hydraulic cylinder of 7-; 8-skirting; 9-balancing weight.
Detailed description of the invention
The present invention is a kind of bearing calibration of deformed fire path wall of roasting furnace.
Related terms first by involved in roaster before describing bearing calibration of the present invention is self-defined as follows:
Composition graphs 3 and Fig. 4, it is natural integer that roaster is provided with N(N) the equal and longitudinal flue wall be parallel to each other in bar interval, the spacing playing the longitudinal flue wall of Article 1 and the longitudinal flue wall of Article 2 is from left to right referred to as quirk, the longitudinal flue wall of Article 2 and the longitudinal flue wall of Article 3 are parallel to each other by two and the equal horizontal flue wall of length is divided into several equal rectangle hoppers of volume, the long limit of rectangle hopper is set as C rice, the minor face of rectangle hopper is set as K rice, the degree of depth of rectangle hopper or be highly set as G rice.Under normal circumstances, the long limit C=7 rice of rectangle hopper, about the minor face K=0.72 rice of rectangle hopper, the degree of depth of rectangle hopper or height G=5 rice.The longitudinal flue wall of N bar is determined according to the design condition of roaster.
Upper, middle and lower three layers of carbon annode block can be piled up by auxiliary material in each rectangle hopper, the volume of carbon annode block is approximately that 6.5 × 0.6 × 1.5(is long × wide × high) about rice, under the effect of auxiliary material, carbon annode block is calcined by quirk, longitudinal flue wall and horizontal flue wall are assembled by refractory brick, the width of wall body of longitudinal flue wall and horizontal flue wall is substantially equal, the spacing of the longitudinal flue wall of Article 3 and the longitudinal flue wall of Article 4 forms quirk again, the longitudinal flue wall of Article 4 and the longitudinal flue wall of Article 5 are divided into again several equal rectangle hoppers of volume by horizontal flue wall, by that analogy to the spacing of (N-1) article longitudinal flue wall and N article of longitudinal flue wall forms quirk, by longitudinal flue wall and horizontal flue wall because the direction making body of wall bend in rectangle hopper by the change of refractory brick thermal stress and to tilt is referred to as internal strain, by longitudinal flue wall and horizontal flue wall because the direction making body of wall bend outside rectangle hopper by the change of refractory brick thermal stress and to tilt is referred to as outer distortion.The most important condition of internal strain and outer distortion is the same rectangle hopper of pointer, enterolithic flue wall this rectangle hopper relative to the direction tilted that bend is convex-shaped, the flue wall of outer distortion this rectangle hopper relative to the direction tilted that bend is concave shape, the relatively adjacent rectangle hopper of internal strain that in this rectangle hopper, a certain flue wall occurs just becomes outer distortion, the relatively adjacent rectangle hopper of outer distortion that in this rectangle hopper, a certain flue wall occurs just becomes internal strain, therefore internal strain and outer distortion must for same rectangle hoppers.Rule of thumb there is enterolithic probability higher, no matter be internal strain or be out of shape outward, the just bad filling carbon annode block and need to implement to correct to deformed fire path wall in rectangle hopper when its deflection reaches 0.5 ~ 0.11 meter.
Composition graphs 1 and Fig. 2, first bearing calibration of the present invention devises a set of school wall telephone, and the basic comprising of school wall telephone comprises cross wall push pedal 1, transverse hydraulic cylinder 2, hinged-support 3, frame 4, vertical wall push pedal 5, lower longitudinal hydraulic cylinder 6, upper longitudinal hydraulic cylinder 7, skirting 8 and balancing weight 9.
The lower end of the cross wall push pedal 1 of two pieces of area equation is separately fixed at arranged on left and right sides below frame 4 by respective hinged-support 3, the upper end of two pieces of cross wall push pedals 1 is separately fixed at arranged on left and right sides above frame 4 by respective transverse hydraulic cylinder 2, and transverse hydraulic cylinder 2 structure is identical and stroke is equal for two pieces of cross wall push pedals 1, two of using.
The vertical wall push pedal 5 of three pieces of area equation is fixed on the same side of frame 4 side by side by upper longitudinal hydraulic cylinder 7 of each self-configuring and lower longitudinal hydraulic cylinder 6, each vertical wall push pedal 5 not only structure is identical and surface area is also identical and be configured with that the upper longitudinal hydraulic cylinder 7 of longitudinal hydraulic cylinder 7 and lower longitudinal hydraulic cylinder 6, three is identical with hydraulic cylinder 6 structure longitudinal under three respectively and stroke is equal.
The area of skirting equals the gross area of the vertical wall push pedal of three pieces of area equation, and skirting is fixed on the another side of frame.
At the bottom even configuration balancing weight 9 of frame 4, under two 2, three, transverse hydraulic cylinders go up longitudinal hydraulic cylinders 7 and three, longitudinal hydraulic cylinder 6 is by a hydraulic power unit fuel feeding, hydraulic power unit is fixed in frame, and under two 2, three, transverse hydraulic cylinders go up longitudinal hydraulic cylinders 7 and three, longitudinal hydraulic cylinder 6 is all implemented to control separately by respective gauge tap.For producing injury to non-deformed fire path wall when alleviating school wall telephone work, except skirting is set, also will strengthen the deadweight steadiness of school wall telephone, balancing weight 9 role strengthens the deadweight steadiness of school wall telephone just, and the quantity and weight of balancing weight 9 can be determined according to actual needs voluntarily.
Long limit and the minor face of the length in the wall telephone appearance and size of school and width reference rectangle hopper also deduct different surplus respectively, height in the wall telephone appearance and size of school is greater than the height of carbon annode block, and the height of cross wall push pedal and vertical wall push pedal and width and school wall telephone overall volume match.
If long limit × minor face × highly=C × K × G=7 rice × 0.72 of setting rectangle hopper meter × 5 meters, the length of carbon annode block × wide × high=6.5 meters × 0.6 meter × 1.5 meters, then the overall volume of school wall telephone can mate for length×width×height=6.4 meter × 0.58 meter × 2.0 meters, height × width=1.5 of cross wall push pedal meter × 0.56 meter, height × width=1.5 of vertical wall push pedal meter × 1.0 meters, height × width=1.5 of skirting meter × 3.0 meters.
Above-mentioned each parameter value is only for reference.Because the amount of capacity of each roaster is indefinite, rectangle hopper specification is not identical yet, its specification of carbon annode block loaded in rectangle hopper is caused also to be not quite similar, therefore the appearance and size one of school wall telephone is will with the specification of rectangle hopper and carbon annode block for foundation, two is the deflections will considering flue wall, and the appearance and size of school wall telephone is followed and is as the criterion with the rectangle hopper that can load distortion smoothly.
The correcting value of school wall telephone is determined by the stroke of each hydraulic cylinder, and the correcting value of school of the present invention wall telephone can reach more than 120mm, once can complete the correction work of flue wall deflection when 50 ~ 110mm.In fact just correct when flue wall deflection reaches 50mm, now minimum to the damage of flue wall.
Composition graphs 3 and Fig. 4, for sake of convenience, assuming that the horizontal flue wall of the longitudinal flue wall in the left side of a certain rectangle hopper and its both sides all there is internal strain and internal strain amount reaches 0.5 ~ 0.11 meter time, on the left side of this rectangle hopper, there is left rectangle hopper, on the right of this rectangle hopper, there is right rectangle hopper, rectangle hopper before the front of this rectangle hopper has, rectangle hopper after the back of this rectangle hopper has, now first in this rectangle hopper, load onto two-layer carbon annode block and auxiliary material on layering uniform spreading, described right rectangle hopper is set to empty van, auxiliary material is filled with by described left rectangle hopper, described front rectangle hopper and rear rectangle hopper are set to empty van equally, join suspender high-ranking officers wall telephone by overhead traveling crane with institute put into this rectangle hopper and make three pieces of vertical wall push pedals just to enterolithic longitudinal flue wall, skirting on the wall telephone of school is just to undeformed longitudinal flue wall, start the gauge tap of two transverse hydraulic cylinders, two pieces of cross wall push pedals act on two enterolithic horizontal flue walls on around hinged-support to external expansion by the thrust of respective transverse hydraulic cylinder, because described front rectangle hopper and rear rectangle hopper are set to empty van, therefore the horizontal flue wall of two internal strains can be restored respectively, when two enterolithic horizontal flue walls return to original position, two transverse hydraulic cylinders quit work and pressurize five to ten minutes, the correction just completing the horizontal flue wall of two internal strains behind the gap stayed because pushing away wall is filled up until auxiliary material, while startup two transverse hydraulic cylinder gauge taps, the gauge tap of longitudinal hydraulic cylinder under simultaneously starting three, the lower end of three pieces of vertical wall push pedals is made first to lean against the lower end of the longitudinal flue wall of internal strain, and then start the gauge tap of three upper longitudinal hydraulic cylinders, the upper end of three pieces of vertical wall push pedals is made to act on the end of enterolithic longitudinal flue wall to external expansion gradually, when the upper end of three pieces of vertical wall push pedals and its lower end are all in vertical configuration, three upper longitudinal hydraulic cylinders quit work and pressurize five to ten minutes, now school wall telephone can produce a propulsive thrust relatively, this propulsive thrust can act on skirting, and in left rectangle hopper, be filled with auxiliary material, injury can not be produced to longitudinal flue wall undeformed in this rectangle hopper, the correction just completing the longitudinal flue wall in the internal strain left side behind the gap stayed because pushing away wall is filled up until auxiliary material, join suspender high-ranking officers wall telephone by overhead traveling crane with institute after above-mentioned correction work completes to hang out, carbon annode block is loaded onto again in this rectangle hopper He in other rectangle hopper, the internal strain stress that flue wall exists just can be eliminated, the physical dimension of basic this rectangle hopper of recovery through the sintering of a production cycle and cohesion.
School wall telephone is utilized to carry out timing, auxiliary material can flow in the gap between flue wall and carbon annode block automatically to prevent the resilience of deformed fire path wall, just can eliminate through the sintering of a production cycle and cohesion the distortional stress that deformed fire path wall exists, reach flue wall correction without the object of internal injury
After above-mentioned correction work completes, to notice that the rectangle hopper be corrected also will fill auxiliary material after loading onto carbon annode block especially, because the flue wall corrected still has built-in thermal stress, if take out carbon annode block and auxiliary material, the flue wall corrected still likely partly recovers internal strain.
When there is outer distortion in a certain rectangle hopper, under the above-mentioned assumption: this rectangle hopper is set to empty van, two-layer carbon annode block will be loaded onto and auxiliary material on layering uniform spreading in described right rectangle hopper, auxiliary material is filled with in the right rectangle hopper be close to described right rectangle hopper, described front rectangle hopper and rear rectangle hopper are all loaded onto two-layer carbon annode block and auxiliary material on layering uniform spreading, by overhead traveling crane and join suspender high-ranking officers wall telephone and put into described right rectangle hopper and make longitudinal flue wall that three pieces of vertical wall push pedals are just externally out of shape, skirting on the wall telephone of school is just to undeformed longitudinal flue wall, the gauge tap of longitudinal hydraulic cylinder under starting three, the lower end of three pieces of vertical wall push pedals is made first to lean against the lower end of the longitudinal flue wall of outer distortion, and then start the gauge tap of three upper longitudinal hydraulic cylinders, the upper end of three pieces of vertical wall push pedals is made to act on the end of longitudinal flue wall of outer distortion to external expansion gradually, when the upper end of three pieces of vertical wall push pedals and its lower end are all in vertical configuration, three upper longitudinal hydraulic cylinders quit work and pressurize five to ten minutes, now school wall telephone can produce a propulsive thrust relatively, this propulsive thrust can act on skirting, and in the rectangle hopper of described the right, be filled with auxiliary material, injury can not be produced to longitudinal flue wall undeformed in described right rectangle hopper, the correction just completing the longitudinal flue wall of outer distortion behind the gap stayed because pushing away wall is filled up until auxiliary material, then high-ranking officers' wall telephone hangs in described front rectangle hopper and rear rectangle hopper respectively, externally be out of shape horizontal flue wall by cross wall push pedal to carry out respectively correcting, join suspender high-ranking officers wall telephone by overhead traveling crane with institute after correction work completes to hang out, carbon annode block is loaded onto again in described right rectangle hopper rectangle hopper, in described front rectangle hopper and rear rectangle hopper, the outer distortional stress that flue wall exists just can be eliminated, the physical dimension of basic this rectangle hopper of recovery through the sintering of a production cycle and cohesion.Above-mentioned outer distortion correction need of work high-ranking officers wall telephone hangs out and hangs in three times, and correction work bothers relatively, but calibration result is good.
From the bearing calibration of above-mentioned internal strain and outer distortion, the vertical wall push pedal of school wall telephone and cross wall push pedal always will be aimed at the convex surface of deformed fire path wall and can not be aimed at the concave surface of deformed fire path wall, therefore the rectangle hopper at deformed fire path wall convex surface place is exactly the location of installing school wall telephone, just must load onto two-layer carbon annode block in this rectangle hopper and auxiliary material on layering uniform spreading, and the rectangle hopper at deformed fire path wall concave surface place must be just empty van is corrected in order to deformed fire path wall, this is basic norm of the present invention, under this basic norm, the bearing calibration of deformed fire path wall of roasting furnace of the present invention is not limited to above-mentioned two kinds of correcting modes.
Bearing calibration of the present invention is simple and practical, effective, does not affect normal production, can not cause damage to deformation fire path, can be user and obtains maximum economic benefit.

Claims (1)

1. a bearing calibration for deformed fire path wall of roasting furnace, related terms involved in roaster is self-defined as follows:
It is natural integer that roaster is provided with N(N) the equal and longitudinal flue wall be parallel to each other in bar interval, the spacing playing the longitudinal flue wall of Article 1 and the longitudinal flue wall of Article 2 is from left to right referred to as quirk, the longitudinal flue wall of Article 2 and the longitudinal flue wall of Article 3 are parallel to each other by two and the equal horizontal flue wall of length is divided into several equal rectangle hoppers of volume, the long limit of rectangle hopper is set as C rice, the minor face of rectangle hopper is set as K rice, the degree of depth of rectangle hopper or be highly set as G rice, three layers of carbon annode block can be piled up by auxiliary material in each rectangle hopper, under the effect of auxiliary material, carbon annode block is calcined by quirk, longitudinal flue wall and horizontal flue wall are assembled by refractory brick, the width of wall body of longitudinal flue wall and horizontal flue wall is substantially equal, the spacing of the longitudinal flue wall of Article 3 and the longitudinal flue wall of Article 4 forms quirk again, the longitudinal flue wall of Article 4 and the longitudinal flue wall of Article 5 are divided into again several equal rectangle hoppers of volume by horizontal flue wall, by that analogy to the spacing of (N-1) article longitudinal flue wall and N article of longitudinal flue wall forms quirk, by longitudinal flue wall and horizontal flue wall because the direction making body of wall bend in rectangle hopper by the change of refractory brick thermal stress and to tilt is referred to as internal strain, by longitudinal flue wall and horizontal flue wall because the direction making body of wall bend outside rectangle hopper by the change of refractory brick thermal stress and to tilt is referred to as outer distortion, rule of thumb there is enterolithic probability higher, no matter be internal strain or be out of shape outward, the just bad filling carbon annode block and need to implement to correct to deformed fire path wall in rectangle hopper when its deflection reaches 0.5 ~ 0.11 meter, it is characterized in that:
First this bearing calibration devises a set of school wall telephone, the basic comprising of school wall telephone comprises cross wall push pedal (1), transverse hydraulic cylinder (2), hinged-support (3), frame (4), vertical wall push pedal (5), lower longitudinal hydraulic cylinder (6), upper longitudinal hydraulic cylinder (7), skirting (8) and balancing weight (9), the lower end of the cross wall push pedal (1) of two pieces of area equation is separately fixed at a left side for frame (4) below by respective hinged-support (3), right both sides, the upper end of two pieces of cross wall push pedals (1) is separately fixed at a left side for frame (4) top by respective transverse hydraulic cylinder (2), right both sides, the vertical wall push pedal (5) of three pieces of area equation is fixed on the same side of frame (4) side by side by upper longitudinal hydraulic cylinder (7) of each self-configuring and lower longitudinal hydraulic cylinder (6), and each vertical wall push pedal (5) not only structure is identical and surface area is also identical and be configured with longitudinal hydraulic cylinder (7) and lower longitudinal hydraulic cylinder (6) respectively, the area of skirting (8) equals the gross area of the vertical wall push pedal (5) of three pieces of area equation, and skirting (8) is fixed on the another side of frame (4), balancing weight (9) is configured with at the bottom even of frame (4), under two transverse hydraulic cylinders (2), three upper longitudinal hydraulic cylinders (7) and three, longitudinal hydraulic cylinder (6) is by a hydraulic power unit fuel feeding, hydraulic power unit is fixed in frame (4), and under two transverse hydraulic cylinders (2), three upper longitudinal hydraulic cylinders (7) and three, longitudinal hydraulic cylinder (6) all implements independent control by respective gauge tap, long limit and the minor face of the length in the wall telephone appearance and size of school and width reference rectangle hopper also deduct different surplus respectively, height in the wall telephone appearance and size of school is greater than the height of carbon annode block, and the height of cross wall push pedal (1) and vertical wall push pedal (5) and width and school wall telephone overall volume match,
Assuming that the horizontal flue wall of the longitudinal flue wall in the left side of a certain rectangle hopper and its both sides all there is internal strain and internal strain amount reaches 0.5 ~ 0.11 meter time, on the left side of this rectangle hopper, there is left rectangle hopper, on the right of this rectangle hopper, there is right rectangle hopper, rectangle hopper before the front of this rectangle hopper has, rectangle hopper after the back of this rectangle hopper has, now first in this rectangle hopper, load onto two-layer carbon annode block and auxiliary material on layering uniform spreading, described right rectangle hopper is set to empty van, auxiliary material is filled with by described left rectangle hopper, described front rectangle hopper and rear rectangle hopper are set to empty van equally, join suspender high-ranking officers wall telephone by overhead traveling crane with institute put into this rectangle hopper and make three pieces of vertical wall push pedals just to enterolithic longitudinal flue wall, skirting on the wall telephone of school is just to undeformed longitudinal flue wall, start the gauge tap of two transverse hydraulic cylinders, two pieces of cross wall push pedals act on two enterolithic horizontal flue walls on around hinged-support to external expansion by the thrust of respective transverse hydraulic cylinder, because described front rectangle hopper and rear rectangle hopper are set to empty van, therefore the horizontal flue wall of two internal strains can be restored respectively, when two enterolithic horizontal flue walls return to original position, two transverse hydraulic cylinders quit work and pressurize five to ten minutes, the correction just completing the horizontal flue wall of two internal strains behind the gap stayed because pushing away wall is filled up until auxiliary material, while startup two transverse hydraulic cylinder gauge taps, the gauge tap of longitudinal hydraulic cylinder under simultaneously starting three, the lower end of three pieces of vertical wall push pedals is made first to lean against the lower end of the longitudinal flue wall of internal strain, and then start the gauge tap of three upper longitudinal hydraulic cylinders, the upper end of three pieces of vertical wall push pedals is made to act on the end of enterolithic longitudinal flue wall to external expansion gradually, when the upper end of three pieces of vertical wall push pedals and its lower end are all in vertical configuration, three upper longitudinal hydraulic cylinders quit work and pressurize five to ten minutes, now school wall telephone can produce a propulsive thrust relatively, this propulsive thrust can act on skirting, and in left rectangle hopper, be filled with auxiliary material, injury can not be produced to longitudinal flue wall undeformed in this rectangle hopper, the correction just completing the longitudinal flue wall of internal strain behind the gap stayed because pushing away wall is filled up until auxiliary material, join suspender high-ranking officers wall telephone by overhead traveling crane with institute after above-mentioned correction work completes to hang out, carbon annode block is loaded onto again in this rectangle hopper He in other rectangle hopper, the internal strain stress that flue wall exists just can be eliminated, the physical dimension of basic this rectangle hopper of recovery through the sintering of a production cycle and cohesion,
When there is outer distortion in a certain rectangle hopper, under the above-mentioned assumption: this rectangle hopper is set to empty van, two-layer carbon annode block will be loaded onto and auxiliary material on layering uniform spreading in described right rectangle hopper, auxiliary material is filled with in the right rectangle hopper be close to described right rectangle hopper, described front rectangle hopper and rear rectangle hopper are all loaded onto two-layer carbon annode block and auxiliary material on layering uniform spreading, by overhead traveling crane and join suspender high-ranking officers wall telephone and put into described right rectangle hopper and make longitudinal flue wall that three pieces of vertical wall push pedals are just externally out of shape, skirting on the wall telephone of school is just to undeformed longitudinal flue wall, the gauge tap of longitudinal hydraulic cylinder under starting three, the lower end of three pieces of vertical wall push pedals is made first to lean against the lower end of the longitudinal flue wall of outer distortion, and then start the gauge tap of three upper longitudinal hydraulic cylinders, the upper end of three pieces of vertical wall push pedals is made to act on the end of longitudinal flue wall of outer distortion to external expansion gradually, when the upper end of three pieces of vertical wall push pedals and its lower end are all in vertical configuration, three upper longitudinal hydraulic cylinders quit work and pressurize five to ten minutes, now school wall telephone can produce a propulsive thrust relatively, this propulsive thrust can act on skirting, and in the rectangle hopper of described the right, be filled with auxiliary material, injury can not be produced to longitudinal flue wall undeformed in described right rectangle hopper, the correction just completing the longitudinal flue wall of outer distortion behind the gap stayed because pushing away wall is filled up until auxiliary material, then high-ranking officers' wall telephone hangs in described front rectangle hopper and rear rectangle hopper respectively, externally be out of shape horizontal flue wall by cross wall push pedal to carry out respectively correcting, join suspender high-ranking officers wall telephone by overhead traveling crane with institute after correction work completes to hang out, carbon annode block is loaded onto again in described right rectangle hopper rectangle hopper, in described front rectangle hopper and rear rectangle hopper, the outer distortional stress that flue wall exists just can be eliminated, the physical dimension of the described right rectangle hopper of basic recovery through the sintering of a production cycle and cohesion.
CN201110358037.8A 2011-11-14 2011-11-14 The bearing calibration of deformed fire path wall of roasting furnace Expired - Fee Related CN102435071B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110358037.8A CN102435071B (en) 2011-11-14 2011-11-14 The bearing calibration of deformed fire path wall of roasting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110358037.8A CN102435071B (en) 2011-11-14 2011-11-14 The bearing calibration of deformed fire path wall of roasting furnace

Publications (2)

Publication Number Publication Date
CN102435071A CN102435071A (en) 2012-05-02
CN102435071B true CN102435071B (en) 2015-12-09

Family

ID=45983281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110358037.8A Expired - Fee Related CN102435071B (en) 2011-11-14 2011-11-14 The bearing calibration of deformed fire path wall of roasting furnace

Country Status (1)

Country Link
CN (1) CN102435071B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102980403A (en) * 2012-12-14 2013-03-20 中国铝业股份有限公司 Method for correcting flue wall of roasting furnace
CN103386667A (en) * 2013-07-18 2013-11-13 济南海川投资集团有限公司 Miniature straightening device for flame path wall of baking furnace

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3044897A1 (en) * 1980-11-28 1982-07-08 Krupp-Koppers Gmbh, 4300 Essen CLAMPING SYSTEM TO AVOID HARMFUL TENSION AND SHEARING TENSIONS IN ANY MULTI-LAYER WALLWORK DISKS
FR2629906A1 (en) * 1988-04-08 1989-10-13 Pechiney Aluminium PROCESS FOR CONSTRUCTING OPEN-ROOM OVENS TO AVOID THEIR DEFORMATION
CN2697560Y (en) * 2004-03-17 2005-05-04 中国铝业股份有限公司 Machine for correcting wall of furnace
CN2852017Y (en) * 2005-12-22 2006-12-27 中国铝业股份有限公司 Corrector for fire channel and transverse wall of roasting furnace
CN201281545Y (en) * 2008-10-14 2009-07-29 青铜峡铝业集团有限公司 Furnace wall straightening machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3044897A1 (en) * 1980-11-28 1982-07-08 Krupp-Koppers Gmbh, 4300 Essen CLAMPING SYSTEM TO AVOID HARMFUL TENSION AND SHEARING TENSIONS IN ANY MULTI-LAYER WALLWORK DISKS
FR2629906A1 (en) * 1988-04-08 1989-10-13 Pechiney Aluminium PROCESS FOR CONSTRUCTING OPEN-ROOM OVENS TO AVOID THEIR DEFORMATION
CN2697560Y (en) * 2004-03-17 2005-05-04 中国铝业股份有限公司 Machine for correcting wall of furnace
CN2852017Y (en) * 2005-12-22 2006-12-27 中国铝业股份有限公司 Corrector for fire channel and transverse wall of roasting furnace
CN201281545Y (en) * 2008-10-14 2009-07-29 青铜峡铝业集团有限公司 Furnace wall straightening machine

Also Published As

Publication number Publication date
CN102435071A (en) 2012-05-02

Similar Documents

Publication Publication Date Title
CN206141578U (en) Construction is with conveyer of being convenient for to unload
CN102435071B (en) The bearing calibration of deformed fire path wall of roasting furnace
Iwicki et al. Failure of cylindrical steel silos composed of corrugated sheets and columns and repair methods using a sensitivity analysis
Li et al. The cavity profile of a diaphragm compressor for a hydrogen refueling station
Ko et al. Utilizing building foundations as micro-scale compressed air energy storage vessel: Numerical study for mechanical feasibility
CN209246095U (en) A kind of leakproof waste incineration reciprocal grate
CN206230663U (en) Prepare the frock of ceramic rod
CN102321776A (en) Hot-blast furnace combined grate suitable for stacking checker bricks with different structures
CN206666955U (en) Reinforced civil grille
CN101799103A (en) Dynamic load suppression based design method of support load of large-scale multi-support boiler
CN104864260A (en) Sealing device for one-section type high-pressure rubber membrane sealing type gas holder
CN202339109U (en) Wall correcting machine for correcting deformation fire path wall of roaster
CN202946922U (en) Elastic sealing structure for inner tank top of dual-shell low-temperature storage tank
CN205279749U (en) Carbide stove bell
CN208475357U (en) A kind of back-end ductwork heating surface tube wears furnace wall sealing structure
CN207141931U (en) A kind of arch steel pipe door shield used for liquid bag
CN206200291U (en) A kind of soldering firing equipment and basic fixed structure
CN102980403A (en) Method for correcting flue wall of roasting furnace
CN203586810U (en) Reinforced fixed wear-resistant precast brick
CN104214426A (en) Stable-structure combined rolling support of heat power pipeline built overhead
CN202272901U (en) Hot-blast stove combination furnace grill suitable for stacking checker bricks with different structures
CN207741105U (en) A kind of Cremation Machine bed of resistance to heatable brick bed
CN212745550U (en) Graphite heat-insulating cylinder
CN205837545U (en) Crucible transfer frame
CN206930172U (en) A kind of novel graphite resistive heating configuration

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151209

Termination date: 20161114