CN102431881A - Inspection well sling - Google Patents
Inspection well sling Download PDFInfo
- Publication number
- CN102431881A CN102431881A CN2011102532945A CN201110253294A CN102431881A CN 102431881 A CN102431881 A CN 102431881A CN 2011102532945 A CN2011102532945 A CN 2011102532945A CN 201110253294 A CN201110253294 A CN 201110253294A CN 102431881 A CN102431881 A CN 102431881A
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- cantilevers
- inspection well
- sling
- oil cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
- Earth Drilling (AREA)
Abstract
The invention, belonging to the technical filed of concrete mechanical equipment, particularly discloses a sling for producing an inspection well. The inspection well sling comprises a crossbeam, a hydraulic station is fixedly arranged on the crossbeam, the two ends of the crossbeam are respectively provided with cantilevers capable of sliding on the crossbeam, and the crossbeam is provided with two power units which are respectively connected with the two cantilevers; an oil cylinder is fixedly connected with the two cantilevers, the lower ends of the cantilevers are hinged to three connection rods to form hinge four-bar mechanisms, one end of each hinge four-bar mechanism is respectively connected with a piston rod of the oil cylinder, and the other end of each hinge four-bar mechanism is respectively connected with a connecting sleeve. Compared with artificial rolling-over in the prior art, the inspection well sling disclosed herein greatly increases the production efficiency and raises the standard rate of tubular products.
Description
Technical field
The invention belongs to the concreting machinery equipment technical field, be specifically related to a kind of used suspender of inspection well of making.
Background technology
City municipal administration infrastructure construction and road rain water and sewer line use the cement concrete inspection well; Now domestic mostly is brick formula with inspection well; Seldom use concrete assembledly,, all take artificial upset now even have fabricatedly; Inefficiency, and tubing is fragile in switching process.
Summary of the invention
The objective of the invention is: the high inspection well suspender of the tubing percentage of A-class goods that a kind of production efficiency is high, produce is provided.
The objective of the invention is to realize like this: the inspection well suspender, comprise a crossbeam, crossbeam top fixedly installs Hydraulic Station, and the two ends of crossbeam are provided with a cantilever that can on crossbeam, slide respectively, and two engine installations that connect two cantilevers respectively are set on the crossbeam; Oil cylinder of difference captive joint on two cantilevers; Four-bar linkage is formed through being hinged three pipe links respectively in the lower end of two cantilevers; One end of each four-bar linkage connects the piston rod of said oil cylinder respectively, and the other end of each four-bar linkage connects an adapter sleeve respectively.
The present invention is equipped with two cantilevers and connects engine installation respectively; Can regulate two distances between the cantilever; To adapt to the mould of different sizes, two cantilever lower ends connect adapter sleeve through four-bar linkage, through the hydraulic oil cylinder driving four-bar linkage adapter sleeve are rotated; With driving the present invention is sling during operation, adapter sleeve is inserted in the trip shaft of mould, and through engine installation adjustment spacing, starts oil cylinder and make adapter sleeve drive die flip, puts down mould then and carries out the demoulding.
The present invention overturns with respect to existing manual, has greatly improved production efficiency and has improved the percentage of A-class goods of tubing.
Description of drawings
Fig. 1 is a kind of structural representation of the present invention.
Fig. 2 is the lateral plan of Fig. 1.
The specific embodiment
Like Fig. 1, shown in 2, the inspection well suspender comprises a crossbeam 2, and crossbeam 2 tops fixedly install Hydraulic Station 3, and the two ends of crossbeam 2 are provided with a cantilever 1 that can on crossbeam 2, slide respectively, and two engine installations 4 that connect two cantilevers 1 respectively are set on the crossbeam 2; Oil cylinder 6 of difference captive joint on two cantilevers 1; Four-bar linkage 7 is formed through being hinged three pipe links respectively in the lower end of two cantilevers 1; One end of each four-bar linkage 7 connects the piston rod of oil cylinder 6 respectively, and the other end of each four-bar linkage 7 connects an adapter sleeve 5 respectively.
Claims (1)
1. inspection well suspender, it is characterized in that: comprise a crossbeam, crossbeam top fixedly installs Hydraulic Station, and the two ends of crossbeam are provided with a cantilever that can on crossbeam, slide respectively, and two engine installations that connect two cantilevers respectively are set on the crossbeam; Oil cylinder of difference captive joint on two cantilevers; Four-bar linkage is formed through being hinged three pipe links respectively in the lower end of two cantilevers; One end of each four-bar linkage connects the piston rod of said oil cylinder respectively, and the other end of each four-bar linkage connects an adapter sleeve respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102532945A CN102431881A (en) | 2011-08-31 | 2011-08-31 | Inspection well sling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102532945A CN102431881A (en) | 2011-08-31 | 2011-08-31 | Inspection well sling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102431881A true CN102431881A (en) | 2012-05-02 |
Family
ID=45980295
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102532945A Pending CN102431881A (en) | 2011-08-31 | 2011-08-31 | Inspection well sling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102431881A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103171967A (en) * | 2013-03-27 | 2013-06-26 | 李东栓 | Flexible posture adjustment conveying system |
CN103170868A (en) * | 2013-03-29 | 2013-06-26 | 江苏南车电机有限公司 | Turnover device of large-sized wind driven generator rotor support |
CN108439178A (en) * | 2018-05-03 | 2018-08-24 | 江苏华光双顺机械制造有限公司 | 180 degree hydraulic pressure reversal hanger |
CN114737612A (en) * | 2022-05-20 | 2022-07-12 | 济南黄河路桥建设集团有限公司 | Municipal road inspection well installation process |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2139114Y (en) * | 1992-11-02 | 1993-07-28 | 山东临沂装载机厂 | Caterpillar loader |
JP2002029686A (en) * | 2000-07-13 | 2002-01-29 | Nkk Corp | Coil lifter |
JP2002308565A (en) * | 2001-04-16 | 2002-10-23 | Kobe Steel Ltd | Automatic roll lifting sling |
CN2900030Y (en) * | 2006-04-04 | 2007-05-16 | 佛山科学技术学院 | Pressure injection part turnover butt jointing mechanism of extrusion casting machine |
CN201372139Y (en) * | 2009-02-02 | 2009-12-30 | 佛山市宝索机械制造有限公司 | Cutting-type paper breaking mechanism of rewinder |
CN101927944A (en) * | 2009-06-18 | 2010-12-29 | 上海振华重工(集团)股份有限公司 | Telescopic single-container hanger |
CN202272618U (en) * | 2011-08-31 | 2012-06-13 | 扬州市华光双瑞实业有限公司 | Inspection well lifting appliance |
-
2011
- 2011-08-31 CN CN2011102532945A patent/CN102431881A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2139114Y (en) * | 1992-11-02 | 1993-07-28 | 山东临沂装载机厂 | Caterpillar loader |
JP2002029686A (en) * | 2000-07-13 | 2002-01-29 | Nkk Corp | Coil lifter |
JP2002308565A (en) * | 2001-04-16 | 2002-10-23 | Kobe Steel Ltd | Automatic roll lifting sling |
CN2900030Y (en) * | 2006-04-04 | 2007-05-16 | 佛山科学技术学院 | Pressure injection part turnover butt jointing mechanism of extrusion casting machine |
CN201372139Y (en) * | 2009-02-02 | 2009-12-30 | 佛山市宝索机械制造有限公司 | Cutting-type paper breaking mechanism of rewinder |
CN101927944A (en) * | 2009-06-18 | 2010-12-29 | 上海振华重工(集团)股份有限公司 | Telescopic single-container hanger |
CN202272618U (en) * | 2011-08-31 | 2012-06-13 | 扬州市华光双瑞实业有限公司 | Inspection well lifting appliance |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103171967A (en) * | 2013-03-27 | 2013-06-26 | 李东栓 | Flexible posture adjustment conveying system |
CN103170868A (en) * | 2013-03-29 | 2013-06-26 | 江苏南车电机有限公司 | Turnover device of large-sized wind driven generator rotor support |
CN108439178A (en) * | 2018-05-03 | 2018-08-24 | 江苏华光双顺机械制造有限公司 | 180 degree hydraulic pressure reversal hanger |
CN114737612A (en) * | 2022-05-20 | 2022-07-12 | 济南黄河路桥建设集团有限公司 | Municipal road inspection well installation process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102966121B (en) | Integrally movable mould frame for pipe rack cast-in-site construction | |
CN202272618U (en) | Inspection well lifting appliance | |
CN102431881A (en) | Inspection well sling | |
CN103726511B (en) | A kind of template system for large-area tunnel immersed tube monobloc cast | |
CN107599132A (en) | A kind of side mold device and side form opening/closing method | |
CN202428530U (en) | Segment hydraulic internal mold device capable of adjusting size | |
CN102658927B (en) | Electric storage bin dredging machine | |
CN102767162A (en) | Concrete double-bracing large-scale mold plate and form stripping and form erecting methods | |
CN204278206U (en) | A kind of steam-pressing aero-concrete cast device for discharging | |
CN205599809U (en) | Redden towards manipulator hand claw device | |
CN214301344U (en) | Adjustable arch culvert internal mold device | |
CN101733833A (en) | Method for demoulding concrete prefabricated member | |
CN207156067U (en) | A kind of side mold device | |
CN202672103U (en) | Large concrete double-bracing template | |
CN103706714B (en) | High-frequency straight seam welded pipe die forming machine fast replacing device | |
CN204431469U (en) | The two special gland of cushion rubber steel socket of core mould vibrating | |
CN209851177U (en) | Square precast concrete assembled inspection shaft mould | |
CN203843050U (en) | Transmission device of cone pressing machine | |
CN204823051U (en) | Conveying device | |
CN204176149U (en) | Toilet promotes forming machine minute-pressure Pipe installing structure | |
CN101823337B (en) | Mold for double-direction bending elbow | |
CN204339957U (en) | A kind of easily replacing pressure head buffer-type concrete block making machine | |
CN103626027A (en) | Special foaming cement lifting clamper | |
CN213703867U (en) | City utility tunnel mould with high-frequency vibration | |
CN203887171U (en) | Sand-box detecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120502 |