CN102430894A - Process for continuously rolling pipeline without causing pressure head - Google Patents

Process for continuously rolling pipeline without causing pressure head Download PDF

Info

Publication number
CN102430894A
CN102430894A CN2011102978424A CN201110297842A CN102430894A CN 102430894 A CN102430894 A CN 102430894A CN 2011102978424 A CN2011102978424 A CN 2011102978424A CN 201110297842 A CN201110297842 A CN 201110297842A CN 102430894 A CN102430894 A CN 102430894A
Authority
CN
China
Prior art keywords
workpiece
beaming roller
arc
bending
veneer reeling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102978424A
Other languages
Chinese (zh)
Inventor
王宏伟
吴荣善
王平
潘子祥
缪吉华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Metallugical Engineering Technology Co Ltd
Original Assignee
Pangang Group Metallugical Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Metallugical Engineering Technology Co Ltd filed Critical Pangang Group Metallugical Engineering Technology Co Ltd
Priority to CN2011102978424A priority Critical patent/CN102430894A/en
Publication of CN102430894A publication Critical patent/CN102430894A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Metal Rolling (AREA)

Abstract

The invention provides a process for continuously rolling a pipeline without causing a pressure head, comprising the following steps: arranging prebent arc-shaped tyre templates on two lower shaft rollers of a plate reeling machine with three shaft rollers; inserting the end of a workpiece to be rolled between the arc-shaped tyre templates and upper shaft roller of the plate reeling machine with three shaft rollers so that the plate reeling machine with three shaft rollers rolls back and forth and the end part of the workpiece to be rolled is prebent; inserting the prebent workpiece to be rolled into the plate reeling machine with three shaft rollers, and bending the prebent workpiece to be rolled repeatedly, wherein the plate reeling machine with three shaft rollers is not provided with an arc-shaped tyre template; taking down the prebent workpiece to be rolled from the plate reeling machine with three shaft rollers, and welding the end part of the workpiece; and rolling the welded workpiece by using the plate reeling machine with three shaft rollers and no arc-shaped tyre template so as to obtain the expected molded workpiece. Due to the adoption of the process, the engineering cost can be reduced, and the labor intensity can be reduced to the lowest level. The process has obvious social and economic benefits.

Description

A kind of pipeline does not have the continuous rolling technology of pressure head
Technical field
The present invention relates to metallurgical pipeline and roll technical field, especially relate to and a kind of the pachydermia pipe is not had the technology that pressure head rolls continuously.
Background technology
Conventional pipeline rolling technology need utilize electric welding will roll the steel plate spreading in advance before the top roll bed or directly reserves the residual straightway of b/2 (b is the spacing of two rollers) usually rolling steel plate in advance, guarantees the precompressed arc quality in preparatory pipe crimping road thus.After pressing arc, utilize gas cutting that residual straightway is removed.This shows that conventional pipeline rolling technology has caused the waste of material, thereby cause cost to increase, need extra manual work in addition, thereby labour cost is high, and labour intensity is big.
Therefore, need to explore a kind of new pipeline rolling technology,, construction cost is minimized, improve productivity effect, and reduce labour intensity to practice thrift the steel plate feed.
Summary of the invention
The invention provides a kind of pipeline does not have the continuous rolling technology of pressure head, and said technology comprises the steps: on two lower rollers of three beaming roller veneer reeling machines, to place curved in advance good arc loose tool plate; With waiting that the end that rolls workpiece is inserted between the last beaming roller and arc loose tool plate of three beaming roller veneer reeling machines, makes the positive and negative rolling of three beaming roller veneer reeling machines, will wait to roll the end pre-bending of workpiece; The workpiece to be rolled of pre-bending is inserted in the three beaming roller veneer reeling machines that arc loose tool plate is not set, then pre-bending is waited that rolling workpiece carries out bending times without number; Workpiece after the bending is taken off from three beaming roller veneer reeling machines, the end of workpiece is welded; Utilize the workpiece after the three beaming roller veneer reeling machines that arc loose tool plate is not set will weld to roll processing again, thus the shaping workpiece that obtains expecting.
Said technology can also comprise the steps: said shaping workpiece is spliced, to reach predetermined length.
The width of arc loose tool plate can be a twice of waiting to roll the width of workpiece.
In addition, can wait to roll workpiece along the predetermined welding allowance for shrinkage of circumferential direction reservation with said, preferably, said welding allowance for shrinkage is 2mm to 3mm.
Preferably, can adopt manual electric arc welding that the end of said workpiece is welded.
Description of drawings
Fig. 1 shows the sketch map that pipeline according to the present invention does not have the pre-bending process of the continuous rolling technology of pressure head;
Fig. 2 shows pipeline according to the present invention and does not have the sketch map of the workpiece after the bending of the continuous rolling technology of pressure head;
Fig. 3 shows the sketch map that pipeline according to the present invention does not have the shaping workpiece that the continuous rolling technology of pressure head obtains.
The specific embodiment
Pipeline according to the present invention does not have the continuous rolling technology of pressure head and comprises the steps: on two lower rollers of three beaming roller veneer reeling machines, to place curved in advance good arc loose tool plate; With waiting that the end that rolls workpiece is inserted between the last beaming roller and arc loose tool plate of three beaming roller veneer reeling machines, makes the positive and negative rolling of three beaming roller veneer reeling machines, will wait to roll the end pre-bending of workpiece; The workpiece to be rolled of pre-bending is inserted in the three beaming roller veneer reeling machines that arc loose tool plate is not set, then pre-bending is waited that rolling workpiece carries out bending times without number; Workpiece after the bending is taken off from three beaming roller veneer reeling machines, the end of workpiece is welded; Utilize the workpiece after the three beaming roller veneer reeling machines that arc loose tool plate is not set will weld to roll processing again, thus the shaping workpiece that obtains expecting.
Said technology can also comprise the steps: a plurality of shaping workpieces that obtain are spliced, to reach length predetermined or expectation.
The width of arc loose tool plate can be a twice of waiting to roll the width of workpiece.
In addition, can wait to roll workpiece along the predetermined welding allowance for shrinkage of circumferential direction reservation with said, preferably, said welding allowance for shrinkage is 2mm to 3mm.
Preferably, can adopt manual electric arc welding that the end of said workpiece is welded.
To combine concrete example that pipeline of the present invention is not had the continuous rolling technology of pressure head below is elaborated.
Roll in the process at pipeline, high to making required precision, and need strict control number material, operation such as cut, roll, could guarantee the pipe crimping fabricating quality thus.
According to the feed situation, rationally arrange batching, guarantee that the longitudinal seam on the same joint pipe crimping must not be greater than twice, two longitudinal joint spacings should not be less than 200mm.
In order to ensure the pipe crimping perimeter dimension, can be with waiting that rolling workpiece reserves predetermined welding allowance for shrinkage along circumferential direction, preferably, the welding allowance for shrinkage is 2~3mm.
Before rolling, when carrying out model number material, need indicate inspection line and center line, with the inspection cut quality with satisfy the assembling requirement.
Because the present invention adopts the continuous rolling technology of no pressure head,, particularly,,, and need not set the length of pressure head in the present invention according to 1: 1 scale lofting expansion according to design pipeline girth so can carry out the dead size blanking.
In addition, in order to guarantee cut quality, sheet material and groove all adopt the pattern semi auto cutting machine, so that cutting accuracy conforms to quality requirements fully.
When the pipe crimping diameter greater than 600mm, and wall thickness should carry out back cover at the root of weld of inside tube, to guarantee the welding quality of pipeline during greater than 6mm.
Example
As shown in Figure 1; Go up at two lower rollers 1 and 1 ' of three beaming roller veneer reeling machines and to place curved in advance good arc loose tool plate 2, preferably, the width of arc loose tool plate 2 rolls steel plate 3 (promptly for waiting; The twice of width workpiece), and the length of arc loose tool plate 2 is than the length weak point of waiting to roll steel plate 3.
With reference to Fig. 1, with waiting that the end that rolls workpiece 3 is inserted between the last beaming roller 4 and arc loose tool plate 2 of three beaming roller veneer reeling machines, makes the positive and negative rolling of three beaming roller veneer reeling machines, will wait to roll the end pre-bending of workpiece 3.Preferably, the internal diameter of arc loose tool plate 2 is slightly less than the external diameter of the circle that workpiece will roll into, and beaming roller is only born by the pressure of curved steel plate like this, and does not bear the pressure of arc loose tool plate 2, thus unlikely damage volume bed.
Should be more than the big 100mm of width than two lower rollers 1 of three beaming roller veneer reeling machines and 1 ' center by the arc length of curved steel plate, and on plate vertical line of picture perpendicular to the sheet material side, make the line of rabbet joint or the top roll parallel axes of vertical line and lower roll.Then, the top roll of three beaming roller veneer reeling machines of the no arc loose tool plate 2 that descends to be compressing plate, and the workpiece to be rolled (particularly, waiting to roll the mid portion of workpiece) of pre-bending is carried out bending times without number.In addition, in round as a ball process, guarantee not wanted move left and right by curved steel plate.
Then, the workpiece after the bending is taken off from three beaming roller veneer reeling machines, and the end of the workpiece after preferably adopting manual electric arc welding to bending welds, thereby obtain pipe shown in Figure 2.Certainly, also can adopt other welding manner to weld such as semiautomatic welding.In addition, as required, can welding material be dried.
In addition, when carrying out the manual welding of multilayer multiple tracks, should segmentation weld symmetrically.Before welding per pass weld seam, should carry out scarfing cinder, as finding to have defectives such as slag inclusion, pore and crackle, must remove and welding again.In order to guarantee welding quality, the longitudinal joint two ends of the pipe of the gained run-on tab of must burn-oning, run-on tab material and thickness are identical with mother metal, and specification is not less than 80mm * 50mm (long * wide).
With utilizing three beaming roller veneer reeling machines of no arc loose tool plate to roll processing after the pipeline welding moulding of pre-bending again, after the pipe of gained reaches requirement, take out, thereby obtain final shaping workpiece, as shown in Figure 3.
In addition, can the shaping workpiece that obtain be carried out the pipeline splicing, splicing length is decided according to haulage vehicle.
Pipeline of the present invention does not have the continuous rolling technology of pressure head can adopt the dead size blanking, on three beaming roller veneer reeling machines, carries out the end prebuckling earlier, and then carries out middle part volume and press, and then can weld, and rolls processing again, takes out after reaching requirement.Hence one can see that, because adopt the dead size blanking, thus saved the steel materials widely, and need not carry out the roll extrusion of pressure head end in addition or beat processing, thereby reduced manufacturing procedure, and make minimumization of labour intensity.Therefore, pipeline of the present invention does not have the continuous rolling technology of pressure head can reduce engineering cost, thereby has the significant social economic benefit.

Claims (6)

1. a pipeline does not have the continuous rolling technology of pressure head, it is characterized in that said technology comprises:
On two lower rollers of three beaming roller veneer reeling machines, place curved in advance good arc loose tool plate;
With waiting that the end that rolls workpiece is inserted between the last beaming roller and arc loose tool plate of three beaming roller veneer reeling machines, makes the positive and negative rolling of three beaming roller veneer reeling machines, will wait to roll the end pre-bending of workpiece;
The workpiece to be rolled of pre-bending is inserted in the three beaming roller veneer reeling machines that arc loose tool plate is not set, then pre-bending is waited that rolling workpiece carries out bending times without number;
Workpiece after the bending is taken off from three beaming roller veneer reeling machines, the end of workpiece is welded;
Utilize the workpiece after the three beaming roller veneer reeling machines that arc loose tool plate is not set will weld to roll processing again, thus the shaping workpiece that obtains expecting.
2. technology according to claim 1 is characterized in that, said technology also comprises: a plurality of shaping workpieces that will obtain splice, to reach predetermined length.
3. technology according to claim 1 is characterized in that, the width of arc loose tool plate is a twice of waiting to roll the width of workpiece.
4. technology according to claim 1 is characterized in that, waits to roll workpiece along the predetermined welding allowance for shrinkage of circumferential direction reservation with said.
5. technology according to claim 4 is characterized in that, said welding allowance for shrinkage is 2mm to 3mm.
6. technology according to claim 1 is characterized in that, adopts manual electric arc welding that the end of said workpiece is welded.
CN2011102978424A 2011-09-28 2011-09-28 Process for continuously rolling pipeline without causing pressure head Pending CN102430894A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102978424A CN102430894A (en) 2011-09-28 2011-09-28 Process for continuously rolling pipeline without causing pressure head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102978424A CN102430894A (en) 2011-09-28 2011-09-28 Process for continuously rolling pipeline without causing pressure head

Publications (1)

Publication Number Publication Date
CN102430894A true CN102430894A (en) 2012-05-02

Family

ID=45979433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102978424A Pending CN102430894A (en) 2011-09-28 2011-09-28 Process for continuously rolling pipeline without causing pressure head

Country Status (1)

Country Link
CN (1) CN102430894A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103542254A (en) * 2013-10-18 2014-01-29 西安轨道交通装备有限责任公司 External reinforcing ring device for outer tank of low-temperature pressure container and processing method
CN103612068A (en) * 2012-11-27 2014-03-05 国机重工(洛阳)有限公司 Road roller rim rolling technology
CN103894457A (en) * 2012-12-28 2014-07-02 南通大通宝富风机有限公司 Plate bending machine with pre-bending device
CN104339124A (en) * 2013-08-05 2015-02-11 上海通华不锈钢压力容器工程有限公司 Multi-curvature forming method for stainless steel cylinder
CN104801578A (en) * 2015-05-21 2015-07-29 江苏一机机械科技有限公司 Bending method for three-roller plate bending machine
CN108380692A (en) * 2018-02-12 2018-08-10 湘潭市智全机械有限公司 A kind of heavy wall stainless steel minor diameter rotary drum forming method
CN109047426A (en) * 2018-07-20 2018-12-21 中国葛洲坝集团机械船舶有限公司 A kind of tile steel plate pressure head fabricated device and method
CN110653296A (en) * 2019-11-12 2020-01-07 江苏伟业铝材有限公司 Aluminum profile arc bending die
CN111531332A (en) * 2020-05-11 2020-08-14 惠州市坤豪塑胶电器制品有限公司 Furnace end automatic production line and process thereof
CN111872632A (en) * 2020-06-12 2020-11-03 中国二冶集团有限公司 Method for manufacturing open pipeline

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6339946B1 (en) * 1998-11-04 2002-01-22 Kawasaki Steel Corporation Pipe forming apparatus and method
CN101069908A (en) * 2007-06-16 2007-11-14 王行山 Process for board-rolling machine to make roll
CN201147785Y (en) * 2007-10-26 2008-11-12 长治钢铁(集团)锻压机械制造有限公司 Plate rolling machine having bending function
CN102151723A (en) * 2011-05-24 2011-08-17 浙江通达钢模有限公司 Forming device for end arc of steel plate

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6339946B1 (en) * 1998-11-04 2002-01-22 Kawasaki Steel Corporation Pipe forming apparatus and method
CN101069908A (en) * 2007-06-16 2007-11-14 王行山 Process for board-rolling machine to make roll
CN201147785Y (en) * 2007-10-26 2008-11-12 长治钢铁(集团)锻压机械制造有限公司 Plate rolling machine having bending function
CN102151723A (en) * 2011-05-24 2011-08-17 浙江通达钢模有限公司 Forming device for end arc of steel plate

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
何宗辉: "采用预弯模消除圆筒体直边", 《石油化工设备》 *
张绪荣: "不预弯卷圆工艺的应用", 《机械工人.热加工》 *
郝泽龙: "三辊卷板机上无剩余边卷圆", 《科技信息》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103612068A (en) * 2012-11-27 2014-03-05 国机重工(洛阳)有限公司 Road roller rim rolling technology
CN103894457A (en) * 2012-12-28 2014-07-02 南通大通宝富风机有限公司 Plate bending machine with pre-bending device
CN104339124A (en) * 2013-08-05 2015-02-11 上海通华不锈钢压力容器工程有限公司 Multi-curvature forming method for stainless steel cylinder
CN103542254A (en) * 2013-10-18 2014-01-29 西安轨道交通装备有限责任公司 External reinforcing ring device for outer tank of low-temperature pressure container and processing method
CN104801578A (en) * 2015-05-21 2015-07-29 江苏一机机械科技有限公司 Bending method for three-roller plate bending machine
CN108380692A (en) * 2018-02-12 2018-08-10 湘潭市智全机械有限公司 A kind of heavy wall stainless steel minor diameter rotary drum forming method
CN109047426A (en) * 2018-07-20 2018-12-21 中国葛洲坝集团机械船舶有限公司 A kind of tile steel plate pressure head fabricated device and method
CN110653296A (en) * 2019-11-12 2020-01-07 江苏伟业铝材有限公司 Aluminum profile arc bending die
CN111531332A (en) * 2020-05-11 2020-08-14 惠州市坤豪塑胶电器制品有限公司 Furnace end automatic production line and process thereof
CN111531332B (en) * 2020-05-11 2021-07-23 惠州市坤豪塑胶电器制品有限公司 Furnace end automatic production line and process thereof
CN111872632A (en) * 2020-06-12 2020-11-03 中国二冶集团有限公司 Method for manufacturing open pipeline
CN111872632B (en) * 2020-06-12 2023-06-20 中国二冶集团有限公司 Manufacturing method of open pipeline

Similar Documents

Publication Publication Date Title
CN102430894A (en) Process for continuously rolling pipeline without causing pressure head
CN102215997B (en) The manufacture method of cartridge
CN107263031A (en) Cylinder is without pre-bending edge rolling moulding process
CN106041420A (en) Barrel rolling technology
CN100563910C (en) A kind of batch processing method of flange blank of pulley with large diameter
CN103286158B (en) Two one-step forming methods are utilized to prepare method and the device of not uniform thickness vertical masonry joint laser welding pipe
CA2967914A1 (en) Method of producing steel pipe and press die used for same
CN102500662A (en) Whole diameter rounding method for large pipe fitting
CN102581566A (en) Sleeve rolling process
CN109604980B (en) Manufacturing method of long cylindrical mold structural member
CN102078888A (en) Method for manufacturing steel pipe with long round section
CN108994120A (en) It is applicable in superhigh intensity, the method for coiling of the small diameter cylinder of ultra-thick steel plates and system
CN101961765B (en) Manufacturing process and equipment for upset forging of flanges
CN104625654A (en) Production method for unequal thickness U rib formation
CN107414424B (en) A kind of forming method of large diameter thin wall stainless steel cylinder
JPS6240088B2 (en)
JP3578584B2 (en) Method of manufacturing square steel pipe
CN106180257A (en) Big template list weld seam threeway forming process and forming device
CN111390506A (en) Production process of silencer assembly for forklift
JP5649226B2 (en) Different diameter pipe manufacturing method and different diameter pipe manufacturing apparatus
CN206253492U (en) The curl bar processing unit of soap lye frame
JP2000167621A (en) Manufacture of square steel tube and device for forming square-shaped steel tube
JPH11285729A (en) Manufacture of uoe steel tube
CN103659180B (en) The shaping splicing method of manufacturing technology of main shaft of large water turbine cold breakdown
JP6028931B2 (en) Steel pipe manufacturing method and manufacturing apparatus thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 617000 No. 28, East Panzhihua Road, Sichuan, Panzhihua

Applicant after: Pan'gang Group Engineering Technology Co., Ltd.

Address before: 617000 No. 28, East Panzhihua Road, Sichuan, Panzhihua

Applicant before: Pangang Group Metallugical Engineering Technology Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: PANGANG GROUP METALLUGICAL ENGINEERING TECHNOLOGY CO., LTD. TO: PAN'GANG GROUP ENGINEERING TECHNOLOGY CO., LTD.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120502

WD01 Invention patent application deemed withdrawn after publication