CN102426321A - 模拟送电调试中的电流互感器一次设备带电的试验方法 - Google Patents

模拟送电调试中的电流互感器一次设备带电的试验方法 Download PDF

Info

Publication number
CN102426321A
CN102426321A CN2011102367736A CN201110236773A CN102426321A CN 102426321 A CN102426321 A CN 102426321A CN 2011102367736 A CN2011102367736 A CN 2011102367736A CN 201110236773 A CN201110236773 A CN 201110236773A CN 102426321 A CN102426321 A CN 102426321A
Authority
CN
China
Prior art keywords
current
disconnecting link
phase
transformer
current transformer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102367736A
Other languages
English (en)
Other versions
CN102426321B (zh
Inventor
贾逸豹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Original Assignee
XINJIANG UYGUR [UIGHUR] AUTONOMOUS REGION POWER TRANSMISSION AND TRANSFORMATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINJIANG UYGUR [UIGHUR] AUTONOMOUS REGION POWER TRANSMISSION AND TRANSFORMATION Co Ltd filed Critical XINJIANG UYGUR [UIGHUR] AUTONOMOUS REGION POWER TRANSMISSION AND TRANSFORMATION Co Ltd
Priority to CN 201110236773 priority Critical patent/CN102426321B/zh
Publication of CN102426321A publication Critical patent/CN102426321A/zh
Application granted granted Critical
Publication of CN102426321B publication Critical patent/CN102426321B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明为模拟送电调试中的电流互感器一次设备带电的试验方法,涉及输电自动化领域,为了确保变电站一次送电成功,对调试要求既要时间快又要准确科学合理,但目前的调试试验方法时间长,人工设备耗费高,不能满足快速高效率的送电成功,本发明采用在电流互感器的一次侧依次连接升流器、调压器,在另一侧用钳形相位表;利用调压器和升流器在电流互感器一次侧加入电流,通过二次电流检测互感电流的变化,利用钳形相位表测试电流相位;相位表上的电压端子以接入所用变电源中的某一相户内外相一致的电压作为基准量,然后分别在户外端子相处和户内保护屏处检测电流相位;本发明具有快速、科学、准确,易于实施的有益效果。

Description

模拟送电调试中的电流互感器一次设备带电的试验方法
本申请是申请日为2008年12月31日、申请号为“200810187962.7”、发明名称为“模拟送电调试的试验方法”的发明专利申请的分案申请。
技术领域
本发明涉及电力系统自动化领域,尤其是输电自动化领域,具体涉及模拟送电调试中的电流互感器一次设备带电的试验方法。
背景技术
目前电网中变电站的建设周期短、标准高,要确保变电站一次送电成功对调试的要求很高。变电站的二次回路包括控制回路、信号回路、电压、电流二次回路等。在试验中,因为控制回路和信号回路都能够通过实际模拟进行检验,但电压、电流二次回路很难模拟真实的情况,所以容易留下隐患,严重时会造成事故的发生。
如变压器升高座电流互感器、电容式电压互感器二次回路和极性常见的试验难点,测试过程复杂,耗时长,馈线间隔电流二次回路检测时间需要2小时,主变间隔电流二次回路检测时间需要5小时,电压回路每个间隔需要6小时,总需时间55小时,而且不仅时间长,所需人工费、设备使用费和车辆使用费相应提高,降低了试验工作的效率。
发明内容
本发明的目的为提供一种科学合理、便于操作,节约人力和测试时间的模拟送电调试中的电流互感器一次设备带电的试验方法。
实现上述目的的技术方案如下:
本发明包括变压器升高座电流互感器的二次回路和极性校验;电容式电压互感器的二次回路和极性校验;电流互感器一次设备带电的方法和电压二次回路正确性的方法。
1、变压器升高座电流互感器的二次回路和极性试验试验方法如下:
(1)将额定电流为10A、额定电压为220V的空气开关与220V直流电源连接,在空气开关的一端连接10A滑线电阻,空气开关另一端接地,此端和滑线电阻输出端与变压器一边绕组两端连接,变压器另一边绕组与微安表连接;
(2)合上空气开关,记录微安表上读数;
(3)断开空气开关,在户内二次保护屏端子排上进行测量电流互感器二次极性。
2、电容式电压互感器的二次回路和极性试验试验方法如下:
(1)将额定电压为2500V的摇表的高压输出L与电容式电压互感器的高压尾N连接,摇表的E输出端通过开关K与电容式电压互感器的另一端A连接,电容式电压互感器另一边绕组连接微安表;
(2)当摇表指针达到最大值时,合上开关K,在户内二次保护屏的端子排上用微安表进行测量电压互感器的二次极性。
3、电流互感器一次设备带电的试验方法:
(1)在电流互感器的一次侧依次连接升流器、调压器,在另一侧用钳形相位表;
(2)利用调压器和升流器在电流互感器一次侧加入电流,通过二次电流检测互感电流的变化,利用钳形相位表测试电流相位;
(3)相位表上的电压端子以接入所用变电源中的某一相户内外相一致的电压作为基准量,然后分别在户外端子相处和户内保护屏处检测电流相位;
电流大小检测步骤如下:
1)首先,将试验选在I母刀闸1G处,把大电流发生器一次线一端引至I母刀闸1G的A相上,另一端直接与设备接地扁铁连接;
2)合上断路器DL、I母刀闸1G、进线侧接地刀闸03G2,其他间隔接地刀闸处于分闸位置;
3)利用电流回路导通原理,电流就通过I母刀闸1G经I母母线、电流互感器一次侧、进线侧接地刀闸03G2经大地形成闭环回路,就可以进行极性和通流试验;
4)进行主变进线间隔试验时,只需将接地刀闸断开,合上主变进线的I母刀闸1G、断路器DL、进线侧接地刀闸03G2,就可以进行该间隔的试验,其他间隔依次进行。
4、电流互感器一次设备带电的试验方法:
(1)依据电压回路原理图和二次接线图,系统的画出二次电压回路的试验展开图,标明需要测量每相回路每一连接处的电缆位置;
(2)将电压互感器端子箱里的二次空气开关断开,将电压互感器一次刀闸断开,在户内母线设屏端子排上加入电压;
(3)单相对地缓慢的加入少量电压8V,观察无异常后,再将电压升到30V;
(4)测量该单相回路电缆中每一连接处的电压值,测试也应为30V,如不等于30V说明电缆接线有问题。
上述技术方案表明,利用变电站内的直流屏电源解决了变压器升高座CT的二次回路和极性校验;用摇表法解决了电容式PT二次回路和极性校验;利用CT一次电流和工作电压全面判断二次电流回路大小、相位。
本发明具有以下有益效果:
以220KV惠宁变电站为例,220KV两个间隔,PT一个间隔;110KV六个间隔、PT两个间隔;35KV五个间隔、PT一个间隔;一台主变。采用对电压、电流二次回路模拟送电调试试验的方法,馈线间隔电流二次回路检测时间每个间隔由过去的2小时节省到30分钟,主变间隔电流二次回路检测时间由过去的5小时节省到2小时,电压回路每个间隔由过去的6小时节省到3小时。总时间由过去的55小时节省到现在的21小时,节约时间34小时。
经济效益:其中人工费:4人*4天*375=6000元
试验设备使用费:4天*2000=8000元
车辆使用费:4天*300=1200元
合计:15200元
按照今年在4个变电站中的经济效益共计60800元。其中设备投入为平时的调试设备不另计成本。
随着以后模拟送电调试的试验新方法的推广应用,其长期收益潜力大,同时社会效益也很大,有效地增强调试实力,更大限度的提高一次设备成功送电的可靠性起到十分显著的作用。
附图说明
图1为变压器升高座CT二次回路和极性校验电路图
图2为电容式PT二次回路和极性校验电路图
图3为电流互感器一次设备带电试验电路图
图4为利用电流回路导通进行极性和流通试验以及主变进线间隔试验电路图
具体实施方式
1、用直流电源进行变压器升高座电流互感器的二次回路和极性校验试验
如图1是变压器升高座CT二次回路和极性校验接线图。
直流电源是采用变电站内的220V操作电源,开关K可取额定电流10A,额定电压是220V空气开关,R是可调的额定电流为10A的滑线电阻,当站内直流电源是220V时电阻应调到20Ω左右,A是0-100μA的指针式微安表。试验时,开关K合上后,大约3秒后微安表才能有指示,并在微安表有明显指示之后再断开开关,就可以在户内二次保护屏端子排上进行测量。用新方法在220KV东疆变具体实施,验证了变压器升高座电流互感器二次回路和极性校验完全正确,替代了只能靠效线的“死办法”,省时省力。此方法在疆内其它调试单位未见使用。
2、用摇表法进行电容式PT二次回路和极性校验试验
如图2所示这种方法是在电容式PT用2500V的摇表点。摇表的高压输出L应接电容式PT的高压尾N端,E端接电容式PT的高压A端,当摇表指针到最大值时合上开关K,同时在户内二次保护屏的端子排上用微安表进行测量。在220KV东疆变具体实施,证明电容式PT的二次回路和极性校验完全正确,用简单的试验设备解决了长期的“难点问题”,此方法科学有效。
3、模拟送电时电流互感器一次设备带电的方法
利用调压器和升流设备在电流互感器的一次侧加入一定量的电流,通过二次电流检测CT变比,并利用钳形表测试电流相位,相位表上的电压端子以接入所用变电源中的某一相户内外相一致的电压作为基准量,然后分别在户外端子箱处和户内保护屏处检测电流相位,此相位应与试验电源的相位相同,误差不大于3°,试验接线如图3所示。用新方法在220KV惠宁变实施巩固,验证了电流二次回路完全正确。此方法在疆内其他调试单位未见使用。
利用电流回路导通原理,通过主母线、断路器、刀闸、接地刀闸转换和大地构成闭合电流回路,接线一次就可完成多个间隔的电流检查,节省了人力和大量的时间。如分别在220KV、110KV、35KV区域只需设备搬运1次,试验接线1次,就可完成测试。试验接线如图4所示。检测步骤:(以220KV惠宁变为例)
1)首先,将试验地点选在蕙远线I母刀闸1G处,把大电流发生器一次线一端引至I母1G刀闸A相上,另一端直接与设备接地扁铁连接;
2)合上断路器DL、合上I母刀闸1G、合上进线侧接地刀闸03G2,其他间隔接地刀闸处于分闸位置;
3)利用电流回路导通原理,电流就通过I母刀闸1G经I母母线、电流互感器一次侧、进线接地刀03G2经大地形成闭环回路,就可以进行极性和通流试验;
4)进行主变进线间隔试验时,只需将蕙远线03G2接地刀闸断开,合上主变进线1G、DL、03G2,就可以进行该间隔的试验,其他间隔依次进行。
4、模拟送电时电压二次回路正确性的方法:
首先,依据电压回路原理图和二次接线图,系统的画出二次电压回路的试验展开图,标明需要测量每相回路每一连接处的电缆位置。
试验时将PT端子箱里的二次空气开关断开,将PT一次刀闸断开,在户内母设屏端子排上加入一定量的电压。加压时,先检查二次电压回路绝缘应良好,以及二次电压回路相间无短路现象。然后单相对地缓慢的加入少量电压8V,观察无异常后,再将电压升到30V。测量该单相回路电缆中每一连接处的电压值,测试也应为30V,如不等于30V说明电缆接线有问题,它的开展,电压二次回路误测、漏测现象基本杜绝。

Claims (1)

1.模拟送电调试中的电流互感器一次设备带电的试验方法,其特征为试验方法如下:
(1)在电流互感器的一次侧依次连接升流器、调压器,在另一侧用钳形相位表;
(2)利用调压器和升流器在电流互感器一次侧加入电流,通过二次电流检测互感电流的变化,利用钳形相位表测试电流相位;
(3)相位表上的电压端子以接入所用变电源中的某一相户内外相一致的电压作为基准量,然后分别在户外端子相处和户内保护屏处检测电流相位;
电流大小检测步骤如下:
1)首先,将试验选在I母刀闸1G处,把大电流发生器一次线一端引至I母刀闸1G的A相上,另一端直接与设备接地扁铁连接;
2)合上断路器DL、I母刀闸1G、进线侧接地刀闸03G2,其他间隔接地刀闸处于分闸位置;
3)利用电流回路导通原理,电流就通过I母刀闸1G经I母母线、电流互感器一次侧、进线侧接地刀闸03G2经大地形成闭环回路,就可以进行极性和通流试验;
4)进行主变进线间隔试验时,只需将接地刀闸断开,合上主变进线的I母刀闸1G、断路器DL、进线侧接地刀闸03G2,就可以进行该间隔的试验,其他间隔依次进行。
CN 201110236773 2008-12-31 2008-12-31 模拟送电调试中的电流互感器一次设备带电的试验方法 Active CN102426321B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110236773 CN102426321B (zh) 2008-12-31 2008-12-31 模拟送电调试中的电流互感器一次设备带电的试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110236773 CN102426321B (zh) 2008-12-31 2008-12-31 模拟送电调试中的电流互感器一次设备带电的试验方法

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN200810187962A Division CN101769980A (zh) 2008-12-31 2008-12-31 模拟送电调试的试验方法

Publications (2)

Publication Number Publication Date
CN102426321A true CN102426321A (zh) 2012-04-25
CN102426321B CN102426321B (zh) 2013-10-16

Family

ID=45960327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110236773 Active CN102426321B (zh) 2008-12-31 2008-12-31 模拟送电调试中的电流互感器一次设备带电的试验方法

Country Status (1)

Country Link
CN (1) CN102426321B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102879708A (zh) * 2012-09-21 2013-01-16 西安供电局 一种110kV 变电站GIS 快速打极性方法
CN103995213A (zh) * 2014-05-29 2014-08-20 中国一冶集团有限公司 一种判别电动机绕组极性的方法
CN104198832A (zh) * 2014-07-09 2014-12-10 中冶建工集团有限公司 一种高压变配电站综合检查试验方法
CN104749461A (zh) * 2015-03-23 2015-07-01 国家电网公司 一种一次加压通流装置、智能变电系统及其控制方法
CN105929352A (zh) * 2016-05-13 2016-09-07 国网山东省电力公司枣庄供电公司 一种组合式电流互感器试验装置
CN106226612A (zh) * 2016-07-04 2016-12-14 国家电网公司 基于钳形相位表的电流互感器二次接线故障诊断方法
CN106841737A (zh) * 2017-02-21 2017-06-13 云南电网有限责任公司 交流二次电流回路的一种小电流放大检测方法
CN108931754A (zh) * 2018-09-26 2018-12-04 云南电网有限责任公司电力科学研究院 一种电流互感器极性及二次绕组混用检测方法
CN112858958A (zh) * 2021-01-05 2021-05-28 中国神华能源股份有限公司国华电力分公司 一种高备变保护装置电流接线极性检测方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6654217B2 (en) * 2000-12-29 2003-11-25 Square D Company Quick responding instantaneous trip system
CN101216535A (zh) * 2008-01-09 2008-07-09 南京南瑞继保电气有限公司 发电机注入式定子接地保护组合式模拟试验屏及试验方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6654217B2 (en) * 2000-12-29 2003-11-25 Square D Company Quick responding instantaneous trip system
CN101216535A (zh) * 2008-01-09 2008-07-09 南京南瑞继保电气有限公司 发电机注入式定子接地保护组合式模拟试验屏及试验方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
叶启明: "判断电压电流互感器极性的新方法", 《大众用电》 *
郁涵: "一种有效检查CT回路完整性的方法", 《华中电力》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102879708B (zh) * 2012-09-21 2015-06-24 西安供电局 一种110kV变电站GIS快速打极性方法
CN102879708A (zh) * 2012-09-21 2013-01-16 西安供电局 一种110kV 变电站GIS 快速打极性方法
CN103995213A (zh) * 2014-05-29 2014-08-20 中国一冶集团有限公司 一种判别电动机绕组极性的方法
CN103995213B (zh) * 2014-05-29 2016-08-17 中国一冶集团有限公司 一种判别电动机绕组极性的方法
CN104198832B (zh) * 2014-07-09 2017-03-08 中冶建工集团有限公司 一种高压变配电站综合检查试验方法
CN104198832A (zh) * 2014-07-09 2014-12-10 中冶建工集团有限公司 一种高压变配电站综合检查试验方法
CN104749461A (zh) * 2015-03-23 2015-07-01 国家电网公司 一种一次加压通流装置、智能变电系统及其控制方法
CN105929352A (zh) * 2016-05-13 2016-09-07 国网山东省电力公司枣庄供电公司 一种组合式电流互感器试验装置
CN106226612A (zh) * 2016-07-04 2016-12-14 国家电网公司 基于钳形相位表的电流互感器二次接线故障诊断方法
CN106226612B (zh) * 2016-07-04 2019-04-26 国家电网有限公司 基于钳形相位表的电流互感器二次接线故障诊断方法
CN106841737A (zh) * 2017-02-21 2017-06-13 云南电网有限责任公司 交流二次电流回路的一种小电流放大检测方法
CN108931754A (zh) * 2018-09-26 2018-12-04 云南电网有限责任公司电力科学研究院 一种电流互感器极性及二次绕组混用检测方法
CN112858958A (zh) * 2021-01-05 2021-05-28 中国神华能源股份有限公司国华电力分公司 一种高备变保护装置电流接线极性检测方法
CN112858958B (zh) * 2021-01-05 2023-02-28 中国神华能源股份有限公司国华电力分公司 一种高备变保护装置电流接线极性检测方法

Also Published As

Publication number Publication date
CN102426321B (zh) 2013-10-16

Similar Documents

Publication Publication Date Title
CN102426321B (zh) 模拟送电调试中的电流互感器一次设备带电的试验方法
CN101769980A (zh) 模拟送电调试的试验方法
EP3045930B1 (en) Testing system of gis electronic mutual inductor and method therefor
CN103105550B (zh) 一种智能化继电保护装置检测方法及系统
CN107255759A (zh) 一种电动汽车交流充电桩自动检测系统
CN100580464C (zh) 发电厂、变电站大型接地网检测方法及其检测系统
CN100568011C (zh) 发电机注入式定子接地保护组合式模拟试验屏及试验方法
CN102540001B (zh) 500kV变电站模拟穿越式三相短路检验交流电流回路的方法
CN202548258U (zh) 交流电流电压回路检验装置
CN103926512A (zh) 模拟交联聚乙烯绝缘电缆局部放电的方法和模拟检测平台
CN106093820A (zh) 配电线路故障定位装置的性能测试系统和方法
CN102565618A (zh) 变电站零序电压回路检验方法
CN104880652A (zh) 一种开关柜带电局放测试系统及其电压信号提取装置
CN203324403U (zh) 含分布式电源的配电网馈线保护数字动态测试系统
CN110672969A (zh) 一种就地化线路保护装置现场测试系统
CN108597291A (zh) 一种配网线损仿真培训系统
CN108169606A (zh) 高压直流换流系统模拟带电检测成套装置及其检测方法
CN105866592B (zh) 动态无功补偿响应波形采集系统及采集方法
CN203037759U (zh) 动态无功补偿装置响应波形检测装置
CN102508052B (zh) 区域网络备自投系统现场带通道运行的测试方法
CN102565614B (zh) 交流电压回路检验方法
CN102879657B (zh) 一种线路相序核对方法
CN201804097U (zh) 高压在线核查测试标准电能计量装置
CN205786889U (zh) 动态无功补偿响应波形采集系统
CN106771841B (zh) 一种变电站s型一次通流系统及方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: XINJIANG UYGUR AUTONOMOUS REGION POWER TRANSMISSION ENGINEERING COMPANY

Effective date: 20130124

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 830011 URUMQI, XINJIANG UYGUR AUTONOMOUS REGION TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20130124

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Address before: 830011 the Xinjiang Uygur Autonomous Region Urumqi Urumqi No. 155 Jiangsu West Road, the Department of production technology

Applicant before: Xinjiang Uygur [Uighur] Autonomous Region Power Transmission and Transformation Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant