CN102426069A - 一种极高应力条件下岩体地应力的测量方法 - Google Patents

一种极高应力条件下岩体地应力的测量方法 Download PDF

Info

Publication number
CN102426069A
CN102426069A CN2011102512373A CN201110251237A CN102426069A CN 102426069 A CN102426069 A CN 102426069A CN 2011102512373 A CN2011102512373 A CN 2011102512373A CN 201110251237 A CN201110251237 A CN 201110251237A CN 102426069 A CN102426069 A CN 102426069A
Authority
CN
China
Prior art keywords
stress
aperture
rock mass
deformation
drilled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102512373A
Other languages
English (en)
Other versions
CN102426069B (zh
Inventor
江权
冯夏庭
陈静
刘继光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Wuhan Institute of Rock and Soil Mechanics of CAS
Priority to CN 201110251237 priority Critical patent/CN102426069B/zh
Publication of CN102426069A publication Critical patent/CN102426069A/zh
Application granted granted Critical
Publication of CN102426069B publication Critical patent/CN102426069B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明涉及一种岩体地应力的测量方法,更具体涉及一种极高地应力条件下岩体地应力的测量方法,测量方法采用对岩体地应力的二次释放实现,即在工作隧洞内选取圆形测量区域,通过在测量区域边界钻设一组周边应力释放孔实现岩体地应力的第一次释放,然后再在测量区域中心钻设中心应力释放孔实现岩体地应力的第二次释放,最后将两次应力释放过程中传感器测量获得的测量小孔的变形相加并代入弹性力学的相关公式,可计算出垂直中心应力释放孔轴线平面上的地应力值。该方法改变了现有应力解除设备无法进行极高地应力条件下岩体地应力量测的局限,用于深部或极高地应力地下工程中采用应力解除设备测量岩体地应力。

Description

一种极高应力条件下岩体地应力的测量方法
技术领域
本发明涉及一种岩体地应力的测量方法,更具体涉及一种极高地应力条件下岩体地应力的测量方法,它适用于深部或极高地应力地下工程中采用应力解除设备测量岩体地应力。
背景技术
目前,我国西部水电开发、南水北调工程、石油/天然气开采、战略能源储存、放射性废料与CO2的地下封存、地下军工掩体工程等,都涉及深部岩体的极高地应力问题(据我国《工程岩体分级标准》,当岩石的饱和单轴抗压强度与岩体地应力值小于4时即为极高地应力),如位于四川的锦屏二级水电站引水隧洞2500m埋深处最大初始地应力约60~70MPa;正在开采的金川镍矿深部采场地应力达50MPa;拟建的南水北调西线工程中埋深约1700m的巴彦格拉山隧洞最大初始地应力估计达到50MPa。这种深部地下工程岩体中极高地应力导致的工程灾害也是十分突出的,如二滩水电站地下厂房修建过程中就因高地应力卸荷导致多根岩体锚索突然断裂;锦屏二级水电站排水隧洞因极高地应力诱发强烈岩爆不仅导致了多次机械设备的损毁,还致使价值过亿的TBM掘进机被掩埋。为避免和减小极高地应力下岩体破坏灾害,准确地获得深部工程岩体极高初始地应力的数值是这些地下工程安全设计中最基础和最重要的工作。
然而,目前国际岩石力学学会建议的两种岩体地应力测量设备都无法进行极高地应力条件下的岩体地应力测量。这是因为:
(1)方法之一的应力解除设备在解除应力作业时,其极高的地应力导致其解除的空心岩筒环状开裂或龟裂破坏,因而应力测量设备的传感器无法准确地量测到空心岩筒在应力卸载过程中的径向变形,从而无法有效地获得岩体的地应力。
(2)方法之二的水压致裂设备在岩体地应力测量时,由于钻孔测量段密封堵头在高压力下防渗困难,无法在钻孔内形成大于岩体的初始最小主应力的稳定钻孔水压(数百个大气压),从而因无法劈裂孔壁岩体或因堵头渗水严重导致不能有效地测量岩体地应力。
此外,其它一些探索性的地应力测量设备或方法,如孔壁破裂特征分析法、岩芯饼化反分析法、变形恢复设备与方法等,仅能对岩体的地应力量级进行大体估计,无法确切地测量到岩体的真实应力值,从而未能被广大研究者和工程师采纳。
可见,借助现有成熟的岩体应力测量设备,开发出一种可实现极高岩体条件下工程岩体地应力的测量方法,具有显著的现实意义和工程需求。
发明内容
针对上述存在问题,本发明的目的在于提供一种在极高应力条件下岩体地应力测量方法,旨在克服当前应力解除设备不能应用于极高应力条件的局限性,确保应力解除设备可以在极高应力条件下准确地量测岩体地应力。
为了上述目的,本发明所采用的技术方案是:一种极高应力条件下岩体地应力的测量方法,所述测量方法的具体步骤包括,
A在已经开挖用于岩体地应力测量的工作隧洞内选取测量区域,所选取的测量区域边界线为圆形,测量区域边界线的直径D1为1.0~1.5m;
B在测量区域的中心位置垂直测量区域表面钻设测量小孔,在测量小孔内放置岩体地应力测量的变形传感器并通过数据线与变形记录仪连接,沿测量区域边界线钻设一组垂直测量区域表面的周边应力释放孔,周边应力释放孔的孔径D2为50~130mm,周边应力释放孔的长度比测量小孔的长度长1.0~1.5m,周边应力释放孔的数量N按公式(a)计算,
N = Int ( 3.14 · D 1 D 2 · η ) - - - ( a )
公式(a)中,Int为取整符号,η为经验系数,取0.8~0.9,周边应力释放孔钻设完成后读取变形记录仪测量到的变形传感器每个触头的实际数值
Figure BSA00000564351100031
然后将变形记录仪的测量值归零;
C以测量小孔的圆点为中心钻设中心应力释放孔,中心应力释放孔的长度不小于测量小孔的长度,钻设完成后读取变形记录仪的测量到的变形传感器每个触头的实际数值
Figure BSA00000564351100032
D将钻设周边应力释放孔后变形记录仪测量的变形传感器第i个触头的变形值
Figure BSA00000564351100033
和钻设中心应力释放孔后变形记录仪测量的变形传感器第i个触头的
Figure BSA00000564351100034
相加,作为变形传感器第i个触头测量的测量小孔卸载释放的总变形εi,然后代入弹性力学中有关薄壁圆筒的应力-变形公式,计算出测量部位垂直测量小孔轴线平面上的岩体最大主应力值、最小主应力值和最大主应力倾角。
所述周边应力释放孔等间距分布在测量区域边界线上且周边应力释放孔的轴线相互平行,并且周边应力释放孔的轴线与测量小孔的轴线平行。
所述周边应力释放孔钻设顺序是按测量区域中心点对称均匀进行。
由于采用了上述技术方案,本发明采用对岩体地应力的二次释放方法改变了现有应力解除设备无法进行极高地应力条件下岩体地应力量测的局限,具有如下优点:
(1)避免中心应力释放孔钻设时空心岩筒破裂:由于首先在测量区域边界线上钻设了一组周边应力释放孔,则测量区域内岩体的地应力得到了相当程度的释放。然后再钻设中心应力释放孔时,则放置变形传感器的空心岩筒区域的应力集中将减小,从而有效地避免了空心岩筒在钻设中心应力释放孔时发生破裂。
(2)确保变形记录仪工作在量程范围内:通过第一阶段在测量区域边界线上钻设周边应力释放孔时变形传感器的触头测量到测量小孔的一部分卸载变形,再通过第二阶段在测量区域钻设中心应力释放孔时变形传感器的触头测量到测量小孔的另一部分卸载变形,可有效避免因极高地应力卸载下测量小孔的卸载变形过大导致测量小孔的卸载变形值超出变形记录仪量程。
(3)实现极高应力下岩体地应力的准确测量:通过分阶段的应力释放确保放置变形传感器的空心岩筒不破裂和变形记录仪工作在正常量程内,从而可实现极高地应力下岩体地应力的准确测量。
附图说明:
图1为一种极高应力条件下岩体地应力的测量方法的平面设计图;
图2为图1的A-A剖面。
具体实施方式:
下面结合附图1和附图2,对本发明一种极高应力条件下岩体地应力的测量方法作进一步详细描述:
见附图1和附图2,本发明的岩体地应力测量方法包括测量区域边界线1、位于测量区域边界线1上布设的周边应力释放孔2、测量区域中心的中心应力释放孔3、与中心应力释放孔3同圆心的空心岩筒4、测量区域中心位置的测量小孔5、测量空心岩筒4卸载变形的含四个触头的变形传感器6、记录卸载变形的变形记录仪7和连接变形传感器6和变形记录仪7的数据线8。
本发明具体实施方式为:
(1)在已经开挖且用于岩体地应力测量的工作隧洞内选取测量区域,所选取的测量区域为圆形,鉴于到地应力测量的中心应力释放孔3的外径为130mm左右,为避免钻设的周边应力释放孔2的岩体应力集中导致中心应力释放孔3区域的岩体应力升高,测量区域的边界线1的直径D1为1.0~1.5m,为避免工作隧洞轮廓形态导致的岩体应力集中,测量区域的工作隧道高度应不小于3.0m。
(2)采用金刚石钻头在圆形测量区域中心位置垂直测量区域钻设一个测量小孔5,测量小孔5的直径稍大于变形传感器6的直径,使得应力传感器6正好能放置在测量小孔5内,为确保测量到的是岩体原始应力而不是工作隧洞浅部岩体应力集中区的应力,测量小孔5的深度大于二倍工作隧洞的高度。
(3)将测量空心岩筒4卸载变形的变形传感器6放置在测量小孔5的底部,并确认变形传感器6的触头与空心岩筒4的内壁接触良好,通过水平定向器将变形传感器6的第1个触头竖直朝上,变形传感器6通过数据线8与测量小孔5外面的变形记录仪7连接,调节变形记录仪7使得其测量初始变形值归零。
(4)采用金刚石钻头沿测量区域边界线1垂直测量区域表面钻设一组周边应力释放孔2,为避免钻设的周边应力释放孔2的直径过大导致钻孔效率偏低,为避免钻设的周边应力释放孔2的直径过小导致钻设的周边应力释放孔2数量过多而致使钻孔时间过长,也为方便直接采用工业通用钻头钻设周边应力释放孔2,周边应力释放孔2的孔径D2为50~130mm,周边应力释放孔等间距地分布在边界线1上,周边应力释放孔2的轴线相互平行,周边应力释放孔2的轴线与测量小孔5的轴线平行,为实现测量小孔底部区域岩体应力得到有效释放,周边应力释放孔2的长度比测量小孔5的长度大1.0~1.5m,周边应力释放孔2的数量N按下经验公式(a)计算,
N = Int ( 3.14 · D 1 D 2 · η ) - - - ( a )
公式(a)中,Int为取整符号,η为经验系数,为避免钻设周边应力释放孔2过稠密而导致边界线1内的岩体完全与边界线1外面的岩体脱离,也为避免钻设周边应力释放孔2过稀疏而导致边界线1内的岩体应力得不到有效释放,根据数值仿真模拟计算分析确定折减系数η取0.8~0.9较好。
(5)周边应力释放孔2的钻设顺序按测量区域中心对称方式均匀进行,即当一个周边应力释放孔2钻设完成后,按测量区域圆心旋转180度后进行下一个周边应力释放孔2的钻设,尽量使得钻设完成的周边应力释放孔2在测量区域边界线1上均匀分布。
(6)当所有布设的周边应力释放孔2钻设完成后,读取并记录下变形记录仪7所量测到的变形传感器6上每一个触头i的变形值
Figure BSA00000564351100052
然后对变形记录仪7的测量变形再进行一次初始变形值归零调节。
(7)采用薄壁金刚石钻头以测量区域圆点为中心,在测量小孔5外钻设中心应力释放孔3,为便于采用通用的工业钻头进行钻设和使得空心岩筒4的壁厚适中,其中心释放率孔3的外径约为130mm,其中心释放孔3的内径约为90mm,其中心释放孔3的长度应不小于测量小孔4的长度。
(8)当中心应力释放孔3钻设完成后,读取并记录下变形记录仪7所测量到的变形传感器6上每一个触头i的变形值
Figure BSA00000564351100061
(9)将变形记录仪7测量第一阶段变形和变形记录仪7测量第二阶段变形
Figure BSA00000564351100063
相加,作为变形传感器6第i个触头的总变形εi
(10)选取变形传感器6中任意三个触头的总变形ε1、ε2和ε3,根据薄壁圆筒弹性力学的应力-变形公式(b),
σ 1 = ( δ 1 2 + δ 3 2 ) + ( δ 1 - δ 2 ) 2 + ( δ 2 - δ 3 ) 2 · E 4 D σ 2 = ( δ 1 2 + δ 3 2 ) - ( δ 1 - δ 2 ) 2 + ( δ 2 - δ 3 ) 2 · E 4 D α = 1 2 · a tan ( 2 δ 2 - ( δ 1 + δ 3 ) δ 1 - δ 3 ) δ 1 = ϵ 1 / K , δ 2 = ϵ 2 / K , δ 3 = ϵ 3 / K - - - ( b )
公式(b)中,atan为三角函数符合;K为传感器标定的变形刚度系数,为事先标定;E为测量区域岩体弹性模量,单位为GPa,可在实验室测量获得;D为测量小孔5的直径,单位为m,α逆时针为正,计算获得测量区域内测量部位垂直测量小孔5轴线的平面上两个主应力σ1和σ2,以及最大主应力σ1与水平面的夹角α。
具体实施例1:
(1)在已经开挖的高度为3m、宽度为3m的工作隧洞掌子面上选取边界线1的直径为1.0m的圆形区域。
(2)采用外径为36mm的金刚石钻头在圆形测量区域中心位置垂直测量区域表面钻设一个测量小孔5,钻设的测量小孔5的长度为7m。
(3)将测量空心岩筒4卸载变形的变形传感器6放置在测量小孔5的底部,并通过水平定向器确保变形传感器6的触头与空心岩筒4的内壁接触良好且变形传感器6的第1个触头竖直朝上,变形传感器6通过数据线8与测量小孔5外面的变形记录仪7连接,调节变形记录仪7使得其测量初始变形值归“0”。
(4)在已知测量区域为D1=1.0m并取折减系数η=0.8的条件下,根据公式(c)
N = Int ( 3.14 · D 1 D 2 · η ) = Int ( 3.14 · 1.0 0.05 · 0.8 ) = 50 - - - ( c )
计算出应钻设的周边应力释放孔2的数量N=50,选用直径D2=0.05m的常用金刚石钻头垂直测量区域钻设周边应力释放孔2,钻设的周边应力释放孔2均匀等间距分布在边界线1上,钻设的周边应力释放孔2的轴线与测量小孔5的轴线平行,钻设的周边应力释放孔2的长度为8.0m。
(5)周边应力释放孔2的钻设顺序按测量区域中心对称方式均匀进行,即当一个周边应力释放孔2钻设完成后,按测量区域圆心旋转180度后进行下一个周边应力释放孔2的钻设,尽量使得钻设完成的周边应力释放孔2在测量区域边界线1上均匀分布。
(6)当所有布设的周边应力释放孔2钻设完成后,读取并记录下变形记录仪7所量测到的变形传感器6上四个触头变形值,分布是
Figure BSA00000564351100072
Figure BSA00000564351100073
然后对变形记录仪7进行一次初始变形值归零调节。
(7)采用外径为130mm的薄壁金刚石钻头以测量区域圆点为中心,在测量小孔外钻设中心应力释放孔3,其中心释放孔3的长度为7.1m。
(8)当中心应力释放孔钻设完成后,读取并记录下变形记录仪7所测量到的变形传感器6上四个触头变形值,分别是
Figure BSA00000564351100076
Figure BSA00000564351100077
Figure BSA00000564351100078
Figure BSA00000564351100079
(9)将变形记录仪7测量第一阶段变形
Figure BSA000005643511000710
和变形记录仪7测量第二阶段变形
Figure BSA000005643511000711
相加,作为变形传感器6上四个触头的总变形,,分别是ε1=42,ε2=30,ε3=49,ε4=65。
(10)选取变形传感器6中任意三个触头的总变形ε1、ε2和ε4,并取K=160,E=25GPa,D=0.036m,根据薄壁圆筒弹性力学的应力-变形关系公式(b),计算获得测量区域内垂直测量小孔5轴线的平面上两个主应力σ1=93.08MPa,σ2=73.75MPa,以及最大主应力与水平面的夹角α=63.96°。
具体实施例2:
(1)在已经开挖的高度为5m宽度为5m的工作隧洞掌子面上选取边界线1的直径为1.5m的圆形区域。
(2)采用外径为36mm的金刚石钻头在圆形测量区域中心位置垂直测量区域表面钻设一个测量小孔5,钻设的测量小孔5的长度为11m。
(3)将测量空心岩筒4卸载变形的变形传感器6放置在测量小孔5的底部,并通过水平定向器确保变形传感器6的触头与空心岩筒4的内壁接触良好且变形传感器6的第1个触头竖直朝上,变形传感器6通过数据线8与测量小孔5外面的变形记录仪7连接,调节变形记录仪7使得其测量初始变形值归“0”。
(4)在已知测量区域为D1=1.5m并取折减系数η=0.9的条件下,根据公式(d)
N = Int ( 3.14 · D 1 D 2 · η ) = Int ( 3.14 · 1.5 0.13 · 0.9 ) = 33 - - - ( d )
计算出应钻设的周边应力释放孔2的数量N=33,选用直径D2=0.13m的常用金刚石钻头垂直测量区域钻设周边应力释放孔2,钻设的周边应力释放孔2均匀等间距分布在边界线1上,钻设的周边应力释放孔2的轴线与测量小孔5的轴线平行,钻设的周边应力释放孔2的长度为12.5m。
(5)周边应力释放孔2的钻设顺序按测量区域中心对称方式均匀进行,即当一个周边应力释放孔2钻设完成后,按测量区域圆心旋转180度后进行下一个周边应力释放孔2的钻设,尽量使得钻设完成的周边应力释放孔2在测量区域边界线1上均匀分布。
(6)当所有布设的周边应力释放孔2钻设完成后,读取并记录下变形记录仪7所量测到的变形传感器6上四个触头变形值,分布是
Figure BSA00000564351100083
Figure BSA00000564351100084
Figure BSA00000564351100085
然后对变形记录仪7进行一次初始变形值归零调节。
(7)采用外径为130mm的薄壁金刚石钻头以测量区域圆点为中心,在测量小孔外钻设中心应力释放孔3,其中心释放孔3的长度为11.2m。
(8)当中心应力释放孔3钻设完成后,读取并记录下变形记录仪7所测量到的变形传感器6上四个触头变形值,分别是
Figure BSA00000564351100091
Figure BSA00000564351100092
Figure BSA00000564351100093
Figure BSA00000564351100094
(9)将变形记录仪7测量第一阶段变形
Figure BSA00000564351100095
和变形记录仪7测量第二阶段变形
Figure BSA00000564351100096
相加,作为变形传感器6上四个触头的总变形,,分别是ε1=29,ε2=40,ε3=27,ε4=12。
(10)选取变形传感器6中任意三个触头的总变形ε1、ε2和ε3,并取K=140,E=30GPa,D=0.036m,根据薄壁圆筒弹性力学的应力-变形关系公式(3),计算获得测量区域内垂直测量小孔5轴线的平面上两个主应力σ1=64.18MPa,σ2=53.24MPa,以及最大主应力与水平面的夹角α=85.30°。

Claims (3)

1.一种极高应力条件下岩体地应力的测量方法,其特征在于:所述测量方法的具体步骤包括,
A在已经开挖用于岩体地应力测量的工作隧洞内选取测量区域,所选取的测量区域边界线为圆形,测量区域边界线(1)的直径D1为1.0~1.5m,
B在测量区域的中心位置垂直测量区域表面钻设测量小孔(5),在测量小孔(5)内放置岩体地应力测量的变形传感器(6)并通过数据线(8)与变形记录仪(7)连接,沿测量区域边界线(1)钻设一组垂直测量区域表面的周边应力释放孔(2),周边应力释放孔(2)的孔径D2为50~130mm,周边应力释放孔(2)的长度比测量小孔(5)的长度长1.0~1.5m,周边应力释放孔(2)的数量N按公式(a)计算,
N = Int ( 3.14 · D 1 D 2 · η ) - - - ( a )
公式(a)中,Int为取整符号,η为经验系数,取0.8~0.9,周边应力释放孔(2)钻设完成后读取变形记录仪(7)测量到的变形传感器(6)每个触头的实际数值然后将变形记录仪(7)的测量值归零,
C以测量小孔(5)的圆点为中心钻设中心应力释放孔(3),中心应力释放孔(3)的长度不小于测量小孔(5)的长度,钻设完成后读取变形记录仪(7)的测量到的变形传感器(6)每个触头的实际数值
Figure FSA00000564351000013
D将钻设周边应力释放孔(2)后变形记录仪(7)测量的变形传感器(6)第i个触头的变形值
Figure FSA00000564351000014
和钻设中心应力释放孔(3)后变形记录仪(7)测量的变形传感器(6)第i个触头的相加,作为变形传感器(6)第i个触头测量的测量小孔(5)卸载释放的总变形εi,然后代入弹性力学中有关薄壁圆筒的应力-变形公式,计算出测量部位垂直测量小孔(5)轴线平面上的岩体最大主应力值、最小主应力值和最大主应力倾角。
2.根据权利要求1所述的一种极高应力条件下岩体地应力的测量方法,其特征在于:所述周边应力释放孔(2)等间距分布在测量区域边界线(1)上且周边应力释放孔(2)的轴线相互平行,并且周边应力释放孔(2)的轴线与测量小孔(5)的轴线平行。
3.根据权利要求1所述的一种极高应力条件下岩体地应力的测量方法,其特征在于:所述周边应力释放孔(2)钻设顺序是按测量区域中心点对称均匀进行。
CN 201110251237 2011-08-29 2011-08-29 一种极高应力条件下岩体地应力的测量方法 Expired - Fee Related CN102426069B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110251237 CN102426069B (zh) 2011-08-29 2011-08-29 一种极高应力条件下岩体地应力的测量方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110251237 CN102426069B (zh) 2011-08-29 2011-08-29 一种极高应力条件下岩体地应力的测量方法

Publications (2)

Publication Number Publication Date
CN102426069A true CN102426069A (zh) 2012-04-25
CN102426069B CN102426069B (zh) 2013-04-17

Family

ID=45960074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110251237 Expired - Fee Related CN102426069B (zh) 2011-08-29 2011-08-29 一种极高应力条件下岩体地应力的测量方法

Country Status (1)

Country Link
CN (1) CN102426069B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103616111A (zh) * 2013-12-09 2014-03-05 中国科学院武汉岩土力学研究所 小孔厚壁套芯应力解除法
CN103790582A (zh) * 2014-01-26 2014-05-14 北京雷雨达科技有限公司 地应力测量设备及方法
CN105181199A (zh) * 2015-05-13 2015-12-23 中国科学院武汉岩土力学研究所 一种地应力测试的旁孔应力解除法
CN105547539A (zh) * 2016-03-01 2016-05-04 中国地震局地壳应力研究所 基于经纬应变线的地应力方向测量系统及方法
CN106194222A (zh) * 2016-09-05 2016-12-07 中国电建集团成都勘测设计研究院有限公司 适用于高地应力条件下的地下洞室群结构及其施工工艺
CN107884107A (zh) * 2017-11-29 2018-04-06 中国电建集团成都勘测设计研究院有限公司 Tbm施工条件下全时段地应力测试系统
CN107255546B (zh) * 2017-08-17 2018-06-29 长江水利委员会长江科学院 解除应力测量法测量精度的校验装置及方法
CN109506556A (zh) * 2018-09-20 2019-03-22 中国矿业大学(北京) 一种煤矿双轴应力应变原位实验装置及方法
CN110907085A (zh) * 2019-11-21 2020-03-24 中国科学院武汉岩土力学研究所 一种基于钻孔变形法的三维地应力测量装置
CN115584966A (zh) * 2022-10-28 2023-01-10 中国地质科学院地质力学研究所 一种利用三轴岩石力学实验获得三维地应力的方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1171676A1 (ru) * 1984-05-14 1985-08-07 Новосибирский государственный университет им.Ленинского комсомола Устройство дл измерени давлени горных пород в скважинах
DE4129701A1 (de) * 1991-09-06 1993-03-11 Halil Ulusar Dr Akbay Messverfahren zur messung von mechanischen spannungen und messwertaufnehmer zur durchfuehrung des verfahrens
CN1337570A (zh) * 2001-09-20 2002-02-27 上海交通大学 钻井局部壁面应力全解除法
CN101493366A (zh) * 2009-01-09 2009-07-29 陈洪凯 钻孔应力传感器及其钻孔应力监测方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1171676A1 (ru) * 1984-05-14 1985-08-07 Новосибирский государственный университет им.Ленинского комсомола Устройство дл измерени давлени горных пород в скважинах
DE4129701A1 (de) * 1991-09-06 1993-03-11 Halil Ulusar Dr Akbay Messverfahren zur messung von mechanischen spannungen und messwertaufnehmer zur durchfuehrung des verfahrens
CN1337570A (zh) * 2001-09-20 2002-02-27 上海交通大学 钻井局部壁面应力全解除法
CN101493366A (zh) * 2009-01-09 2009-07-29 陈洪凯 钻孔应力传感器及其钻孔应力监测方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
马光等: "岩体绝对应力测量", 《有色金属》, no. 04 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103616111A (zh) * 2013-12-09 2014-03-05 中国科学院武汉岩土力学研究所 小孔厚壁套芯应力解除法
CN103790582A (zh) * 2014-01-26 2014-05-14 北京雷雨达科技有限公司 地应力测量设备及方法
CN105181199B (zh) * 2015-05-13 2017-08-25 中国科学院武汉岩土力学研究所 一种地应力测试的旁孔应力解除法
CN105181199A (zh) * 2015-05-13 2015-12-23 中国科学院武汉岩土力学研究所 一种地应力测试的旁孔应力解除法
CN105547539B (zh) * 2016-03-01 2018-01-30 中国地震局地壳应力研究所 基于经纬应变线的地应力方向测量系统及方法
CN105547539A (zh) * 2016-03-01 2016-05-04 中国地震局地壳应力研究所 基于经纬应变线的地应力方向测量系统及方法
CN106194222A (zh) * 2016-09-05 2016-12-07 中国电建集团成都勘测设计研究院有限公司 适用于高地应力条件下的地下洞室群结构及其施工工艺
CN107255546B (zh) * 2017-08-17 2018-06-29 长江水利委员会长江科学院 解除应力测量法测量精度的校验装置及方法
CN107884107A (zh) * 2017-11-29 2018-04-06 中国电建集团成都勘测设计研究院有限公司 Tbm施工条件下全时段地应力测试系统
CN107884107B (zh) * 2017-11-29 2023-11-21 中国电建集团成都勘测设计研究院有限公司 Tbm施工条件下全时段地应力测试系统
CN109506556A (zh) * 2018-09-20 2019-03-22 中国矿业大学(北京) 一种煤矿双轴应力应变原位实验装置及方法
CN110907085A (zh) * 2019-11-21 2020-03-24 中国科学院武汉岩土力学研究所 一种基于钻孔变形法的三维地应力测量装置
CN110907085B (zh) * 2019-11-21 2020-11-24 中国科学院武汉岩土力学研究所 一种基于钻孔变形法的三维地应力测量装置
CN115584966A (zh) * 2022-10-28 2023-01-10 中国地质科学院地质力学研究所 一种利用三轴岩石力学实验获得三维地应力的方法

Also Published As

Publication number Publication date
CN102426069B (zh) 2013-04-17

Similar Documents

Publication Publication Date Title
CN102426069B (zh) 一种极高应力条件下岩体地应力的测量方法
Xia et al. Structural characteristics of columnar jointed basalt in drainage tunnel of Baihetan hydropower station and its influence on the behavior of P-wave anisotropy
Siren et al. Considerations and observations of stress-induced and construction-induced excavation damage zone in crystalline rock
CN106814407B (zh) 基于单一钻孔变形测量确定岩体三维地应力的方法
CN103293560B (zh) 一种采动三向应力场的测试方法
CN102749660A (zh) 高地应力地区近水平岩层岩爆的综合预报方法
CN105180888B (zh) 高地应力软弱围岩隧道开挖预留变形量确定方法
CN103744128A (zh) 一种用于地下洞室岩爆烈度等级的综合预报方法
CN110514342A (zh) 快速测定软岩地层地应力的测量装置及方法
CN113960695A (zh) 一种复杂城市环境富水岩溶精细探查方法
CN103363954A (zh) 一种地面沉降监测系统
Yang et al. Minimum safe thickness of rock plug in karst tunnel according to upper bound theorem
Gale Fracture properties from laboratory and large scale field tests: evidence of scale effects
CN103234826A (zh) 片岩各向异性弹性模量测定方法
CN110794039B (zh) 利用岩体波速计算帷幕灌浆岩体裂隙充填率的方法
CN102797267A (zh) 密闭式沉井侧壁摩阻力计
de Mello Franco et al. Determination of the natural stress state in a Brazilian rock mass by back analysing excavation measurements: a case study
CN102817344A (zh) 综合摩阻力计
Munir Development of correlation between rock classification system and modulus of deformation
Ai et al. Study on the Method for Measuring Stress on Rock Mass Excavation Surface under Extremely High Stress Conditions
CN113153282A (zh) 覆岩水力及岩石力学监测方法及系统
Ma et al. Research on in situ stress distribution of the railway tunnels in southwest China based on the complete temperature compensation technology
CN111898244A (zh) 一种线状工程勘察阶段岩爆风险评估方法
Pavlov et al. The hydraulic fracture opening pressure multiple test for the stress state measurement in permeable rock
Haimson Status of in situ stress determination methods

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130417

Termination date: 20130829