CN102425432A - Timely yield supporting system for deep high-stress broken-expansion surrounding rocks - Google Patents

Timely yield supporting system for deep high-stress broken-expansion surrounding rocks Download PDF

Info

Publication number
CN102425432A
CN102425432A CN2011104190251A CN201110419025A CN102425432A CN 102425432 A CN102425432 A CN 102425432A CN 2011104190251 A CN2011104190251 A CN 2011104190251A CN 201110419025 A CN201110419025 A CN 201110419025A CN 102425432 A CN102425432 A CN 102425432A
Authority
CN
China
Prior art keywords
supporting
submodule
design
scheme
good time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104190251A
Other languages
Chinese (zh)
Inventor
余伟健
朱永建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Science and Technology
Hunan University of Science and Technology
Original Assignee
Hunan University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Science and Technology filed Critical Hunan University of Science and Technology
Priority to CN2011104190251A priority Critical patent/CN102425432A/en
Publication of CN102425432A publication Critical patent/CN102425432A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a timely yield supporting system for deep high-stress broken-expansion surrounding rocks. The system mainly comprises a surrounding rock classification and evaluation submodule RC, a timely yield supporting design submodule SY and a feedback design submodule DR; the surrounding rock classification and evaluation submodule RC is used for performing computation and analysis according to parameter input from an engineering geological survey so as to obtain an overall supporting scheme; the timely yield supporting design submodule SY is used for receiving computed results and the overall supporting scheme obtained from the surrounding rock classification and evaluation submodule RC, performing integrated optimization to obtain an optimal scheme, and then performing construction and supporting tests on a high-stress soft rock roadway; and the feedback design submodule DR is used for performing feedback design on the original supporting scheme by using real-time monitoring data, which is obtained by monitoring the roadway surrounding rocks in real time, in a use process after the supporting is finished, and obtaining an adjusted supporting scheme, wherein the adjusted supporting scheme is used for performing graphic generating and processing mainly through a graphic processing and generating module CAD (Computer-Aided Design), a displayer, graph outputting equipment and the like. The timely yield supporting system disclosed by the invention has a very good effect on optimizing an excavation sequence and supporting after proper yielding and provides safety guarantee for mining.

Description

The in good time yield supporting system of the heavily stressed broken bloated country rock in deep
Technical field
The present invention relates to a kind of supporting design system of deep tunnel country rock.
Background technology
Along with the lot of consumption of expanding economy and mineral resources, roadway excavation more and more develops to the deep.But because in the middle of excavation and construction, geological conditions becomes increasingly complex, each construction project encounters greater difficulties than ever.Particularly,, add deep geostatic stress effect, cause surrouding rock deformation big, phenomenons such as supporting inefficacy because the whole degree of crushing of rock mass is bigger for excavation and support work than the place, deep.This has all had a strong impact on the development progress and the operation plan in each big mining area.
At present, generally adopt a kind of or cooperative programs in the spray of anchor net, anchor cable, anchor notes or the steel bow member etc. for the supporting of deep weak surrounding rock; For heavily stressed, the breaking surrounding rock in the complex structure zone, release or yield supporting technology has been proposed then.But let how many ununified standards of measurement of pressing displacement or discharging stress, its systematic research is operated in still rare both at home and abroad.Therefore, according to the design philosophy of " optimize sequence of excavation, suitably let and press the back supporting ", a kind of supporting method for designing and system of deep tunnel country rock proposed.
Summary of the invention
For overcoming the above problems; The present invention provides a kind of in good time yield supporting system that is suitable for the heavily stressed broken bloated country rock in deep; Design scheme of the present invention is following: the in good time yield supporting system of the heavily stressed broken bloated country rock in a kind of deep mainly comprises rocvk classification and estimates submodule RC, the submodule of yield supporting design in good time SY, Feedback Design submodule DR; Wherein:
Said rocvk classification and evaluation submodule RC are used for the parameter according to engineering geological survey is input into capable computational analysis, draw overall supporting scheme;
Said in good time yield supporting design submodule SY is used for receiving rocvk classification and estimates resulting result of calculation of submodule RC and overall supporting scheme; Obtain 16 schemes according to three factors, four horizontal quadrature test design methods; And respectively these schemes are carried out numerical analysis; Complex optimum goes out preferred plan, according to this preferred plan that draws is constructed and supporting test in the high stressed soft rock tunnel;
Said Feedback Design submodule DR is used for the use after supporting is accomplished; To monitor resulting real-time monitor data to roadway surrounding rock in real time former supporting scheme will be carried out Feedback Design; And obtaining adjusting supporting scheme, the adjustment supporting scheme mainly carries out figure through graphics process and generation module CAD, display and map delivery device etc. to be generated and handles.
The module that said in good time yield supporting design submodule SY is used for Orthogonal Experiment and Design can be the OET of system.Adopt this system can avoid repetitive operation as much as possible, can let us pick out the representational point of part in the comprehensive test and make an experiment, possess even dispersion, neat comparable characteristics, can high efficiency, quick, the economic design that makes an experiment.
Said in good time yield supporting design submodule SY is used for the module that 16 schemes are carried out numerical analysis can be finite difference numerical Analysis System FLAC.This system call ground class large software FLAC; It can calculate the deformation process of geotechnical engineering under supporting condition; It is the quick Lagrange routine analyzer of a kind of explicit finite difference continuous media; 6 kinds of materials such as embedded elastic model, More-Coulomb criterion, strain hardening and strain softening model, advantage such as can simulate that stress field under the different loading environments generates, underground chamber excavation and anchor pole or anchor cable are provided with.
The system that said in good time yield supporting design submodule SY is used for complex optimum can be overall merit and optimization system OMO.This system synthesis has been considered the estimation of stability index of underground country rock engineering; Comprise desired values such as final drag that maximum displacement monitoring, final rate of convergence, supporting and protection structure bears, plastic zone hoop scope, safety factor, thereby can comparatively reasonably find out preferred preferred plan.
Figure of description:
Fig. 1 is a workflow diagram of the present invention.
Specific embodiment:
Below in conjunction with specific embodiment the present invention is done further elaboration explanation.Shown in flow chart: the in good time yield supporting system of the heavily stressed broken bloated country rock in a kind of deep in the present embodiment, it mainly comprises rocvk classification and estimates submodule RC1, yield supporting design submodule SY2 and Feedback Design submodule DR3 in good time; Wherein:
Said rocvk classification and evaluation submodule RC1 are used for the parameter according to engineering geological survey is input into capable computational analysis, draw overall supporting scheme;
Said in good time yield supporting design submodule SY2 is used for receiving rocvk classification and estimates resulting result of calculation of submodule RC1 and overall supporting scheme; The OET4 of employing system obtains 16 schemes according to three factors, four horizontal quadrature test design methods; FLAC carries out numerical analysis to these schemes respectively with the finite difference numerical Analysis System; Overall merit and optimization system OMO6 complex optimum go out preferred plan, according to this preferred plan that draws are constructed and supporting test in the high stressed soft rock tunnel;
Said Feedback Design submodule DR (3) is used for the use after supporting is accomplished; To monitor resulting real-time monitor data to roadway surrounding rock in real time former supporting scheme will be carried out Feedback Design; And obtaining adjusting supporting scheme, the adjustment supporting scheme mainly carries out figure through graphics process and generation module CAD, display and map delivery device etc. to be generated and handles.
Above specific embodiment is a better embodiment of the present invention; But be not full content of the present invention; Adopt some functional modules among alternative the present invention of identical function module to reach all equivalents that same purpose etc. is done in spirit of the present invention, all will be in protection domain of the present invention.

Claims (4)

1. the in good time yield supporting system of the heavily stressed broken bloated country rock in deep, it is characterized in that: it mainly comprises rocvk classification and estimates submodule RC (1), the submodule SY (2) of yield supporting design in good time, Feedback Design submodule DR (3); Wherein:
Said rocvk classification and evaluation submodule RC (1) are used for the parameter according to engineering geological survey is input into capable computational analysis, draw overall supporting scheme;
Said in good time yield supporting design submodule SY (2) is used for receiving rocvk classification and estimates resulting result of calculation of submodule RC (1) and overall supporting scheme; Obtain 16 schemes according to three factors, four horizontal quadrature test design methods; And respectively these schemes are carried out numerical analysis; Complex optimum goes out preferred plan, according to this preferred plan that draws is constructed and supporting test in the high stressed soft rock tunnel;
Said Feedback Design submodule DR (3) is used for the use after supporting is accomplished; To monitor resulting real-time monitor data to roadway surrounding rock in real time former supporting scheme will be carried out Feedback Design; And obtaining adjusting supporting scheme, the adjustment supporting scheme mainly carries out figure through graphics process and generation module CAD, display and map delivery device etc. to be generated and handles.
2. according to the in good time yield supporting system of the heavily stressed broken bloated country rock in the described a kind of deep of claim 1, it is characterized in that: the module that said in good time yield supporting design submodule SY (2) is used for Orthogonal Experiment and Design is the OET of system (4).
3. according to the in good time yield supporting system of the heavily stressed broken bloated country rock in the described a kind of deep of claim 1, it is characterized in that: the module that said in good time yield supporting design submodule SY (2) is used for 16 schemes are carried out numerical analysis is finite difference numerical Analysis System FLAC (5).
4. according to the in good time yield supporting system of the heavily stressed broken bloated country rock in the described a kind of deep of claim 1, it is characterized in that: the system that said in good time yield supporting design submodule SY (2) is used for complex optimum is overall merit and optimization system OMO (6).
CN2011104190251A 2011-12-15 2011-12-15 Timely yield supporting system for deep high-stress broken-expansion surrounding rocks Pending CN102425432A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104190251A CN102425432A (en) 2011-12-15 2011-12-15 Timely yield supporting system for deep high-stress broken-expansion surrounding rocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104190251A CN102425432A (en) 2011-12-15 2011-12-15 Timely yield supporting system for deep high-stress broken-expansion surrounding rocks

Publications (1)

Publication Number Publication Date
CN102425432A true CN102425432A (en) 2012-04-25

Family

ID=45959457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104190251A Pending CN102425432A (en) 2011-12-15 2011-12-15 Timely yield supporting system for deep high-stress broken-expansion surrounding rocks

Country Status (1)

Country Link
CN (1) CN102425432A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103244101A (en) * 2013-04-27 2013-08-14 中国矿业大学 Method for evaluating quality of rock stratum while drilling
CN105631102A (en) * 2015-12-24 2016-06-01 河南理工大学 Numerical simulation determination method of deep high-stress roadway drilling pressure relief parameter
CN107575234A (en) * 2017-09-07 2018-01-12 长沙有色冶金设计研究院有限公司 A kind of deep-well support design method
CN111369156A (en) * 2020-03-11 2020-07-03 中铁(天津)隧道工程勘察设计有限公司 Method for evaluating local stability of surrounding rock excavated by oversized cross-chamber rock tunnel

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103244101A (en) * 2013-04-27 2013-08-14 中国矿业大学 Method for evaluating quality of rock stratum while drilling
CN103244101B (en) * 2013-04-27 2016-06-01 中国矿业大学 With the quality of rock masses evaluation method crept into
CN105631102A (en) * 2015-12-24 2016-06-01 河南理工大学 Numerical simulation determination method of deep high-stress roadway drilling pressure relief parameter
CN105631102B (en) * 2015-12-24 2018-12-04 河南理工大学 A kind of numerical simulation of deep high stress tunnel drilling relief parameter determines method
CN107575234A (en) * 2017-09-07 2018-01-12 长沙有色冶金设计研究院有限公司 A kind of deep-well support design method
CN111369156A (en) * 2020-03-11 2020-07-03 中铁(天津)隧道工程勘察设计有限公司 Method for evaluating local stability of surrounding rock excavated by oversized cross-chamber rock tunnel

Similar Documents

Publication Publication Date Title
Jiang et al. Analysis of stress redistribution in soil and earth pressure on tunnel lining using the discrete element method
CN102425432A (en) Timely yield supporting system for deep high-stress broken-expansion surrounding rocks
CN105550441A (en) Engineering rock mass fracture degradation numerical simulation method based on continuous medium
Li et al. Study on roadheader cutting load at different properties of coal and rock
Yong et al. Dynamic effect and control of key strata break of immediate roof in fully mechanized mining with large mining height
Wang et al. Determination of mechanical parameters for jointed rock masses
CN103606019B (en) Mine goaf overlying stratum sedimentation dynamic prediction method based on time-space relationship
Fu et al. Investigations of the sequential excavation and reinforcement of an underground cavern complex using the discontinuous deformation analysis method
Liu et al. Y-Mat: an improved hybrid finite-discrete element code for addressing geotechnical and geological engineering problems
Liu et al. Dynamic response simulation of lining structure for tunnel portal section under seismic load
Fei et al. Evolution mechanism of karst sinkholes in Wuhan city
CN104318005A (en) Virtools based multivariate data fusion virtual test display system
Hu et al. Dynamic rupture simulations with heterogeneous initial stresses inversed from a given slip distribution: A case study of the 2017 Mw 6.5 Jiuzhaigou earthquake
Dai et al. Stability evaluation on surrounding rocks of underground powerhouse based on microseismic monitoring
Guangyun et al. Effect of vertical acceleration on site liquefaction in pulse ground motion
Pang et al. Analysis of main controlling factors of overburden failure in coal mining under thick coal seam geological conditions
Pierce et al. Use of synthetic rock masses (SRM) to investigate jointed rock mass strength and deformation behavior
Lyu et al. Nonlinear seismic response of a hydraulic tunnel considering fluid-solid coupling
Pan et al. An attempt on the application of the gradient particle size discrete element specimen in rock engineering
Kamkar et al. Investigating the performance of common models for soil behaviour on prediction of ground surface settlement induced by tunneling in coarse-grained soils using finite element method
Cheng et al. Necessity of using heterogeneous ellipsoidal Earth model with terrain to calculate co-seismic effect
Rong et al. A New Seismic Hazard Model for Mainland China
Villani et al. Shallow structural setting of an active normal fault zone in the 30 October 2016 Mw 6.5 central Italy earthquake imaged through a multidisciplinary geophysical approach.
Hsieh et al. Interpretation of magnetic data based on Euler deconvolution and crustal magnetization in Taiwan
Knapp et al. The mobility of rock avalanches: disintegration, entrainment and deposition-a conceptual approach

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120425