CN102418546A - Pneumatic ventilation structure for underpass - Google Patents

Pneumatic ventilation structure for underpass Download PDF

Info

Publication number
CN102418546A
CN102418546A CN2011103011748A CN201110301174A CN102418546A CN 102418546 A CN102418546 A CN 102418546A CN 2011103011748 A CN2011103011748 A CN 2011103011748A CN 201110301174 A CN201110301174 A CN 201110301174A CN 102418546 A CN102418546 A CN 102418546A
Authority
CN
China
Prior art keywords
air
underground
exhausting
passage
transverse tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103011748A
Other languages
Chinese (zh)
Inventor
陈蜀乔
陈雨彤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN2011103011748A priority Critical patent/CN102418546A/en
Publication of CN102418546A publication Critical patent/CN102418546A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Ventilation (AREA)

Abstract

The invention relates to a pneumatic ventilation structure for an underpass, and belongs to the field of traffic engineering. The building structure of the conventional underpass is not changed, an air collection and air inlet device and a pneumatic air extracting device are arranged on plane awnings at left and right underground entryways, so that ventilation of the underpass is realized; the plane awnings at the left and right underground entryways have straight top plate structures and are supported by a support upright post and a transverse support pipe; the air collection and air inlet device is arranged in the center of a plane top plate at the left underground entryway; and the pneumatic air extracting device is arranged in the center of a plane top plate at the right underground entryway. The structure is air-powered, energy-saving and environment-friendly, does not need any power device, realizes natural ventilation of the underpass, and solves the problems of poor air environment, dirty air and mildew-wet walls in the underpass, the health hazard of people entering the underpass, and the like.

Description

Pass underground passage pneumatic air-exchanging structure in street under a kind of
Technical field
The present invention relates to pass the pneumatic air-exchanging structure of street underground passage under a kind of, belong to the traffic engineering field.
Background technology
Underground pedestrian passageway does not receive the restriction of ground level road width, and sleety weather uses safer, and is less to ground landscape and traffic impact.But in long underground pedestrian passageway; Because people residence time long (as do small business etc.), particularly old man and weakling have rational Design of ventilation if throw; Ventilation is not enough; Underground passage air environment certainly will be relatively poor, and that air becomes is dirty, wall is mould wet, and the people's in the admission passage health is worked the mischief; In addition, also can influence it and use, like the safety of electrical equipment in the passage etc.So how under the investment of minimum and operating cost condition, solve the ventilating problem of underground pedestrian passageway.This is a problem demanding prompt solution.
General middle following several kinds of schemes (" building heat-energy air conditioner " Municipal Design and Research Inst. Nanjing City that adopts on the present engineering; Xie Ninghan; 2001 years the 4th phases, p47): 1. the mode that the most extensively adopts is no wind pipe type induced draught, is to utilize the ventilation fan to carry out forced ventilation at the passage middle position; Its shortcoming is to want consumes electric power, and there is noise in motor.2. blast is very little to the influence that underground pedestrian passageway ventilates, and can ignore.So, how to take measures, create the condition of ventilating of helping with blast? One of measure; Increase the access area; Strengthen the effect of blast and hot pressing, make under identical blast and hot pressing function, to have produced bigger ventilation motive force, its shortcoming is that construction costs increases; Two of measure increases the hole wall height, and with the pattern such as streamlined that the hole barricade is designed to help ventilating, utilizes it to introduce bigger ventilation as the ventilation deflector; Three of measure, according to the long-term prevailing wind in locality always be provided with the hole towards, using population has the long time towards the windward side; Four of measure reduces the exit and entrance gradient, makes to block near the hole lessly, reduces flowing resistance, increases ventilation.Above-mentioned four measures are common to exist a shortcoming exactly because building structure has symmetry, makes and can only improve the air flow condition in underground passage two end entrance sources, little to the change of passage centre.How to realize efficient, unpowered, the low-cost ventilation of underground passage, its relevant patent is actually rare.
Summary of the invention
The purpose of this invention is to provide a kind of building structure that can realize down passing the pneumatic ventilation of street underground passage, relatively poor to solve underground passage air environment, air is dirty, wall mould wet, to problems such as the people's in the admission passage health work the mischief.
Technical scheme of the present invention is: pass underground passage pneumatic air-exchanging structure in street under a kind of; Do not change existing building structure of passing the street underground passage down, realize the ventilation of passing the street underground passage down through installation collection wind inlet duct and pneumatic air extractor on the plane canopy 1 at underground entrance passage place, the left and right sides.
Pass the left underground entrance passage 2 of the pneumatic air-exchanging structure of street underground passage and the plane canopy 1 at right underground entrance passage 7 places under said and all adopt straight top board structure or other structure, come supporting plane canopy 1 through support post 12 and cross binding pipe 11.At left underground entrance passage 2 place flat top central authorities installation collection wind inlet ducts, the pneumatic air extractor of right underground entrance passage 7 places flat top central authorities installation.
The installation site of said collection wind inlet duct and pneumatic air extractor can exchange.
Said collection wind inlet duct is made up of arc air gathering plate 2, blast pipe 3, air inlet transverse tube 9, blast pipe air intake duct 10, left side backplate 18.Arc air gathering plate 2 constitutes both wings, is connected fixing with left side backplate 18.Air inlet transverse tube 9 laterally is installed on the plane canopy 1 of below of arc air gathering plate 2, and pouring waterproof bonding material in place, slit makes it fixing and do not seep water.Air inlet transverse tube 9 is provided with blast pipe air intake duct 10, and air inlet transverse tube 9 lower ends central authorities are communicated with blast pipe 3, blast pipe 3 lower ends export with under pass street underground passage 4 and be communicated with.Arc air gathering plate 2 can be one or more pairs of and symmetrical placement.
Said pneumatic air extractor is made up of V-type curved panel 14, exhausting groove 15, exhausting transverse tube 16, exhausting scavenge trunk 17, right side backplate 19.Be provided with the V-type curved panel 14 that two symmetries are placed, be connected fixing with right side backplate 19.Exhausting transverse tube 16 laterally is installed on the plane canopy 1 of V-arrangement cambered plate 14 belows; Exhausting transverse tube 16 is provided with exhausting groove 15; Exhausting scavenge trunk 17 1 ends are communicated with exhausting transverse tube 16; The other end is to extending below, and is divided into two-way and enters into down and pass street underground passage 4 entrance, and two lower port are near passing the ground of street underground passage 4 and extend internally one section down.
Said exhausting transverse tube 16 embeds and is placed on the plane canopy 1 of V-arrangement cambered plate 14 belows, and is higher than the plane of plane canopy 1.
Operating principle of the present invention is: utilize air-flow different, pressure is also different, and air-flow is big more, and pressure is more little.When the street was crossed in wind, the right and left underground entrance passage had air-flow to get into simultaneously, was provided with collection wind inlet duct on left underground entrance passage 2 flat top; And be provided with pneumatic air extractor on right underground entrance passage 7 top boards, make that when air flow stream is crossed passage passing street underground passage 4 exists differential pressure of atmospheric pressure down; The air pressure on the left side is big, and the air pressure on the right is little, make air can under pass street underground passage 4 left sides and flow to the right; Form the convection current air, pass street underground passage ventilation under realizing.
When collection wind inlet duct was crossed in wind, a side of the arc air gathering plate 2 of two both wings symmetry poured into air-flow in the air inlet transverse tube 9 through blast pipe air intake duct 10 along cambered surface, and air inlet transverse tube 9 is to extending below, and air draught is sent into down passed in the street underground passage 4.Consider rainy day, current might enter into down through blast pipe air intake duct 10 and pass in the street underground passage 4, cause passage moist.Air inlet transverse tube 9 laterally is placed on the plane canopy 1, and pouring waterproof bonding material in place, slit makes it to fix and do not seep water.So just keep off current outside air inlet transverse tube 9, avoid passing in the street underground passage 4 under the rainwater inflow.
When pneumatic air extractor was crossed in wind, air-flow poured into pneumatic groove 6 along cambered surface and flows out, and the structure of the V-arrangement cambered plate 14 of depression makes the air velocity at pneumatic groove 6 places become big, and air pressure diminishes.Because the air pressure at pneumatic groove 6 places less than ambient air pressure, constitutes differential pressure of atmospheric pressure, form the convection current air.Exhausting transverse tube 16 is installed in pneumatic groove 6 belows, and exhausting transverse tube 16 tops are exhausting grooves 15, are depression, so just in exhausting transverse tube 16, deflate.And the other end of exhausting scavenge trunk 17 is to extending below; Being divided into two-way enters into down and passes street underground passage 4 entrance; Two approaching ground of passing street underground passage 4 down of lower port; And in passage, extend one section, and so just foul atmosphere in the underground passage is extracted out, pass street underground passage ventilation under realizing.Exhausting transverse tube 16 embeds and is placed on the plane canopy 1, is higher than the plane, so just keeps off current outside exhausting transverse tube 16, avoids passing in the street underground passage 4 under the rainwater inflow.
The invention has the beneficial effects as follows: with wind is power, has realized the natural ventilation that time passes the street underground passage need not any power set also its civil structure for a change, energy-conserving and environment-protective.It is relatively poor to have solved underground passage air environment, air is dirty, wall mould wet, to problems such as the people's in the admission passage health work the mischief.
Description of drawings
Fig. 1 is a vertical view of the present invention;
Fig. 2 collects wind inlet duct master sectional view for the present invention;
Fig. 3 is an air inlet pipe sketch map of the present invention;
Fig. 4 is the present invention left side underground passage inlet A-A sectional view;
Fig. 5 is the pneumatic air extractor master of a present invention sectional view;
Fig. 6 is an exhaust tube sketch map of the present invention;
Fig. 7 is the right underground passage inlet of the present invention B-B sectional view;
Fig. 8 is master's sectional view of the present invention;
Each label is among the figure: 1: plane canopy, 2: left underground entrance passage, 3: blast pipe, 4: pass the street underground passage, 5 down: exhaust column; 6: pneumatic groove, 7: right underground entrance passage, 8: wind collection slot, 9: air intake transverse tube, 10: the blast pipe air intake duct; 11: cross binding pipe, 12: support post, 13: underground passage entrance steps, 14:V shape cambered plate, 15: the exhausting groove; 16: exhausting transverse tube, 17: exhausting scavenge trunk, 18: left side backplate, 19: the right side backplate.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment, the present invention is described further, but content of the present invention is not limited to said scope.
Embodiment 1: shown in Fig. 1-8; Pass underground passage pneumatic air-exchanging structure in street under a kind of; Do not change existing building structure of passing the street underground passage down, realize the ventilation of passing the street underground passage down through installation collection wind inlet duct and pneumatic air extractor on the plane canopy 1 at underground entrance passage place, the left and right sides.
Pass the left underground entrance passage 2 of the pneumatic air-exchanging structure of street underground passage and the plane canopy 1 at right underground entrance passage 7 places under said and all adopt straight top board structure, support through support post 12 and cross binding pipe 11.At left underground entrance passage 2 place flat top central authorities installation collection wind inlet ducts, the pneumatic air extractor of right underground entrance passage 7 places flat top central authorities installation.
Said collection wind inlet duct is made up of arc air gathering plate 2, blast pipe 3, air inlet transverse tube 9, blast pipe air intake duct 10, left side backplate 18.Arc air gathering plate 2 constitutes both wings, is connected fixing with left side backplate 18.Air inlet transverse tube 9 laterally is installed on the plane canopy 1 of below of arc air gathering plate 2, and pouring waterproof bonding material in place, slit makes it fixing and do not seep water.Air inlet transverse tube 9 is provided with blast pipe air intake duct 10, and air inlet transverse tube 9 lower ends central authorities are communicated with blast pipe 3, blast pipe 3 lower ends export with under pass street underground passage 4 and be communicated with.Arc air gathering plate 2 is a pair of and symmetrical placement.
Said pneumatic air extractor is made up of V-type curved panel 14, exhausting groove 15, exhausting transverse tube 16, exhausting scavenge trunk 17, right side backplate 19.Be provided with the V-type curved panel 14 that two symmetries are placed, be connected fixing with right side backplate 19.Exhausting transverse tube 16 laterally is installed on the plane canopy 1 of V-arrangement cambered plate 14 belows; Exhausting transverse tube 16 is provided with exhausting groove 15; Exhausting scavenge trunk 17 1 ends are communicated with exhausting transverse tube 16; The other end is to extending below, and is divided into two-way and enters into down and pass street underground passage 4 entrance, and two lower port are near passing the ground of street underground passage 4 and extend internally one section down.
Said exhausting transverse tube 16 embeds and is placed on the plane canopy 1 of V-arrangement cambered plate 14 belows, and is higher than the plane of plane canopy 1.
Operating principle of the present invention is: utilize air-flow different, pressure is also different, and air-flow is big more, and pressure is more little.When the street was crossed in wind, the right and left underground entrance passage had air-flow to get into simultaneously, was provided with collection wind inlet duct on left underground entrance passage 2 flat top; And be provided with pneumatic air extractor on right underground entrance passage 7 top boards, make that when air flow stream is crossed passage passing street underground passage 4 exists differential pressure of atmospheric pressure down; The air pressure on the left side is big, and the air pressure on the right is little, make air can under pass street underground passage 4 left sides and flow to the right; Form the convection current air, pass street underground passage ventilation under realizing.
When collection wind inlet duct was crossed in wind, a side of the arc air gathering plate 2 of two both wings symmetry poured into air-flow in the air inlet transverse tube 9 through blast pipe air intake duct 10 along cambered surface, and air inlet transverse tube 9 is to extending below, and air draught is sent into down passed in the street underground passage 4.Consider rainy day, current might enter into down through blast pipe air intake duct 10 and pass in the street underground passage 4, cause passage moist.Air inlet transverse tube 9 laterally is placed on the plane canopy 1, and pouring waterproof bonding material in place, slit makes it to fix and do not seep water.So just keep off current outside air inlet transverse tube 9, avoid passing in the street underground passage 4 under the rainwater inflow.
When pneumatic air extractor was crossed in wind, air-flow poured into pneumatic groove 6 along cambered surface and flows out, and the structure of the V-arrangement cambered plate 14 of depression makes the air velocity at pneumatic groove 6 places become big, and air pressure diminishes.Because the air pressure at pneumatic groove 6 places less than ambient air pressure, constitutes differential pressure of atmospheric pressure, form the convection current air.Exhausting transverse tube 16 is installed in pneumatic groove 6 belows, and exhausting transverse tube 16 tops are exhausting grooves 15, are depression, so just in exhausting transverse tube 16, deflate.And the other end of exhausting scavenge trunk 17 is to extending below; Being divided into two-way enters into down and passes street underground passage 4 entrance; Two approaching ground of passing street underground passage 4 down of lower port; And in passage, extend one section, and so just foul atmosphere in the underground passage is extracted out, pass street underground passage ventilation under realizing.Exhausting transverse tube 16 embeds and is placed on the plane canopy 1, is higher than the plane, so just keeps off current outside exhausting transverse tube 16, avoids passing in the street underground passage 4 under the rainwater inflow.
Embodiment 2: shown in Fig. 1-8; Pass underground passage pneumatic air-exchanging structure in street under a kind of; Do not change existing building structure of passing the street underground passage down, realize the ventilation of passing the street underground passage down through installation collection wind inlet duct and pneumatic air extractor on the plane canopy 1 at underground entrance passage place, the left and right sides.
Pass the left underground entrance passage 2 of the pneumatic air-exchanging structure of street underground passage and the plane canopy 1 at right underground entrance passage 7 places under said and all adopt straight top board structure, support through support post 12 and cross binding pipe 11.At left underground entrance passage 2 place flat top central authorities installation collection wind inlet ducts, the pneumatic air extractor of right underground entrance passage 7 places flat top central authorities installation.
The installation site of said collection wind inlet duct and pneumatic air extractor can exchange.
Said collection wind inlet duct is made up of arc air gathering plate 2, blast pipe 3, air inlet transverse tube 9, blast pipe air intake duct 10, left side backplate 18.Arc air gathering plate 2 constitutes both wings, is connected fixing with left side backplate 18.Air inlet transverse tube 9 laterally is installed on the plane canopy 1 of below of arc air gathering plate 2, and pouring waterproof bonding material in place, slit makes it fixing and do not seep water.Air inlet transverse tube 9 is provided with blast pipe air intake duct 10, and air inlet transverse tube 9 lower ends central authorities are communicated with blast pipe 3, blast pipe 3 lower ends export with under pass street underground passage 4 and be communicated with.Arc air gathering plate 2 is two pairs and symmetry placement.
Said pneumatic air extractor is made up of V-type curved panel 14, exhausting groove 15, exhausting transverse tube 16, exhausting scavenge trunk 17, right side backplate 19.Be provided with the V-type curved panel 14 that two symmetries are placed, be connected fixing with right side backplate 19.Exhausting transverse tube 16 laterally is installed on the plane canopy 1 of V-arrangement cambered plate 14 belows; Exhausting transverse tube 16 is provided with exhausting groove 15; Exhausting scavenge trunk 17 1 ends are communicated with exhausting transverse tube 16; The other end is to extending below, and is divided into two-way and enters into down and pass street underground passage 4 entrance, and two lower port are near passing the ground of street underground passage 4 and extend internally one section down.
Said exhausting transverse tube 16 embeds and is placed on the plane canopy 1 of V-arrangement cambered plate 14 belows, and is higher than the plane of plane canopy 1.

Claims (6)

1. pass the pneumatic air-exchanging structure of street underground passage under one kind; All adopt straight top board structure on the straight canopy (1) that left side underground entrance passage (2) and right underground entrance passage (7) are located; It is characterized in that: come supporting plane canopy (1) through support post (12) and cross binding pipe (11); Locate flat top central authorities at left underground entrance passage (2) collection wind inlet duct is installed, right underground entrance passage (7) is located flat top central authorities pneumatic air extractor is installed.
2. pass underground passage pneumatic air-exchanging structure in street under according to claim 1, it is characterized in that: the installation site of said collection wind inlet duct and pneumatic air extractor can exchange.
3. pass underground passage pneumatic air-exchanging structure in street under according to claim 1, it is characterized in that: said collection wind inlet duct is made up of arc air gathering plate (2), blast pipe (3), air inlet transverse tube (9), blast pipe air intake duct (10), left side backplate (18); Arc air gathering plate (2) constitutes both wings; Be connected fixing with left side backplate (18); Air inlet transverse tube (9) laterally is installed on the plane canopy (1) of below of arc air gathering plate (2); Air inlet transverse tube (9) is provided with blast pipe air intake duct (10), and air inlet transverse tube (9) lower end central authorities are communicated with blast pipe (3), blast pipe (3) lower end export with under pass street underground passage (4) and be communicated with.
4. pass underground passage pneumatic air-exchanging structure in street under according to claim 3, it is characterized in that: said arc air gathering plate (2) can be one or more pairs of and symmetrical placement.
5. pass underground passage pneumatic air-exchanging structure in street under according to claim 1, it is characterized in that: said pneumatic air extractor is made up of V-type curved panel (14), exhausting groove (15), exhausting transverse tube (16), exhausting scavenge trunk (17), right side backplate (19); Be provided with the V-type curved panel (14) that symmetry is placed; Be connected fixing with right side backplate (19); Exhausting transverse tube (16) laterally is installed on the plane canopy (1) of V-arrangement cambered plate (14) below; Exhausting transverse tube (16) is provided with exhausting groove (15), and exhausting scavenge trunk (17) one ends are communicated with exhausting transverse tube (16), and the other end is to extending below; Be divided into two-way and enter into down and pass street underground passage (4) entrance, two lower port are near passing the ground of street underground passage (4) and extend internally one section down.
6. pass underground passage pneumatic air-exchanging structure in street under according to claim 5, it is characterized in that: said exhausting transverse tube (16) embeds on the plane canopy (1) that is placed on V-arrangement cambered plate (14) below, and is higher than the plane of plane canopy (1).
CN2011103011748A 2011-10-09 2011-10-09 Pneumatic ventilation structure for underpass Pending CN102418546A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103011748A CN102418546A (en) 2011-10-09 2011-10-09 Pneumatic ventilation structure for underpass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103011748A CN102418546A (en) 2011-10-09 2011-10-09 Pneumatic ventilation structure for underpass

Publications (1)

Publication Number Publication Date
CN102418546A true CN102418546A (en) 2012-04-18

Family

ID=45943166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103011748A Pending CN102418546A (en) 2011-10-09 2011-10-09 Pneumatic ventilation structure for underpass

Country Status (1)

Country Link
CN (1) CN102418546A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103244167A (en) * 2013-05-02 2013-08-14 中邮建技术有限公司 Manhole forced ventilation construction method and manhole forced ventilation curtain

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3824911A (en) * 1971-12-16 1974-07-23 I Janelid Ventilation of a tunnel, mine adit or the like
CN1289878A (en) * 2000-09-20 2001-04-04 岳阳市人民防空办公室 Substructure with directional natural ventilation
CN2628925Y (en) * 2003-04-27 2004-07-28 孙东行 Indoor ventilator
CN101660824A (en) * 2009-09-08 2010-03-03 曹清 Energy-saving environment-friendly ventilation system
CN102200022A (en) * 2011-04-20 2011-09-28 杭州行者工业产品设计事务所 Tunnel ventilation system
CN202284478U (en) * 2011-10-09 2012-06-27 昆明理工大学 Pneumatic ventilation structure for street-cross underground passage

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3824911A (en) * 1971-12-16 1974-07-23 I Janelid Ventilation of a tunnel, mine adit or the like
CN1289878A (en) * 2000-09-20 2001-04-04 岳阳市人民防空办公室 Substructure with directional natural ventilation
CN2628925Y (en) * 2003-04-27 2004-07-28 孙东行 Indoor ventilator
CN101660824A (en) * 2009-09-08 2010-03-03 曹清 Energy-saving environment-friendly ventilation system
CN102200022A (en) * 2011-04-20 2011-09-28 杭州行者工业产品设计事务所 Tunnel ventilation system
CN202284478U (en) * 2011-10-09 2012-06-27 昆明理工大学 Pneumatic ventilation structure for street-cross underground passage

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103244167A (en) * 2013-05-02 2013-08-14 中邮建技术有限公司 Manhole forced ventilation construction method and manhole forced ventilation curtain
CN103244167B (en) * 2013-05-02 2015-09-30 中邮建技术有限公司 Manhole shaft forced ventilation construction method and manhole shaft forced ventilation cloth curtain

Similar Documents

Publication Publication Date Title
CN202284478U (en) Pneumatic ventilation structure for street-cross underground passage
CN106014468A (en) Double-hole complementary vertical/inclined shaft ventilation system for expressway tunnel
CN100523399C (en) Pincer type arcuate ventilator
CN202023371U (en) Building structure system conforming to human architecture
CN202284355U (en) Wind and solar ventilation structure for street-cross underground passage
CN202416659U (en) Building structure for natural ventilation of underpass underground passage
CN207296002U (en) Dismantled and assembled assembled house
CN102418546A (en) Pneumatic ventilation structure for underpass
CN2782754Y (en) Combined space corridor
CN208998272U (en) A kind of ventilation systems in underground car parks system
CN2845252Y (en) Buried substation
CN102363986B (en) Street crossing underground passage wind power and solar ventilation structure
CN202787313U (en) Wind driven ventilating and lighting device for underpass
CN201077994Y (en) Breathing place used for synthesis pipe canal
CN101363655B (en) Energy-conserving and consumption-reducing normal temperature air draft passage and hot air draft passage in spinning factory building
CN207409986U (en) A kind of cable duct for being capable of automatic dehumidifying ventilation
CN201541066U (en) Ventilating structure of partial embedded preassemble type transformer substation
CN102383519B (en) Natural ventilation building structure for underground passage of street
CN201250501Y (en) Reverse filling protection hood of exhausting and ventilating channel used in building
CN208185021U (en) A kind of multilayer is collected folk songs wind tower
KR200381711Y1 (en) A Discharging cover of air for outdoor machine of an air conditioner
CN205536363U (en) Underground garage ventilation structure
CN210262850U (en) Novel municipal administration guardrail
CN206916637U (en) A kind of urban streets and lanes of anti-strong wind sand weather environment
CN2359383Y (en) Funnel cap for air-out

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120418