CN102413504B - Congestion control method and equipment - Google Patents

Congestion control method and equipment Download PDF

Info

Publication number
CN102413504B
CN102413504B CN201110457449.7A CN201110457449A CN102413504B CN 102413504 B CN102413504 B CN 102413504B CN 201110457449 A CN201110457449 A CN 201110457449A CN 102413504 B CN102413504 B CN 102413504B
Authority
CN
China
Prior art keywords
mobile management
congestion control
network
network equipment
terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110457449.7A
Other languages
Chinese (zh)
Other versions
CN102413504A (en
Inventor
王胡成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Datang Mobile Communications Equipment Co Ltd
Original Assignee
China Academy of Telecommunications Technology CATT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Telecommunications Technology CATT filed Critical China Academy of Telecommunications Technology CATT
Priority to CN201110457449.7A priority Critical patent/CN102413504B/en
Publication of CN102413504A publication Critical patent/CN102413504A/en
Priority to PCT/CN2012/081968 priority patent/WO2013097503A1/en
Application granted granted Critical
Publication of CN102413504B publication Critical patent/CN102413504B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W74/00Wireless channel access, e.g. scheduled or random access
    • H04W74/08Non-scheduled or contention based access, e.g. random access, ALOHA, CSMA [Carrier Sense Multiple Access]
    • H04W74/0833Non-scheduled or contention based access, e.g. random access, ALOHA, CSMA [Carrier Sense Multiple Access] using a random access procedure
    • H04W74/0841Non-scheduled or contention based access, e.g. random access, ALOHA, CSMA [Carrier Sense Multiple Access] using a random access procedure with collision treatment
    • H04W74/085Non-scheduled or contention based access, e.g. random access, ALOHA, CSMA [Carrier Sense Multiple Access] using a random access procedure with collision treatment collision avoidance
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/0289Congestion control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/18Management of setup rejection or failure
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/50Connection management for emergency connections

Abstract

The embodiment of the invention discloses a congestion control method and equipment, relating to the technical field of wireless communication, wherein the method and equipment are used for improving the success rate of a terminal accessing a network. In the invention, when the congestion state of the current network recovers and the time corresponding to a stored mobile management backoff time value for congestion control does not arrive, the network side equipment sets the stored mobile management backoff time value to be invalid; and after receiving a mobile management request sent by the terminal, the network side equipment does not directly reject the mobile management request according to the mobile management backoff time value, namely that when the congestion state of the network recovers, the mobile management request sent by the terminal is not rejected by the network due to congestion control, thereby improving the success rate of the terminal accessing the network.

Description

Jamming control method and equipment
Technical field
The present invention relates to wireless communication field, relate in particular to a kind of jamming control method and equipment.
Background technology
Existing 3G (Third Generation) Moblie standardization body (3GPP) agreement has proposed mobile management congestion control (the APN based Mobility Management control) mechanism based on Access Point Name (APN).
According to the mobile management congestion control mechanism based on APN, network carries out the mobile management congestion control based on APN to the subscriber equipment (UE) of the special APN that contracted, when such UE sends mobile management (mobility management, MM) when request (request) is to network, network judges whether to start the mobile management congestion control based on APN, if, send the refuse information of this mobile management request to UE, and may in this refuse information, carry the information that mobile management is kept out of the way timer (mobility management back-off timer), UE keeps out of the way after the information of timer receiving mobile management, before keeping out of the way timer expiry, this mobile management no longer initiates to adhere to (attach) process except urgency traffic (emergency service) to network.Simultaneously, if network side maintains the context of this UE, can preserve mobile management back off time value this mobile management keep out of the way the time-out time of timer, before time corresponding to mobile management back off time value arrives, network can be refused the request of the attach except urgency traffic that this UE sends.
The judgement of above-mentioned network start mobile management congestion control based on APN according to as follows: the speed of mobile management Non-Access Stratum (NAS) message that one group of UE of this special APN that contracted sends has exceeded certain threshold value or has dropped under certain threshold value; And/or, the configuration in network management.
Existing 3GPP) agreement also proposed mobile management congestion control (the General NAS Mobility Management Congestion Control) mechanism of general NAS layer.
According to the mobile management congestion control of general NAS layer, in the time that UE sends mobile management request to network, if network side is not also for this UE sets up emergency bearing context (emergency bearer context), network judges whether to start the mobile management congestion control of general NAS layer, if, send the refuse information of this mobile management request to UE, and in this refuse information, carry the information that mobile management is kept out of the way timer, UE keeps out of the way after the information of timer receiving mobile management, start the local timer of keeping out of the way, before this keeps out of the way timer expiry, UE can not initiate any non-emergent business to network, the mobile management request of non-high priority or called service.Meanwhile, network side may preserve mobile management back off time value this mobile management keep out of the way the time-out time of timer, before time corresponding to mobile management back off time value arrives, network can be refused the mobile management request of any non-called service that UE sends; If network side has been set up emergency bearing context for this UE, network can be accepted any mobile management request of UE.
Keep out of the way timer run duration at mobile management, the UE of connected state can initiating updating of tracking area (TAU) process.
Above-mentioned judgement start general NAS layer mobile management congestion control according to as follows: network is in general overload (General Overload Condition).
For the common UE (being non-high-priority users) that does not set up emergency bearing business (emergency bearer service), keep out of the way timer in operation if there is mobile management, UE can initiate the mobile management request for emergency bearing business, but mobile management is kept out of the way timer, continuation keeps operation.UE keeps out of the way timer run duration at mobile management can initiate the mobile management request for emergency bearing business, the object of doing is like this to consider that network may recover from congestion state before mobile management is kept out of the way timer expiry, thereby can accept this mobile management request that UE sends.This mechanism is introduced in 3GPPTS24.301.
If but the mobile management request that UE initiates is service request (service request), TAU or Routing Area Update (RAU) request, the NAS layer of network cannot judge whether this mobile management request is for emergency bearing business so, therefore network is still likely refused this mobile management request, and this mechanism cannot be realized.
Realizing in process of the present invention, inventor finds to exist in prior art following technical problem:
The jamming control method that 3GPP proposes, keep out of the way timer and stop terminal to initiate mobile management request the network congestion in the situation that by issuing mobile management, simultaneously in network side preservation mobile management back off time value, for refusing the mobile management request of follow-up UE initiation.But the method may be brought following problem: if network is before time corresponding to mobile management back off time value arrives, recover from congestion state, the mobile management request that terminal is initiated so still can be refused by network, thereby makes normally access network of terminal.
summary of the invention
The embodiment of the present invention provides a kind of jamming control method and equipment, for improving the success rate of accessing terminal to network.
A kind of jamming control method, the method comprises:
Network equipment determine current network congestion state recover and preserve time corresponding to mobile management back off time value for congestion control do not arrive after, it is invalid that described mobile management back off time value is set to;
Network equipment receives after the mobile management request of described terminal transmission, determines whether according to current network conditions the described mobile management request of accepting;
Wherein, be not attached to network in described terminal, and in the time that network equipment starts the mobile management congestion control based on APN for terminal, further comprise: network equipment arranges the first congestion control that described APN is corresponding and starts the value identifying, so that the first congestion control startup mark expression has been contracted, the mobile management signaling of the terminal of described APN occurs congested at network side; It is invalid that described mobile management back off time value is set to, specifically comprise: network equipment is revised the first congestion control and started the value identifying, so that the first congestion control startup mark expression has been contracted, the mobile management signaling of the terminal of described APN does not occur congested at network side; Or, be not attached to network in described terminal, in the time that network equipment starts general mobile management congestion control for terminal, further comprise: network equipment arranges the second congestion control that this network equipment is corresponding and starts mark, represent that this network equipment transships so that the second congestion control starts mark; It is invalid that described mobile management back off time value is set to, and specifically comprises: network equipment is revised the second congestion control and started the value identifying, and represents that this network equipment transships so that the second congestion control starts mark;
Described according to current network conditions determine whether accept described mobile management request, specifically comprise: represent that this network equipment transships if the second current congestion control starts mark, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuse described mobile management request, if so, start general mobile management congestion control; If starting mark, the second current congestion control represents that this network equipment transships, and one or more APN of described terminal unit contractual corresponding first congestion control start mark represent contracted corresponding A PN terminal mobile management signaling network side occur congested, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuse described mobile management request, if so, start the mobile management congestion control based on these one or more APN; If starting mark, the second current congestion control represents that this network equipment transships, and the first congestion control that all APN of described terminal unit contractual are corresponding starts mark all represent the to have contracted mobile management signaling of terminal of corresponding A PN and does not occur congestedly at network side, and network equipment is accepted described mobile management request.
A kind of congestion control equipment, this equipment comprises:
The first setting unit, after not arriving for the time corresponding to mobile management back off time value for congestion control of recovering at the congestion state of determining current network and preserve, it is invalid that described mobile management back off time value is set to;
Control unit, for receiving after the mobile management request of described terminal transmission, determines whether according to current network conditions the described mobile management request of accepting;
Wherein, this device also comprises: the second setting unit, for not being attached to network in described terminal, and while starting the mobile management congestion control based on APN for terminal, the first congestion control that described APN is corresponding is set and starts the value identifying, so that the first congestion control startup mark expression has been contracted, the mobile management signaling of the terminal of described APN occurs congested at network side, described the first setting unit is used for: amendment the first congestion control starts the value of mark, so that the first congestion control startup mark expression has been contracted, the mobile management signaling of the terminal of described APN does not occur congested at network side, or, the 3rd setting unit, for not being attached to network in described terminal, and while starting general mobile management congestion control for terminal, the second congestion control that this equipment is corresponding is set and starts mark, represent that this equipment transships so that the second congestion control starts mark, described the first setting unit is used for: amendment the second congestion control starts the value of mark, represents that this equipment transships so that the second congestion control starts mark,
Described control unit specifically for: represent that this network equipment transships if current the second congestion control starts mark, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuse described mobile management request, if so, start general mobile management congestion control; If starting mark, the second current congestion control represents that this network equipment transships, and one or more APN of described terminal unit contractual corresponding first congestion control start mark represent contracted corresponding A PN terminal mobile management signaling network side occur congested, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuse described mobile management request, if so, start the mobile management congestion control based on these one or more APN; If starting mark, the second current congestion control represents that this network equipment transships, and the first congestion control that all APN of described terminal unit contractual are corresponding starts mark all represent the to have contracted mobile management signaling of terminal of corresponding A PN and does not occur congestedly at network side, and network equipment is accepted described mobile management request.
In this programme, network equipment recovers and when the time corresponding to mobile management back off time value for congestion control of preserving does not arrive at the congestion state of current network, it is invalid that the mobile management back off time value of preservation is set to, after this receiving after the mobile management request of terminal transmission, no longer directly refuse this mobile management request according to mobile management back off time value, also while being the congestion state recovery of network, the mobile management request that terminal sends can not refused because of congestion control by network, thereby has improved the success rate of accessing terminal to network.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of embodiment of the present invention supplying method;
Fig. 2 provides the structural representation of equipment for the embodiment of the present invention.
Embodiment
In order to improve the success rate of accessing terminal to network, the embodiment of the present invention provides a kind of jamming control method, in this method, network equipment recovers and when the time corresponding to mobile management back off time value for congestion control of preserving does not arrive at the congestion state of current network, it is invalid that the mobile management back off time value of preservation is set to, after this receiving after the mobile management request of terminal transmission, no longer directly refuse this mobile management request according to mobile management back off time value.
Referring to Fig. 1, the jamming control method that the embodiment of the present invention provides, comprises the following steps:
Step 10: network equipment determine current network congestion state recover and preserve time corresponding to mobile management back off time value for congestion control do not arrive after, it is invalid that this mobile management back off time value is set to;
Step 11: network equipment receives after the mobile management request of this terminal transmission, determines whether according to current network conditions the described mobile management request of accepting.
Concrete, it is the terminal (non attached UE) that is not attached to network in this terminal, and when the congestion control that network equipment starts for this terminal is the mobile management congestion control of the APN based on this terminal unit contractual, in step 10, whether the congestion state of determining current network recovers, and specific implementation can be as follows:
Network equipment judges whether the condition of the mobile management congestion control that meets the APN of predefined startup based on this terminal unit contractual according to current network condition, if do not meet, the mobile management signaling of determining the terminal of this APN that contracted does not occur congested at network side, and definite congestion state recovers, if meet, the mobile management signaling of the terminal of definite this APN that contracted is congested in network side generation, and definite congestion state does not recover.Here, the condition of the mobile management congestion control of the APN of startup based on this terminal unit contractual is: the speed of mobile management Non-Access Stratum (NAS) message that one group of UE of this special APN that contracted sends has exceeded certain threshold value or dropped under certain threshold value; And/or, the configuration in network management.
In the time that network equipment starts the mobile management congestion control based on APN for terminal, network equipment can arrange the first congestion control that this APN is corresponding and start the value identifying, so that the first congestion control startup mark expression has been contracted, the mobile management signaling of the terminal of this APN occurs congested at network side;
Accordingly, it is invalid that mobile management back off time value is set to, specific implementation can be as follows: network equipment is revised the first congestion control and started the value identifying, so that the first congestion control startup mark expression has been contracted, the mobile management signaling of the terminal of this APN does not occur congested at network side.
Concrete, be the terminal that is not attached to network in this terminal, and the congestion control that starts for this terminal of network equipment is while being general mobile management congestion control, in step 10, determines whether the congestion state of current network recovers, specific implementation can be as follows:
Network equipment judges whether to meet the condition of the general mobile management congestion control of predefined startup according to current network condition, if do not meet, determine that this network equipment transships, and the congestion state of definite network recovers, if meet, determine that this network equipment transships, and the congestion state of definite network does not recover.Here the condition that starts general mobile management congestion control, is: the network of this network equipment management is in general overload (General Overload Condition).
In the time that network equipment starts general mobile management congestion control for terminal, network equipment can arrange the second congestion control that this network equipment is corresponding and start mark, represents that this network equipment transships so that the second congestion control starts mark;
Accordingly, it is invalid that this mobile management back off time value is set to, and specific implementation can be as follows: network equipment is revised the second congestion control and started the value identifying, and represents that this network equipment transships so that the second congestion control starts mark.
Concrete, be the terminal (attached UE) that has been attached to network in this terminal, and the congestion control that starts for this terminal of network equipment is while being general mobile management congestion control, in step 10, whether the congestion state of determining current network recovers, and specific implementation can be as follows:
Network equipment judges whether to meet the condition of the general mobile management congestion control of predefined startup according to current network condition, if do not meet, determine that this network equipment transships, and the congestion state of definite network recovers, if meet, determine that this network equipment transships, and the congestion state of definite network does not recover.
In the time that network equipment starts general mobile management congestion control for terminal, network equipment can arrange the second congestion control that this network equipment is corresponding and start mark, represents that this network equipment transships so that the second congestion control starts mark;
Accordingly, it is invalid that described mobile management back off time value is set to, specific implementation can be as follows: if determine, the congestion state of the network of this network equipment management recovers, network equipment is revised the value of the second congestion control startup mark, represents that this network equipment transships so that the second congestion control starts mark.
Concrete, for the terminal that is not attached to network, in step 11, determining whether and accept this mobile management request according to current network conditions, specific implementation can be as follows:
If starting mark, the second current congestion control represents that this network equipment transships, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuses described mobile management request, if so, start general mobile management congestion control;
If starting mark, the second current congestion control represents that this network equipment transships, and one or more APN of described terminal unit contractual corresponding first congestion control start mark represent contracted corresponding A PN terminal mobile management signaling network side occur congested, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuse described mobile management request, if so, start the mobile management congestion control based on these one or more APN;
If starting mark, the second current congestion control represents that this network equipment transships, and the first congestion control that all APN of described terminal unit contractual are corresponding starts mark all represent the to have contracted mobile management signaling of terminal of corresponding A PN and does not occur congestedly at network side, and network equipment is accepted described mobile management request.
Concrete, for the terminal that is attached to network, in step 11, determining whether and accept described mobile management request according to current network conditions, specific implementation can be as follows:
If starting mark, the second current congestion control represents that this network equipment transships, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuses described mobile management request, if so, start general mobile management congestion control;
Represent that this network equipment transships if the second current congestion control starts mark, network equipment is accepted described mobile management request.
Further, after step 11, network equipment determine current network again enter congestion state time, can carry out following two kinds operation one of:
First, if this time corresponding to mobile management back off time value does not arrive, this mobile management back off time value of network equipment is set to effectively, concrete, if contracted, the mobile management signaling of the terminal of this APN occurs congested at network side again, revise the first congestion control that this APN is corresponding and start mark, so that this first congestion control startup mark expression has been contracted, the mobile management signaling of the terminal of this APN occurs congested at network side; If this network equipment transships again, revise the second congestion control that this network equipment is corresponding and start mark, so that starting mark, this second congestion control represents that this network equipment transships; The follow-up mobile management request that determines whether this terminal transmission receiving according to prior art according to this mobile management back off time value;
The second, if this mobile management back off time value is corresponding, time is up reaches or in the past, network equipment starts congestion control for this terminal again.
In the present invention, it is at network side, whether congested information to occur for the mobile management signaling of the terminal of this APN that represents to have contracted that the first congestion control of APN starts mark; It is for representing whether this network equipment the information of overload occurs that the second congestion control of network equipment starts mark.There is not congested information at network side in the initial value that the first congestion control starts mark need to represent the to have contracted mobile management signaling of terminal of this APN, the initial value that the second congestion control starts mark need to represent that this network equipment transships.
In the present invention, network equipment can be any equipment that can carry out congestion control such as MME.
In the present invention, for non attached UE, mobile management request is for adhering to request, and for attached UE, mobile management request is except other requests of adhering to request.
Below in conjunction with specific embodiment, the present invention will be described:
Embodiment mono-:
The present embodiment is for non attached UE, specific as follows:
Step 1, MME receive adhering to after request of terminal transmission, and judgement meets the condition of the mobile management congestion control of the APN of predefined startup based on terminal unit contractual, determine that the mobile management signaling of the terminal of this APN that contracted occurs congested at network side;
Step 2, MME send and refuse the refuse information that this adheres to request to terminal, carry the information that mobile management is kept out of the way timer in this refuse information; Preserve simultaneously mobile management back off time value this mobile management keep out of the way the time-out time of timer; And the value that the first congestion control that this APN is corresponding starts mark is set is 1, occur congested with the mobile management signaling of the terminal of this APN that represents to have contracted at network side;
Judgement does not meet after the condition of mobile management congestion control of the APN of predefined startup based on terminal unit contractual and the time corresponding to mobile management back off time value of preservation do not arrive according to current network conditions for step 3, MME, revising the value that the first congestion control that this APN is corresponding starts mark is 0, does not occur congested with the mobile management signaling of the terminal of this APN that represents to have contracted at network side;
Step 4, MME receive adhering to after request that terminal sends, one determine whether acceptance this adheres to request as follows:
Method one: represent that this MME transships if the second current congestion control starts mark, MME determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuses this and adheres to request, if so, start general mobile management congestion control;
If starting mark, the second current congestion control represents that this MME transships, and one or more APN of this terminal unit contractual corresponding first congestion control start mark represent contracted corresponding A PN terminal mobile management signaling network side occur congested, MME determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuse this and adhere to request, if so, start the mobile management congestion control based on these one or more APN;
If starting mark, the second current congestion control represents that this MME transships, and the first congestion control that all APN of this terminal unit contractual are corresponding starts mark all represent the to have contracted mobile management signaling of terminal of corresponding A PN and does not occur congestedly at network side, and MME accepts this and adheres to request.
Step 5:MME judgement meets after the condition of mobile management congestion control of the APN of predefined startup based on terminal unit contractual again, if the time corresponding to mobile management back off time value of preserving does not arrive, the first corresponding this APN congestion control is started to mark and be revised as 1, mobile management signaling with the terminal of the described APN that represents to have contracted occurs congested at network side, when what the terminal after this receiving again sent adheres to request, directly refuse this according to this mobile management back off time value and adhere to request; If the mobile management back off time value of preserving is corresponding, time is up reaches or in the past, arrives step 2.
Embodiment bis-:
The present embodiment is for non attached UE, specific as follows:
Step 1, MME receive adhering to after request of terminal transmission, and judgement meets the condition of the general mobile management congestion control of predefined startup, determine that the network of this MME management is in congestion state;
Step 2, MME send and refuse the refuse information that this adheres to request to terminal, carry the information that mobile management is kept out of the way timer in this refuse information; Preserve simultaneously mobile management back off time value this mobile management keep out of the way the time-out time of timer; And arrange this MME corresponding second congestion control start mark value be 1, to represent that this MME transships;
Judgement does not meet after the condition of the general mobile management congestion control of predefined startup and the time corresponding to mobile management back off time value of preservation do not arrive according to current network conditions for step 3, MME, the value of revising the second congestion control startup mark that this MME is corresponding is 0, to represent that this MME transships;
Step 4, MME receive adhering to after request that terminal sends, one determine whether acceptance this adheres to request according to the method described above;
Step 5:MME judgement meets after the condition of the general mobile management congestion control of predefined startup again, if the time corresponding to mobile management back off time value of preserving does not arrive, the second corresponding this MME congestion control is started to mark and be revised as 1, to represent that this MME transships, when what the terminal after this receiving again sent adheres to request, directly refuse this according to this mobile management back off time value and adhere to request; If the mobile management back off time value of preserving does not arrive or in the past, arrives step 2.
Embodiment tri-:
The present embodiment is for attached UE, specific as follows:
Step 1, MME receive after the MM request of terminal transmission, and judgement meets the condition of the general mobile management congestion control of predefined startup, determine that the network of this MME management is in congestion state;
Step 2, MME send the refuse information of this MM request of refusal to terminal, carry the information that mobile management is kept out of the way timer in this refuse information; Preserve simultaneously mobile management back off time value this mobile management keep out of the way the time-out time of timer; And arrange this MME corresponding second congestion control start mark value be 1, to represent that this MME transships;
Judgement does not meet after the condition of the general mobile management congestion control of predefined startup and the time corresponding to mobile management back off time value of preservation do not arrive according to current network conditions for step 3, MME, the value of revising the second congestion control startup mark that this MME is corresponding is 0, to represent that this MME transships;
Step 4, MME receive after the MM request of terminal transmission, determine whether according to method two the described mobile management request of accepting;
Method two: represent that this MME transships if the second current congestion control starts mark, MME determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuses MM request, if so, start general mobile management congestion control;
Represent that this MME transships if the second current congestion control starts mark, accept this MM request.
Step 5:MME judgement meets after the condition of the general mobile management congestion control of predefined startup again, if the time corresponding to mobile management back off time value of preserving does not arrive, the second corresponding this MME congestion control is started to mark and be revised as 1, to represent that this MME transships, when what the terminal after this receiving again sent adheres to request, directly refuse this according to this mobile management back off time value and adhere to request; If the mobile management back off time value of preserving does not arrive or in the past, arrives step 2.
Referring to Fig. 2, the embodiment of the present invention provides a kind of congestion control equipment, and this equipment comprises:
The first setting unit 20, after not arriving for the time corresponding to mobile management back off time value for congestion control of recovering at the congestion state of determining current network and preserve, it is invalid that described mobile management back off time value is set to;
Control unit 21, for receiving after the mobile management request of described terminal transmission, determines whether according to current network conditions the described mobile management request of accepting.
Further, described the first setting unit 20 for:
It is the terminal that is not attached to network in described terminal, and when the congestion control starting for described terminal is the mobile management congestion control of the Access Point Name APN based on this terminal unit contractual, judge whether to meet the condition of the mobile management congestion control of predefined startup based on described APN according to current network condition, if do not meet, the mobile management signaling of determining the terminal of this APN that contracted does not occur congested at network side, and definite congestion state recovers, if meet, the mobile management signaling of determining the terminal of this APN that contracted occurs congested at network side, and definite congestion state does not recover.
Further, this equipment also comprises:
The second setting unit 22, for in the time starting the mobile management congestion control based on APN for terminal, the first congestion control that described APN is corresponding is set and starts the value identifying, so that the first congestion control startup mark expression has been contracted, the mobile management signaling of the terminal of described APN occurs congested at network side;
Described the first setting unit 20 for:
Revise the value that the first congestion control starts mark, so that the first congestion control startup mark expression has been contracted, the mobile management signaling of the terminal of described APN does not occur congested at network side.
Further, described the first setting unit 20 for:
It is the terminal that is not attached to network in described terminal, and when the congestion control starting for described terminal is general mobile management congestion control, judge whether to meet the condition of the general mobile management congestion control of predefined startup according to current network condition, if do not meet, determine that this network equipment transships, and the recovery of the congestion state of definite network, if meet, determine that this network equipment transships, and the congestion state of definite network does not recover.
Further, this equipment also comprises:
The 3rd setting unit 23, for when start general mobile management congestion control for terminal, arranges the second congestion control that this equipment is corresponding and starts mark, represents that this equipment transships so that the second congestion control starts mark;
Described the first setting unit 20 for:
Revise the value that the second congestion control starts mark, represent that this equipment transships so that the second congestion control starts mark.
Further, described the first setting unit 20 for:
It is the terminal that has been attached to network in described terminal, and when the congestion control starting for described terminal is general mobile management congestion control, judge whether to meet the condition of the general mobile management congestion control of predefined startup according to current network condition, if do not meet, determine that this network equipment transships, and the recovery of the congestion state of definite network, if meet, determine that this network equipment transships, and the congestion state of definite network does not recover.
Further, this equipment also comprises:
The 4th setting unit 24, for when start general mobile management congestion control for terminal, arranges the second congestion control that this equipment is corresponding and starts mark, represents that this equipment transships so that the second congestion control starts mark;
Described the first setting unit 20 for:
Revise the value that the second congestion control starts mark, represent that this equipment transships so that the second congestion control starts mark.
Further, described control unit 21 for:
If starting mark, the second current congestion control represents that this network equipment transships, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuses described mobile management request, if so, start general mobile management congestion control;
If starting mark, the second current congestion control represents that this network equipment transships, and one or more APN of described terminal unit contractual corresponding first congestion control start mark represent contracted corresponding A PN terminal mobile management signaling network side occur congested, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuse described mobile management request, if so, start the mobile management congestion control based on these one or more APN;
If starting mark, the second current congestion control represents that this network equipment transships, and the first congestion control that all APN of described terminal unit contractual are corresponding starts mark all represent the to have contracted mobile management signaling of terminal of corresponding A PN and does not occur congestedly at network side, and network equipment is accepted described mobile management request.
Further, described control unit 21 for:
If starting mark, the second current congestion control represents that this network equipment transships, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuses described mobile management request, if so, start general mobile management congestion control;
Represent that this network equipment transships if the second current congestion control starts mark, network equipment is accepted described mobile management request.
Further, this equipment also comprises:
Recovery unit 25, for again entering after congestion state in definite current network, described mobile management back off time value is set to effectively; Determine whether the mobile management request of the described terminal transmission receiving according to described mobile management back off time value; Or,
Again start congestion control for described terminal.
The embodiment of the present invention also provides a kind of Mobility Management Entity (MME), and this MME comprises described congestion control equipment.
To sum up, beneficial effect of the present invention comprises:
In the scheme that the embodiment of the present invention provides, network equipment recovers and when the time corresponding to mobile management back off time value for congestion control of preserving does not arrive at the congestion state of current network, it is invalid that the mobile management back off time value of preservation is set to, after this receiving after the mobile management request of terminal transmission, no longer directly refuse this mobile management request according to mobile management back off time value, also while being the congestion state recovery of network, the mobile management request that terminal sends can not refused because of congestion control by network, thereby improve the success rate of accessing terminal to network.
The present invention is with reference to describing according to flow chart and/or the block diagram of the method for the embodiment of the present invention, equipment (system) and computer program.Should understand can be by the flow process in each flow process in computer program instructions realization flow figure and/or block diagram and/or square frame and flow chart and/or block diagram and/or the combination of square frame.Can provide these computer program instructions to the processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing device to produce a machine, the instruction that makes to carry out by the processor of computer or other programmable data processing device produces the device for realizing the function of specifying at flow process of flow chart or multiple flow process and/or square frame of block diagram or multiple square frame.
These computer program instructions also can be stored in energy vectoring computer or the computer-readable memory of other programmable data processing device with ad hoc fashion work, the instruction that makes to be stored in this computer-readable memory produces the manufacture that comprises command device, and this command device is realized the function of specifying in flow process of flow chart or multiple flow process and/or square frame of block diagram or multiple square frame.
These computer program instructions also can be loaded in computer or other programmable data processing device, make to carry out sequence of operations step to produce computer implemented processing on computer or other programmable devices, thereby the instruction of carrying out is provided for realizing the step of the function of specifying in flow process of flow chart or multiple flow process and/or square frame of block diagram or multiple square frame on computer or other programmable devices.
Although described the preferred embodiments of the present invention, once those skilled in the art obtain the basic creative concept of cicada, can make other change and amendment to these embodiment.So claims are intended to be interpreted as comprising preferred embodiment and fall into all changes and the amendment of the scope of the invention.
Obviously, those skilled in the art can carry out various changes and modification and not depart from the spirit and scope of the present invention the present invention.Like this, if these amendments of the present invention and within modification belongs to the scope of the claims in the present invention and equivalent technologies thereof, the present invention is also intended to comprise these changes and modification interior.

Claims (15)

1. a jamming control method, is characterized in that, the method comprises:
Network equipment determine current network congestion state recover and preserve time corresponding to mobile management back off time value for congestion control do not arrive after, it is invalid that described mobile management back off time value is set to;
Network equipment receives after the mobile management request of described terminal transmission, determines whether according to current network conditions the described mobile management request of accepting;
Wherein, be not attached to network in described terminal, and in the time that network equipment starts the mobile management congestion control based on APN for terminal, further comprise: network equipment arranges the first congestion control that described APN is corresponding and starts the value identifying, so that the first congestion control startup mark expression has been contracted, the mobile management signaling of the terminal of described APN occurs congested at network side; It is invalid that described mobile management back off time value is set to, specifically comprise: network equipment is revised the first congestion control and started the value identifying, so that the first congestion control startup mark expression has been contracted, the mobile management signaling of the terminal of described APN does not occur congested at network side; Or, be not attached to network in described terminal, in the time that network equipment starts general mobile management congestion control for terminal, further comprise: network equipment arranges the second congestion control that this network equipment is corresponding and starts mark, represent that this network equipment transships so that the second congestion control starts mark; It is invalid that described mobile management back off time value is set to, and specifically comprises: network equipment is revised the second congestion control and started the value identifying, and represents that this network equipment transships so that the second congestion control starts mark;
Described according to current network conditions determine whether accept described mobile management request, specifically comprise: represent that this network equipment transships if the second current congestion control starts mark, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuse described mobile management request, if so, start general mobile management congestion control; If starting mark, the second current congestion control represents that this network equipment transships, and one or more APN of described terminal unit contractual corresponding first congestion control start mark represent contracted corresponding A PN terminal mobile management signaling network side occur congested, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuse described mobile management request, if so, start the mobile management congestion control based on these one or more APN; If starting mark, the second current congestion control represents that this network equipment transships, and the first congestion control that all APN of described terminal unit contractual are corresponding starts mark all represent the to have contracted mobile management signaling of terminal of corresponding A PN and does not occur congestedly at network side, and network equipment is accepted described mobile management request.
2. the method for claim 1, it is characterized in that, be not attached to network in described terminal, and when the congestion control that network equipment starts for described terminal is the mobile management congestion control of the Access Point Name APN based on this terminal unit contractual, whether the congestion state of described definite current network recovers comprises:
Network equipment judges whether to meet the condition of the mobile management congestion control of predefined startup based on described APN according to current network condition, if do not meet, the mobile management signaling of determining the terminal of this APN that contracted does not occur congested at network side, and definite congestion state recovers, if meet, the mobile management signaling of the terminal of definite this APN that contracted is congested in network side generation, and definite congestion state does not recover.
3. the method for claim 1, it is characterized in that, be not attached to network in described terminal, and the congestion control that starts for described terminal of network equipment is while being general mobile management congestion control, whether the congestion state of described definite current network recovers comprises:
Network equipment judges whether to meet the condition of the general mobile management congestion control of predefined startup according to current network condition, if do not meet, determine that this network equipment transships, and the congestion state of definite network recovers, if meet, determine that this network equipment transships, and the congestion state of definite network does not recover.
4. the method for claim 1, it is characterized in that, be attached to network in described terminal, and the congestion control that starts for described terminal of network equipment is while being general mobile management congestion control, whether the congestion state of described definite current network recovers comprises:
Network equipment judges whether to meet the condition of the general mobile management congestion control of predefined startup according to current network condition, if do not meet, determine that this network equipment transships, and the congestion state of definite network recovers, if meet, determine that this network equipment transships, and the congestion state of definite network does not recover.
5. method as claimed in claim 4, it is characterized in that, in the time that network equipment starts general mobile management congestion control for terminal, further comprise: network equipment arranges the second congestion control that this network equipment is corresponding and starts mark, represent that this network equipment transships so that the second congestion control starts mark;
It is invalid that described mobile management back off time value is set to, and specifically comprises:
If the congestion state recovery of the network of definite this network equipment management, network equipment is revised the value of the second congestion control startup mark, does not transship so that second this network equipment of congestion control startup mark expression is managed.
6. method as claimed in claim 5, is characterized in that, described according to current network conditions determine whether accept described mobile management request, specifically comprise:
If starting mark, the second current congestion control represents that this network equipment transships, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuses described mobile management request, if so, start general mobile management congestion control;
Represent that this network equipment transships if the second current congestion control starts mark, network equipment is accepted described mobile management request.
7. the method for claim 1, is characterized in that, determine whether the described mobile management request of acceptance according to current network conditions after, further comprises:
Network equipment determines that current network enters congestion state again, and described mobile management back off time value is set to effectively; Determine whether the mobile management request of the described terminal transmission receiving according to described mobile management back off time value; Or,
Network equipment starts congestion control for described terminal again.
8. a congestion control equipment, is characterized in that, this equipment comprises:
The first setting unit, after not arriving for the time corresponding to mobile management back off time value for congestion control of recovering at the congestion state of determining current network and preserve, it is invalid that described mobile management back off time value is set to;
Control unit, for receiving after the mobile management request of described terminal transmission, determines whether according to current network conditions the described mobile management request of accepting;
Wherein, this device also comprises: the second setting unit, for not being attached to network in described terminal, and while starting the mobile management congestion control based on APN for terminal, the first congestion control that described APN is corresponding is set and starts the value identifying, so that the first congestion control startup mark expression has been contracted, the mobile management signaling of the terminal of described APN occurs congested at network side, described the first setting unit is used for: amendment the first congestion control starts the value of mark, so that the first congestion control startup mark expression has been contracted, the mobile management signaling of the terminal of described APN does not occur congested at network side, or, the 3rd setting unit, for not being attached to network in described terminal, and while starting general mobile management congestion control for terminal, the second congestion control that this equipment is corresponding is set and starts mark, represent that this equipment transships so that the second congestion control starts mark, described the first setting unit is used for: amendment the second congestion control starts the value of mark, represents that this equipment transships so that the second congestion control starts mark,
Described control unit specifically for: represent that this network equipment transships if current the second congestion control starts mark, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuse described mobile management request, if so, start general mobile management congestion control; If starting mark, the second current congestion control represents that this network equipment transships, and one or more APN of described terminal unit contractual corresponding first congestion control start mark represent contracted corresponding A PN terminal mobile management signaling network side occur congested, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuse described mobile management request, if so, start the mobile management congestion control based on these one or more APN; If starting mark, the second current congestion control represents that this network equipment transships, and the first congestion control that all APN of described terminal unit contractual are corresponding starts mark all represent the to have contracted mobile management signaling of terminal of corresponding A PN and does not occur congestedly at network side, and network equipment is accepted described mobile management request.
9. equipment as claimed in claim 8, is characterized in that, described the first setting unit is used for:
It is the terminal that is not attached to network in described terminal, and when the congestion control starting for described terminal is the mobile management congestion control of the Access Point Name APN based on this terminal unit contractual, judge whether to meet the condition of the mobile management congestion control of predefined startup based on described APN according to current network condition, if do not meet, the mobile management signaling of determining the terminal of this APN that contracted does not occur congested at network side, and definite congestion state recovers, if meet, the mobile management signaling of determining the terminal of this APN that contracted occurs congested at network side, and definite congestion state does not recover.
10. equipment as claimed in claim 8, is characterized in that, described the first setting unit is used for:
It is the terminal that is not attached to network in described terminal, and when the congestion control starting for described terminal is general mobile management congestion control, judge whether to meet the condition of the general mobile management congestion control of predefined startup according to current network condition, if do not meet, determine that this network equipment transships, and the recovery of the congestion state of definite network, if meet, determine that this network equipment transships, and the congestion state of definite network does not recover.
11. equipment as claimed in claim 8, is characterized in that, described the first setting unit is used for:
Be attached to network in described terminal, and when the congestion control starting for described terminal is general mobile management congestion control, judge whether to meet the condition of the general mobile management congestion control of predefined startup according to current network condition, if do not meet, determine that this network equipment transships, and the recovery of the congestion state of definite network, if meet, determine that this network equipment transships, and the congestion state of definite network does not recover.
12. equipment as claimed in claim 11, is characterized in that, this equipment also comprises:
The 4th setting unit, for when start general mobile management congestion control for terminal, arranges the second congestion control that this equipment is corresponding and starts mark, represents that this equipment transships so that the second congestion control starts mark;
Described the first setting unit is used for:
Revise the value that the second congestion control starts mark, represent that this equipment transships so that the second congestion control starts mark.
13. equipment as claimed in claim 12, is characterized in that, described control unit is used for:
If starting mark, the second current congestion control represents that this network equipment transships, network equipment determines whether to arrive the time corresponding to mobile management back off time value of storage, if not, refuses described mobile management request, if so, start general mobile management congestion control;
Represent that this network equipment transships if the second current congestion control starts mark, network equipment is accepted described mobile management request.
14. equipment as claimed in claim 8, is characterized in that, this equipment also comprises:
Recovery unit, for again entering after congestion state in definite current network, described mobile management back off time value is set to effectively; Determine whether the mobile management request of the described terminal transmission receiving according to described mobile management back off time value; Or,
Again start congestion control for described terminal.
15. 1 kinds of Mobility Management Entity MME, is characterized in that, this MME comprises as the congestion control equipment as described in arbitrary in claim 8-14.
CN201110457449.7A 2011-12-30 2011-12-30 Congestion control method and equipment Active CN102413504B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110457449.7A CN102413504B (en) 2011-12-30 2011-12-30 Congestion control method and equipment
PCT/CN2012/081968 WO2013097503A1 (en) 2011-12-30 2012-09-26 Congestion control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110457449.7A CN102413504B (en) 2011-12-30 2011-12-30 Congestion control method and equipment

Publications (2)

Publication Number Publication Date
CN102413504A CN102413504A (en) 2012-04-11
CN102413504B true CN102413504B (en) 2014-12-10

Family

ID=45915279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110457449.7A Active CN102413504B (en) 2011-12-30 2011-12-30 Congestion control method and equipment

Country Status (2)

Country Link
CN (1) CN102413504B (en)
WO (1) WO2013097503A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102413504B (en) * 2011-12-30 2014-12-10 电信科学技术研究院 Congestion control method and equipment
CN103975622B (en) * 2012-07-27 2018-07-17 华为技术有限公司 Jamming control method, mobile management net element and equipment
US9603186B2 (en) * 2014-05-08 2017-03-21 Intel IP Corporation Mobility management entity, user equipment and methods for machine type communication
CN108574964B (en) * 2017-03-10 2019-08-23 电信科学技术研究院 A kind of jamming control method and device controlling face data
CN110650495A (en) * 2018-06-27 2020-01-03 电信科学技术研究院有限公司 Congestion control method, equipment and device
CN112738848B (en) * 2019-10-14 2022-12-06 中国移动通信集团安徽有限公司 Core network load adjusting method, device, equipment and computer readable storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101494588A (en) * 2008-01-22 2009-07-29 中兴通讯股份有限公司 Rapid route opening method for aerial interface
CN102224756A (en) * 2008-09-23 2011-10-19 高通股份有限公司 Method and apparatus for reducing successive pre-registration attempts by access terminals
CN102244916A (en) * 2011-07-29 2011-11-16 电信科学技术研究院 Method and equipment for controlling session management

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100570830B1 (en) * 2003-07-29 2006-04-12 삼성전자주식회사 method for medium access in wireless local area network system based on carrier sense multiple access with collision avoidance and apparatus thereof
CN102098759A (en) * 2011-02-18 2011-06-15 电信科学技术研究院 Method and device for access control
CN102413504B (en) * 2011-12-30 2014-12-10 电信科学技术研究院 Congestion control method and equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101494588A (en) * 2008-01-22 2009-07-29 中兴通讯股份有限公司 Rapid route opening method for aerial interface
CN102224756A (en) * 2008-09-23 2011-10-19 高通股份有限公司 Method and apparatus for reducing successive pre-registration attempts by access terminals
CN102244916A (en) * 2011-07-29 2011-11-16 电信科学技术研究院 Method and equipment for controlling session management

Also Published As

Publication number Publication date
WO2013097503A1 (en) 2013-07-04
CN102413504A (en) 2012-04-11

Similar Documents

Publication Publication Date Title
CN102186224B (en) Method for controlling access and device
CN102413504B (en) Congestion control method and equipment
CN102111847B (en) Access control method and device
CN102547912B (en) A kind of connection control method and device
CN107113906B (en) Method and device for releasing Radio Resource Control (RRC) connection
CN102448042B (en) Method for rejecting mobility management process and network side device
CN101282511B (en) Bearing processing method
CN103857005A (en) Access control method and device
CN101534495B (en) Method for establishing the service bearing of user equipment and device thereof
CN103857008A (en) Access control method and device
CN102131270A (en) Method and user equipment for reestablishing packet data network connection
CN105142193A (en) Method and device for cell reselection and method and device for cell reselection control
CN103546968A (en) Downlink data triggering and paging method and equipment
CN105636049A (en) User signaling control method and apparatus and mobility management entity
CN102264157A (en) Method and device for releasing resources in shifting process
CN101296496B (en) Method for preventing false resource release in tracing section updating or switching course
CN112995976B (en) Method for allowing user equipment to be separated from network entity
CN103096376A (en) Method and system for network congestion control
CN102740266A (en) Context synchronization method and system thereof
CN103067967B (en) A kind of control method of session management back off timer and terminal
US20230328789A1 (en) Busy indication transmission method and apparatus
CN105637931A (en) Circuit-switching service processing method and terminal
CN102448141A (en) Congestion processing method and equipment in machine communication
CN102209390A (en) Distribution method and equipment of paging range
CN102934406B (en) The method of deexcitation ISR, the method for amendment bearing parameter and network system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20210527

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

TR01 Transfer of patent right