CN102412575A - 送端电网高频切机安全自动装置配置方案的仿真评估方法 - Google Patents
送端电网高频切机安全自动装置配置方案的仿真评估方法 Download PDFInfo
- Publication number
- CN102412575A CN102412575A CN2011103855366A CN201110385536A CN102412575A CN 102412575 A CN102412575 A CN 102412575A CN 2011103855366 A CN2011103855366 A CN 2011103855366A CN 201110385536 A CN201110385536 A CN 201110385536A CN 102412575 A CN102412575 A CN 102412575A
- Authority
- CN
- China
- Prior art keywords
- send
- frequency
- electrical network
- safety device
- direct current
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Control Of Eletrric Generators (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明提出一种送端电网高频切机安全自动装置配置方案的仿真评估方法,其包括:建立包含机组侧和电网侧频率控制相关重要元件的送端电网频率仿真数据模型;设定送端电网电力外送水平的基础研究工况点;假定直流闭锁连锁切机安全自动装置正确动作,逐个对各个基础研究工况点计算送端电网的2种外送通道故障形式,获得送端电网的仿真结果;假定直流闭锁连锁切机安全自动装置拒动,逐个对各个基础研究工况点计算送端电网的2种外送通道故障形式,获得送端电网的仿真结果;根据步骤C和步骤D所获得的仿真结果,来评估高频切机安全自动装置配置方案的效果是否良好。该方法具有评估快速、准确,考虑因素全面,操作简单方便等优点,具有较高的实用价值。
Description
技术领域
本发明涉及电力系统频率稳定方法,具体涉及送端电网高频切机安全自动装置配置方案的仿真评估方法。
背景技术
大型能源基地和负荷中心在地域分布的不一致要求电力大容量、远距离传输,为同时发挥直流输电经济传输距离远、交流输电运行方式调整灵活且可靠度高的优点,目前在能源基地同时建设交流通道和直流通道向外网送电呈增多趋势,当交流通道因故障断开,或者交流通道与直流通道同时因故障断开,送端电网的频率会在通道断开瞬间因存在功率过剩而迅速升高,随后动态变化,系统中机组侧和电网侧的一些控制元件将响应频率的变化进行调节或者动作,通常主要包括:(1)汽轮发电机组的调速控制系统测量电网频率改变汽轮机的调节汽门开度,进而改变机组的机械功率;(2)水轮发电机组的调速控制系统测量电网频率改变水轮机的导叶开度,进而改变机组的机械功率;(3)汽轮发电机组的汽轮机超速保护测量电网频率,当达到启动定值时暂时关闭机组的调节汽门,降低机组的机械功率,待电网频率降低至超速保护的恢复定值时重新开启机组的调节汽门,增加机组的机械功率;(4)直流送端换流站安装的直流闭锁连锁切机安全自动装置监测直流线路的运行状态,当发生直流闭锁故障,直流通道断开时,切除送端电网一些电厂的机组;(5)变电站安装的低频减载安全自动装置测量电网频率,当频率达到启动定值时切除部分负荷。这些控制手段对于送端电网在外送电力较少的情况下通常可以将频率控制在要求的范围内,但是对于外送电力较多的情况,由于外送通道断开后频率变化的幅度较大,传统的频率控制手段效果将较为有限,很难保证频率的安全和稳定。
为送端电网配置高频切机安全自动装置是解决外送电力较多情况下发生外送通道断开故障时的频率控制问题的一项重要技术措施,即在电网多个适当位置的电厂内分散布设高频切机安全自动装置,装置上设定若干轮次的动作定值,当测量电网频率达到动作定值时自动切除相对应的机组,达到平衡电网功率,控制电网频率的目的。要保证高频切机安全自动装置的效果,必须使它与系统原有的主要频率控制元件间的协调配合关系良好,并且对电网不同的运行工况和控制条件具有广泛的适应性。由于实际电力系统对运行的安全性和稳定性要求极高,高频切机安全自动装置的配置方案不可能通过实际电网发生故障时才进行检验,只能通过仿真计算提前进行评估,论证其科学有效后再投入电网使用。
发明内容
本发明的目的在于提出一种评估快速、准确,考虑因素全面,操作简单方便的送端电网高频切机安全自动装置配置方案的仿真评估方法。该方法通过建立送端电网频率仿真数据模型,设定送端电网多个电力外送的运行工况和2种外送通道的故障形式,进行仿真分析,评估高频切机安全自动装置配置的效果,判定配置方案与主要频率控制元件间的协调配合关系是否良好,判定对电网不同的运行工况和控制条件的适应性是否良好。
为实现上述目的,本发明提供了送端电网高频切机安全自动装置配置方案的仿真评估方法,具体包括如下步骤:
步骤A:建立包含机组侧和电网侧频率控制相关重要元件的送端电网频率仿真数据模型;
步骤B:设定送端电网电力外送水平的基础研究工况点;
步骤C:假定直流闭锁连锁切机安全自动装置正确动作,对各个基础研究工况点、逐个计算送端电网的2种外送通道故障形式,获得送端电网的仿真结果;
步骤D:假定直流闭锁连锁切机安全自动装置拒动,对各个基础研究工况点、逐个计算送端电网的2种外送通道故障形式,获得送端电网的仿真结果;
步骤E:根据步骤C和步骤D所获得的仿真结果,来评估高频切机安全自动装置配置方案的效果是否良好。
本发明的一个优选技术方案为:所述步骤A中,频率控制相关重要元件包括有机组侧的汽轮发电机组调速控制系统、水轮发电机组调速控制系统和汽轮发电机组的汽轮机超速保护,以及送端电网侧的直流闭锁连锁切机安全自动装置和低频减载安全自动装置。
本发明的一个优选技术方案为:所述步骤B中,采用牛顿-拉夫逊法进行潮流计算,并设定至少4个送端电网电力外送水平的基础研究工况点,每个工况点应满足:调整送端电网外送功率Pt占电网机组总出力Pg的比例值λ在30%-50%之间。所述选取基础研究工况点的数量以4个为佳。
本发明的一个优选技术方案为:所述步骤C和步骤D中,采用隐式梯形数值积分算法,逐个计算各个基础研究工况点的送端电网的2种外送通道故障形式。
本发明的一个优选技术方案为:所述步骤C和步骤D中,送端电网的2种外送通道故障形式为:(1)交流通道断开,同时直流通道发生部分闭锁使直流外送电力降低为原送电功率值的一半;(2)交流通道断开,同时直流通道发生全部闭锁使直流外送电力降低为0。
本发明的一个优选技术方案为:所述步骤C和步骤D中,获得送端电网的仿真结果包括:
1)汽轮发电机组的汽轮机超速保护动作次数N;
2)送端电网侧的低频减载安全自动装置是否动作;
3)送端电网侧的频率在动态变化过程中的最高频率fh;
4)送端电网侧的频率经历动态变化后达到的稳态值fs。
本发明的一个优选技术方案为:所述步骤E中,当步骤C和步骤D中的仿真结果满足下述全部条件时,则认为高频切机安全自动装置配置方案的效果良好;否则,认为效果不好:
1)汽轮发电机组的汽轮机超速保护动作次数N满足:N<4;
2)送端电网侧的低频减载安全自动装置没有动作;
3)送端电网侧的频率在动态变化过程中的最高频率fh满足:fh<53Hz;
4)送端电网侧的频率经历动态变化后达到的稳态值fs满足:49.5Hz<fs<50.5Hz。
本发明的有益效果:本发明送端电网高频切机安全自动装置配置方案的仿真评估方法计及了机组侧和电网侧频率控制相关重要元件的调节特性和动作特性,通过设定送端电网多个电力外送的运行工况和2种外送通道的故障形式,对高频切机安全自动装置配置方案的效果进行有效检验和科学评估,及时发现配置方案的缺陷和问题,防止效果不好的配置方案投入电网使用,给电网的频率稳定控制带来安全隐患。本发明的仿真评估方法具有评估快速、准确,考虑因素全面,操作简单方便等优点,具有较高的实用价值和良好的市场前景。
附图说明
图1为本发明方法采用的汽轮发电机组调速控制系统传递函数框图;
图2为本发明方法采用的水轮发电机组调速控制系统传递函数框图;
图3为本发明方法采用的汽轮发电机组的汽轮机超速保护与调速控制系统连接关系示意图;
图4为本发明实施例中宁夏电网电力外送通道情况示意图;
图5为本发明送端电网高频切机安全自动装置配置方案的仿真评估方法的流程图。
具体实施方式
下面以运用本发明方法对作为典型送端电网的宁夏电网一套高频切机安全自动装置配置方案进行仿真评估为实施例,对本发明方法进行详细描述。宁夏电网该套高频切机安全自动装置配置方案如表1所示。
表1宁夏电网的一套高频切机安全自动装置配置方案
图5示出了本发明送端电网高频切机安全自动装置配置方案的仿真评估方法的流程图,具体包括如下步骤:
步骤A:建立宁夏电网的频率仿真数据模型,包含的频率控制相关重要元件有:汽轮发电机组调速控制系统、水轮发电机组调速控制系统和汽轮发电机组的汽轮机超速保护,±660kV银东直流闭锁连锁切机安全自动装置和低频减载安全自动装置。所建立的汽轮发电机组调速控制系统的传递函数如图1所示,以机组转速偏差Δω和增益系数K的乘积为输入量,经过汽轮机控制器和油动机环节,输出调门开度指令PGV给汽轮机。所建立的水轮发电机组调速控制系统的传递函数如图2所示,以机组转速偏差Δω和增益系数K的乘积为输入量,经过水轮机控制器和油动机环节,输出调门开度指令PGV给水轮机。所建立的汽轮发电机组的汽轮机超速保护与汽轮机调速控制系统连接关系如图3所示,汽轮机超速保护输出控制信号到汽轮机的高压调速汽门和中压调速汽门,当达到启动条件时关闭调速汽门,当达到恢复条件时重新开启调速汽门。所建立的±660kV银东直流闭锁连锁切机安全自动装置以±660kV银东直流是否发生直流闭锁为动作条件,若发生则发出切机指令给电厂机组。所建立的低频减载安全自动装置以电网频率是否降低至小于49Hz并且持续时间达到0.2s为动作条件,若发生则发出切负荷指令给变电站。
步骤B:通过潮流计算,设定宁夏电网4个电力外送水平的基础研究工况点,如表2所示,宁夏电网外送功率Pt占该电网机组总出力Pg的比例λ分布于30%-50%之间。
表2宁夏电网的基础研究工况点
图4示出了宁夏电网电力外送通道的情况示意图,本例中以±660kV银川东-山东青岛的直流线路构成宁夏电网的电力外送直流通道,以750kV银川东-甘肃白银、330kV迎水桥-甘肃石城、330kV宁安-甘肃白银、330kV清水河-甘肃固原构成宁夏电网的电力外送交流通道。
步骤C:假定±660kV银东直流闭锁连锁切机安全自动装置可正确动作,对各个基础研究工况点,逐个利用动态仿真程序计算宁夏电网的2种外送通道故障形式,即(1)交流通道断开,同时±660kV银东直流发生单极闭锁使直流外送电力降低为原送电功率值的一半;(2)交流通道断开,同时±660kV银东直流发生双极闭锁使直流外送电力降低为0。获得宁夏电网主要频率控制元件的动作行为和频率的动态变化情况如表3所示,作为评估高频切机安全自动装置配置方案的判断依据的第一种情况。
表3银东直流闭锁连锁切机安全自动装置可正确动作时宁夏电网外送通道故障下主要频率控制元件的动作行为和频率的动态变化情况
步骤D:假定±660kV银东直流闭锁连锁切机安全自动装置拒动,对各个基础研究工况点,逐个利用动态仿真程序计算宁夏电网的2种外送通道故障形式,即(1)交流通道断开,同时±660kV银东直流发生单极闭锁使直流外送电力降低为原送电功率值的一半;(2)交流通道断开,同时±660kV银东直流发生双极闭锁使直流外送电力降低为0。获得宁夏电网主要频率控制元件的动作行为和频率的动态变化情况如表4所示,作为评估高频切机安全自动装置配置方案的判断依据的第一种情况。
表4银东直流闭锁连锁切机安全自动装置拒动时宁夏电网外送通道故障下主要频率控制元件的动作行为和频率的动态变化情况
步骤E:根据步骤C和步骤D获得的仿真结果,评估宁夏电网该套高频切机安全自动装置配置方案的效果,根据表3和表4可见:
(1)汽轮发电机组的汽轮机超速保护动作次数N=0,满足:N<4;
(2)送端电网的低频减载安全自动装置没有动作;
(3)送端电网的频率在动态变化过程中的最高频率fh满足:fh<53Hz;
(4)送端电网的频率经历动态变化后达到的稳态值fs满足:49.5Hz<fs<50.5Hz;
因此该套宁夏电网高频切机安全自动装置的配置方案与主要频率控制元件间的协调配合关系良好,对电网不同的运行工况和控制条件具有良好的适应性。
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,尽管参照上述实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者等同替换,而未脱离本发明精神和范围的任何修改或者等同替换,其均应涵盖在本发明的权利要求范围当中。
Claims (8)
1.一种送端电网高频切机安全自动装置配置方案的仿真评估方法,其特征在于,该方法包括:
步骤A:建立包含机组侧和电网侧频率控制相关重要元件的送端电网频率仿真数据模型;
步骤B:设定送端电网电力外送水平的基础研究工况点;
步骤C:假定直流闭锁连锁切机安全自动装置正确动作,对各个基础研究工况点、逐个计算送端电网的2种外送通道故障形式,获得送端电网的仿真结果;
步骤D:假定直流闭锁连锁切机安全自动装置拒动,对各个基础研究工况点、逐个计算送端电网的2种外送通道故障形式,获得送端电网的仿真结果;
步骤E:根据步骤C和步骤D所获得的仿真结果,来评估高频切机安全自动装置配置方案的效果是否良好。
2.如权利要求1所述的仿真评估方法,其特征在于:所述步骤A中,频率控制相关重要元件包括有机组侧的汽轮发电机组调速控制系统、水轮发电机组调速控制系统和汽轮发电机组的汽轮机超速保护,以及送端电网侧的直流闭锁连锁切机安全自动装置和低频减载安全自动装置。
3.如权利要求1所述的仿真评估方法,其特征在于:所述步骤B中,采用牛顿-拉夫逊法进行潮流计算,并设定至少4个送端电网电力外送水平的基础研究工况点,每个工况点应满足:调整送端电网外送功率Pt占电网机组总出力Pg的比例值λ在30%-50%之间。
4.如权利要求3所述的仿真评估方法,其特征在于:所述选取基础研究工况点的数量为4个。
5.如权利要求1所述的仿真评估方法,其特征在于:所述步骤C和步骤D中,采用隐式梯形数值积分算法,逐个计算各个基础研究工况点的送端电网的2种外送通道故障形式。
6.如权利要求1所述的仿真评估方法,其特征在于:所述步骤C和步骤D中,送端电网的2种外送通道故障形式为:(1)交流通道断开,同时直流通道发生部分闭锁使直流外送电力降低为原送电功率值的一半;(2)交流通道断开,同时直流通道发生全部闭锁使直流外送电力降低为0。
7.如权利要求1所述的仿真评估方法,其特征在于:所述步骤C和步骤D中,获得送端电网的仿真结果包括:
1)汽轮发电机组的汽轮机超速保护动作次数N;
2)送端电网侧的低频减载安全自动装置是否动作;
3)送端电网侧的频率在动态变化过程中的最高频率fh;
4)送端电网侧的频率经历动态变化后达到的稳态值fs。
8.如权利要求1所述的仿真评估方法,其特征在于:所述步骤E中,当步骤C和步骤D中的仿真结果满足下述全部条件时,则认为高频切机安全自动装置配置方案的效果良好;否则,认为效果不好:
1)汽轮发电机组的汽轮机超速保护动作次数N满足:N<4;
2)送端电网侧的低频减载安全自动装置没有动作;
3)送端电网侧的频率在动态变化过程中的最高频率fh满足:fh<53Hz;
4)送端电网侧的频率经历动态变化后达到的稳态值fs满足:49.5Hz<fs<50.5Hz。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110385536.6A CN102412575B (zh) | 2011-11-29 | 2011-11-29 | 送端电网高频切机安全自动装置配置方案的仿真评估方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110385536.6A CN102412575B (zh) | 2011-11-29 | 2011-11-29 | 送端电网高频切机安全自动装置配置方案的仿真评估方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102412575A true CN102412575A (zh) | 2012-04-11 |
CN102412575B CN102412575B (zh) | 2014-08-27 |
Family
ID=45914495
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110385536.6A Active CN102412575B (zh) | 2011-11-29 | 2011-11-29 | 送端电网高频切机安全自动装置配置方案的仿真评估方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102412575B (zh) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103236714A (zh) * | 2013-04-12 | 2013-08-07 | 中国南方电网有限责任公司 | 一种电力系统中切机量计算方法 |
CN104268332A (zh) * | 2014-09-22 | 2015-01-07 | 国家电网公司 | 一种基于区域互联电网频率特性的高频切机仿真配置方法 |
CN104979819A (zh) * | 2014-04-08 | 2015-10-14 | 国家电网公司 | 一种考虑送端闭锁压升的直流功率与切机措施控制方法 |
CN105279568A (zh) * | 2014-12-25 | 2016-01-27 | 贵州电网公司电力调度控制中心 | 一种电力系统高频切机策略整定方法 |
CN105391050A (zh) * | 2015-10-28 | 2016-03-09 | 南方电网科学研究院有限责任公司 | 高周切机配置方案的校核方法和系统 |
CN105743086A (zh) * | 2014-12-11 | 2016-07-06 | 国家电网公司 | 一种分层汇集外送型电网的高频切机方案的确定方法 |
CN106786714A (zh) * | 2016-12-07 | 2017-05-31 | 中国南方电网有限责任公司 | 一种异步电网直流闭锁动态频率监测与安全校核方法 |
CN108092260A (zh) * | 2017-11-30 | 2018-05-29 | 中国电力科学研究院有限公司 | 一种多通道受电断面振荡解列控制措施的仿真评估方法 |
CN109038664A (zh) * | 2018-08-02 | 2018-12-18 | 山东大学 | 计及风机涉网保护高频分轮次整定方法 |
CN109586267A (zh) * | 2018-10-23 | 2019-04-05 | 中国电力科学研究院有限公司 | 一种应对直流闭锁的负荷紧急控制电网仿真方法及装置 |
CN111525598A (zh) * | 2020-05-12 | 2020-08-11 | 国网四川省电力公司经济技术研究院 | 一种抑制送端电网高频问题的优化切机容量获取方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101594002A (zh) * | 2009-07-03 | 2009-12-02 | 河海大学 | 城市电网运行的自愈控制方法 |
CN101667749A (zh) * | 2009-04-23 | 2010-03-10 | 福建省电力有限公司 | 电力现场作业安全自动监控系统 |
CN101741682A (zh) * | 2009-12-16 | 2010-06-16 | 东北电网有限公司 | 安全自动装置动作行为智能报告系统 |
-
2011
- 2011-11-29 CN CN201110385536.6A patent/CN102412575B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101667749A (zh) * | 2009-04-23 | 2010-03-10 | 福建省电力有限公司 | 电力现场作业安全自动监控系统 |
CN101594002A (zh) * | 2009-07-03 | 2009-12-02 | 河海大学 | 城市电网运行的自愈控制方法 |
CN101741682A (zh) * | 2009-12-16 | 2010-06-16 | 东北电网有限公司 | 安全自动装置动作行为智能报告系统 |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103236714B (zh) * | 2013-04-12 | 2014-12-03 | 中国南方电网有限责任公司 | 一种电力系统中切机量计算方法 |
CN103236714A (zh) * | 2013-04-12 | 2013-08-07 | 中国南方电网有限责任公司 | 一种电力系统中切机量计算方法 |
CN104979819A (zh) * | 2014-04-08 | 2015-10-14 | 国家电网公司 | 一种考虑送端闭锁压升的直流功率与切机措施控制方法 |
CN104979819B (zh) * | 2014-04-08 | 2017-06-23 | 国家电网公司 | 一种考虑送端闭锁压升的直流功率与切机措施控制方法 |
CN104268332A (zh) * | 2014-09-22 | 2015-01-07 | 国家电网公司 | 一种基于区域互联电网频率特性的高频切机仿真配置方法 |
CN105743086B (zh) * | 2014-12-11 | 2018-07-10 | 国家电网公司 | 一种分层汇集外送型电网的高频切机方案的确定方法 |
CN105743086A (zh) * | 2014-12-11 | 2016-07-06 | 国家电网公司 | 一种分层汇集外送型电网的高频切机方案的确定方法 |
CN105279568A (zh) * | 2014-12-25 | 2016-01-27 | 贵州电网公司电力调度控制中心 | 一种电力系统高频切机策略整定方法 |
CN105279568B (zh) * | 2014-12-25 | 2019-01-22 | 贵州电网公司电力调度控制中心 | 一种电力系统高频切机策略整定方法 |
CN105391050A (zh) * | 2015-10-28 | 2016-03-09 | 南方电网科学研究院有限责任公司 | 高周切机配置方案的校核方法和系统 |
CN105391050B (zh) * | 2015-10-28 | 2018-03-30 | 南方电网科学研究院有限责任公司 | 高周切机配置方案的校核方法和系统 |
CN106786714B (zh) * | 2016-12-07 | 2019-09-03 | 中国南方电网有限责任公司 | 一种异步电网直流闭锁动态频率监测与安全校核方法 |
CN106786714A (zh) * | 2016-12-07 | 2017-05-31 | 中国南方电网有限责任公司 | 一种异步电网直流闭锁动态频率监测与安全校核方法 |
CN108092260A (zh) * | 2017-11-30 | 2018-05-29 | 中国电力科学研究院有限公司 | 一种多通道受电断面振荡解列控制措施的仿真评估方法 |
CN109038664A (zh) * | 2018-08-02 | 2018-12-18 | 山东大学 | 计及风机涉网保护高频分轮次整定方法 |
CN109038664B (zh) * | 2018-08-02 | 2020-05-26 | 山东大学 | 计及风机涉网保护高频分轮次整定方法 |
CN109586267A (zh) * | 2018-10-23 | 2019-04-05 | 中国电力科学研究院有限公司 | 一种应对直流闭锁的负荷紧急控制电网仿真方法及装置 |
CN109586267B (zh) * | 2018-10-23 | 2021-10-12 | 中国电力科学研究院有限公司 | 一种应对直流闭锁的负荷紧急控制电网仿真方法及装置 |
CN111525598A (zh) * | 2020-05-12 | 2020-08-11 | 国网四川省电力公司经济技术研究院 | 一种抑制送端电网高频问题的优化切机容量获取方法 |
CN111525598B (zh) * | 2020-05-12 | 2023-04-11 | 国网四川省电力公司经济技术研究院 | 一种抑制送端电网高频问题的优化切机容量获取方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102412575B (zh) | 2014-08-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102412575B (zh) | 送端电网高频切机安全自动装置配置方案的仿真评估方法 | |
CN106816887B (zh) | 风电场柔性直流并网与直流外送的源网协调控制方法 | |
CN103454521B (zh) | 一种风电场电网运行模拟装置 | |
CN103346577B (zh) | 降低风电场功率损耗的风电场avc无功控制系统及方法 | |
CN104158199B (zh) | 对电力系统实时状态进行无功电压优化控制的系统和方法 | |
CN102195294A (zh) | 一种风电场无功综合优化控制方法 | |
CN103746389B (zh) | 基于无功电压特性的风电500kV汇集变电站无功补偿配置方法 | |
CN111459048A (zh) | 一种svg控制硬件在环的仿真平台及仿真方法 | |
CN103560547A (zh) | 一种交直流输电线路中交流系统故障的处理方法 | |
CN102868178B (zh) | 风电场电压自动控制系统中提高并网暂态稳定性的方法 | |
Lee et al. | A new communication-free grid frequency and AC voltage control of hybrid LCC-VSC-HVDC systems for offshore wind farm integration | |
Shi et al. | Coordinating multiple resources for emergency frequency control in the energy receiving-end power system with HVDCs | |
CN103425822A (zh) | 一种特高压交流同步联网通道潮流转移比仿真方法 | |
CN103390081A (zh) | 一种弱联系电网中频率控制装置定值参数的仿真配置方法 | |
CN202260632U (zh) | 电网智能风电稳定控制系统 | |
CN201897723U (zh) | 一种针对汽机局域网运行的控制系统 | |
CN101325324B (zh) | 一种基于实时运行方式的架空线抗凝冰方法 | |
Kirakosyan et al. | An improved frequency support algorithm for MT-HVDC systems | |
CN106451518B (zh) | 一种确定柔性直流电网直流场电气主接线的方法及系统 | |
CN115207941A (zh) | 一种电力系统惯量水平评估方法 | |
Yi-ying et al. | The digital-analog hybrid simulation system of large scale wind and thermo electric power transmission with HVDC link | |
Hassan et al. | Improving the capability curves of a grid-connected wind farm: Gabel El-Zeit, Egypt | |
CN103956742B (zh) | 一种复杂能源环境下电力系统运行方式的确定方法 | |
CN203608079U (zh) | 单元机组协调控制系统 | |
Auddy et al. | Field validation of a doubly fed induction generator (DFIG) model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |