CN102412517A - 带电断、接66kV变压器中性点隔离开关引线方法 - Google Patents

带电断、接66kV变压器中性点隔离开关引线方法 Download PDF

Info

Publication number
CN102412517A
CN102412517A CN201110410403XA CN201110410403A CN102412517A CN 102412517 A CN102412517 A CN 102412517A CN 201110410403X A CN201110410403X A CN 201110410403XA CN 201110410403 A CN201110410403 A CN 201110410403A CN 102412517 A CN102412517 A CN 102412517A
Authority
CN
China
Prior art keywords
neutral point
isolating switch
lead
wire fixture
insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110410403XA
Other languages
English (en)
Other versions
CN102412517B (zh
Inventor
周作成
于铭凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinzhou Power Supply Co Of Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Jinzhou Power Supply Co Of Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinzhou Power Supply Co Of Liaoning Electric Power Co Ltd filed Critical Jinzhou Power Supply Co Of Liaoning Electric Power Co Ltd
Priority to CN201110410403.XA priority Critical patent/CN102412517B/zh
Publication of CN102412517A publication Critical patent/CN102412517A/zh
Application granted granted Critical
Publication of CN102412517B publication Critical patent/CN102412517B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种带电断、接66kV变压器中性点隔离开关引线方法,具体步骤如下:1、将可移动引线固定装置放置在中性点隔离开关附近;2、组立绝缘硬梯;3、将中心点隔离开关上的引线端子取下,并固定在可移动引线固定装置的锁定装置上;4、将可移动引线固定装置固定在附近构支架上;5、将可移动引线固定装置移回;6、将引线固定装置的锁定装置处的引线端子取下并连接在中心点隔离开关上。优点是:提高了变压器、中性点隔离开关的可用率和系统供电可靠性,最大程度的满足用户对用电的需求;保证作业人员的工作安全、适应现场的地面环境;运输、使用方便。

Description

带电断、接66kV变压器中性点隔离开关引线方法
技术领域
本发明属于高压电路检修领域,特别涉及一种带电断、接66kV变压器中性点隔离开关引线方法。
背景技术
66kV系统为中性点经消弧线圈接地系统,运行在该系统中的66kV等级变压器均为全绝缘变压器,在正常运行情况下,中性点隔离开关会产生位移电压,尤其是在系统发生故障时,位移电压会增大。中性点隔离开关工作状态的好坏关系到消弧线圈工作的可靠性,进而影响系统的安全稳定。因此,提高中性点隔离开关的保养水平和检修质量至关重要。
中性点隔离开关的检修工作不能在存在电压的环境下进行,所以目前在检修时采用断电检修的方法。一旦检修中性点隔离开关,连接在系统中的变压器同时断电,严重影响了设备可用率和供电可靠性。为减少断电次数,系统中大部分中性点隔离开关的检修周期被延长,使中性点隔离开关超期运行,导致中性点隔离开关经常出现操作时机构卡涩、导电部分接触不良的现象。
发明内容
本发明要解决的技术问题是提供一种能够为检修中性点隔离开关提供无电环境的带电断、接66kV变压器中性点隔离开关引线方法,从而提高中性点隔离开关、变压器的可用率,及供电可靠性。
本发明是这样实现的:
一种带电断、接66kV变压器中性点隔离开关引线方法,其特殊之处在于具体步骤如下:
1、将可移动引线固定装置放置在地面距离中性点隔离开关合适位置,以方便带电作业人员工作; 
2、在隔离开关一侧组立绝缘硬梯,用绝缘绳索以打拉线的方式将梯子固定;
3、带电作业人员登上绝缘硬梯,绑好安全带,在安全监护下,将中心点隔离开关上的引线端子取下,并将引线端子连接在引线固定装置锁定装置处,连接完成后带电作业人员沿绝缘硬梯下至地面;
4、将可移动引线固定装置移动至合适位置,保证检修时带电引线与检修隔离开关人员的正常活动范围之间的距离在1.5m以上,将可移动引线固定装置固定在附近构支架上;
5、检修完成后,将可移动引线固定装置移动至合适位置,以方便带电作业人员工作;
6、带电作业人员登上绝缘硬梯,将引线固定装置锁定装置处的引线端子取下并连接在中心点隔离开关上,连接完成后带电作业人员沿绝缘硬梯下至地面。
上述的带电断、接66kV变压器中性点隔离开关引线方法,所述的可移动引线固定装置是由支架、设在支架底部的滑轮、设在支架上的支柱绝缘子,设在支柱绝缘子上的锁定装置、安装在支架一侧可拆卸拉线铁、安装在拉线铁的另一端的可拆卸抱箍构成,所述的拉线铁和抱箍有多组且规格不同,根据地面环境与附近构支架选取适合的拉线铁、抱箍,利用抱箍将可移动引线固定装置固定在附近构支架上。
本发明的有益效果是:
1、实现了在不断电的条件下检修中性点隔离开关,提高了变压器、中性点隔离开关的可用率和系统供电可靠性,最大程度的满足用户对用电的需求。
2、通过在引线固定装置底部设有的滑轮,可以调节带电引线与作业人员及检修设备之间的距离,以保证作业人员的工作安全、适应现场的地面环境。
3、可移动引线固定装置中的拉线铁、抱箍都是可以拆卸的,运输、使用方便,在不同的地面环境下,可以使用不同规格的拉线铁、抱箍,适应性强。
附图说明
图1是本发明的可移动引线固定装置结构示意图;
图2是本发明的操作初始位置示意图;
图3是本发明的帯电引线拆下后连接示意图;
图4本发明的中性点隔离开关检修后连接示意图;
图5是本发明的操作完毕后示意图。
图中:1-中性点隔离开关,2-引线端子,3-引线固定装置,301-锁定装置,302-支柱绝缘子,303-支架,304-移动滑轮,305-抱箍,306-拉线铁,4-附近构支架,5-绝缘硬梯。
具体实施方式
如图1所示,本发明的引线固定装置3由支架303、设在支架303底部的移动滑轮304、设在支架303上的支柱绝缘子302,设在支柱绝缘子上的锁定装置301、通过螺栓安装在支架303一侧的可拆卸拉线铁306、通过螺栓安装在拉线铁306的另一端的可拆卸抱箍305构成,所述的拉线铁306和抱箍305有多组且规格不同。
本发明的带电断、接66kV变压器中性点隔离开关引线方法包括以下步骤:
1、将可移动引线固定装置3放置在地面距离中性点隔离开关1合适位置,以方便带电作业人员工作。
2、在中性点隔离开关1一侧组立绝缘硬梯5,用绝缘绳索以打拉线的方式将梯子固定。
3、带电作业人员登上绝缘硬梯5,绑好安全带,在安全监护下,将中心点隔离开关1上的引线端子2取下,并将引线端子2连接在引线固定装置3的锁定装置301处,连接完成后带电作业人员沿绝缘硬梯5下至地面。
4、将可移动引线固定装置3移动至合适位置,保证检修时带电引线与检修中性点隔离开关人员的正常活动范围之间的距离在1.5m以上,根据地面环境与附近构支架4选取适合的拉线铁306、抱箍305,利用抱箍305将可移动引线固定装置3固定在附近构支架4上。
.5、检修完成后,将可移动引线固定装置3移动至合适位置,以方便带电作业人员工作。
6、带电作业人员登上绝缘硬梯5,将引线固定装置3的锁定装置301处的引线端子2取下并连接在中心点隔离开关1上,连接完成后带电作业人员沿绝缘硬梯5下至地面。

Claims (2)

1.一种带电断、接66kV变压器中性点隔离开关引线方法,其特征在于:
1.1 将可移动引线固定装置放置在地面距离中性点隔离开关合适位置,以方便带电作业人员工作; 
1.2 在隔离开关一侧组立绝缘硬梯,用绝缘绳索以打拉线的方式将梯子固定;
1.3 带电作业人员登上绝缘硬梯,绑好安全带,在安全监护下,将中心点隔离开关上的引线端子取下,并将引线端子连接在引线固定装置的锁定装置处,连接完成后带电作业人员沿绝缘硬梯下至地面;
1.4 将可移动引线固定装置移动至合适位置,保证检修时带电引线与检修隔离开关人员的正常活动范围之间的距离在1.5m以上,将可移动引线固定装置固定在附近构支架上;
1.5 检修完成后,将可移动引线固定装置移动至合适位置,以方便带电作业人员工作;
1.6 带电作业人员登上绝缘硬梯,将引线固定装置锁定装置处的引线端子取下并连接在中心点隔离开关上,连接完成后带电作业人员沿绝缘硬梯下至地面。
2.根据权利要求1所述的带电断、接66kV变压器中性点隔离开关引线方法,其特征在于:所述的可移动引线固定装置是由支架、设在支架底部的滑轮、设在支架上的支柱绝缘子,设在支柱绝缘子上的锁定装置、安装在支架一侧可拆卸拉线铁、安装在拉线铁的另一端的可拆卸抱箍构成,所述的拉线铁和抱箍有多组且规格不同,根据地面环境与附近构支架选取适合的拉线铁、抱箍,利用抱箍将可移动引线固定装置固定在附近构支架上。
CN201110410403.XA 2011-12-12 2011-12-12 带电断、接66kV变压器中性点隔离开关引线方法 Active CN102412517B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110410403.XA CN102412517B (zh) 2011-12-12 2011-12-12 带电断、接66kV变压器中性点隔离开关引线方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110410403.XA CN102412517B (zh) 2011-12-12 2011-12-12 带电断、接66kV变压器中性点隔离开关引线方法

Publications (2)

Publication Number Publication Date
CN102412517A true CN102412517A (zh) 2012-04-11
CN102412517B CN102412517B (zh) 2014-06-25

Family

ID=45914443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110410403.XA Active CN102412517B (zh) 2011-12-12 2011-12-12 带电断、接66kV变压器中性点隔离开关引线方法

Country Status (1)

Country Link
CN (1) CN102412517B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103219658A (zh) * 2013-02-19 2013-07-24 辽宁省电力有限公司鞍山供电公司 Gw5隔离开关单侧停电作业方法
CN111342377A (zh) * 2020-02-28 2020-06-26 广东电网有限责任公司 Alstom隔离开关不停电更换抱箍的检修工装和检修方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000013936A (ja) * 1998-06-22 2000-01-14 Yaskawa Electric Corp 制御盤更新方法
CN201238159Y (zh) * 2008-07-28 2009-05-13 济南供电公司 Gw4-110型隔离开关检修支架
CN101771243A (zh) * 2009-01-06 2010-07-07 哈尔滨电业局 隔离开关检修抱杆

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000013936A (ja) * 1998-06-22 2000-01-14 Yaskawa Electric Corp 制御盤更新方法
CN201238159Y (zh) * 2008-07-28 2009-05-13 济南供电公司 Gw4-110型隔离开关检修支架
CN101771243A (zh) * 2009-01-06 2010-07-07 哈尔滨电业局 隔离开关检修抱杆

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张海胜: "带负荷10kV配电线路更换隔离开关作业的探讨与实施", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *
杨晓翔 等: "带负荷更换10kV线路柱上开关的作业方法", 《湖州师范学院学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103219658A (zh) * 2013-02-19 2013-07-24 辽宁省电力有限公司鞍山供电公司 Gw5隔离开关单侧停电作业方法
CN111342377A (zh) * 2020-02-28 2020-06-26 广东电网有限责任公司 Alstom隔离开关不停电更换抱箍的检修工装和检修方法
CN111342377B (zh) * 2020-02-28 2024-03-26 广东电网有限责任公司 Alstom隔离开关不停电更换抱箍的检修工装和检修方法

Also Published As

Publication number Publication date
CN102412517B (zh) 2014-06-25

Similar Documents

Publication Publication Date Title
CN203531485U (zh) 高压输电电缆终端杆
CN102222862A (zh) 智能型敞开式绝缘变台
CN204439667U (zh) 一种便携式电流互感器测试钳
CN202535016U (zh) Opgw进站光缆安全接地固定组件
CN102412517A (zh) 带电断、接66kV变压器中性点隔离开关引线方法
CN201528061U (zh) 直接微调式验电接地环
CN113009379A (zh) 一种基于无人机斜拉法的特高压线路人工短路试验方法
CN202159776U (zh) 双舌拉紧式多方向接地线夹
CN101752805B (zh) 用于地电位立杆的绝缘支架及作业方法
CN202339977U (zh) 用于分布式基站的防雷电直流馈电线缆的接地结构
CN203481034U (zh) 开启式电流互感器
CN202749310U (zh) 可更换内置电压互感器式高压交流分界断路器
CN206452082U (zh) 变电站出线架构上的光纤复合架空地线的接地机构
CN107276032A (zh) 一种变压器中性点接地保护装置
CN203645104U (zh) 低压断路器专用接地线
CN202220050U (zh) 一种起重机供电系统
CN209730616U (zh) 一种变电站地埋式出线间隔布置结构
CN206400166U (zh) 一种变电站单杆双缆opgw余缆安装金具
CN203632182U (zh) 一种20kV架空线路的防雷装置
CN204715394U (zh) 一种变压器基础台
CN202075368U (zh) 相线接地语音报警装置
CN205610205U (zh) 一种变压器中性点接地保护装置
CN202737127U (zh) 并联变压器安全连接装置
CN103746198A (zh) 验电接地一体杆
CN203275740U (zh) 电力单杆光缆预留架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20120928

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120928

Address after: 121000 Guta District, Liaoning, Jiefang Road No. three, No. 9, No.

Applicant after: Jinzhou Power Supply Company of Liaoning Electric Power Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 121000 Guta District, Liaoning, Jiefang Road No. three, No. 9, No.

Applicant before: Jinzhou Power Supply Company of Liaoning Electric Power Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant