CN102410744B - Waste heat comprehensive utilization system in aluminum profile production line - Google Patents

Waste heat comprehensive utilization system in aluminum profile production line Download PDF

Info

Publication number
CN102410744B
CN102410744B CN2011103806872A CN201110380687A CN102410744B CN 102410744 B CN102410744 B CN 102410744B CN 2011103806872 A CN2011103806872 A CN 2011103806872A CN 201110380687 A CN201110380687 A CN 201110380687A CN 102410744 B CN102410744 B CN 102410744B
Authority
CN
China
Prior art keywords
furnace
smoke
aluminum
production line
waste heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2011103806872A
Other languages
Chinese (zh)
Other versions
CN102410744A (en
Inventor
谭连元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOSHAN TONGRUN THERMAL ENERGY TECHNOLOGY CO LTD
Original Assignee
FOSHAN TONGRUN THERMAL ENERGY TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOSHAN TONGRUN THERMAL ENERGY TECHNOLOGY CO LTD filed Critical FOSHAN TONGRUN THERMAL ENERGY TECHNOLOGY CO LTD
Priority to CN2011103806872A priority Critical patent/CN102410744B/en
Publication of CN102410744A publication Critical patent/CN102410744A/en
Application granted granted Critical
Publication of CN102410744B publication Critical patent/CN102410744B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

本发明公开了一种铝型材生产线余热综合利用系统,通过排烟管道、送烟管道、输烟管道、排烟阀、输烟阀、安全阀、换热器、送风机及送烟阀组成的烟气输送网络将铝型材生产线上的熔铸炉、铝锭预热室、均质炉、铝棒加热炉、时效炉、固化炉和烘干炉连通起来组成铝型材生产线余热综合利用系统。该系统能将铝型材生产线上的上游高温炉排出的高温烟气中的余热分配到下游各低温炉中,每个炉的余热都能为下游炉所充分利用。该系统将现在生产每吨铝型材所需的250立方米的燃气量降低至每吨只需130立方米燃气,节能将近50%。并且,在降低燃气消耗的同时也降低了各种污染气体的排放量。该系统将高温烟气的变为低温烟气排放,同样也降低了烟气除尘系统的成本。

The invention discloses a comprehensive waste heat utilization system of an aluminum profile production line, which consists of a smoke exhaust pipe, a smoke delivery pipe, a smoke delivery pipeline, a smoke exhaust valve, a smoke delivery valve, a safety valve, a heat exchanger, a blower fan and a smoke delivery valve. The gas transmission network connects the casting furnace, aluminum ingot preheating chamber, homogenizing furnace, aluminum rod heating furnace, aging furnace, curing furnace and drying furnace on the aluminum profile production line to form a comprehensive waste heat utilization system for the aluminum profile production line. The system can distribute the waste heat in the high-temperature flue gas discharged from the upstream high-temperature furnace on the aluminum profile production line to the downstream low-temperature furnaces, and the waste heat of each furnace can be fully utilized by the downstream furnaces. This system reduces the gas consumption of 250 cubic meters per ton of aluminum profiles to 130 cubic meters of gas per ton, saving energy by nearly 50%. Moreover, while reducing gas consumption, it also reduces the emission of various polluting gases. The system changes the high-temperature flue gas into low-temperature flue gas emission, which also reduces the cost of the flue gas dust removal system.

Description

一种铝型材生产线余热综合利用系统A comprehensive utilization system of waste heat in aluminum profile production line

技术领域 technical field

本发明涉及一种余热利用系统,尤其涉及的是一种铝型材生产线余热综合利用系统。 The invention relates to a waste heat utilization system, in particular to a comprehensive utilization system of waste heat in an aluminum profile production line.

背景技术 Background technique

现有的铝型材生产线上的生产设备如熔铸炉、均质炉、时效炉等,其在生产过程中产生的高温烟气都是直接或者经除尘系统处理后排放。熔铸炉产生的高温烟气的温度达到800—1000℃,均质炉排放的高温烟气的温度达到600℃左右,时效炉排放的高温烟气其温度也可达到200℃。这种高温烟气排放,一方面带走了生产线上将近50%的热量,造成了燃气的大量浪费,不利于生产成本的降低;另一方面,高温烟气直接排放的话,烟气中带有大量的有害气体,不利于环保,经除尘后排放的话,高温烟气对除尘系统的要求非常高,除尘系统的建设成本非常昂贵。 The production equipment on the existing aluminum profile production line, such as casting furnace, homogenizing furnace, aging furnace, etc., the high-temperature flue gas generated during the production process is discharged directly or after being treated by the dust removal system. The temperature of the high-temperature flue gas produced by the casting furnace reaches 800-1000°C, the temperature of the high-temperature flue gas emitted by the homogenizing furnace reaches about 600°C, and the temperature of the high-temperature flue gas emitted by the aging furnace can also reach 200°C. This kind of high-temperature flue gas emission, on the one hand, takes away nearly 50% of the heat in the production line, resulting in a large waste of gas, which is not conducive to the reduction of production costs; on the other hand, if the high-temperature flue gas is directly discharged, the flue gas contains A large amount of harmful gas is not conducive to environmental protection. If it is discharged after dust removal, the high-temperature flue gas has very high requirements on the dust removal system, and the construction cost of the dust removal system is very expensive.

因此,现有技术还有待于改进和发展。 Therefore, the prior art still needs to be improved and developed.

发明内容 Contents of the invention

本发明的目的在于提供一种铝型材生产线余热综合利用系统,以解决上述现有技术中铝型材生产线高温烟气直接排放导致的资源浪费巨大、环保代价高昂的技术问题。 The purpose of the present invention is to provide a comprehensive utilization system for waste heat of an aluminum profile production line to solve the above-mentioned technical problems of huge waste of resources and high environmental protection costs caused by the direct discharge of high-temperature flue gas from the aluminum profile production line in the prior art.

本发明的技术方案如下: Technical scheme of the present invention is as follows:

一种铝型材生产线余热综合利用系统,包括熔铸炉、铝锭预热室、均质炉、铝棒加热炉、时效炉、固化炉、烘干炉、排烟管道、送烟管道、输烟管道、排烟阀、输烟阀、安全阀、换热器、送风机及送烟阀,在熔铸炉、铝锭预热室、均质炉、铝棒加热炉、时效炉、固化炉、烘干炉的出烟口上均设置有排烟管道;在铝锭预热室、均质炉、铝棒加热炉、时效炉、固化炉、烘干炉的进烟口上均设置有送烟管道;所述各个炉中的高温炉的排烟管道与低温炉的送烟管道通过所述的输烟管道连通;所述排烟阀设置在排烟管道的排烟口处;所述输烟阀和安全阀设置在输烟管道上;所述送风机及送烟阀设置在所述送烟管道上,其设置位置依送风方向依次为送风机、送烟阀。 A comprehensive waste heat utilization system for an aluminum profile production line, including a melting and casting furnace, an aluminum ingot preheating chamber, a homogenizing furnace, an aluminum rod heating furnace, an aging furnace, a curing furnace, a drying furnace, a smoke exhaust pipe, a smoke delivery pipe, and a smoke delivery pipe , smoke exhaust valve, smoke delivery valve, safety valve, heat exchanger, blower and smoke delivery valve, in melting and casting furnace, aluminum ingot preheating chamber, homogenizing furnace, aluminum rod heating furnace, aging furnace, curing furnace, drying furnace There are smoke exhaust pipes on the smoke outlets of the aluminum ingot preheating chamber, homogeneous furnace, aluminum rod heating furnace, aging furnace, curing furnace, and drying furnace. The smoke exhaust pipe of the high temperature furnace in the furnace communicates with the smoke delivery pipeline of the low temperature furnace through the smoke delivery pipeline; the smoke exhaust valve is arranged at the smoke outlet of the smoke exhaust pipeline; the smoke delivery valve and the safety valve are arranged On the smoke delivery pipeline; the air blower and the smoke supply valve are arranged on the smoke supply pipeline, and the setting positions thereof are the blower fan and the smoke supply valve in sequence according to the air supply direction.

所述的铝型材生产线余热综合利用系统,其中,还包括换热器,所述换热器设置在所述各个炉子的送烟管道上。 The comprehensive waste heat utilization system of the aluminum profile production line further includes a heat exchanger, and the heat exchanger is arranged on the smoke delivery pipes of each furnace.

所述的铝型材生产线余热综合利用系统,其中,还包括水箱,所述烘干炉的排烟管道插入到所述水箱中,所述烘干炉的排烟管道上设置有换热器。 The comprehensive waste heat utilization system of the aluminum profile production line further includes a water tank into which the exhaust pipe of the drying furnace is inserted, and a heat exchanger is arranged on the exhaust pipe of the drying furnace.

所述的铝型材生产线余热综合利用系统,其中,所述熔铸炉的数量至少为一个,所述铝锭预热室的数量至少为一个,所述均质炉的数量至少为一个,所述铝棒加热炉的数量至少为一个,所述时效炉的数量至少为一个,所述固化炉的数量至少为一个,所述烘干炉的数量至少为一个。 The waste heat comprehensive utilization system of the aluminum profile production line, wherein, the number of the melting and casting furnace is at least one, the number of the aluminum ingot preheating chamber is at least one, the number of the homogenizing furnace is at least one, and the aluminum There is at least one rod heating furnace, at least one aging furnace, at least one curing furnace, and at least one drying furnace.

所述的铝型材生产线余热综合利用系统,其中,还包括监控系统,所述监控系统包括中央处理器、数据监控装置及调控装置,所述数据监控装置和调控装置设置在所述铝型材生产线余热综合利用系统中的各个炉体上,所述数据监控装置和调控装置分别与中央处理器电联接。 The comprehensive waste heat utilization system of the aluminum profile production line further includes a monitoring system, the monitoring system includes a central processing unit, a data monitoring device and a control device, and the data monitoring device and the control device are set at the waste heat On each furnace body in the comprehensive utilization system, the data monitoring device and the control device are respectively electrically connected to the central processing unit.

所述的铝型材生产线余热综合利用系统,其中,所述的监控装置包括压力监控器和温度监控器。 In the comprehensive waste heat utilization system of the aluminum profile production line, the monitoring device includes a pressure monitor and a temperature monitor.

所述的铝型材生产线余热综合利用系统,其中,所述的调控装置包括排烟阀、输烟阀、安全阀、换热器、送风机及送烟阀。 In the comprehensive waste heat utilization system of the aluminum profile production line, the control device includes a smoke exhaust valve, a smoke delivery valve, a safety valve, a heat exchanger, a blower fan and a smoke delivery valve.

本发明通过利用排烟管道、送烟管道、输烟管道、排烟阀、输烟阀、安全阀、换热器、送风机及送烟阀组成的烟气输送网络将铝型材生产线上的熔铸炉、铝锭预热室、均质炉、铝棒加热炉、时效炉、固化炉和烘干炉连通起来组成铝型材生产线余热综合利用系统。该系统能将铝型材生产线上的上游的高温炉排出的高温烟气中的余热分配到下游各低温炉中,每个炉的余热都能为下游炉所充分利用。该系统将现在生产每吨铝型材所需的250立方米的燃气量降低至每吨只需130立方米燃气,节能将近50%。并且,在降低燃气消耗的同时也降低了各种污染气体的排放量。该系统将高温烟气的变为低温烟气排放,同样也降低了烟气除尘系统的成本。 The present invention transfers the melting and casting furnace on the aluminum profile production line to , aluminum ingot preheating chamber, homogeneous furnace, aluminum rod heating furnace, aging furnace, curing furnace and drying furnace are connected to form a comprehensive waste heat utilization system for aluminum profile production line. The system can distribute the waste heat in the high-temperature flue gas discharged from the upstream high-temperature furnace on the aluminum profile production line to the downstream low-temperature furnaces, and the waste heat of each furnace can be fully utilized by the downstream furnaces. This system reduces the gas consumption of 250 cubic meters per ton of aluminum profiles to 130 cubic meters of gas per ton, saving energy by nearly 50%. Moreover, while reducing gas consumption, it also reduces the emission of various polluting gases. The system changes the high-temperature flue gas into low-temperature flue gas emission, which also reduces the cost of the flue gas dust removal system.

附图说明 Description of drawings

图1是本发明中铝型材生产线余热综合利用系统的结构示意图; Fig. 1 is the structural schematic diagram of the waste heat comprehensive utilization system of the aluminum profile production line of the present invention;

图2是本发明中铝型材生产线余热综合利用系统中监控系统的结构示意图; Fig. 2 is a structural schematic diagram of the monitoring system in the waste heat comprehensive utilization system of the aluminum profile production line of the present invention;

图3是本发明中铝型材生产线余热综合利用系统工作流程图。 Fig. 3 is a working flow diagram of the waste heat comprehensive utilization system of the aluminum profile production line of the present invention.

具体实施方式 Detailed ways

为使本发明的目的、技术方案及优点更加清楚、明确,以下参照附图并举实施例对本发明进一步详细说明。 In order to make the object, technical solution and advantages of the present invention more clear and definite, the present invention will be further described in detail below with reference to the accompanying drawings and examples.

如图1所述本发明中铝型材生产线余热综合利用系统的结构示意图,本铝型材生产线余热综合利用系统包括熔铸炉1、铝锭预热室2、均质炉3、铝棒加热炉4、时效炉5、固化炉6、烘干炉7、排烟管道8、送烟管道9、输烟管道10、排烟阀11、输烟阀12、安全阀13、换热器14、送风机15及送烟阀16。在熔铸炉1、铝锭预热室2、均质炉3、铝棒加热炉4、时效炉5、固化炉6和烘干炉7之中,除熔铸炉1只设置有排烟管道8外,其余各炉都相应的设置有排烟管道8及送烟管道9。上游炉的排烟管道8和其相邻下游炉的送烟管道9之间通过输烟管道10连通,即熔铸炉1、均质炉3和时效炉5各自的排烟管道8与铝锭预热室2、铝棒加热炉4和固化炉6各自的送烟管道9之间相邻连通,铝锭预热室2、铝棒加热炉4和固化炉6各自的排烟管道8与均质炉3、时效炉5和烘干炉7各自的送烟管道9之间相邻连通,烘干炉7的排烟管道直接向外排出,或者连接烟气除尘系统。在各个排烟管道8的排烟口处设置有排烟阀11,输烟阀12和安全阀13根据本系统控制及分配高温烟气的需要设置在各个输烟管道10上,换热器14、送风机15及送烟阀16设置在各个送烟管道上,其设置位置关系随送烟方向依次为换热器14、送风机15、送烟阀16。高温烟气经换热器14换热后,其中携带的余热通过送风机15送入下游炉中。其中,熔铸炉1中的烟气温度接近1050℃,铝锭预热室2中的烟气温度可达500℃,均质炉3中的烟气温度可达600℃,铝棒加热炉4中的烟气温度为500℃左右,时效炉5和固化炉6中的烟气温度则只有200℃左右,烘干炉7的烟气温度约为80℃,烘干炉排出的烟气中的余热可利用换热器转化后,用于热水。 As shown in Figure 1, the structure diagram of the waste heat comprehensive utilization system of the aluminum profile production line in the present invention, the waste heat comprehensive utilization system of the aluminum profile production line includes a melting and casting furnace 1, an aluminum ingot preheating chamber 2, a homogenizing furnace 3, an aluminum rod heating furnace 4, Aging furnace 5, curing furnace 6, drying furnace 7, smoke exhaust pipe 8, smoke delivery pipe 9, smoke delivery pipeline 10, smoke exhaust valve 11, smoke delivery valve 12, safety valve 13, heat exchanger 14, blower 15 and Send smoke valve 16. In melting and casting furnace 1, aluminum ingot preheating chamber 2, homogenizing furnace 3, aluminum rod heating furnace 4, aging furnace 5, curing furnace 6 and drying furnace 7, except that melting and casting furnace 1 is only provided with smoke exhaust pipe 8 , all the other furnaces are provided with smoke exhaust pipe 8 and smoke delivery pipe 9 accordingly. The smoke exhaust pipe 8 of the upstream furnace and the smoke delivery pipe 9 of its adjacent downstream furnace are connected through the smoke delivery pipe 10, that is, the respective smoke exhaust pipes 8 of the melting and casting furnace 1, the homogeneous furnace 3 and the aging furnace 5 are connected with the aluminum ingot The heat chamber 2, the aluminum rod heating furnace 4 and the respective smoke delivery pipes 9 of the curing furnace 6 are connected adjacently, and the respective smoke exhaust pipes 8 of the aluminum ingot preheating chamber 2, the aluminum rod heating furnace 4 and the curing furnace 6 are connected to the homogeneous Furnace 3, aging furnace 5 and drying furnace 7 are adjacently connected to each other through smoke delivery pipes 9, and the smoke exhaust pipe of drying furnace 7 is directly discharged outward, or connected to a flue gas dedusting system. A smoke exhaust valve 11 is arranged at the smoke outlet of each smoke exhaust pipe 8, a smoke delivery valve 12 and a safety valve 13 are arranged on each smoke delivery pipeline 10 according to the needs of the system for controlling and distributing high-temperature smoke, and a heat exchanger 14 , air blower 15 and smoke delivery valve 16 are arranged on each smoke delivery pipe, and its setting position relationship is followed by heat exchanger 14, blower fan 15, smoke delivery valve 16 with the direction of smoke delivery. After the high-temperature flue gas is exchanged by the heat exchanger 14, the residual heat carried in it is sent to the downstream furnace through the blower 15. Among them, the flue gas temperature in melting and casting furnace 1 is close to 1050°C, the flue gas temperature in aluminum ingot preheating chamber 2 can reach 500°C, the flue gas temperature in homogenizing furnace 3 can reach 600°C, and the flue gas temperature in aluminum rod heating furnace 4 can reach 500°C. The temperature of the flue gas in the aging furnace 5 and the curing furnace 6 is only about 200°C, the temperature of the flue gas in the drying furnace 7 is about 80°C, and the waste heat in the flue gas discharged from the drying furnace It can be used for hot water after conversion by heat exchanger.

如图2所示本发明中铝型材生产线余热综合利用系统中监控系统的结构示意图,铝型材生产线余热综合利用系统中还包括一个监控系统,用以检测铝型材生产线余热综合利用系统中各炉内的温度和压力状态及控制高温烟的分配。该检测系统包括中央处理器17、熔铸炉数据检测装置18、熔铸炉调控装置19、铝锭预热室数据监测装置20、铝锭预热室调控装置21、均质炉数据监测装置22、均质炉调控装置23、铝棒加热炉数据监测装置24、铝棒加热炉调控装置25、时效炉数据监测装置26、时效炉调控装置27、固化炉数据检测装置28、固化炉调控装置29、烘干炉数据监测装置20和烘干炉调控装置31。上述数据监测装置在现有的铝型材生产线上就已经存在,如压力监测器、温度监测器(图中未示出)等,安装在铝型材生产线上各个炉内。上述各个调控装置在本发明中为图1中所示的排烟阀11、输烟阀12、送烟阀16、安全阀13、换热器14、送风机15等,数据监测装置监测到各炉中的数据后,将数据信号发送到中央处理器17,中央处理器17根据数据信号做出判断并发出操作指令到各调控装置,通过控制各调控装置的开关来调节高温烟的分配,以使生产线上各个炉中的数据都处于正常状态。 As shown in Figure 2, the structural diagram of the monitoring system in the comprehensive utilization system of waste heat of aluminum profile production line in the present invention, the comprehensive utilization system of waste heat of aluminum profile production line also includes a monitoring system, which is used to detect the inside of each furnace in the comprehensive utilization system of waste heat of aluminum profile production line The temperature and pressure state and control the distribution of high temperature smoke. The detection system includes a central processing unit 17, a melting and casting furnace data detection device 18, a melting and casting furnace control device 19, an aluminum ingot preheating chamber data monitoring device 20, an aluminum ingot preheating chamber control device 21, a homogeneous furnace data monitoring device 22, a Quality furnace control device 23, aluminum rod heating furnace data monitoring device 24, aluminum rod heating furnace control device 25, aging furnace data monitoring device 26, aging furnace control device 27, curing furnace data detection device 28, curing furnace control device 29, baking A drying furnace data monitoring device 20 and a drying furnace control device 31 . The above-mentioned data monitoring devices already exist on the existing aluminum profile production line, such as pressure monitors, temperature monitors (not shown in the figure), etc., which are installed in each furnace on the aluminum profile production line. In the present invention, each of the above-mentioned control devices is the smoke exhaust valve 11 shown in Fig. 1, the smoke delivery valve 12, the smoke delivery valve 16, the safety valve 13, the heat exchanger 14, the fan 15, etc., and the data monitoring device monitors each furnace After receiving the data, the data signal is sent to the central processing unit 17, and the central processing unit 17 makes a judgment according to the data signal and sends an operation command to each control device, and adjusts the distribution of high-temperature smoke by controlling the switch of each control device, so that The data in each furnace on the production line is in a normal state.

如图3所示,本发明中铝型材生产线余热综合利用系统工作流程图,本铝型材生产线余热综合利用系统在其监控系统的控制下进行余热的分配利用。监控系统通过对铝型材生产线上各个炉炉内的数据进行监测分析,根据分析结果利用其调控装置控制该余热综合利用系统中各个阀门的开关,从而进行余热的分配。其基本流程如下:1、接近1000℃左右的高温烟气从熔铸炉中排出,可供铝锭预热室、监控系统通过对铝棒加热炉及固化炉使用。铝锭预热室、铝棒加热炉及固化炉中的数据进行分析,判定是否需要进烟。若都不需要进烟,高温烟气则直接从熔铸炉中排出。2、铝锭预热室中的500℃左右的高温烟气可供均质炉、时效炉和烘干炉使用,监控系统通过对均质炉、时效炉和烘干炉中的数据进行分析,判定是否需要进烟。若都不需要进烟,高温烟气则直接从铝锭加热炉中排出。3、均质炉中的高温烟气的温度可达600℃,可供铝棒加热炉和固化炉使用,监控系统通过对铝棒加热炉和固化炉中的数据进行分析,判定是否需要进烟。若都不需要进烟,高温烟气则直接从均质炉炉中排出。4、铝棒加热炉中的高温烟气也可达500℃,烟气流出后,可供时效炉和烘干炉使用,监控系统通过对时效炉和烘干炉中的数据进行分析,判定其是否需要进烟。若都不需要,高温烟气则直接从铝棒加热炉中排出。5、时效炉中的高温烟气的温度为200℃左右,可直接排出或直接供给固化炉使用。6、固化炉中的高温烟气也只有200℃左右,可直接排出或直接供给烘干炉使用。7、最后,烘干炉中的烟气则直接排出或经除尘系统处理后排出。 As shown in Figure 3, the working flow chart of the waste heat comprehensive utilization system of the aluminum profile production line in the present invention, the waste heat comprehensive utilization system of the aluminum profile production line distributes and utilizes waste heat under the control of its monitoring system. The monitoring system monitors and analyzes the data in each furnace on the aluminum profile production line, and uses its control device to control the switch of each valve in the waste heat comprehensive utilization system according to the analysis results, so as to distribute the waste heat. The basic process is as follows: 1. The high-temperature flue gas close to 1000 ℃ is discharged from the melting and casting furnace, which can be used by the aluminum ingot preheating chamber and the monitoring system through the aluminum rod heating furnace and curing furnace. The data in the aluminum ingot preheating chamber, aluminum rod heating furnace and curing furnace are analyzed to determine whether smoke is required. If no smoke is needed, the high-temperature flue gas is directly discharged from the casting furnace. 2. The high-temperature flue gas of about 500°C in the aluminum ingot preheating chamber can be used by the homogenizing furnace, aging furnace and drying furnace. The monitoring system analyzes the data in the homogenizing furnace, aging furnace and drying furnace. Determine if you need to smoke. If there is no need to enter the smoke, the high-temperature flue gas is directly discharged from the aluminum ingot heating furnace. 3. The temperature of the high-temperature flue gas in the homogeneous furnace can reach 600°C, which can be used in the aluminum rod heating furnace and curing furnace. The monitoring system analyzes the data in the aluminum rod heating furnace and curing furnace to determine whether it is necessary to enter the smoke . If there is no need to enter the smoke, the high-temperature flue gas is directly discharged from the homogeneous furnace. 4. The high-temperature flue gas in the aluminum rod heating furnace can also reach 500°C. After the flue gas flows out, it can be used in the aging furnace and drying furnace. The monitoring system analyzes the data in the aging furnace and drying furnace to determine its Do you need to smoke. If neither is needed, the high-temperature flue gas is directly discharged from the aluminum rod heating furnace. 5. The temperature of the high-temperature flue gas in the aging furnace is about 200°C, which can be directly discharged or directly supplied to the curing furnace. 6. The high-temperature flue gas in the curing furnace is only about 200°C, which can be directly discharged or directly supplied to the drying furnace. 7. Finally, the flue gas in the drying furnace is discharged directly or after being treated by the dust removal system.

由上述实施例可以看出,本发明提供的铝型材生产线余热综合利用系统,在监控系统的控制下,通过送风机、阀门、换热器等功能件,能将铝型材生产线上的上游炉排出的高温烟气中的余热分配到下游各炉中,每个炉的余热都能为下游炉所充分利用。通过计算,该系统能将现有的生产每吨铝型材所需的250立方米的燃气量降低至每吨只需130立方米燃气,节能将近50%。并且,在降低燃气消耗的同时也降低了各种污染气体的排放量。另外,该系统将高温烟气的变为低温烟气排放,同样也降低了烟气除尘系统的成本。 It can be seen from the above embodiments that the waste heat comprehensive utilization system of the aluminum profile production line provided by the present invention can discharge the waste heat from the upstream furnace on the aluminum profile production line through the blower, valve, heat exchanger and other functional parts under the control of the monitoring system. The waste heat in the high-temperature flue gas is distributed to the downstream furnaces, and the waste heat of each furnace can be fully utilized by the downstream furnaces. According to calculations, the system can reduce the existing 250 cubic meters of gas required to produce per ton of aluminum profiles to only 130 cubic meters of gas per ton, saving energy by nearly 50%. Moreover, while reducing gas consumption, it also reduces the emission of various polluting gases. In addition, the system changes the high-temperature flue gas into low-temperature flue gas emission, which also reduces the cost of the flue gas dust removal system.

应当理解的是,本发明的应用不限于上述的举例,对本领域普通技术人员来说,可以根据上述说明加以改进或变换,例如,本系统中的熔铸炉、铝锭预热室、均质炉、铝棒加热炉、时效炉、固化炉及烘干炉,其数量可以为两个以上,相应的该系统中的烟气输送管道也设置为网状结构,因而该系统也可建成一个余热综合利用网。另外,烘干炉的的排烟管道还可以外接一个水箱,排烟管道上设置一个换热器,通过换热器转换器排出的烟气的余热用于热水。所有这些改进和变换都应属于本发明所附权利要求的保护范围。 It should be understood that the application of the present invention is not limited to the above examples, and those skilled in the art can improve or transform according to the above description, for example, the casting furnace, aluminum ingot preheating chamber, homogenizing furnace in this system , aluminum rod heating furnace, aging furnace, curing furnace and drying furnace, the number of which can be more than two, and the corresponding flue gas conveying pipeline in the system is also set in a mesh structure, so the system can also be built into a waste heat comprehensive Use the net. In addition, the smoke exhaust pipe of the drying furnace can also be connected with a water tank, and a heat exchanger is arranged on the smoke exhaust pipe, and the waste heat of the flue gas discharged through the heat exchanger converter is used for hot water. All these improvements and changes should belong to the protection scope of the appended claims of the present invention.

Claims (6)

1.一种铝型材生产线余热综合利用系统,其特征在于,包括熔铸炉、铝锭预热室、均质炉、铝棒加热炉、时效炉、固化炉、烘干炉、排烟管道、送烟管道、输烟管道、排烟阀、输烟阀、安全阀、换热器、送风机及送烟阀,在熔铸炉、铝锭预热室、均质炉、铝棒加热炉、时效炉、固化炉、烘干炉的出烟口上均设置有排烟管道;在铝锭预热室、均质炉、铝棒加热炉、时效炉、固化炉、烘干炉的进烟口上均设置有送烟管道;所述熔铸炉、均质炉和时效炉各自的排烟管道与铝锭预热室、铝棒加热炉和固化炉各自的送烟管道之间相邻连通,所述铝锭预热室、铝棒加热炉和固化炉各自的排烟管道与均质炉、时效炉和烘干炉各自的送烟管道之间相邻连通,烘干炉的排烟管道直接向外排出;所述熔铸炉、铝锭预热室、均质炉、铝棒加热炉、时效炉、固化炉、烘干炉的排烟管道的排烟口处均设置有排烟阀;所述铝型材生产线余热综合利用系统的各个输烟管道上均设有输烟阀和安全阀;所述铝锭预热室、均质炉、铝棒加热炉、时效炉、固化炉、烘干炉的送烟管道上均设置有换热器、送风机和送烟阀,换热器、送风机和送烟阀的设置位置依送风方向依次为换热器、送风机、送烟阀。 1. A system for comprehensive utilization of waste heat in an aluminum profile production line, characterized in that it includes a melting and casting furnace, an aluminum ingot preheating chamber, a homogenizing furnace, an aluminum rod heating furnace, an aging furnace, a curing furnace, a drying furnace, a smoke exhaust pipe, a delivery Smoke pipes, smoke pipes, smoke exhaust valves, smoke valves, safety valves, heat exchangers, blowers and smoke valves, in melting and casting furnaces, aluminum ingot preheating chambers, homogenizing furnaces, aluminum rod heating furnaces, aging furnaces, Smoke exhaust pipes are installed on the smoke outlets of the curing furnace and drying furnace; smoke delivery pipes are installed on the smoke inlets of the aluminum ingot preheating chamber, homogeneous furnace, aluminum rod heating furnace, aging furnace, curing furnace, and drying furnace. Smoke pipes; the smoke exhaust pipes of the melting and casting furnace, the homogenizing furnace and the aging furnace are adjacent to and connected with the respective smoke delivery pipes of the aluminum ingot preheating chamber, the aluminum rod heating furnace and the curing furnace, and the aluminum ingot preheating The smoke exhaust pipes of the chamber, the aluminum rod heating furnace and the curing furnace are adjacent to each other and the smoke delivery pipes of the homogenizing furnace, the aging furnace and the drying furnace, and the smoke exhaust pipes of the drying furnace are directly discharged outward; Smoke exhaust valves are installed at the smoke exhaust pipes of melting and casting furnaces, aluminum ingot preheating chambers, homogenizing furnaces, aluminum rod heating furnaces, aging furnaces, curing furnaces, and drying furnaces; Smoke valves and safety valves are provided on each smoke pipeline of the utilization system; the smoke pipelines of the aluminum ingot preheating chamber, homogeneous furnace, aluminum rod heating furnace, aging furnace, curing furnace, and drying furnace are equipped with A heat exchanger, a blower fan and a smoke supply valve are arranged, and the positions of the heat exchanger, the blower blower and the smoke supply valve are arranged in order of the heat exchanger, the blower fan and the smoke supply valve according to the air supply direction. 2.根据权利要求1所述的铝型材生产线余热综合利用系统,其特征在于,还包括水箱,所述烘干炉的排烟管道插入到所述水箱中,所述烘干炉的排烟管道上设置有换热器。 2. The waste heat comprehensive utilization system of the aluminum profile production line according to claim 1, further comprising a water tank, the exhaust pipe of the drying furnace is inserted into the water tank, and the smoke exhaust pipe of the drying furnace A heat exchanger is provided on it. 3.根据权利要求1或2所述的铝型材生产线余热综合利用系统,其特征在于,所述熔铸炉的数量至少为一个,所述铝锭预热室的数量至少为一个,所述均质炉的数量至少为一个,所述铝棒加热炉的数量至少为一个,所述时效炉的数量至少为一个,所述固化炉的数量至少为一个,所述烘干炉的数量至少为一个。 3. The waste heat comprehensive utilization system of aluminum profile production line according to claim 1 or 2, characterized in that the number of the melting and casting furnace is at least one, the number of the aluminum ingot preheating chamber is at least one, and the homogeneous There is at least one furnace, at least one aluminum rod heating furnace, at least one aging furnace, at least one curing furnace, and at least one drying furnace. 4.根据权利要求1所述的铝型材生产线余热综合利用系统,其特征在于,还包括监控系统,所述监控系统包括中央处理器、数据监控装置及调控装置,所述数据监控装置和调控装置设置在所述铝型材生产线余热综合利用系统中的各个炉体上,所述数据监控装置和调控装置分别与中央处理器电联接。 4. The waste heat comprehensive utilization system of an aluminum profile production line according to claim 1, further comprising a monitoring system, the monitoring system comprising a central processing unit, a data monitoring device and a control device, the data monitoring device and the control device It is arranged on each furnace body in the waste heat comprehensive utilization system of the aluminum profile production line, and the data monitoring device and the control device are respectively electrically connected with the central processing unit. 5.根据权利要求4所述的铝型材生产线余热综合利用系统,其特征在于,所述的数据监控装置包括压力监控器和温度监控器。 5. The system for comprehensive utilization of waste heat in an aluminum profile production line according to claim 4, wherein the data monitoring device includes a pressure monitor and a temperature monitor. 6.根据权利要求4或5所述的铝型材生产线余热综合利用系统,其特征在于,所述的调控装置包括排烟阀、输烟阀、安全阀、换热器、送风机及送烟阀。 6. The waste heat comprehensive utilization system of aluminum profile production line according to claim 4 or 5, characterized in that the control device includes a smoke exhaust valve, a smoke delivery valve, a safety valve, a heat exchanger, a blower and a smoke supply valve.
CN2011103806872A 2011-11-25 2011-11-25 Waste heat comprehensive utilization system in aluminum profile production line Active CN102410744B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103806872A CN102410744B (en) 2011-11-25 2011-11-25 Waste heat comprehensive utilization system in aluminum profile production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103806872A CN102410744B (en) 2011-11-25 2011-11-25 Waste heat comprehensive utilization system in aluminum profile production line

Publications (2)

Publication Number Publication Date
CN102410744A CN102410744A (en) 2012-04-11
CN102410744B true CN102410744B (en) 2013-10-16

Family

ID=45912962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103806872A Active CN102410744B (en) 2011-11-25 2011-11-25 Waste heat comprehensive utilization system in aluminum profile production line

Country Status (1)

Country Link
CN (1) CN102410744B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103398592B (en) * 2013-08-19 2015-04-29 佛山市广旭节能自动化科技有限公司 Heat recovery system of aluminum homogeneous furnace
CN103453778B (en) * 2013-09-03 2015-04-01 南通曼特威金属材料有限公司 Waste gas drying system for smelting furnace
CN110343834B (en) * 2019-08-15 2024-06-21 沈阳东大三建工业炉制造有限公司 Device and method for utilizing flue gas waste heat of aluminum alloy T6 heat treatment furnace
CN113432440A (en) * 2021-05-25 2021-09-24 苏州鼎佳炉窑科技有限公司 Waste heat recovery system of aluminum alloy casting workshop
CN120627707B (en) * 2025-03-26 2026-02-03 河南万达铝业有限公司 Comprehensive utilization system and method for waste heat of waste aluminum treatment production line

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201191140Y (en) * 2007-11-09 2009-02-04 山东华恒矿业有限公司 Waste heat utilization system for novel gangue kiln
CN201857406U (en) * 2010-10-14 2011-06-08 佛山市通润热能科技有限公司 Preheating system for homogenizing furnace and aging furnace
CN102173444A (en) * 2011-02-24 2011-09-07 山东三丰集团股份有限公司 System and method for comprehensive utilization of tail gas of aluminium sulphate reaction kettles
CN202361819U (en) * 2011-11-25 2012-08-01 佛山市通润热能科技有限公司 Comprehensive waste heat utilization system on aluminum section production line

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201191140Y (en) * 2007-11-09 2009-02-04 山东华恒矿业有限公司 Waste heat utilization system for novel gangue kiln
CN201857406U (en) * 2010-10-14 2011-06-08 佛山市通润热能科技有限公司 Preheating system for homogenizing furnace and aging furnace
CN102173444A (en) * 2011-02-24 2011-09-07 山东三丰集团股份有限公司 System and method for comprehensive utilization of tail gas of aluminium sulphate reaction kettles
CN202361819U (en) * 2011-11-25 2012-08-01 佛山市通润热能科技有限公司 Comprehensive waste heat utilization system on aluminum section production line

Also Published As

Publication number Publication date
CN102410744A (en) 2012-04-11

Similar Documents

Publication Publication Date Title
CN102410744B (en) Waste heat comprehensive utilization system in aluminum profile production line
CN104801174B (en) A kind of activated coke flue gas purification system
CN102673118B (en) High temperature heat pump energy saving system for printing machinery
CN105214921A (en) A kind of automobile coating drying chamber high-temperature flue gas utilizes system and utilizes technique
CN204224467U (en) Limestone kiln and system for producing calcium carbide
CN103808135A (en) Tunnel furnace with wide furnace chamber applied to large workpiece
CN202361819U (en) Comprehensive waste heat utilization system on aluminum section production line
CN204346078U (en) A kind of roller way kiln residual heat using device
CN201317871Y (en) Distributed mounting and connecting structure of waste heat recovery device of forming machine
CN108224930A (en) Single cycle wind turbine hot air drying system
CN102829617A (en) Waste gas heat energy environmental-friendly comprehensive utilization device
CN106766970A (en) A kind of recuperation of heat ducting system for kiln
CN201505627U (en) Coating machine oven air inlet and outlet pipeline system capable of recycling waste heat
CN206373325U (en) A kind of aluminium alloy turns aluminium frock heating constant-temperature equipment
CN205679040U (en) A kind of utilize fume afterheat pulpous state insulation material is carried out coupling be dried system
CN204648986U (en) A kind of board-like pair of preheater process system for gas burning lime kiln
CN211988031U (en) Urea pyrolysis system directly adopting clean flue gas as heat source
CN103712439B (en) Rotary kiln outer drum waste heat collecting system and collecting method thereof
CN201488567U (en) Energy-saving device utilizing smoke of kiln for supplying heat to spray tower
CN106091661B (en) System for coupling and drying slurry-like heat-insulating material by using flue gas waste heat
CN208075596U (en) A kind of cooler for mineral hot furnace flue gas cleaning system
CN203342903U (en) Energy-saving and emission-reduction device used for industrial vertical mill
CN204522739U (en) A kind of activated coke flue gas purification system
CN203083378U (en) Waste heat utilization device of fuel gas shuttle kiln
CN210711607U (en) Blast furnace hot blast stove series device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Waste heat comprehensive utilization system in aluminum profile production line

Effective date of registration: 20200629

Granted publication date: 20131016

Pledgee: Guangdong Nanhai Rural Commercial Bank branch branch of Limited by Share Ltd.

Pledgor: FOSHAN TONGRUN THERMAL ENERGY TECHNOLOGY Co.,Ltd.

Registration number: Y2020980003515

PE01 Entry into force of the registration of the contract for pledge of patent right
CP02 Change in the address of a patent holder

Address after: 528100 the third of No.10 (F1) in plot B of central science and Technology Industrial Zone, Leping Town, Sanshui District, Foshan City, Guangdong Province

Patentee after: FOSHAN TONGRUN THERMAL ENERGY TECHNOLOGY Co.,Ltd.

Address before: 528137 No.5, Jiye Avenue, central science and Technology Industrial Park, Leping Town, Sanshui District, Foshan City, Guangdong Province

Patentee before: FOSHAN TONGRUN THERMAL ENERGY TECHNOLOGY Co.,Ltd.

CP02 Change in the address of a patent holder
PP01 Preservation of patent right

Effective date of registration: 20241231

Granted publication date: 20131016

PP01 Preservation of patent right