CN102409686B - 垃圾山生态护坡方法及采用该方法的垃圾山绿化坡面 - Google Patents

垃圾山生态护坡方法及采用该方法的垃圾山绿化坡面 Download PDF

Info

Publication number
CN102409686B
CN102409686B CN201110279828.1A CN201110279828A CN102409686B CN 102409686 B CN102409686 B CN 102409686B CN 201110279828 A CN201110279828 A CN 201110279828A CN 102409686 B CN102409686 B CN 102409686B
Authority
CN
China
Prior art keywords
garbage
massif
hill
garbage mountain
main reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110279828.1A
Other languages
English (en)
Other versions
CN102409686A (zh
Inventor
高振生
王玉磊
苏军委
高俊虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing and Henderson Urban International New York Ltd
Original Assignee
BEIJING ZHENGHE HENGJIBIN AQUATIC ECOSYSTEM ENVIRONMENT CONTROL CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ZHENGHE HENGJIBIN AQUATIC ECOSYSTEM ENVIRONMENT CONTROL CO LTD filed Critical BEIJING ZHENGHE HENGJIBIN AQUATIC ECOSYSTEM ENVIRONMENT CONTROL CO LTD
Priority to CN201110279828.1A priority Critical patent/CN102409686B/zh
Publication of CN102409686A publication Critical patent/CN102409686A/zh
Application granted granted Critical
Publication of CN102409686B publication Critical patent/CN102409686B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本发明涉及一种垃圾山生态护坡方法及采用该方法的垃圾山绿化坡面,经过打孔、浇注预埋有主钢筋的混凝土柱、铺设植生袋和交叉焊接钢筋形成保护植生袋的钢筋网格形成为所述坡面,所述坡面包括设置在垃圾山的山体中预埋有主钢筋的若干混凝土柱和铺设在所述垃圾山的山体上的植生袋,外露的所述主钢筋上交叉焊接有钢筋形成用于拢住所述植生袋的钢筋网格。本发明可实现在坡度较大情况下的水土保持,可适用于0-90度坡度的各种各样地形地貌的垃圾山修复覆盖,成本较低,在进行垃圾山改造的同时还可充分利用垃圾山进行绿化造景。

Description

垃圾山生态护坡方法及采用该方法的垃圾山绿化坡面
技术领域
本发明涉及一种垃圾山绿化方法和采用该方法获得的垃圾山护坡结构。
背景技术
目前,在垃圾山的处理中,坡面覆盖结构比较普遍使用的施工方法是封场覆盖,接着按照由上至下,先边坡后场底的顺序铺设土工布、土工膜、复合土工网格,然后封盖素土进行绿化栽植。此该方法不仅费用高,而且只能将山体塑造成规则的几何形状,不能适应各种坡度的垃圾山处理以及所有的地形地貌,极大地制约了绿化造景功能。
发明内容
为了解决上述问题,本发明提供了一种垃圾山生态护坡方法及采用该方法的垃圾山绿化坡面,不仅成本较低,允许将垃圾山人工塑造成多种几何形状,以适应各种各样的地形地貌,增强了绿化、造景功能。
本发明所采用的主要技术方案是:
本发明保护一种垃圾山生态护坡方法,包括以下步骤:
(1)在垃圾山的山体中打孔并浇筑形成若干混凝土柱,所述混凝土柱内预埋主钢筋,所述主钢筋的上部露出所述混凝土柱;
(2)在垃圾山的山体上均匀铺设植生袋;
(3)将钢筋交叉焊接在外露的所述主钢筋上形成钢筋网格拢住所述植生袋;
(4)对所述植生袋浇水养护。
本发明还保护一种垃圾山绿化坡面,包括设置在垃圾山的山体中的若干混凝土柱、预埋在所述混凝土柱中的主钢筋和均匀铺设在所述垃圾山的山体上的植生袋,所述主钢筋上部露出所述山体,外露的所述主钢筋上交叉焊接有钢筋形成用于拢住所述植生袋的钢筋网格。
本发明的有益效果为:
由于铺设植生袋并进行正常的浇水养护,可利用植生袋内种子发芽成长达到对垃圾山的绿化改造目的。
通过设置混凝土柱和在混凝土柱的外伸主钢筋上交叉焊接钢筋形成钢筋网格,对植生袋起到一定的加固、防护作用,使得对于垃圾山的绿化改造不受其坡度、地形地貌的制约,并且在改造垃圾山的同时可充分利用其进行绿化造景。
由于浇筑混凝土柱前的打孔采用加长臂挖掘机破碎头前端焊接Φ150cm尖端为锥形的钢管进行机械作业,工作效率大大提高,本发明的方法施工简单,成本较低,且所形成的坡面结构简单、寿命长、容易维护。
附图说明
图1为本发明的护坡的平面结构示意图;
图2为本发明的护坡的立面结构示意图。
具体实施方式
如图1、2所示,本发明保护一种垃圾山生态护坡方法,该方法主要包括以下步骤:
(1)对原有垃圾山9进行初步的地形塑造。
(2)采用勾机作业在垃圾山的山体中打孔,孔间距为1m左右,优选呈梅花桩式分布,向孔中浇筑混凝土形成若干混凝土柱1,浇筑时各所述孔中扦插有主钢筋2,所述主钢筋的扦插深度以使所述主钢筋的上部露出固化后的所述混凝土柱为准。打孔作业时优选使用加长臂挖掘机破碎头前端焊接Φ150cm尖端为锥形的钢管,钢管长1.5米,进行机械作业,改变以前使用洛阳铲进行的人工打孔,工作效率大大提高。
(3)在垃圾山的山体上均匀铺设植生袋3,且由下至上交错码放。
(4)将钢筋4交叉焊接在外露的所述主钢筋上形成钢筋网格以拢住所述植生袋,使得该方法可适用于0-90坡度的垃圾山修复覆盖,所述钢筋大致平行于山体的坡面。所述钢筋网格与所述植生袋紧密接触,以实现对其的充分保护,如可防止山体滑坡或植生袋发生移位等。
(5)对所述植生袋浇水养护,以保持植生袋的湿度,使植生袋内的种子发芽成长进而达到绿化改造的效果。
视垃圾山的原有土质情况,可以适当地在浇筑混凝土柱之前先在所述山体整个区域上均匀覆盖素土层5并找平,作为植物生长的基础土壤。所述素土层的厚度可以为25~50cm,优选为30cm。铺设植生袋时应注意压实,使植生袋与素土充分接触。
优选地,所述混凝土柱依行、列分布并垂直于所述山体设置,相邻两行的混凝土柱之间相互错开,优选的错开距离为同一行中相邻两混凝土柱间距的一半。
所述混凝土柱的深度(即打孔深度)可以为1.2~1.8m,优选为1.5m,所述主钢筋的长度可以为1.2~1.8m,优选为1.5m,露出所述山体的所述主钢筋的长度(等于露出所述混凝土柱的所述主钢筋的长度)可以为0.3~0.7m,优选为0.5m,埋入所述混凝土柱的深度优选为1m。
所述主钢筋的直径可以为10~15mm,优选采用12#螺纹钢筋,所述钢筋的直径可以为5~8mm,优选采用φ6钢筋。
为了减少雨水对山体的冲刷,可以在所述山体的上下两端修挖排水沟6、7,通常所述排水沟沿所述山体的两端边缘延伸,优选地,所述排水沟的宽度为40cm,深度为60cm。还可在下端的所述排水沟7之外设置挡土墙8,所述挡土墙自地面向下延伸,其一侧壁构成下端的所述排水沟的一个侧壁,可起到一定的加固、防护作用,所述挡土墙的宽度优选为40cm,深度优选为150cm。
整个施工过程中应注意进行分层压实。
本发明还保护一种垃圾山绿化坡面,该坡面可采用前述的各种施工方法建造而成,主要包括设置在垃圾山的山体中的若干混凝土柱1、预埋在所述混凝土柱中的主钢筋2和均匀铺设在所述垃圾山的山体上的植生袋3,所述主钢筋的上部露出所述混凝土柱,外露的所述主钢筋上交叉焊接有钢筋4形成用于拢住所述植生袋的钢筋网格,所述钢筋大致平行于山体的坡面设置。
本发明涉及的所述植生袋的成分主要是外层的无纺布、绿网和内置的草籽(预先在植生袋生产厂置入),其中外层材料可抗紫外线、抗盐碱和抗腐蚀,并且有很强的透水性能,袋内装土量为袋容积三分之二最为适宜,草种在植生袋中很易发芽生长,而且草根、树根极易穿过植生袋与外界土壤结合。草种、树种优选耐干旱、抗贫瘠并且繁殖快的丛生苗木,如:紫穗槐、胡枝子、山枣等,从而在苗木成活后对垃圾山达到根本治理的目的。
所述植生袋与所述山体的表面之间还可以铺设有25~50cm的素土层5,且所述植生袋与素土层紧密接触。
所述山体的上下两端还可设置有排水沟6、7,在下端的所述排水沟之外还可设置有挡土墙8。所述排水沟和挡土墙的结构参数同前所述。
本发明可实现在坡度较大情况下的水土保持,可适用于0-90度坡度的垃圾山修复覆盖,不仅可达到垃圾山改造的目的,还可充分利用垃圾山进行绿化造景。

Claims (7)

1.一种垃圾山生态护坡方法,其特征在于包括以下步骤:
(1)在垃圾山的山体中打孔并浇筑形成若干混凝土柱,所述混凝土柱内预埋主钢筋,所述主钢筋的上部露出所述混凝土柱,所述混凝土柱依行、列分布并垂直于所述山体设置,相邻两行的混凝土柱之间相互错开;
(2)在垃圾山的山体上均匀铺设植生袋;
(3)将钢筋交叉焊接在外露的所述主钢筋上形成钢筋网格拢住所述植生袋;
(4)对所述植生袋浇水养护;
所述山体的上下两端设置排水沟,在下端的所述排水沟之外设置挡土墙。
2.根据权利要求1所述的垃圾山生态护坡方法,其特征在于浇筑混凝土柱之前先在所述山体整个区域上均匀覆盖素土层。
3.根据权利要求2所述的垃圾山生态护坡方法,其特征在于所述素土层的厚度为25~50cm。
4.根据权利要求3所述的垃圾山生态护坡方法,其特征在于所述混凝土柱深1.2~1.8m,所述主钢筋的长度为1.2~1.8m,露出所述山体的所述主钢筋的长度为0.3~0.7m。
5.根据权利要求4所述的垃圾山生态护坡方法,其特征在于所述主钢筋的直径为10~15mm,所述钢筋的直径为5~8mm。
6.一种采用如权利要求1所述的垃圾山生态护坡方法的垃圾山绿化坡面,其特征在于包括设置在垃圾山的山体中的若干混凝土柱、预埋在所述混凝土柱中的主钢筋和均匀铺设在所述垃圾山的山体上的植生袋,所述主钢筋上部露出所述山体,外露的所述主钢筋上交叉焊接有钢筋形成用于拢住所述植生袋的钢筋网格,所述山体的上下两端设置有排水沟,在下端的所述排水沟之外还设置有挡土墙。
7.根据权利要求6所述的垃圾山绿化坡面,其特征在于所述植生袋与所述山体的表面之间还铺设有25~50cm的素土层。
CN201110279828.1A 2011-09-20 2011-09-20 垃圾山生态护坡方法及采用该方法的垃圾山绿化坡面 Active CN102409686B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110279828.1A CN102409686B (zh) 2011-09-20 2011-09-20 垃圾山生态护坡方法及采用该方法的垃圾山绿化坡面

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110279828.1A CN102409686B (zh) 2011-09-20 2011-09-20 垃圾山生态护坡方法及采用该方法的垃圾山绿化坡面

Publications (2)

Publication Number Publication Date
CN102409686A CN102409686A (zh) 2012-04-11
CN102409686B true CN102409686B (zh) 2014-04-23

Family

ID=45912006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110279828.1A Active CN102409686B (zh) 2011-09-20 2011-09-20 垃圾山生态护坡方法及采用该方法的垃圾山绿化坡面

Country Status (1)

Country Link
CN (1) CN102409686B (zh)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102599003A (zh) * 2012-04-17 2012-07-25 南京大源园林建设有限公司 一种岩石山坡草棍植草方法
CN102677651B (zh) * 2012-04-26 2015-01-07 北京正和恒基滨水生态环境治理股份有限公司 山体生态修复方法
CN102936898B (zh) * 2012-11-26 2015-06-03 中冶赛迪工程技术股份有限公司 滴灌生态护坡装置
CN103122640A (zh) * 2012-12-21 2013-05-29 陕西红叶园林绿化设计工程集团有限公司 一种边坡防护结构及防护方法
CN103222397B (zh) * 2013-04-03 2014-08-13 葛加君 插管器的制作方法
CN103321229A (zh) * 2013-05-14 2013-09-25 李尚喜 山体增高措施与施工
CN103828633B (zh) * 2013-12-05 2015-10-28 大连环复生态技术有限公司 植生袋护坡复绿方法和复绿结构
CN109083161A (zh) * 2018-08-02 2018-12-25 浙江交工集团股份有限公司 适用于狭长空间拼宽的生态护坡结构及其施工方法
CN109083158A (zh) * 2018-09-28 2018-12-25 浙江工业大学 滑裂面加固装置及其施工方法
CN113412765A (zh) * 2021-05-26 2021-09-21 浙江同济科技职业学院 一种库岸消落带生态修复方法
CN115059098A (zh) * 2022-07-15 2022-09-16 广东省水利水电第三工程局有限公司 一种垂直边坡生态改造固定装置及施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2605734Y (zh) * 2002-08-13 2004-03-10 深圳市万信达环境绿化建设有限公司 岩石边坡喷混植生建植层
JP2005155163A (ja) * 2003-11-26 2005-06-16 Adoban:Kk 斜面安定装置
CN101213910A (zh) * 2008-01-09 2008-07-09 卢正才 一种利用网格植生袋进行边坡绿化的方法
CN102174816A (zh) * 2011-01-24 2011-09-07 中国科学院南京地理与湖泊研究所 一种不稳定土石边坡的生态修复构造法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2605734Y (zh) * 2002-08-13 2004-03-10 深圳市万信达环境绿化建设有限公司 岩石边坡喷混植生建植层
JP2005155163A (ja) * 2003-11-26 2005-06-16 Adoban:Kk 斜面安定装置
CN101213910A (zh) * 2008-01-09 2008-07-09 卢正才 一种利用网格植生袋进行边坡绿化的方法
CN102174816A (zh) * 2011-01-24 2011-09-07 中国科学院南京地理与湖泊研究所 一种不稳定土石边坡的生态修复构造法

Also Published As

Publication number Publication date
CN102409686A (zh) 2012-04-11

Similar Documents

Publication Publication Date Title
CN102409686B (zh) 垃圾山生态护坡方法及采用该方法的垃圾山绿化坡面
CN102444134B (zh) 一种基于上部为土质层、下部为岩质层的边坡的护坡方法
CN107893422B (zh) 一种加固型生态护坡结构及其施工方法
JPH09302667A (ja) 自然生態自己復元式法面工法および法面構造
CN104186233A (zh) 一种框格梁边坡绿化方法及框格梁边坡绿化设施
CN201080611Y (zh) 用于岩质边坡的立体绿化构架
CN105544567B (zh) 一种岩质陡坡全坡面绿化工法的土建结构
CN110552356B (zh) 一种高原区道路下边坡挂渣综合治理系统及其施工方法
KR20120021670A (ko) 녹화용 식생 보강 매트리스 개비온 및 그 시공방법
CN104652452A (zh) 一种用于喀斯特地区护坡的集水灌溉装置
CN111549748A (zh) 一种基于重力式格宾结构的矿山生态综合修复方法
CN103362135B (zh) 防崩岗、护水土的网草护坡
CN102677651B (zh) 山体生态修复方法
CN111485565A (zh) 一种绿色生态边坡一体化加固方法
CN204014608U (zh) 一种框格梁边坡绿化设施
CN203530993U (zh) 一种钢筋网片种植穴
CN204119877U (zh) 一种边坡复绿装置
CN106717413A (zh) 一种海绵城市绿化灌溉系统及其施工方法
CN110424419A (zh) 一种框格梁边坡绿化系统的施工方法
KR20110047424A (ko) 콘크리트 파일의 연이은 설치에 의하여 설치된 식생공간부를 이용한 식생옹벽 및 이의 시공방법
CN212641481U (zh) 一种山体多元矩阵生态修复结构
CN206267161U (zh) 一种适用于土质边坡的三维植被网护坡施工结构
CN108222036A (zh) 一种生态柔性排水沟及其构筑方法
CN209816870U (zh) 利于边坡植被生长陡立混凝土框格梁护坡系统
CN107419855B (zh) 一种适用于地下车库顶板上的大型乔木种植方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: BEIJING ZHENGHE HENGJI WATERFRONT ECOLOGICAL ENVIR

Free format text: FORMER NAME: BEIJING ZHENGHE HENGJI WATERFRONT ECOLOGICAL ENVIRONMENTAL TREATMENT CO., LTD.

CP03 Change of name, title or address

Address after: 100084 Beijing Road, Zhongguancun, Tsinghua Science and Technology Park, No. 1, science and technology building, block B, layer 21, layer

Patentee after: Beijing Zhenghe Hengji Binshui Ecology Environmental Management Co., Ltd.

Address before: 100094, Beijing, Yongfeng Haidian District industrial base, No. 3 North Wing Road, block A, room 314, room 3

Patentee before: Beijing Zhenghe Hengjibin Aquatic Ecosystem Environment Control Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170509

Address after: 100084 Beijing Road, Zhongguancun, Tsinghua Science and Technology Park, No. 1, science and technology building, block B, layer 27, layer

Patentee after: Beijing City Planning & Design Institute Co., Ltd.

Address before: 100084 Beijing Road, Zhongguancun, Tsinghua Science and Technology Park, No. 1, science and technology building, block B, layer 21, layer

Patentee before: Beijing Zhenghe Hengji Binshui Ecology Environmental Management Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100084, 27 floor, block B, science and technology building, Tsinghua Science and Technology Park, 1 Zhongguancun East Road, Haidian District, Beijing.

Patentee after: Beijing and Henderson Urban International New York Ltd

Address before: 100084, 27 floor, block B, science and technology building, Tsinghua Science and Technology Park, 1 Zhongguancun East Road, Haidian District, Beijing.

Patentee before: Beijing City Planning & Design Institute Co., Ltd.