CN102404791B - Determination method of load information and determination device of load information - Google Patents

Determination method of load information and determination device of load information Download PDF

Info

Publication number
CN102404791B
CN102404791B CN201010279885.5A CN201010279885A CN102404791B CN 102404791 B CN102404791 B CN 102404791B CN 201010279885 A CN201010279885 A CN 201010279885A CN 102404791 B CN102404791 B CN 102404791B
Authority
CN
China
Prior art keywords
core network
network node
load information
user terminal
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010279885.5A
Other languages
Chinese (zh)
Other versions
CN102404791A (en
Inventor
林良书
杜艳艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Group Shanghai Co Ltd
Original Assignee
China Mobile Group Shanghai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Group Shanghai Co Ltd filed Critical China Mobile Group Shanghai Co Ltd
Priority to CN201010279885.5A priority Critical patent/CN102404791B/en
Publication of CN102404791A publication Critical patent/CN102404791A/en
Application granted granted Critical
Publication of CN102404791B publication Critical patent/CN102404791B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a determination method of load information and a determination device of the load information which are used for solving the problem that the real-time load information of core network nodes is difficult to determine by adopting the manner for determining the load information of the core network nodes according to pre-allocated weights in the prior art. The method comprises the following steps that: the number of the user terminals respectively connected with each core network nodes is determined by an allocation node; and the load information of the corresponding core network node is determined respectively according to the number.

Description

Definite method and the device of load information
Technical field
The present invention relates to communication technical field, relate in particular to a kind of definite method and device of load information.
Background technology
Resources of core network pond is a kind of new networking mode, this networking mode has been broken in legacy network a wireless network node (as radio network controller (RNC, Radio Network Controller)/base station controller (BSC, Base Station Controller)/eNodeB) can only be connected to a core network node (as (MSC of mobile switching centre, Mobile Switching Center/GPRS serving GPRS support node (SGSN, Servicing GPRS Support Node)/mobile management entity (MME, Mobile Management Entity)) restriction, but a wireless network node is connected on multiple core network nodes, jointly form a resources of core network pond by these multiple core network nodes.This resources of core network pond can provide service for the wireless network node that is connected to this resources of core network pond including this wireless network node.
In the time that user terminal is registered to the core network node in resources of core network pond, the load balancing principle for definite core network node load information that can provide according to prior art, is registered on certain core network node in resources of core network pond.And in the time having core network node to break down in resources of core network pond, also can be according to load balancing principle, by wireless network node or core network node (wireless network node now and core network node can be referred to as distribution node), thereby being assigned to other core network nodes that do not break down in resources of core network pond, the login request message that user terminal is originally sent to this core network node realizes superfluous calamity.
At present, the load balancing principle that prior art provides distributes different weight (the weight here can for being used to indicate the capacity factor measure etc. of core network node nominal load) to realize by being respectively in advance different core network node often.The defect of utilizing this load balancing principle to determine that core network node load information exists is: because the load information of core network node is generally in dynamic change, and which that prior art provides is the mode of a kind of " static state ", the weight setting generally can temporal evolution, the load information allowing to after changing according to core network node is adjusted weight, also need manually to reconfigure, thereby also have certain hysteresis quality.What as can be seen here, prior art provided determines that according to pre-assigned weight the mode of core network node load information is difficult to determine the real-time load information of core network node.
Summary of the invention
The embodiment of the present invention provides a kind of definite method and device of load information, in order to solve adopt that prior art provides determine the mode of core network node load information according to pre-assigned weight, be difficult to the problem of the real-time load information of definite core network node.
The embodiment of the present invention is by the following technical solutions:
A definite method for load information, comprising: distribution node is obtained the mark of the core network node of the user terminal connection of user terminal to send up; And according to the mark of the core network node obtaining, determine respectively the number of the user terminal of the mark that reports same core network node; And according to described number, determine respectively the load information of corresponding core network node.
Preferably, the method also comprises: distribution node is obtained the core network node of user terminal connection and the corresponding relation of the affiliated resources of core network of core network node; According to described number and described corresponding relation, the number sum of the user terminal that each core network node that definite each resources of core network pond comprises respectively connects; And according to described number sum, determine respectively the load information in corresponding resources of core network pond.
Preferably, distribution node, from the specific field that adheres to notification message or position update notification message of user terminal to send up, is resolved mark and the described corresponding relation of the core network node that obtains user terminal connection.
Preferably, in the time that core network node is moving exchanging center MSC, described specific field is the NRI place field in interim identification code TMSI.
Preferably, the method can also comprise: the nominal load information of obtaining each core network node of each reporting of network-core nodes; For arbitrary core network node, according to the nominal load of this core network node obtaining and this core network node load information of determining, determine the idling-resource information of this core network node.
Preferably, the method can also comprise: the bearer context that distribution node sends according to user terminal is set up request message, determines default bearing number that user terminal activates and the mark of the corresponding core network node of dedicated bearer number; And determine according to described number that respectively the load information of corresponding core network node is specially: according to described number and default bearing number and dedicated bearer number, determine respectively the load information of corresponding core network node.
A determining device for load information, comprising: mark acquiring unit, the mark of core network node connecting for obtaining the user terminal of user terminal to send up; Number determining unit, for according to the mark of the core network node that obtains of mark acquiring unit, determines respectively the number of the user terminal of the mark that reports same core network node; The first load information determining unit, for the number definite according to number determining unit, determines respectively the load information of corresponding core network node.
The beneficial effect of the embodiment of the present invention is as follows:
The mark of the core network node that the such scheme that the embodiment of the present invention provides connects according to the user terminal of user terminal to send up by distribution node, determine respectively the number that is attached to the user terminal on same core network node, thereby according to definite number, determine the load information of corresponding core network node.The mark that the state that is currently connected to core network node based on user terminal gets off to obtain the core network node that user terminal connects owing to adopting this scheme, therefore, the load information of the core network node of determining thus can embody the real-time load information of core network node, thereby this scheme that the embodiment of the present invention provides can solve adopt that prior art provides determine the mode of core network node load information according to pre-assigned weight, be difficult to the problem of the real-time load information of definite core network node.
Brief description of the drawings
The idiographic flow schematic diagram of definite method of a kind of load information that Fig. 1 provides for the embodiment of the present invention;
Fig. 2 is the concrete structure schematic diagram of the TMSI in the embodiment of the present invention;
Fig. 3 is for being four look principle schematic;
Fig. 4 is the schematic diagram that utilizes the successive bits bit field carrying MSC POOL-ID in NRI;
Fig. 5 be in the embodiment of the present invention in two MSC Pool networking, and BSC first line of a couplet switch belongs to the scene of two Pool;
Fig. 6 be in the embodiment of the present invention by MGW the concrete schematic diagram as distribution node;
Fig. 7 determines the idiographic flow schematic diagram of the number of the user terminal that each MSC is current connected in MSC Pool for MGW;
Fig. 8 is the enforcement scene schematic diagram of the second embodiment in the embodiment of the present invention;
Fig. 9 is that the MME/SGSN in the embodiment of the present invention closes the schematic diagram of establishing node group Pool;
Figure 10 is the FE Pool schematic diagram under distributed HLR networking scene;
To be core network element be connected to each FE in FE pond and carry out the schematic diagram of the load balancing of SCCP layer by direct-connected mode to Figure 11;
The concrete structure schematic diagram of the determining device of the load information that Figure 12 provides for the embodiment of the present invention.
Embodiment
For solve adopt that prior art provides determine the mode of core network node load information according to pre-assigned weight, be difficult to the problem of the real-time load information of determining core network node, the embodiment of the present invention provides a kind of definite scheme of load information, the core concept of this scheme is, by adding up respectively the number that is attached to the user terminal on core network node, determine the load information of core network node.Based on this core concept, first the embodiment of the present invention provides a kind of definite method of load information, and the idiographic flow schematic diagram of the method as shown in Figure 1, comprises the following steps:
Step 11, distribution node is obtained the mark of the core network node of the user terminal connection of user terminal to send up, in embodiments of the present invention, user terminal can carry core network node mark by a newly-increased message, also the mark of core network node can be carried in existing message, such as, in the prior art, user terminal adheres to after core network node completing, or after completing place is upgraded, can send respectively and adhere to notification message to distribution node, position update notification message, therefore, in the embodiment of the present invention, can consider the mark of the core network node that carries user terminal connection in these message,
Step 12, distribution node is according to the mark of the core network node obtaining, determine respectively the number of the user terminal of the mark that reports same core network node, such as, the user terminal sum that can suppose the mark A that reports core network node has 200,000, and reports the user terminal sum of the mark A of core network node to have 300,000;
Step 13, according to definite number, determines respectively the load information of corresponding core network node.
With the above-mentioned example that is assumed to be, according to definite number 200,000,300,000, by step 13, just can determine and be designated the current load of the core network node of A for having connected 200,000 user terminals, and be designated the current load of the core network node of B for having connected 300,000 user terminals.According to definite load information, the follow-up user terminal that just can be implemented as new access distributes core network node or carries out the load in resources of core network pond is shifted etc. to operation.
Because follow-up load transfer operation need to be considered the idling-resource information of core network node, therefore, in order to determine the idling-resource of core network node, in the embodiment of the present invention, can also further improve said method, concrete improvement is, said method can further include the step of the nominal load information of the each core network node that obtains each reporting of network-core nodes, thereby for arbitrary core network node, just can be according to the nominal load of this core network node obtaining and this core network node load information of determining, determine the idling-resource information of this core network node.This idling-resource information of determining can also further combine with the load balancing principle providing in prior art, to realize according to this idling-resource information of determining, the capacity factor measure of core network node is re-started to adjustment.
Based on the core concept of said method, the method that the embodiment of the present invention provides can also realize determining resources of core network pond load information.Particularly, said method can further reach the technique effect of determining core net resource pool load information by following step:
First, distribution node is obtained the core network node of user terminal connection and the corresponding relation of the affiliated resources of core network of core network node.Mention above, the mark of the core network node that user terminal can be connected is carried on to adhere in notification message or position update notification message and sends to distribution node, similarly, also this corresponding relation can be carried in the specific field that adheres to notification message or position update notification message, distribution node, by the parsing to message, just can obtain mark and the above-mentioned corresponding relation of the core network node of user terminal connection.It should be noted that, in embodiments of the present invention, in the time that core network node is MSC, this specific field can be interim identification code (TMSI, Temporary Mobile Subscriber Identity) in NRI place field, and in the time that core network node is MME, this specific field can be the specific field in GUTIs.
Then, according to number and the above-mentioned corresponding relation of the user terminal of the mark that reports same core network node of determining, the number sum of the user terminal that each core network node that definite each resources of core network pond comprises respectively connects, such as, suppose the above-mentioned A of being designated, the core network node of B all belongs to the resources of core network pond that is designated 1, and this resources of core network pond only comprises this two core network nodes, according to the number 200,000 of above-mentioned definite user terminal, 300000, just can determine that the load in this resources of core network pond that is designated 1 is for having connected 500,000 user terminals.
Finally, according to and definite number sum is determined respectively the load information in corresponding resources of core network pond.
It should be noted that, in the method that the embodiment of the present invention provides, general only consideration is to be connected to the number of the user terminal on core network node as the load of this core network node, but, in actual applications, the processing resource that the default bearing number activating due to user terminal and dedicated bearer number also can consume core network node, therefore, within also can considering that default bearing number that user terminal is activated and dedicated bearer number are divided into the load category of core network node.
In the time of load using default bearing number and dedicated bearer number as core network node, the said method that the embodiment of the present invention provides can further include step: the bearer context that distribution node sends according to user terminal is set up request message, determines default bearing number that user terminal activates and the mark of the corresponding core network node of dedicated bearer number.Thereby distribution node is in the time determining the load information of core network node, be according to number and default bearing number and the dedicated bearer number of the user terminal of the mark that reports same core network node of determining, determine respectively the load information of corresponding core network node.
Such scheme provided by the invention is without adding extra equipment, can user terminal adhere to or position updating process in, obtain the mark in the current accompanying core network node of user terminal and resources of core network pond, just can determine the number of the user terminal that core network node and resources of core network pond connect.Further; the default bearing number and the dedicated bearer number that activate according to user terminal; and by estimation the current performance consumption situation of the each core network node in resources of core network pond (as cpu resource Expenditure Levels etc.); just can further realize between different core network resource pool, and load balancing or migration in same resources of core network pond.
Below taking said method four specific embodiments in practice as example, describe said method that the embodiment of the present invention provides application flow in practice in detail.
The first embodiment:
Under the scene of MSC Pool, that network node mark and user terminal identification adopt conventionally is TMSI, and as shown in Figure 2, its length is 32bits altogether for the structure of TMSI, and wherein the length of NRI is 0~10bits, and its bit14 at TMSI is between bit23.Low especially, NRI length is to represent that this NRI is not used and represent the function of MSC/MSS not enabled MSC Pool when being 0.
In concrete programme, conventionally adopt the 23rd~17 these 7 bit bit fields in TMSI to be used as NRI field, because NRI is 7, so effectively NRI quantity is just 128.
According to four chromogen reasons as shown in Figure 3, adjacent or the crossing corresponding NRI in resources of core network pond (Pool1~Pool 4 in figure) cannot repeat, when the quantity of effective NRI is 128, and while having 4 resources of core network ponds adjacent between two, the quantity of distributing to the NRI in each resources of core network pond is just 32.Meanwhile, be NULL NRI owing to will reserving a NRI for each resources of core network pond, so for a resources of core network pond, the quantity of available NRI is just 31.
The embodiment of the present invention selects 2 bits for carrying the mark in resources of core network pond in NRI, such as, can adopt two bit bit fields in TMSI to carry the mark (MSC POOL-ID) in MSC pond, thereby NRI is divided into four groups, be respectively used in 4 MSC ponds, particularly, the schematic diagram that utilizes successive bits bit field in NRI carrying MSC POOL-ID as shown in Figure 4.Wherein, 00,01,10,11 is different MSC POOL-ID.
Adopt in this way, just can utilize specific field in TMSI to carry out the mark in the MSC pond that indicating user terminal is currently connected to, thereby distribution node is by the TMSI of counting user terminal, the user terminal number that the each MSC just can dynamic sensing comprising to each MSC pond connects.The method be applicable to as shown in Figure 5 belong to the scene of two Pool at two MSC Pool networking, BSC first line of a couplet switch, wherein, MSC1, MSC2 and a MSC Pool1 of MSC3 composition, MSC4, MSC5 and a MSC Pool2 of MSC6 composition.BSC AREA1, BSC AREA 2, BSC AREA 5 and BSC AREA6 belong to MSC Pool1.BSC AREA2, BSC AREA 3, BSC AREA 6 and BSCAREA7 belong to MSC Pool2.For BSC AREA2 and BSC AREA 6, the MSC of its first line of a couplet has the situation that adheres to different MS C Pool separately, such as, MSC1 belongs to MSC Pool1, and MSC4 belongs to MSC Pool 2, the scheme providing according to prior art, owing to not having relevant agreement or specification to arrange the mark in resources of core network pond, therefore,, for this situation as shown in Figure 5, prior art is to obtain resources of core network pond information that user terminal is current be connected to.And in embodiments of the present invention, owing to being provided with different marks for different core network resource pool, therefore, by two bit bit fields in TMSI as shown in Figure 4, just can know the mark in the resources of core network pond that user terminal is current be connected to.
In first embodiment of the invention, can consider by media gateway MGW as distribution node, particularly, by MGW as the concrete schematic diagram of distribution node as shown in Figure 6.When MGW is during as distribution node, it can add up the TMSI of each user terminal of attached thereto, and from NRI field, read respectively the mark (MSC-ID) of the each MSC under MSC POOL-ID and this MSC POOL-ID, finally calculate corresponding TMSI number, i.e. terminal use's number under a certain specific MSC-ID in a certain specific MSC POOL-ID.Repeatedly carry out this process, this MGW just can obtain the user terminal number under the each MSC in the each MSC Pool of current its first line of a couplet, and is organized into an information table as shown in table 1:
Table 1:
The mark of the MSC that MSC POOL-ID 1 comprises MSC-ID1 MSC-ID2 MSC-ID3
The number of the user terminal adhering to 400000 600000 500000
The mark of the MSC that MSC POOL-ID 2 comprises MSC-ID4 MSC-ID5 MSC-ID6
The number of the user terminal adhering to 300000 500000 600000
The information table that each MGW can himself count to other MGW broadcast transmission respectively, be that each MGW can be by intercoursing this information table and carrying out Classifying Sum statistics, make each MGW can perception with obtain the each MSC Pool of its first line of a couplet in the number of current the be connected user terminal of each MSC, whole statistical flowsheet as shown in Figure 7, comprises step:
Step 71, MGW obtains the TMSI that user terminal UE sends, and from the NRI field of TMSI, obtains the mark of MSC Pool resource pool;
Step 72, MGW has judged whether to obtain the MSC of each MSC Pool that MGW connects
POOL-ID, while being no, continues execution step 71 in judged result, otherwise, execution step 73;
Step 73 is obtained the mark MSC-ID of MSC from the NRI field of TMSI, determines the mark of the MSC that belongs to a MSC Pool together;
Step 74, statistics obtains the number of the user terminal that each MSC connects, and determines the mark of each MSC that belongs to a MSC Pool together, thereby generates information table as shown in table 1;
Step 75, interactive information table between different MGW;
Step 76, MGW is according to the information table that obtains alternately and the information table that self generates, determines the number of the user terminal that each MSC Pool connects.
In first embodiment of the invention, by carry MSC in the TMSI of user terminal to send up
The method of POOL-ID, makes each MGW can obtain the user terminal number that in each MSC Pool of its first line of a couplet, each MSC connects, thereby determines the load information of each MSC Pool.The benefit that MGW determines the load information of each MSC Pool is, in the time that the load of certain MSC Pool is overweight, MGW can be according to the load information of other MSC Pool, selects another suitable MSC Pool to provide service for user terminal.
In addition, in first embodiment of the invention, the advantage of carrying MSC POOL-ID by NRI field is also, while going out, enter MSC Pool due to user terminal, can cause the change (comprising the change of MSC POOL-ID and MSC-ID) of the NRI field in TMSI, and can send response message to MGW, MGW just can go out user, enter the MSC that Dynamic Acquisition user terminal connects in MSC Pool, the identification information of MSC Pool like this, and again realizes the statistics of the user terminal number that MSC/MSC Pool is connected.
The second embodiment:
Similar with MSC Pool, under the scene of MME Pool, that network node mark and user terminal identification adopt conventionally is GUTI.MMEGI, MMEC in GUTI and M-TMSI field are indicated respectively mark, the mark of MME and the mark of the user terminal that this MME connects in MME pond.Particularly, the enforcement scene of the second embodiment as shown in Figure 8.Wherein, the distribution node described in the method that eNodeB provides for the embodiment of the present invention.
ENodeB is in the time determining the load information of MME, the GUTI that can send for the each user terminal being attached on MME, from GUTI, read respectively the each MMEC under MMEGI and this MMEGI, thereby obtain the corresponding M-TMSI number of a certain specific MMEC in a certain specific MMEGI, i.e. the number of user terminal.Repeatedly carry out this process, eNodeB just can obtain the user terminal number under the each MME in the each MMEPool of current its first line of a couplet.Further, the bearer context that each eNodeB can also receive in conjunction with it is set up request message, count current activated default bearing number and the dedicated bearer number of user terminal in each MME in the each MME Pool of its first line of a couplet, and be organized into an information table as shown in table 2.
Table 2
In conjunction with the intercommunication flow process between eNodeB, such as, the information table that the X2 interface of each eNodeB based on as shown in Figure 8 self counts to other eNodeB broadcast transmission, be that each eNodeB can be by intercoursing this information table and carrying out Classifying Sum statistics, make each eNodeB can perception with obtain the each MME Pool of its first line of a couplet in current be connected user terminal number under each MME, and current activated dedicated bearer number and the default bearing number of each user terminal, thereby each eNodeB can realize the load information that estimates the each MME in the each MME of its first line of a couplet pond, thereby information that can comprehensive each MME, the MME serving for user terminal selecting or initiate load migration flow process come balance resources of core network pond in load.
The 3rd embodiment:
The 3rd embodiment is mainly the scene of disposing for the network integration, and so-called fusion disposed, and it refers to and can, by upgrading existing network SGSN to support MME, allow MME support existing network SGSN function simultaneously, reaches the fusion of existing network core net and SAE network in network element rank.According to investigation, the PS territory equipment of most manufacturer is all supported NE-level, and other merges, and fused controlling network element (MME+SGSN) can access 2G/3G and LTE user simultaneously.In the time that user terminal accesses by 2G/3G, merge network element and enable traditional SGSN function, in the time that user terminal accesses by LTE, merge network element and enable MME function.Equally, this MME/SGSN closes and establishes network element and also can resources of core network be shared by the networking mode of resource pool, and supports the access of 2G/3G user terminal and LTE user terminal simultaneously.Particularly, MME/SGSN close establish node group Pool schematic diagram as shown in Figure 9, in Fig. 9, BSC/RNC and eNodeB are linked in the resource pool of two MME/SGSN on respectively.
It is worth mentioning that, although closing, MME/SGSN establishes node for different user types, its functional role of playing the part of is different, but establish for node for a certain closing, its hardware platform and software platform have determined the combination property of a certain equipment, as support maximum adhesion user terminal number 1,000,000 (comprising 2G/3G user terminal and LTE user terminal), operator can be according to actual networking demand, as networking scale, the ratio that user model and business model etc. configure this closes maximum 2G/3G user terminal number and the maximum LTE user terminal number of establishing the required support of node, as configure at 4: 6 o'clock, to close and establish the maximum 2G/3G user terminal number that node supports be 400,000 to this MME/SGSN, correspondingly, support that maximum LTE user terminal number is 600,000.Therefore, close at MME/SGSN under the scene of establishing node group Pool, close the access of establishing node and support simultaneously BSC/RNC and eNodeB although a certain, but for BSC/RNC or eNodeB, what it obtained is only that this closes maximum load and the performance situation that node is supported under current access way of establishing, be that it is without considering that this closes user terminal number and the performance consumption situation of the current accompanying different system on node of establishing, accordingly, eNodeB MME/SGSN close establish node pool in when the LTE user terminal selecting core network node, in full accord with the scheme that the second embodiment provides.
But owing to there is no open interface between the each BSC/RNC in 2G/3G network, be that each BSC/RNC cannot intercourse the information table that it counts on, therefore, propose in the present embodiment, to in BSC/RNC, set up resource factor table, and in the time that MME/SGSN Pool is initialized, just each MME/SGSN be closed to the resource of establishing node and be handed down in advance each BSC/RNC in Pool.As supposed, each MME/SGSN closes that to establish the maximum 2G/3G user terminal number that node supported be 400,000, and in Fig. 9,2 BSC/RNC of the each access in each MME/SGSN pond, therefore, each BSC/RNC receives that it is 200,000 that each MME/SGSN closes the load factor of establishing node.Thus, in a specific BSC/RNC, will exist each MME/SGSN to close and establish the resource factor that node distributes this BSC/RNC, when BSC/RNC need to close while establishing node for a certain user terminal selecting MME/SGSN, this BSC/RNC will count by the current user terminal number that adheres to of the each MME/SGSN node in this equipment each MME/SGSN pond attached thereto, obtaining thus existing how many user terminals accesses each MME/SGSN by this BSC/RNC and closes and establish node, thereby obtaining each MME/SGSN in resource factor table closes and establishes node remaining resource in this BSC/RNC, thus, its present load situation based on MME/SGSN pond is that one of 2G/3G user terminal selecting is closed and established node.
The 4th embodiment: the 4th embodiment is mainly for the FE Pool under distributed HLR networking scene.Distributed HSS/HLR is a kind of evolution to the centralized HSS/HLR of tradition, and itself and centralized HLR are similar, has still retained three kinds of functions of centralized HLR, completes protocol processes, data management and data storage, and its framework as shown in figure 10.This framework adopts the structure of layer-stepping, is specifically divided into protocol layer, data route layer and data storage layer.Protocol layer is also referred to as front end (Front End, FE), for the treatment of signaling and applied logic.Data route layer and data storage layer are referred to as rear end (Back End, BE) or customer data base, and the mode that data route entity and data storage entities adopt physics to set up separately is disposed.
In distributed HLR framework, front end FE realizes load balancing in the mode of resource pool in signaling aspect, and core network element can be by direct-connected mode, is connected to each FE in FE pond and carries out the load balancing of SCCP layer, and its schematic diagram as shown in figure 11.
Because the each FE in FE pond has configured identical HLR ID, therefore, core network element is in the time receiving the MSISDN user terminal requests that contains identical HLR ID, the number of the user terminal that can connect according to same FE, determine the load information of each FE in current FE pond, this signaling request is linked in a certain specific FE by DPC addressing system.In the embodiment of the present invention, can identify FE resource pool by several continuous bits in the DPC of 24bit coding, when each core network element is selected FE in each FE pond, can add up the MSISDN/IMSI number that is attached to the each user terminal on a certain specific DPC, i.e. user terminal number.Repeatedly carry out this process, this core network element just can obtain the user terminal number under the each FE in the each FE of current its first line of a couplet pond, generates an information table as shown in table 3.
Table 3:
DPC(FE POOL-ID1) FE-1(DPC1) FE-2(DPC2) FE-3(DPC3)
Adhere to user terminal number 400000 600000 500000
DPC(FE POOL-ID2) FE-4(DPC4) FE-5(DPC5) FE-6(DPC6)
Adhere to user terminal number 300000 500000 600000
Be addressed to STP if core network element carries out GT to signaling request, when the each FE in FE pond is only connected with H/LSTP in signaling district, can completes and generate above-mentioned information table by STP.
Definite method of the load information providing corresponding to the embodiment of the present invention, the embodiment of the present invention also provides a kind of determining device of load information, and the concrete structure schematic diagram of this device as shown in figure 12, comprises following functions unit:
Mark acquiring unit 121, the mark of core network node connecting for obtaining the user terminal of user terminal to send up;
Number determining unit 122, for according to the mark of the core network node that obtains of mark acquiring unit 121, determines respectively the number of the user terminal of the mark that reports same core network node;
The first load information determining unit 123, for the number definite according to number determining unit 122, determines respectively the load information of corresponding core network node.
Preferably, this device that the embodiment of the present invention provides can further include with lower unit, in order to realize determining of load information to resources of core network pond.Particularly, those unit comprise:
Corresponding relation acquiring unit, for obtaining the corresponding relation of resources of core network under core network node that user terminal connects and core network node; Number sum determining unit, for the corresponding relation obtaining according to the definite number of number determining unit and corresponding relation acquiring unit, determines respectively the number sum of the user terminal that each core network node that each resources of core network pond comprises connects; And the second load information determining unit, for the number sum definite according to number sum determining unit, determine respectively the load information in corresponding resources of core network pond.
Preferably, in embodiments of the present invention, mark acquiring unit specifically can be for from the specific field that adheres to notification message or position update notification message of user terminal to send up, resolves the mark of the core network node that obtains user terminal connection; Corresponding relation acquiring unit can, specifically for from the specific field that adheres to notification message or position update notification message of user terminal to send up, be resolved and obtain above-mentioned corresponding relation.
In order to determine the idling-resource information of core network node, the said apparatus that the embodiment of the present invention provides can also comprise: nominal load information acquisition unit, for obtaining the nominal load information of each core network node of each reporting of network-core nodes; Idling-resource information determining unit, be used for for arbitrary core network node, the nominal load of this core network node obtaining according to nominal load information acquisition unit and this core network node load information of determining, determine the idling-resource information of this core network node.
In the time that the default bearing number that user terminal is activated and dedicated bearer number are divided into the loading range of core network node, the bearer context that this device that the embodiment of the present invention provides can further include for sending according to user terminal is set up request message, determine the mark determining unit of the mark of default bearing number that user terminal activates and the corresponding core network node of dedicated bearer number, above-mentioned the first load information determining unit 123 can be specifically for the number and this mark determining unit definite default bearing number and dedicated bearer number definite according to number determining unit 122, determine respectively the load information of corresponding core network node.
Obviously, those skilled in the art can carry out various changes and modification and not depart from the spirit and scope of the present invention the present invention.Like this, if these amendments of the present invention and within modification belongs to the scope of the claims in the present invention and equivalent technologies thereof, the present invention is also intended to comprise these changes and modification interior.

Claims (10)

1. a definite method for load information, is characterized in that, comprising:
Distribution node, by the parsing to the specific field that adheres to notification message or position update notification message, is obtained the mark of the accompanying core network node of user terminal, and wherein, distribution node refers to wireless network node and core network node;
According to the mark of the core network node obtaining, determine respectively the number that is attached to the user terminal on each core network node; And
According to described number, determine respectively the load information of corresponding core network node;
Described method also comprises:
Obtain the nominal load information of each core network node of each reporting of network-core nodes;
For arbitrary core network node, according to the nominal load of this core network node obtaining and this core network node load information of determining, determine the idling-resource information of this core network node; According to the idling-resource information of determining, the capacity factor measure of this core network node is adjusted.
2. the method for claim 1, is characterized in that, also comprises:
Distribution node is obtained the core network node of user terminal connection and the corresponding relation in the affiliated resources of core network of core network node pond;
According to described number and described corresponding relation, the number sum of accompanying user terminal on each core network node that definite each resources of core network pond comprises respectively; And
According to described number sum, determine respectively the load information in corresponding resources of core network pond.
3. method as claimed in claim 2, is characterized in that, distribution node, by the parsing to the specific field that adheres to notification message or position update notification message, obtains described corresponding relation.
4. method as claimed in claim 3, is characterized in that, in the time that core network node is moving exchanging center MSC, described specific field is the NRI place field in interim identification code TMSI;
In the time that core network node is SGSN, described specific field is the NRI place field in interim identification code P-TMSI;
In the time that core network node is MME, described specific field is the MMEC place field in interim identification code GUTI.
5. the method for claim 1, is characterized in that, also comprises:
Distribution node is determined default bearing number that user terminal activates and the mark of the corresponding core network node of dedicated bearer number; And
The load information of determining respectively corresponding core network node according to described number, specifically comprises:
According to described number and default bearing number and dedicated bearer number, determine respectively the load information of corresponding core network node.
6. a determining device for load information, is characterized in that, comprising:
Mark acquiring unit, for by the parsing to the specific field that adheres to notification message or position update notification message, obtains the mark of the accompanying core network node of user terminal;
Number determining unit, for according to the mark of the core network node obtaining, determines respectively the number that is attached to the user terminal on each core network node;
The first load information determining unit, for the number definite according to number determining unit, determines respectively the load information of corresponding core network node;
Described device also comprises:
Fixed load information acquisition unit, for obtaining the nominal load information of each core network node of each reporting of network-core nodes;
Idling-resource information determining unit, be used for for arbitrary core network node, the nominal load of this core network node obtaining according to nominal load information acquisition unit and this core network node load information of determining, determine the idling-resource information of this core network node;
Described device also for: according to the idling-resource information of determining, the capacity factor measure of this core network node is adjusted.
7. device as claimed in claim 6, is characterized in that, also comprises:
Corresponding relation acquiring unit, for obtaining the corresponding relation in resources of core network pond under core network node that user terminal connects and core network node;
Number sum determining unit, for the corresponding relation obtaining according to the definite number of number determining unit and corresponding relation acquiring unit, determines respectively the number sum of user terminal accompanying on each core network node that each resources of core network pond comprises; And
The second load information determining unit, for the number sum definite according to number sum determining unit, determines respectively the load information in corresponding resources of core network pond.
8. device as claimed in claim 7, is characterized in that, described corresponding relation acquiring unit, specifically for by the parsing to the specific field that adheres to notification message or position update notification message, obtains described corresponding relation.
9. device as claimed in claim 8, is characterized in that, in the time that core network node is moving exchanging center MSC, described specific field is the NRI place field in interim identification code TMSI;
In the time that core network node is SGSN, described specific field is the NRI place field in interim identification code P-TMSI.
10. device as claimed in claim 6, is characterized in that, also comprises:
Mark determining unit, determines default bearing number that user terminal activates and the mark of the corresponding core network node of dedicated bearer number for root; And
Described the first load information determining unit specifically for: according to the definite number of number determining unit and definite default bearing number and the dedicated bearer number of mark determining unit, determine respectively the load information of corresponding core network node.
CN201010279885.5A 2010-09-09 2010-09-09 Determination method of load information and determination device of load information Active CN102404791B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010279885.5A CN102404791B (en) 2010-09-09 2010-09-09 Determination method of load information and determination device of load information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010279885.5A CN102404791B (en) 2010-09-09 2010-09-09 Determination method of load information and determination device of load information

Publications (2)

Publication Number Publication Date
CN102404791A CN102404791A (en) 2012-04-04
CN102404791B true CN102404791B (en) 2014-09-24

Family

ID=45886464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010279885.5A Active CN102404791B (en) 2010-09-09 2010-09-09 Determination method of load information and determination device of load information

Country Status (1)

Country Link
CN (1) CN102404791B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104066118A (en) * 2013-03-21 2014-09-24 中国移动通信集团广东有限公司 Load sharing method and system for switching of access modes
CN104684024A (en) * 2013-11-29 2015-06-03 中国移动通信集团江苏有限公司 Load balancing method and device of core network element pool
CN104735724B (en) * 2013-12-20 2019-07-02 中兴通讯股份有限公司 Load balance process method, apparatus, radio access node and user equipment
CN105577561A (en) * 2014-10-15 2016-05-11 中兴通讯股份有限公司 Method and system for realizing load balancing between virtualized network elements, and virtualized network element
CN105828384B (en) * 2015-01-09 2019-06-21 中国移动通信集团河北有限公司 A kind of the dynamic load leveling control method and system of LTE base station core network access
US20170214627A1 (en) * 2016-01-21 2017-07-27 Futurewei Technologies, Inc. Distributed Load Balancing for Network Service Function Chaining
CN111629404B (en) * 2019-02-27 2022-06-10 华为技术有限公司 Communication method and device
CN112492644A (en) * 2020-11-20 2021-03-12 深圳市宏电技术股份有限公司 Distributed Mesh networking network

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101170717A (en) * 2006-10-26 2008-04-30 华为技术有限公司 A method and system for realizing license mechanism of mobile switching center in the pool
CN101730132A (en) * 2009-12-08 2010-06-09 华为技术有限公司 Service processing method, access network equipment and communication system
CN101765153A (en) * 2008-12-25 2010-06-30 中兴通讯股份有限公司 Method and system for realizing load balance

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100342501B1 (en) * 2000-08-19 2002-06-28 윤종용 Method and apparatus for managing dormant state in a wireless packet data system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101170717A (en) * 2006-10-26 2008-04-30 华为技术有限公司 A method and system for realizing license mechanism of mobile switching center in the pool
CN101765153A (en) * 2008-12-25 2010-06-30 中兴通讯股份有限公司 Method and system for realizing load balance
CN101730132A (en) * 2009-12-08 2010-06-09 华为技术有限公司 Service processing method, access network equipment and communication system

Also Published As

Publication number Publication date
CN102404791A (en) 2012-04-04

Similar Documents

Publication Publication Date Title
CN102404791B (en) Determination method of load information and determination device of load information
CN103444248B (en) Paging control method and device
CN104797007B (en) A kind of communication system
CN104145492B (en) Machine type communication (MTC) is carried out in a network using Non-Access Stratum (NAS) signaling
CN1653738B (en) Method for communication data packet between mobile terminal users of network service
CN107211256A (en) Group communication function for transmission group communication information in a communication network
CN101127652B (en) A method, device and system for identifying access anchor of user terminal to external network
CN103858517A (en) Communication system, method and apparatus
CN103703862A (en) Method and terminal for performing detach procedure
CN102075859A (en) Long term evolution (LTE) system-based information pushing method and system
CN102098727B (en) Data rate control method and device
CN101895858A (en) Location update strategy acquisition, location update reject and paging methods and equipment
CN101111078A (en) Method for implementing load equalization in pool district and core network node
CN103188738A (en) Resource allocation method, device and system
CN104969582B (en) For obtaining the method and system of location information from wireless network
CN101646157B (en) Method for managing pool information and equipment thereof
CN100563365C (en) A kind of access events statistical method and device
CN102421190A (en) Method for paging machine type communication (MTC) equipment and equipment
CN102131311A (en) Machine-to-machine communication method and device
CN101111059B (en) Method for associated update of position district and routing district
JP5181845B2 (en) Wireless communication system, arbitration device, and arbitration method
WO2020249101A1 (en) Communication method and apparatus
CN100438469C (en) Method for selecting service core network node
CN103379592B (en) For remotely accessing the method and device of local network
CN104244184B (en) A kind of method and device for obtaining terminal positional information

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant