CN102404160A CN201010281379XA CN201010281379A CN102404160A CN 102404160 A CN102404160 A CN 102404160A CN 201010281379X A CN201010281379X A CN 201010281379XA CN 201010281379 A CN201010281379 A CN 201010281379A CN 102404160 A CN102404160 A CN 102404160A
Authority
CN
China
Prior art keywords
server
load
professional
display abnormality
balancing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201010281379XA
Other languages
Chinese (zh)
Other versions
CN102404160B (en
Inventor
彭家华
林志云
赵智勇
陈翔宇
刘良军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Group Fujian Co Ltd
Original Assignee
China Mobile Group Fujian Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Group Fujian Co Ltd filed Critical China Mobile Group Fujian Co Ltd
Priority to CN201010281379.XA priority Critical patent/CN102404160B/en
Publication of CN102404160A publication Critical patent/CN102404160A/en
Application granted granted Critical
Publication of CN102404160B publication Critical patent/CN102404160B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a method and a system for realizing intelligent monitoring, wherein a server group and a load balance device group are connected to form a server pool; the method comprises the steps that A, an intelligent monitoring centre scans the operation condition of the server employed by the server pool and the operation condition of the service on the server; and B, if the operation condition of the server or the operation condition of the service on the server is abnormal, the intelligent monitoring centre regulates the connection state of the load balance device connected with the server. According to the invention, the service performance and usability can be monitored and flexible calling among large-range resources can be realized.

Description

Intelligent monitoring implementation method and system
Technical field
The present invention relates to monitoring technique, particularly intelligent monitoring implementation method and system.
Background technology
At present, business supporting network progressively develops into a real physical network from a notion, presents more and more significantly " networking " characteristic.In business supporting network, attainable high available means and concurrent processing ability are mainly the load equalizer technology.
The load equalizer technology is based upon on the existing network infrastructure, its need be between server and external network the installation load balancing equipment, and be that load equalizer is realized load balancing strategy and intelligentized traffic management by task equipment.Be specially: load equalizer is shared many nodes such as handling respectively on the server with a large amount of concurrent visits or data traffic; Monitor in real time such as self-defining monitoring script on the activity of TCP/IP port and each node device through the network port; Judge the availability of backend nodes, so that realize internodal seamless switching.
Can find out that self-defining monitoring script is monitored on the activity of the main port Network Based of existing load equalizer technology and the node, this can't monitor professional inner performance and availability of traffics.And existing load equalizer technology can't provide comprehensive load balancing based on the overall operation situation of backend nodes to be judged, can not realize calling flexibly between resource on a large scale.
Summary of the invention
The invention provides intelligent monitoring implementation method and system,, realize calling flexibly between resource on a large scale so that when monitoring service feature and availability.
Technical scheme provided by the invention comprises:
A kind of intelligent monitoring implementation method is connected to form server pools with server zone and load-balancing device crowd; This method comprises:
A, intelligent monitor and control center scan in the said server pools with the ruuning situation of server with should be on server professional ruuning situation;
If B is with the ruuning situation of server or should professional ruuning situation display abnormality, then intelligent monitor and control center's adjustment and the connection status of being somebody's turn to do at the load-balancing device that is connected with server on server.
Preferably, among the said step B, if all then further comprise: when the time of scanning arrives, return execution in step A all normal with all ruuning situations professional on server of the ruuning situation of server and this.
Preferably, in the said steps A, intelligent monitor and control center in real time or every at a distance from setting-up time scan in the said server pools with the ruuning situation of server with should be on server the ruuning situation of business.
Preferably, saidly comprise that in ruuning situation this is with the alarm index of server and at least one in the performance index with server;
Preferably, the adjustment among the said step B comprises:
B1, intelligent monitor and control center are that each server is provided with mark in the server pools, and show through the HTTP page;
B2; Said load-balancing device is through the HTTP page of the outer monitoring routine call intelligent monitor and control center of operation setting, so that said outer monitoring program is given said load-balancing device according to the mark output correspondent keyword of each server on the said HTTP page, wherein; If a server be labeled as first the sign; The outer monitoring program is then exported keyword UP, if a server be labeled as second the sign, the outer monitoring program is then exported keyword down;
When B3, said load-balancing device export keyword UP in said outer monitoring program according to the mark of server, be connected with this server; Identify this server for to use server; When the output keyword was down, this server of getting along well connected, and identifying this server is standby server.
Preferably, saidly comprise that in ruuning situation this is with the alarm index of server and at least one in the performance index with server;
Wherein, comprise at the alarm index display abnormality with server: this is in machine and this at least one in unreachable with server network of delaying with server; Performance index display abnormality with server comprises: should surpass first set point at the cpu busy percentage with server and should surpass at least one in second set point in the memory usage with server.
Preferably, the setting among the said step B1 comprises:
B11, if at the alarm index display abnormality with server, then intelligent monitor and control center is polled to according to the priority size order of standby server and is used to take over this at the server with server work; If at the performance index display abnormality with server, then intelligent monitor and control center is polled to according to the priority size order of standby server and is used for and is somebody's turn to do at the server of realizing load balancing with server;
B12; If at alarm index display abnormality with server; Confirm that then being used to take over this is the server that said load-balancing device need connect at the server with server work; If with the performance indications display abnormality of server, confirm that then this is with server and be used for and should realizing that the server of load balancing be the server that said load-balancing device need be connected with server;
B13, each server-tag that intelligent monitor and control center need connect said load-balancing device be first the sign, and with other server-tags in the said server pools be second the sign.
Preferably, the ruuning situation of said business comprises: the alarm index of this business and at least one in the performance index;
Wherein, professional alarm index display abnormality comprises: move that this professional application program is undesired to be lower than at least one in the 3rd set point with availability this application program; Performance of services index display abnormality comprises: the disposal ability that this professional backlog is higher than the 4th set point and said application program surpasses at least one in the 5th set point.
Preferably, the setting among the said step B1 comprises:
B21, if on server professional alarm index display abnormality, then intelligent monitor and control center is polled to according to the priority size order of standby server and is used to move this professional server; If performance of services index display abnormality on server, then intelligent monitor and control center is polled to according to the priority size order of standby server and is used for and is somebody's turn to do sharing this professional server with the server equilibrium;
B22; If professional alarm index display abnormality on server; Confirm that then this is being the server that said load-balancing device need be connected with server with the server that is used to move said business; If performance of services index display abnormality on server, then confirm this with server and be used for said be the server that said load-balancing device need be connected at the server of sharing said business with the server equilibrium;
B23, each server-tag that intelligent monitor and control center need connect said load-balancing device be first the sign, and with other server-tags in the said server pools be second the sign.
A kind of intelligent monitoring realizes system, comprises server zone, load-balancing device crowd and intelligent monitor and control center, wherein,
Said server zone and said load-balancing device crowd are connected to form server pools;
Said intelligent monitor and control center be used for scanning said server pools with the ruuning situation of server with should be on server professional ruuning situation; If with the ruuning situation of server or should professional ruuning situation display abnormality, then adjustment and the connection status of being somebody's turn to do on server at the load-balancing device that is connected with server.
Preferably, said intelligent monitor and control center in real time or every at a distance from setting-up time scan in the said server pools with the ruuning situation of server with should be on server the ruuning situation of business.
Preferably, said intelligent monitor and control center is used to also that each server is provided with mark in the server pools, and shows through the HTTP page;
Comprise at each load-balancing device that is connected with server with said:
Call unit is used for the HTTP page through the outer monitoring routine call intelligent monitor and control center of operation setting, so that said outer monitoring program is given said load-balancing device according to the mark output correspondent keyword of each server on the said HTTP page; Wherein, if a server be labeled as first the sign, the outer monitoring program is then exported keyword UP, if a server be labeled as second the sign, the outer monitoring program is then exported keyword down;
Connect adjustment unit, be used for when said outer monitoring program is exported keyword UP according to the mark of server, being connected with this server; Identify this server for to use server; When the output keyword was down, this server of getting along well connected, and identifying this server is standby server.
Preferably, saidly comprise that in ruuning situation this is with the alarm index of server and at least one in the performance index with server; Wherein, comprise at the alarm index display abnormality with server: this is in machine and this at least one in unreachable with server network of delaying with server; Performance index display abnormality with server comprises: should surpass first set point at the cpu busy percentage with server and should surpass at least one in second set point in the memory usage with server;
Said intelligent monitor and control center comprises:
First poll units is used for when with the alarm index display abnormality of server the time, is polled to according to the priority size order of standby server to be used to take over this at the server with server work; And, be polled to according to the priority size order of standby server and be used for and be somebody's turn to do at the server of realizing load balancing with server when the time with the performance index display abnormality of server;
First determining unit; Be used for when when using the alarm index display abnormality of server; Confirm that being used to take over this is the server that said load-balancing device need connect at the server with server work; When the time, confirm that this is with server and be used for and should be the server that said load-balancing device need be connected at the server with server realization load balancing with the performance indications display abnormality of server;
Adjustment unit, each server-tag that is used for said load-balancing device need be connected be first the sign, and with other server-tags in the said server pools be second the sign.
Preferably, the ruuning situation of said business comprises: the alarm index of this business and at least one in the performance index;
Wherein, professional alarm index display abnormality comprises: move that this professional application program is undesired to be lower than at least one in the 3rd set point with availability this application program; Performance of services index display abnormality comprises: the disposal ability that this professional backlog is higher than the 4th set point and said application program surpasses at least one in the 5th set point;
Said intelligent monitor and control center comprises:
Second poll units is used for when alarm index display abnormality professional on server, is polled to according to the priority size order of standby server to be used to move this professional server; And when performance of services index display abnormality on server, be polled to according to the priority size order of standby server and be used for and be somebody's turn to do sharing this professional server with the server equilibrium;
Second determining unit; Be used for when alarm index display abnormality professional on server; Confirm that this is being the server that said load-balancing device need be connected with server with the server that is used to move said business; And when performance of services index display abnormality on server, confirm this with server and be used for said be the server that said load-balancing device need be connected at the server of sharing said business with the server equilibrium;
Adjustment unit, each server-tag that is used for said load-balancing device need be connected be first the sign, and with other server-tags in the said server pools be second the sign; Adjust the connection status of said load-balancing device according to the mark of each server.
Can find out that by above technical scheme among the present invention, in the ruuning situation with server, and should be on server professional ruuning situation can realize effectively collecting the performance and the availability of traffics information of professional inside through scanning;
Further, the present invention through adjustment with this in the load-balancing device connection status that is connected with server, be put under the uniform management the server zone of the whole network on the whole, realize in a big way between resource seamless, call flexibly;
Further, the present invention has inherited all functions of original load equalizer technology, when the adjustment connection status, need not interrupting service, has also realized the load balancing between resource simultaneously.
Description of drawings
The basic flow sheet that Fig. 1 provides for the embodiment of the invention;
The flow chart that the intelligent monitor and control center that Fig. 2 provides for the embodiment of the invention communicates by letter with load-balancing device;
The system construction drawing that Fig. 3 provides for the embodiment of the invention.
Embodiment
In order to make the object of the invention, technical scheme and advantage clearer, describe the present invention below in conjunction with accompanying drawing and specific embodiment.
Thinking with networking in the embodiment of the invention makes up business supporting network, and sets up intelligent monitor and control center on this basis.This intelligent monitor and control center is based on the cloud computing exploitation, and it can couple together server zone and load-balancing device through network, forms server pools.Afterwards, carry out flow process shown in Figure 1.
Referring to Fig. 1, the basic flow sheet that Fig. 1 provides for the embodiment of the invention.As shown in Figure 1, the operation that this intelligent monitor and control center carries out can comprise:
Step 101, in the intelligent monitor and control center scanning server pond with the ruuning situation of server and should be on server professional ruuning situation.
In this step 101, can Surveillance center can be in real time or every at a distance from setting-up time such as in 3 seconds scanning server ponds with the ruuning situation of server and the ruuning situation of being somebody's turn to do business on server.
In addition, in this step 101 at the server that can be with server in operation management territory or the network management system, it can comprise the server in the professional detection system, the server in the operation management system etc., the embodiment of the invention does not specifically limit.
If step 102 is with the ruuning situation of server or should professional ruuning situation display abnormality, then intelligent monitor and control center's adjustment and the connection status of being somebody's turn to do at the load-balancing device that is connected with server on server.
In the step 102, mainly be included in alarm index and performance index, wherein, can comprise: in the machine of whether delaying with server, at least one in unreachable with server network in alarm index with server with server in ruuning situation with server; Performance index with server can comprise: with the cpu busy percentage of server, with in the memory usage of server at least one.Wherein, if at alarm index display abnormality, represent that then this is in machine and in unreachable with server network at least one of delaying with server with server; If at performance index display abnormality with server, then represent this surpass with the cpu busy percentage of server first set point such as 90% with should with the memory usage of server above at least one in such as 80% of second set point.Preferably, in the present embodiment, first set point also can be identical with second set point, such as all being 90%.
In the step 102, ruuning situation professional on server comprises: professional alarm index and at least one in the performance index; Wherein, whether normal professional alarm index comprises: at least one in the availability of the professional application program of operation and this application program; The performance of services index comprises: at least one in the disposal ability of professional backlog and this professional application program of operation.Wherein, if professional alarm index display abnormality, then this professional application program of expression operation is undesired is lower than at least one in the 3rd set point with availability this application program; If performance of services index display abnormality, then the professional backlog of the expression disposal ability that is higher than the 4th set point and moves this professional application program surpasses at least one in the 5th set point.
Preferably, in the present embodiment, if all of scanning then when arrive in sweep time, are returned execution in step 101 at the equal display abnormality of ruuning situation with all business on server of the ruuning situation of server and this.
For making technical scheme provided by the invention clearer, present invention is described to lift two specific embodiments below.
Embodiment one:
Present embodiment one is to describe as example at the ruuning situation display abnormality that uses server.If intelligent monitor and control center scans with the ruuning situation display abnormality of server such as server 1, then need adjust the load-balancing device that is connected with this server 1 connection status such as equipment 1 in above-mentioned steps 101.How to adjust the connection status of equipment 1 as for intelligent monitor and control center, below described.
When the alarm index display abnormality of server 1; Intelligent monitor and control center is earlier according to the priority size order poll standby server of standby server (priority of standby server by the user in advance according to the actual conditions setting), so that be polled to the server that is used to take over this server 1 work.Certainly,, then can increase server newly, this server that increases newly confirmed as the server that is used to take over this server 1 work if the intact all standby servers of poll still do not find the standby server of taking over this server 1 work.
And when the performance index display abnormality of server 1, intelligent monitor and control center is earlier according to the priority size order poll standby server of standby server, so that be polled to the server that is used for realizing with server 1 load balancing.Certainly,, then can increase server newly, this server that increases newly confirmed as the server that is used for realizing load balancing with server 1 if the intact all standby servers of poll still do not find the standby server of realizing load balancing with server 1.
Afterwards, this intelligent monitor and control center and equipment 1 communicate through the mode of HTTP, so that the connection status of adjustment equipment 1 is specifically as shown in Figure 2.
Referring to Fig. 2, the flow chart that the intelligent monitor and control center that Fig. 2 provides for the embodiment of the invention communicates by letter with load-balancing device.As shown in Figure 2, this flow process can may further comprise the steps:
Step 201; Intelligent monitor and control center confirms that equipment 1 needs the server that connects; The server that mark should be confirmed is first sign, and other servers are second sign in the mark server pools, and passes through the mark of each server in the HTTP page display server pond.
If the alarm index display abnormality of server 1, then this step 201 server that will be used to take over server 1 work is confirmed as the server that equipment 1 needs connect, and this server of determining of mark is first sign, and other servers of mark are second to identify.
If the performance index display abnormality of server 1; Then this step 201 realizes that with server 1 and being used for of determining and server 1 server of load balancing confirms as the server that equipment 1 needs are connected; This server of determining of mark is first sign, and other servers of mark are second sign.
In the present embodiment; First sign is concrete to can be 1 when realizing, if a server be labeled as first sign such as 1, represent that then this server using server for what communicate by letter with equipment 1; Can be 0 and second sign is concrete when realizing; If a server be labeled as second the sign such as 0, represent that then this server is a standby server, is not in the state of using.
Step 202, equipment 1 is through the HTTP page of the outer monitoring routine call intelligent monitor and control center of operation setting.
In this step 201, the outer monitoring program is through the HTTP page at curl command calls intelligence management and control center.
Step 203, to each server on the HTTP page, the outer monitoring program is given equipment 1 according to the mark output correspondent keyword of server.
In this step 203, if server be labeled as first sign, then the keyword of outer monitoring program output is UP, indication equipment 1 can communicate with this server.If server be labeled as second sign, then the keyword of outer monitoring program output is down, indication equipment 1 this server of discord communicates.
Step 204, if the keyword of output is UP, then equipment 1 is connected with this server, promptly equipment 1 communicates with this server, if the keyword of output is down, then equipment 1 this server of discord connects, i.e. equipment 1 this server communication of discord.
Here, equipment 1 is specially with server communication: equipment 1 sends packet to this server, and at this moment, this server is to use server; And equipment 1 discord server communication is not then sent out packet for equipment 1 and is given this server, and at this moment, this server is a standby server.
So far, through above-mentioned steps, realized the flow process of intelligent monitor and control center's scheduling with the load-balancing device server in communication.Can find out that in this flow process, it is directly mutual with load-balancing device to need not the user, but accomplish and operations such as the server switching of load communication equipment, loading, realization troubleshooting seamless switching by intelligent monitor and control center.
More than embodiment one is described, below embodiment two is described.
Embodiment two:
Present embodiment two is to use ruuning situation display abnormality professional on the server to describe as example.If intelligent monitor and control center scans professional such as professional 1 ruuning situation display abnormality on such as server 1 with server, then need adjust the load-balancing device that is connected with this server 1 connection status such as equipment 1 in above-mentioned steps 101.How to adjust the connection status of equipment 1 as for intelligent monitor and control center, below described.
When on the server 1 during professional 1 alarm index display abnormality, intelligent monitor and control center according to the priority size order poll standby server of standby server, can move professional 1 server so that be polled to earlier.Certainly,, then can increase server newly, this server that increases newly confirmed as the server that is used to move business 1 if the intact all standby servers of poll still do not find and can move professional 1 server.
And when on the server 1 during professional 1 performance index display abnormality, intelligent monitor and control center is earlier according to the priority size order poll standby server of standby server, is used for the server that this business 1 is shared in server 1 equilibrium so that be polled to.Certainly,, then can increase server newly, this server that increases newly is confirmed as be used for the server that this business 1 is shared in server 1 equilibrium if the intact all standby servers of poll still do not find with server 1 equilibrium to share the server of this business 1.
Afterwards, this intelligent monitor and control center and equipment 1 communicate through the mode of HTTP, so as the connection status of adjustment equipment 1, concrete flow process as shown in Figure 2.
Need to prove; In above-mentioned steps 201; If professional 1 alarm index display abnormality on the server 1; Then above-mentioned steps 201 is confirmed as the server that equipment 1 needs are connected with server 1 with the server that is used to move professional 1, and this server of determining of mark is first to identify, and other servers of mark are second to identify.Here why also server 1 is confirmed as the server that equipment 1 needs connection; Mainly be because: server 1 just can not normally move professional 1; Other business that its also possible normal operational outfit 1 provides; Therefore, for avoiding service disconnection, also server 1 is needed the server of connection here as equipment 1.
If professional 1 performance index display abnormality on the server 1; Then above-mentioned steps 201 is shared server 1 server of this business 1 and is confirmed as the server that equipment 1 needs are connected with server 1 equilibrium of determining of being used for; This server of determining of mark is first sign, and other servers of mark are second sign.
More than method that the embodiment of the invention is provided be described, the system that provides in the face of the embodiment of the invention is down described.
The embodiment of the invention provides intelligent monitoring to realize system, specifically referring to Fig. 3.As shown in Figure 3, this system can comprise server zone 301, load-balancing device crowd 302 and intelligent monitor and control center 303, wherein,
Server zone 301 comprises 2 servers at least, and the load-balancing device crowd comprises 1 load-balancing device at least.In the present embodiment, server zone 301 is connected to form server pools with load-balancing device crowd 302;
Intelligent monitor and control center 303 be used for scanning said server pools with the ruuning situation of server with should be on server professional ruuning situation; If with the ruuning situation of server or should professional ruuning situation display abnormality, then adjustment and the connection status of being somebody's turn to do on server at the load-balancing device that is connected with server.
In the present embodiment, intelligent monitor and control center 303 can be in real time or every at a distance from setting-up time scan in the said server pools with the ruuning situation of server with should be on server the ruuning situation of business.
Server pools also comprises and is not used in the standby server of managing business in the present embodiment.Preferably, the intelligent monitor and control center 303 in the present embodiment is used to also that each server is provided with mark in the server pools, and shows through the HTTP page;
And comprise at each load-balancing device that is connected with server with said: call unit be connected adjustment unit (these two unit are not shown in Fig. 3).
Wherein, Call unit; Be used for the HTTP page, so that said outer monitoring program is given said load-balancing device according to the mark output correspondent keyword of each server on the said HTTP page through the outer monitoring routine call intelligent monitor and control center of operation setting; Wherein, if a server be labeled as first the sign, the outer monitoring program is then exported keyword UP, if a server be labeled as second the sign, the outer monitoring program is then exported keyword down;
Connect adjustment unit, be used for when said outer monitoring program is exported keyword UP according to the mark of server, being connected with this server; Identify this server for to use server; When the output keyword was down, this server of getting along well connected, and identifying this server is standby server.
How to be provided with as for intelligent monitor and control center 303 that each server is provided with mark in the server pools, can to comprise two kinds of structures when specifically realizing, these two kinds of structures are with unusual situation to occur relevant.
If occurring unusually with the ruuning situation of server,, comprising that in ruuning situation this is with the alarm index of server and at least one in the performance index here with server; Wherein, comprise at the alarm index display abnormality with server: this is in machine and this at least one in unreachable with server network of delaying with server; Performance index display abnormality with server comprises: should surpass first set point at the cpu busy percentage with server and should surpass at least one in second set point in the memory usage with server.Based on this, as shown in Figure 3, the embodiment of the invention provides a kind of structure of intelligent monitor and control center 303.Specifically can comprise:
First poll units 3031 is used for when with the alarm index display abnormality of server the time, is polled to according to the priority size order of standby server to be used to take over this at the server with server work; And, be polled to according to the priority size order of standby server and be used for and be somebody's turn to do at the server of realizing load balancing with server when the time with the performance index display abnormality of server;
First determining unit 3032; Be used for when when using the alarm index display abnormality of server; Confirm that being used to take over this is the server that said load-balancing device need connect at the server with server work; When the time, confirm that this is with server and be used for and should be the server that said load-balancing device need be connected at the server with server realization load balancing with the performance indications display abnormality of server;
Adjustment unit 3033, each server-tag that is used for said load-balancing device need be connected be first the sign, and with other server-tags in the said server pools be second the sign.
Preferably, in the present embodiment, if professional ruuning situation occurs unusually on server, here, professional ruuning situation comprises: the alarm index of this business and at least one in the performance index; Wherein, professional alarm index display abnormality comprises: move that this professional application program is undesired to be lower than at least one in the 3rd set point with availability this application program; Performance of services index display abnormality comprises: the disposal ability that this professional backlog is higher than the 4th set point and said application program surpasses at least one in the 5th set point; Then as shown in Figure 3, the embodiment of the invention also discloses the another kind of structure of intelligent monitor and control center 303.Specifically can comprise:
Second poll units 3034 is used for when alarm index display abnormality professional on server, is polled to according to the priority size order of standby server to be used to move this professional server; And when performance of services index display abnormality on server, be polled to according to the priority size order of standby server and be used for and be somebody's turn to do sharing this professional server with the server equilibrium;
Second determining unit 3035; Be used for when alarm index display abnormality professional on server; Confirm that this is being the server that said load-balancing device need be connected with server with the server that is used to move said business; And when performance of services index display abnormality on server, confirm this with server and be used for said be the server that said load-balancing device need be connected at the server of sharing said business with the server equilibrium;
Adjustment unit 3036, each server-tag that is used for said load-balancing device need be connected be first the sign, and with other server-tags in the said server pools be second the sign.
So far, the device that the embodiment of the invention is provided is described.
Can find out that by above technical scheme among the present invention, in the ruuning situation with server, and should be on server professional ruuning situation can realize effectively collecting the performance and the availability of traffics information of professional inside through scanning;
Further, the present invention through adjustment with this in the load-balancing device connection status that is connected with server, be put under the uniform management the server zone of the whole network on the whole, realize in a big way between resource seamless, call flexibly;
Further the, the present invention has inherited all functions of original load equalizer technology, when the adjustment connection status, need not interrupting service, has also realized the load balancing between resource simultaneously.
The above is merely preferred embodiment of the present invention, and is in order to restriction the present invention, not all within spirit of the present invention and principle, any modification of being made, is equal to replacement, improvement etc., all should be included within the scope that the present invention protects.

Claims (13)

1. an intelligent monitoring implementation method is characterized in that, server zone and load-balancing device crowd are connected to form server pools; This method comprises:
A, intelligent monitor and control center scan in the said server pools with the ruuning situation of server with should be on server professional ruuning situation;
If B is with the ruuning situation of server or should professional ruuning situation display abnormality, then intelligent monitor and control center's adjustment and the connection status of being somebody's turn to do at the load-balancing device that is connected with server on server.
2. method according to claim 1; It is characterized in that, among the said step B, if all are all normal with all ruuning situations professional on server of the ruuning situation of server and this; Then further comprise: when the time of scanning arrives, return execution in step A.
3. based on claim 1 or 2 described methods, it is characterized in that, in the said steps A, intelligent monitor and control center in real time or every at a distance from setting-up time scan in the said server pools with the ruuning situation of server with should be on server the ruuning situation of business.
4. method according to claim 1 is characterized in that, the adjustment among the said step B comprises:
B1, intelligent monitor and control center are that each server is provided with mark in the server pools, and show through the HTTP page;
B2; Said load-balancing device is through the HTTP page of the outer monitoring routine call intelligent monitor and control center of operation setting, so that said outer monitoring program is given said load-balancing device according to the mark output correspondent keyword of each server on the said HTTP page, wherein; If a server be labeled as first the sign; The outer monitoring program is then exported keyword UP, if a server be labeled as second the sign, the outer monitoring program is then exported keyword down;
When B3, said load-balancing device export keyword UP in said outer monitoring program according to the mark of server, be connected with this server; Identify this server for to use server; When the output keyword was down, this server of getting along well connected, and identifying this server is standby server.
5. method according to claim 4 is characterized in that, saidly comprises that in the ruuning situation with server this is with the alarm index of server and at least one in the performance index;
Wherein, comprise at the alarm index display abnormality with server: this is in machine and this at least one in unreachable with server network of delaying with server; Performance index display abnormality with server comprises: should surpass first set point at the cpu busy percentage with server and should surpass at least one in second set point in the memory usage with server.
6. method according to claim 5 is characterized in that, the setting among the said step B1 comprises:
B11, if at the alarm index display abnormality with server, then intelligent monitor and control center is polled to according to the priority size order of standby server and is used to take over this at the server with server work; If at the performance index display abnormality with server, then intelligent monitor and control center is polled to according to the priority size order of standby server and is used for and is somebody's turn to do at the server of realizing load balancing with server;
B12; If at alarm index display abnormality with server; Confirm that then being used to take over this is the server that said load-balancing device need connect at the server with server work; If with the performance indications display abnormality of server, confirm that then this is with server and be used for and should realizing that the server of load balancing be the server that said load-balancing device need be connected with server;
B13, each server-tag that intelligent monitor and control center need connect said load-balancing device be first the sign, and with other server-tags in the said server pools be second the sign.
7. method according to claim 4 is characterized in that, the ruuning situation of said business comprises: the alarm index of this business and at least one in the performance index;
Wherein, professional alarm index display abnormality comprises: move that this professional application program is undesired to be lower than at least one in the 3rd set point with availability this application program; Performance of services index display abnormality comprises: the disposal ability that this professional backlog is higher than the 4th set point and said application program surpasses at least one in the 5th set point.
8. method according to claim 7 is characterized in that, the setting among the said step B1 comprises:
B21, if on server professional alarm index display abnormality, then intelligent monitor and control center is polled to according to the priority size order of standby server and is used to move this professional server; If performance of services index display abnormality on server, then intelligent monitor and control center is polled to according to the priority size order of standby server and is used for and is somebody's turn to do sharing this professional server with the server equilibrium;
B22; If professional alarm index display abnormality on server; Confirm that then this is being the server that said load-balancing device need be connected with server with the server that is used to move said business; If performance of services index display abnormality on server, then confirm this with server and be used for said be the server that said load-balancing device need be connected at the server of sharing said business with the server equilibrium;
B23, each server-tag that intelligent monitor and control center need connect said load-balancing device be first the sign, and with other server-tags in the said server pools be second the sign.
9. an intelligent monitoring realizes system, it is characterized in that this system comprises server zone, load-balancing device crowd and intelligent monitor and control center, wherein,
Said server zone and said load-balancing device crowd are connected to form server pools;
Said intelligent monitor and control center be used for scanning said server pools with the ruuning situation of server with should be on server professional ruuning situation; If with the ruuning situation of server or should professional ruuning situation display abnormality, then adjustment and the connection status of being somebody's turn to do on server at the load-balancing device that is connected with server.
10. system according to claim 9 is characterized in that, said intelligent monitor and control center in real time or every at a distance from setting-up time scan in the said server pools with the ruuning situation of server with should be on server the ruuning situation of business.
11. system according to claim 9 is characterized in that, said intelligent monitor and control center is used to also that each server is provided with mark in the server pools, and shows through the HTTP page;
Comprise at each load-balancing device that is connected with server with said:
Call unit is used for the HTTP page through the outer monitoring routine call intelligent monitor and control center of operation setting, so that said outer monitoring program is given said load-balancing device according to the mark output correspondent keyword of each server on the said HTTP page; Wherein, if a server be labeled as first the sign, the outer monitoring program is then exported keyword UP, if a server be labeled as second the sign, the outer monitoring program is then exported keyword down;
Connect adjustment unit, be used for when said outer monitoring program is exported keyword UP according to the mark of server, being connected with this server; Identify this server for to use server; When the output keyword was down, this server of getting along well connected, and identifying this server is standby server.
12. system according to claim 11 is characterized in that, saidly comprises that in the ruuning situation with server this is with the alarm index of server and at least one in the performance index; Wherein, comprise at the alarm index display abnormality with server: this is in machine and this at least one in unreachable with server network of delaying with server; Performance index display abnormality with server comprises: should surpass first set point at the cpu busy percentage with server and should surpass at least one in second set point in the memory usage with server;
Said intelligent monitor and control center comprises:
First poll units is used for when with the alarm index display abnormality of server the time, is polled to according to the priority size order of standby server to be used to take over this at the server with server work; And, be polled to according to the priority size order of standby server and be used for and be somebody's turn to do at the server of realizing load balancing with server when the time with the performance index display abnormality of server;
First determining unit; Be used for when when using the alarm index display abnormality of server; Confirm that being used to take over this is the server that said load-balancing device need connect at the server with server work; When the time, confirm that this is with server and be used for and should be the server that said load-balancing device need be connected at the server with server realization load balancing with the performance indications display abnormality of server;
Adjustment unit, each server-tag that is used for said load-balancing device need be connected be first the sign, and with other server-tags in the said server pools be second the sign.
13. system according to claim 11 is characterized in that, the ruuning situation of said business comprises: the alarm index of this business and at least one in the performance index;
Wherein, professional alarm index display abnormality comprises: move that this professional application program is undesired to be lower than at least one in the 3rd set point with availability this application program; Performance of services index display abnormality comprises: the disposal ability that this professional backlog is higher than the 4th set point and said application program surpasses at least one in the 5th set point;
Said intelligent monitor and control center comprises:
Second poll units is used for when alarm index display abnormality professional on server, is polled to according to the priority size order of standby server to be used to move this professional server; And when performance of services index display abnormality on server, be polled to according to the priority size order of standby server and be used for and be somebody's turn to do sharing this professional server with the server equilibrium;
Second determining unit; Be used for when alarm index display abnormality professional on server; Confirm that this is being the server that said load-balancing device need be connected with server with the server that is used to move said business; And when performance of services index display abnormality on server, confirm this with server and be used for said be the server that said load-balancing device need be connected at the server of sharing said business with the server equilibrium;
Adjustment unit, each server-tag that is used for said load-balancing device need be connected be first the sign, and with other server-tags in the said server pools be second the sign; Adjust the connection status of said load-balancing device according to the mark of each server.
CN201010281379.XA 2010-09-13 2010-09-13 Method and system for realizing intelligent monitoring Active CN102404160B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010281379.XA CN102404160B (en) 2010-09-13 2010-09-13 Method and system for realizing intelligent monitoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010281379.XA CN102404160B (en) 2010-09-13 2010-09-13 Method and system for realizing intelligent monitoring

Publications (2)

Publication Number Publication Date
CN102404160A true CN102404160A (en) 2012-04-04
CN102404160B CN102404160B (en) 2014-04-09

Family

ID=45885975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010281379.XA Active CN102404160B (en) 2010-09-13 2010-09-13 Method and system for realizing intelligent monitoring

Country Status (1)

Country Link
CN (1) CN102404160B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102946468A (en) * 2012-10-18 2013-02-27 广东欧珀移动通信有限公司 Automatic mobile phone operating program abnormality alarming method and system
CN103118055A (en) * 2012-10-10 2013-05-22 中兴通讯股份有限公司 Method and device for multi-media access
CN103716253A (en) * 2013-12-27 2014-04-09 广州华多网络科技有限公司 Method and device for requesting data
WO2019095448A1 (en) * 2017-11-17 2019-05-23 深圳市鹰硕技术有限公司 Monitoring system for remote education system server farm
CN112821843A (en) * 2020-12-31 2021-05-18 哈尔滨宇龙自动化有限公司 Intelligent switching control method and system for variable-frequency speed-regulation multi-load system
CN113242283A (en) * 2021-04-29 2021-08-10 西安点告网络科技有限公司 Server dynamic load balancing method, system, equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1495634A (en) * 2002-06-27 2004-05-12 上海汉唐科技有限公司 Server clustering load balancing method and system
CN101296176A (en) * 2007-04-25 2008-10-29 阿里巴巴集团控股有限公司 Data processing method and apparatus based on cluster
CN101741850A (en) * 2009-12-25 2010-06-16 北京邮电大学 Multitask concurrent executive system and method for hybrid network service

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1495634A (en) * 2002-06-27 2004-05-12 上海汉唐科技有限公司 Server clustering load balancing method and system
CN101296176A (en) * 2007-04-25 2008-10-29 阿里巴巴集团控股有限公司 Data processing method and apparatus based on cluster
CN101741850A (en) * 2009-12-25 2010-06-16 北京邮电大学 Multitask concurrent executive system and method for hybrid network service

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103118055A (en) * 2012-10-10 2013-05-22 中兴通讯股份有限公司 Method and device for multi-media access
CN102946468A (en) * 2012-10-18 2013-02-27 广东欧珀移动通信有限公司 Automatic mobile phone operating program abnormality alarming method and system
CN103716253A (en) * 2013-12-27 2014-04-09 广州华多网络科技有限公司 Method and device for requesting data
WO2019095448A1 (en) * 2017-11-17 2019-05-23 深圳市鹰硕技术有限公司 Monitoring system for remote education system server farm
CN109800120A (en) * 2017-11-17 2019-05-24 深圳市鹰硕技术有限公司 A kind of monitoring system of the server zone of long-distance educational system
CN109800120B (en) * 2017-11-17 2020-12-08 鹰硕(韶关)信息产业集团有限公司 Monitoring system of server group of remote education system
CN112821843A (en) * 2020-12-31 2021-05-18 哈尔滨宇龙自动化有限公司 Intelligent switching control method and system for variable-frequency speed-regulation multi-load system
CN113242283A (en) * 2021-04-29 2021-08-10 西安点告网络科技有限公司 Server dynamic load balancing method, system, equipment and storage medium

Also Published As

Publication number Publication date
CN102404160B (en) 2014-04-09

Similar Documents

Publication Publication Date Title
US10942786B2 (en) Network management
US9838483B2 (en) Methods, systems, and computer readable media for a network function virtualization information concentrator
CN102404160B (en) Method and system for realizing intelligent monitoring
CN102307223B (en) A kind of method and system realizing application platform adaptation
US10708121B2 (en) Intelligent network
CN102394925B (en) Communication method and device for remote monitoring diagnosis center and area regulation center
EP3100163A1 (en) Methods, systems, and computer readable media for a cloud-based virtualization orchestrator
CN103856963A (en) Method for establishing intelligence communication channels
CN103312605A (en) Gateway device identity setting method and management gateway device
CN109005126B (en) Data stream processing method, device and computer readable storage medium
EP3644646A1 (en) Load-balancing method and apparatus
CN103795575A (en) Multi-data-centre-oriented system monitoring method
CN104469314A (en) Video monitoring system and method of electric power construction field
CN102045451A (en) Uniform message scheduling system and business message notification method and system
CN103124436B (en) A kind of wireless telecommunication system, cloud virtual base station and resource regulating method
CN103124219B (en) A kind of wireless telecommunication system, cloud virtual base station and resource regulating method
CN111209112A (en) Exception handling method and device
WO2008058570A1 (en) A system and a method relating to network management
CN1832297A (en) Communication method and managing equipment of low voltage distribution field
CN102856980A (en) Method for comprehensively managing power distribution communication network
CN114124662A (en) Resource intelligent operation and maintenance system based on cross-network environment
CN109413062A (en) Fictitious host computer is by the monitor processing method of malicious attack and system, node server
CN102158361A (en) Equipment and method for maintaining reliability of distributed enterprise service bus intermediate flow
CN112333091B (en) Routing system, method and device
CN109117266B (en) Video artificial intelligence training platform based on multilayer framework

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant