Running method of heat pump water heater Download PDFInfo
- Publication number
- CN102401473B CN102401473B CN201010285011.0A CN201010285011A CN102401473B CN 102401473 B CN102401473 B CN 102401473B CN 201010285011 A CN201010285011 A CN 201010285011A CN 102401473 B CN102401473 B CN 102401473B
- Authority
- CN
- China
- Prior art keywords
- water
- time
- heat pump
- user
- heating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Heat-Pump Type And Storage Water Heaters (AREA)
Abstract
The invention relates to a running method of a heat pump water heater. Multi-time water using habits of a user in a very long term are recorded, a sampling space for multi-time water use during bathing of the user is provided, statistics is conducted according to data in the sampling space to obtain general used water quantity and hot water using time during the bathing of the user, the water heating starting time and the water heating ending time of a heat pump are set according to the statistical data and the heating speed of the heat pump, the water heating starting time and the running time of the heat pump can be set according to the water heating speed and the heated water quantity of the heat pump, the heat loss of excessive hot water in a water storage barrel is reduced and the waste of energy required for heating water is decreased.
Description
Technical field
The present invention relates to the technical field of water heater, is a kind of water habits different according to user specifically, the heat time of automatic decision setting hot water, thus reduces the operation method of the Teat pump boiler of hot water waste in water butt.
Background technology
Teat pump boiler utilizes inverse Carnot's principle exactly, by medium, heat is delivered to the equipment the water of high temperature from cryogenic object.Heat pump assembly, can make medium (refrigerant) phase transformation, become lower than low-temperature heat source, thus spontaneous absorption heat of low-temperature heat source; Get back to the medium after compressor, be compressed into again high temperature (also higher than the water of high temperature) gases at high pressure, thus spontaneous heat release is to high temperature heat source; Realize from by the device of the transfer of heat of low-temperature heat source to the water of high temperature.Because electricity is not participate in heating directly, so required electricity is not a lot, and the utilization rate of electric energy is higher.
Current domestic and international market Teat pump boiler mainly contains two kinds: one is that evaporimeter absorbs heat from air, progressively raises the water temperature in condenser come the equipment of water heating, be called air source hot pump water heater by conversion; Another kind is that evaporimeter absorbs heat from water, raises the water temperature in condenser come the equipment of water heating, be called water source heat pump water heater by conversion.
Existing Teat pump boiler, comprising: shell, and form the outward appearance of water heater, and hold all parts of water heater, enclosure is divided into host machine part and bucket part; Evaporimeter, is arranged on the host machine part of Teat pump boiler, with air generation heat exchange; Fan, is arranged on host machine part, will guide for periods of heating in air intake to shell; Fan electromotor, for fan provides power, drive fan continues to rotate; Compressor, by the liquid refrigerants of gaseous coolant boil down to HTHP and order about refrigerant flowing; Water butt, is arranged on above-mentioned bucket part, it draws cold water inlet and hot water outlet, holds and store water; Coil pipe, is arranged in water butt, and one end is connected with the refrigerant exit of compressor, and the other end is connected with evaporimeter, and guiding refrigerant flows in coils and carries out heat exchange with the cold water in water butt.Compressor and motor rotation when accessing power supply, high temperature refrigerant after compressor compression flows through coil pipe, in storage tank, the coil pipe of high temperature and cold water carry out exchange heat, water temperature in water butt is raised, refrigerant expansion valve, get back to compressor after evaporimeter thus complete circulation, along with the running of fan electromotor, fan starts to rotate, room air enters into enclosure by the air inlet that shell host machine part is arranged, and carry out heat exchange with evaporimeter, the temperature of refrigerant is raised, thus by the transfer of heat in room air in refrigerant, then air flows back to indoor by exhaust outlet again.Then refrigerant is inhaled into compressor inside again, thus starts refrigerant circulation next time.
Fig. 1 is the step schematic diagram of the operation method of Teat pump boiler in prior art.
As shown in Figure 1, in the operation method of the Teat pump boiler of prior art, user presets the water temperature of needs, and then heat pump is started working, until water temperature reaches setting value, water heater enters holding state.Because the water temperature in water storage barrel of heater is usually all far above room temperature, now there is heat trnasfer, heat in water constantly runs off, water temperature drop, cause water temperature drop to during lower than user's set water temperature 5 DEG C when consuming hot water or heat transfer because of user, heat pump brings into operation work again, and the water continued as in water butt heats, water temperature is raised again, is keep water temperature heat pump to carry out intermittent work according to the Temperature Regime of Main of reality when water heater is in holding state.
But, there is following not foot point in prior art as above:
In the Teat pump boiler operation method of above-mentioned prior art, when needs use hot water, compressor starts works, refrigerant in coil pipe heats the cold water in water butt, if user must be heated to desired temperature by unified for the water in whole water butt when having explicitly call for water temperature, heat time is longer, if also little to the demand of hot water, the hot water remained in water butt gradually can only cool and cool off, and in fact causes covert energy waste.In addition under the control logic of existing operation method, the hot water in water heater is relatively large with the extraneous temperature difference, and therefore heat loss is many.Therefore existing most of water heater user selects, being pulled up by attaching plug without during hot water, to be plugged by attaching plug in advance when using hot water.Inconvenience is brought to user.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of water habits different according to user, the heat time of automatic decision setting hot water, thus reduces the operation method of the Teat pump boiler of hot water waste in water butt.
The technical scheme that the present invention takes for the technical problem existed in solution known technology is:
The operation method of Teat pump boiler of the present invention, have when user has a bath repeatedly by hot water amount and the sampler space with the hot water time, and carry out adding up general water consumption when showing that user has a bath according to the data in the sampler space, according to water heating time started and the water heating end time of the firing rate setting heat pump of statistics and heat pump itself, specifically comprise the following steps:
Whether fall into the sampler space with water in: if this operation falls in the sampler space really if before Teat pump boiler runs, detecting this time operation, user is then needed to carry out water temperature setting, heat pump brings into operation, design temperature is heated to the water in water butt, when user's use water causes water temperature drop amplitude to exceed heating interval, heat pump again brings into operation and to heat water, and circulation performs above-mentioned heating steps, if this time run not in sampling range, by temperature sensor, the water temperature in water butt is measured, according to statistics judge hot water amount in water butt whether enough user to have a bath use, if the water yield is enough, maintenance is measured, when hot water amount is inadequate, heat pump brings into operation work, water in water butt is heated, according to the running time of the using amount of hot water setting heat pump of statistics, make to keep heated condition in the time period of heat pump between water heating time started and water heating end time, after arriving the water heating end time, heat pump stops heating, and continue to measure the water temperature in water butt, according to circumstances circulating-heating step.
The present invention also can by the following technical solutions:
Use user in the process of hot water at every turn and the water usage data of user is upgraded.
Preset a fixing maximum amount of water value, when single water consumption exceeds the maximum amount of water value of setting, judge whether this water consumption meets normal water consumption according to the statistics in sampling range, then water heating time started and water heating dwell time is upgraded as normal, expand the traffic coverage of heat pump, as abnormal, ignore this numerical value.
Maximum amount of water value is not more than the heap(ed) capacity of Teat pump boiler water butt.
Be repeatedly that regular user has a bath at every turn hot water amount used and use the time span of hot water within the time period of many days by the sampler space of water.
Repeatedly water consumption statistics data in the sampler space are by normal distribution arrangement.
Operation of heat pump time between water heating time started and water heating end time and the time synchronized of user's bathing water are carried out.
The advantage that the present invention has and good effect are:
In the operation method of Teat pump boiler of the present invention, Teat pump boiler can record the repeatedly water habits of user within a very long time automatically, the general water consumption of this user is drawn according to sensing data, and this general water usage data is analyzed, that removes disengaging user custom uses water abnormity point, long-time the adding up of process show that this user's uses water statistics, according to use water time started and the end time of data judging user.Thus Teat pump boiler can start the time of water heating and the running time of heat pump according to the water heating speed of heat pump self and water yield setting, to reduce the thermal loss of excessive hot water in water butt, reduces the waste of the energy needed for heating water.
Accompanying drawing explanation
Fig. 1 is the step schematic diagram of the operation method of Teat pump boiler in prior art;
Fig. 2 is the step schematic diagram of the operation method of Teat pump boiler of the present invention;
Fig. 3 is the step schematic diagram that in the operation method of Teat pump boiler of the present invention, statistics upgrades.
Detailed description of the invention
Referring to drawings and Examples, the present invention will be described in detail.
Fig. 2 is the step schematic diagram of the operation method of Teat pump boiler of the present invention; Fig. 3 is the step schematic diagram that in the operation method of Teat pump boiler of the present invention, statistics upgrades.
For everyone, have a bath relatively fixing with the hot water time, therefore total bathtime Normal Distribution of used aloned person or one family, therefore by installing discharge detector on hot water feeding pipe, the perception of user's heat water time can be carried out, and these data are recorded in single-chip microcomputer, through the record of about 20 days, what can count user uses hot water rule, show that this user has a bath the roughly water yield used and the time of middle use hot water of having a bath at every turn, thus can according to the water yield in the firing rate of water heater heat pump itself and water butt, setting obtains enough hot water required times, therefore water heating time started and the water heating end time of heat pump is set further, in this time period, heat pump obtains user and to have a bath required enough hot water, thus the heat loss of high-temperature water in minimizing bucket.
As Fig. 2, shown in Fig. 3, the operation method of Teat pump boiler of the present invention, have when user has a bath repeatedly by hot water amount and the sampler space with the hot water time, namely add up this user to have a bath in 20 days hot water amount used and the concrete numerical value by hot water time span, and carry out adding up according to the data in the sampler space and draw the general water consumption of user when once having a bath, according to water heating time started and the water heating end time of the firing rate setting heat pump of statistics and heat pump itself, it is the running time of heat pump between water heating time started and water heating end time, specifically comprise the following steps:
Whether detect this time operation before Teat pump boiler runs falls in the sampler space with water, namely judge whether this operation is in the scope of statistics of first 20 days in advance, if then need the use habit manually carrying out setting to make water heater record user in scope of statistics, complete before this time runs if added up, then this time run and automatically run according to statistics: if this operation falls in the sampler space really, user is then needed to carry out water temperature setting, heat pump brings into operation, design temperature is heated to the water in water butt, when user's use water causes water temperature drop amplitude to exceed heating interval, namely when the hot water water temperature in water butt is lower than design temperature 5 DEG C, heat pump again brings into operation and to heat water, water temperature is made again to rise to design temperature, circulation performs above-mentioned heating steps, if this time run not in sampling range, by temperature sensor, the water temperature in water butt is measured, according to the whether enough single uses of having a bath of hot water amount that statistics judges in water butt, if the water yield is enough, maintenance is measured, when hot water amount is inadequate, heat pump brings into operation work, water in water butt is heated, according to the running time of the using amount of hot water setting heat pump of statistics, make to keep heated condition in the time period of heat pump between water heating time started and water heating end time, after arriving the water heating end time drawn according to analysis of statistical data, heat pump stops heating, and continue to measure the water temperature in water butt, according to circumstances circulating-heating step.
Use user in the process of hot water at every turn and the water usage data of user is upgraded, statistics is made a change according to the recent condition of user, to have a bath the continuous change of required hot water amount to adapt to user under Various Seasonal and temperature regime.
Preset a fixing maximum amount of water value, this maximum amount of water value can be set as 40 liters, when single water consumption exceeds the maximum amount of water value of setting, judge whether this water consumption meets normal water consumption according to the statistics in sampling range, as normally then upgraded the service time of hot water, expand the traffic coverage of heat pump, as abnormal, ignore this numerical value.
Maximum amount of water value is not more than the heap(ed) capacity of Teat pump boiler water butt.
Operation of heat pump time between water heating time started and water heating end time and the time synchronized of user's bathing water are carried out, heat pump is according to length heating work running time calculated, the heating of heat pump was just stopped, to save the energy before user has had a bath.
Be repeatedly that regular user has a bath at every turn hot water amount used and use the time span of hot water within the time period of many days by the sampler space of water.
In the operation method of Teat pump boiler of the present invention, Teat pump boiler can record the repeatedly water habits of user within a very long time automatically, the general water consumption of this user is drawn according to sensing data, and this general water usage data is analyzed, that removes disengaging user custom uses water abnormity point, long-time the adding up of process show that this user's uses water statistics, according to use water time started and the end time of data judging user.Thus Teat pump boiler can start the time of water heating and the running time of heat pump according to the water heating speed of heat pump self and water yield setting, to reduce the thermal loss of excessive hot water in water butt, reduces the waste of the energy needed for heating water.
The above, it is only preferred embodiment of the present invention, not any pro forma restriction is done to the present invention, although the present invention with preferred embodiment openly as above, but, and be not used to limit the present invention, any those skilled in the art, do not departing within the scope of technical solution of the present invention, certainly the technology contents of announcement can be utilized to make a little change or modification, become the Equivalent embodiments of equivalent variations, in every case be the content not departing from technical solution of the present invention, according to any simple modification that technical spirit of the present invention is done above embodiment, equivalent variations and modification, all belong in the scope of technical solution of the present invention.
Claims (7)
1. the operation method of a Teat pump boiler, have when user has a bath repeatedly by hot water amount and the sampler space with the hot water time, and carry out adding up general water consumption when showing that user has a bath according to the data in the sampler space, according to water heating time started and the water heating end time of the firing rate setting heat pump of statistics and heat pump itself, specifically comprise the following steps:
Whether detect this time operation before Teat pump boiler runs falls in the sampler space with water, namely judge whether this operation is in the scope of statistics of first 20 days in advance: if this operation falls in the sampler space really, user is then needed to carry out water temperature setting, heat pump brings into operation, design temperature is heated to the water in water butt, when user's use water causes water temperature drop amplitude to exceed heating interval, heat pump again brings into operation and to heat water, and circulation performs above-mentioned heating steps, if this time run not in sampling range, by temperature sensor, the water temperature in water butt is measured, according to statistics judge hot water amount in water butt whether enough user to have a bath use, if the water yield is enough, maintenance is measured, when hot water amount is inadequate, heat pump brings into operation work, water in water butt is heated, according to the running time of the using amount of hot water setting heat pump of statistics, make to keep heated condition in the time period of heat pump between water heating time started and water heating end time, after arriving the water heating end time, heat pump stops heating, and continue to measure the water temperature in water butt, according to circumstances circulating-heating step.
2. the operation method of Teat pump boiler according to claim 1, is characterized in that: use user in the process of hot water at every turn and upgrade the water usage data of user.
3. the operation method of Teat pump boiler according to claim 2, it is characterized in that: preset a fixing maximum amount of water value, when single water consumption exceeds the maximum amount of water value of setting, judge whether this water consumption meets normal water consumption according to the statistics in sampling range, then water heating time started and water heating dwell time is upgraded as normal, expand the traffic coverage of heat pump, as abnormal, ignore this numerical value.
4. the operation method of Teat pump boiler according to claim 3, is characterized in that: maximum amount of water value is not more than the heap(ed) capacity of Teat pump boiler water butt.
5. the operation method of Teat pump boiler according to claim 1, is characterized in that: be repeatedly that regular user has a bath at every turn hot water amount used and use the time span of hot water within the time period of many days by the sampler space of water.
6. the operation method of Teat pump boiler according to claim 5, is characterized in that: the repeatedly water consumption statistics data in the sampler space are arranged by normal distribution.
7. the operation method of Teat pump boiler according to claim 1, is characterized in that: the operation of heat pump time between water heating time started and water heating end time and the time synchronized of user's bathing water are carried out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010285011.0A CN102401473B (en) | 2010-09-17 | 2010-09-17 | Running method of heat pump water heater |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010285011.0A CN102401473B (en) | 2010-09-17 | 2010-09-17 | Running method of heat pump water heater |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102401473A CN102401473A (en) | 2012-04-04 |
CN102401473B true CN102401473B (en) | 2015-04-29 |
Family
ID=45883933
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010285011.0A Expired - Fee Related CN102401473B (en) | 2010-09-17 | 2010-09-17 | Running method of heat pump water heater |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102401473B (en) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103968552B (en) * | 2013-01-30 | 2018-01-02 | 美的集团股份有限公司 | A kind of electric heater and its control method |
CN104456963B (en) * | 2013-09-25 | 2018-02-27 | 珠海格力电器股份有限公司 | The control method and device of compressor operating frequency |
CN104764204A (en) * | 2015-03-18 | 2015-07-08 | 黄成博 | Household electric water heater control system having remote control function |
CN104764201A (en) * | 2015-03-18 | 2015-07-08 | 黄成博 | Electric water heater intelligent-control system having remote control function |
CN104764198A (en) * | 2015-03-18 | 2015-07-08 | 陈斌 | Intelligent control system of electric water heater |
CN106123352A (en) * | 2016-07-01 | 2016-11-16 | 重庆蓝岸通讯技术有限公司 | The intelligent adjusting method of water heater and intelligent water heater |
CN106123305B (en) * | 2016-07-29 | 2019-02-01 | 芜湖美的厨卫电器制造有限公司 | The method for heating and controlling and electric heater of electric heater |
WO2018027366A1 (en) * | 2016-08-06 | 2018-02-15 | 胡明祥 | User feedback-based adjustment method for automatic heating and water heater |
CN108931060A (en) * | 2017-05-22 | 2018-12-04 | 李海磊 | A kind of intelligent water heater power-economizing method based on cloud computing |
CN107202428B (en) * | 2017-06-28 | 2020-10-16 | 合肥工业大学 | State estimation method for single electric water heater |
CN107741095B (en) * | 2017-09-21 | 2020-09-04 | 珠海优特物联科技有限公司 | Control method and device of water return device |
CN109682074B (en) * | 2017-10-19 | 2021-08-06 | 芜湖美的厨卫电器制造有限公司 | Control method of water heater and control method of air conditioner |
CN108006988B (en) * | 2017-11-09 | 2019-01-18 | 珠海格力电器股份有限公司 | Water heater control method, device and computer readable storage medium |
CN110398063B (en) * | 2019-07-05 | 2021-06-22 | 芜湖美的厨卫电器制造有限公司 | Water heater, control method thereof and computer-readable storage medium |
CN112413928B (en) * | 2020-11-11 | 2021-10-15 | 珠海格力电器股份有限公司 | Heat pump unit and control method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61110840A (en) * | 1984-11-01 | 1986-05-29 | Mitsubishi Electric Corp | Controlling device for electric water heater |
JPS61147053A (en) * | 1984-12-19 | 1986-07-04 | Mitsubishi Electric Corp | Control device of electric hot water apparatus |
US4943003A (en) * | 1988-02-15 | 1990-07-24 | Sanden Corporation | Control device for heat pump with hot-water supply facility |
CN1632409A (en) * | 2004-12-29 | 2005-06-29 | 上海交通大学 | Intelligent type heat pump water heater |
CN101135471A (en) * | 2007-09-29 | 2008-03-05 | 江苏天舒电器有限公司 | Method for forecasting and controlling heat pump hot-water system dynamic energy conservation operation |
CN101634483A (en) * | 2009-05-22 | 2010-01-27 | 吴江金达精工机械有限公司 | Controllable water heater |
-
2010
- 2010-09-17 CN CN201010285011.0A patent/CN102401473B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61110840A (en) * | 1984-11-01 | 1986-05-29 | Mitsubishi Electric Corp | Controlling device for electric water heater |
JPS61147053A (en) * | 1984-12-19 | 1986-07-04 | Mitsubishi Electric Corp | Control device of electric hot water apparatus |
US4943003A (en) * | 1988-02-15 | 1990-07-24 | Sanden Corporation | Control device for heat pump with hot-water supply facility |
CN1632409A (en) * | 2004-12-29 | 2005-06-29 | 上海交通大学 | Intelligent type heat pump water heater |
CN101135471A (en) * | 2007-09-29 | 2008-03-05 | 江苏天舒电器有限公司 | Method for forecasting and controlling heat pump hot-water system dynamic energy conservation operation |
CN101634483A (en) * | 2009-05-22 | 2010-01-27 | 吴江金达精工机械有限公司 | Controllable water heater |
Also Published As
Publication number | Publication date |
---|---|
CN102401473A (en) | 2012-04-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102401473B (en) | Running method of heat pump water heater | |
CN103090456B (en) | Multiple-energy-source combines hot-water heating system and multiple-energy-source controls switching method | |
CN103900251B (en) | Immediately heating water heater | |
CN102213489A (en) | Method and system for parallel connection of multiple gas heaters | |
JP2007170690A (en) | Heat pump water heater and its control method | |
CN103542614B (en) | heating and refrigerating system | |
CN103900247A (en) | Instant water heater | |
CN201637193U (en) | Heat pump system of multi-heat sources | |
CN103900248B (en) | Immediately heating water heater | |
CN201368523Y (en) | Solar heating system for heavy oil metering station | |
CN208332724U (en) | Thermal storage unit and storage heating system | |
CN208750945U (en) | Central Air Conditioning Billing System | |
CN202432683U (en) | Air source variable frequency heat pump water heater | |
CN203052987U (en) | Instantaneous water heater | |
CN202171323U (en) | Cabinet type air-source heat-pump water heating device | |
CN102980234A (en) | High-temperature geothermal water series connection heating system and heating method thereof | |
CN101832596A (en) | Solar air source heat pumps energy-saving low-temperature central hot water supply device for high-rise buildings | |
CN107676858A (en) | heating system | |
CN203443109U (en) | Novel air-source heat pump water heater | |
CN203052984U (en) | Instant-heat type water heater | |
CN208606252U (en) | The heating system of various energy resources integrated complementary | |
CN204043195U (en) | Water temperature control device in a kind of water heater funnel | |
CN202885245U (en) | High-efficiency energy-saving heat pump water heater with a plurality of water tanks | |
CN108758762A (en) | A kind of air source heat pump system trilogy supply multipurpose water tank | |
CN201779842U (en) | Energy-saving air source instant water heater |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150429 Termination date: 20190917 |
|
CF01 | Termination of patent right due to non-payment of annual fee |