CN102394781A - Switch port attribute modeling method based on IEC-61850 - Google Patents
Switch port attribute modeling method based on IEC-61850 Download PDFInfo
- Publication number
- CN102394781A CN102394781A CN2011103606166A CN201110360616A CN102394781A CN 102394781 A CN102394781 A CN 102394781A CN 2011103606166 A CN2011103606166 A CN 2011103606166A CN 201110360616 A CN201110360616 A CN 201110360616A CN 102394781 A CN102394781 A CN 102394781A
- Authority
- CN
- China
- Prior art keywords
- ports themselves
- switch ports
- zswp
- switch
- logical node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000013480 data collection Methods 0.000 claims description 7
- 238000004891 communication Methods 0.000 description 7
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003862 health status Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103606166A CN102394781A (en) | 2011-11-15 | 2011-11-15 | Switch port attribute modeling method based on IEC-61850 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103606166A CN102394781A (en) | 2011-11-15 | 2011-11-15 | Switch port attribute modeling method based on IEC-61850 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102394781A true CN102394781A (en) | 2012-03-28 |
Family
ID=45861991
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103606166A Pending CN102394781A (en) | 2011-11-15 | 2011-11-15 | Switch port attribute modeling method based on IEC-61850 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102394781A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104967533A (en) * | 2015-05-26 | 2015-10-07 | 国网智能电网研究院 | Method and apparatus of adding IEC 61850 configuration interface to SDN controller |
CN105022018A (en) * | 2015-06-10 | 2015-11-04 | 国家电网公司 | An electric energy metering remote verification apparatus modeling method based on the IEC61850 |
CN105762763A (en) * | 2014-12-15 | 2016-07-13 | 成都交大运达电气有限公司 | Railway traction power supply system main transformer differential protection model based on IEC61850 standard |
US10379935B2 (en) * | 2014-06-11 | 2019-08-13 | Korea Electric Power Corporation | Agent system for intelligent system management by digital substation and operation method therefor |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1960107A (en) * | 2006-12-01 | 2007-05-09 | 北京四方继保自动化股份有限公司 | Intellective method of modeling electronic equipment compatible to IEC61850 standard, and traditional protection models |
US20070226326A1 (en) * | 2006-03-24 | 2007-09-27 | Cisco Technology, Inc. | Method and apparatus for automatically managing sub-layer interfaces |
US20100040068A1 (en) * | 2008-08-18 | 2010-02-18 | Abb Technology Ag | Configuration of a process control system |
CN102123045A (en) * | 2011-01-18 | 2011-07-13 | 河南龙源许继科技发展股份有限公司 | Modeling method for high-voltage equipment on-line monitoring systems based on international electro-technical commission (IEC) 61850 |
-
2011
- 2011-11-15 CN CN2011103606166A patent/CN102394781A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070226326A1 (en) * | 2006-03-24 | 2007-09-27 | Cisco Technology, Inc. | Method and apparatus for automatically managing sub-layer interfaces |
CN1960107A (en) * | 2006-12-01 | 2007-05-09 | 北京四方继保自动化股份有限公司 | Intellective method of modeling electronic equipment compatible to IEC61850 standard, and traditional protection models |
US20100040068A1 (en) * | 2008-08-18 | 2010-02-18 | Abb Technology Ag | Configuration of a process control system |
CN102123045A (en) * | 2011-01-18 | 2011-07-13 | 河南龙源许继科技发展股份有限公司 | Modeling method for high-voltage equipment on-line monitoring systems based on international electro-technical commission (IEC) 61850 |
Non-Patent Citations (2)
Title |
---|
徐敏等: "基于IEC 61850标准的电抗器保护建模方法", 《电网技术》 * |
王刚等: "基于IEC 61850的线路微机保护模型设计", 《太原理工大学学报》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10379935B2 (en) * | 2014-06-11 | 2019-08-13 | Korea Electric Power Corporation | Agent system for intelligent system management by digital substation and operation method therefor |
CN105762763A (en) * | 2014-12-15 | 2016-07-13 | 成都交大运达电气有限公司 | Railway traction power supply system main transformer differential protection model based on IEC61850 standard |
CN104967533A (en) * | 2015-05-26 | 2015-10-07 | 国网智能电网研究院 | Method and apparatus of adding IEC 61850 configuration interface to SDN controller |
CN104967533B (en) * | 2015-05-26 | 2018-10-23 | 国网智能电网研究院 | Increase the method and apparatus that IEC 61850 configures interface on a kind of SDN controllers |
CN105022018A (en) * | 2015-06-10 | 2015-11-04 | 国家电网公司 | An electric energy metering remote verification apparatus modeling method based on the IEC61850 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kriger et al. | A detailed analysis of the GOOSE message structure in an IEC 61850 standard-based substation automation system | |
CN102315971A (en) | Network equipment modeling method based on IEC-61850 standard | |
EP2579227A1 (en) | Data acquisition concentrator and data acquisition method | |
CN102263680A (en) | Smart home system | |
CN102075378A (en) | IEC61850 standard-based GOOSE communication simulation method | |
CN102394781A (en) | Switch port attribute modeling method based on IEC-61850 | |
CN206559386U (en) | Embedded industry intelligent gateway and internet of things data acquisition monitoring system based on SoC | |
CN106921660A (en) | A kind of method for supporting random communication protocol shared channel resources | |
CN112187582B (en) | Intelligent substation process layer switch port flow monitoring pre-warning system and method | |
CN104735039A (en) | Communication conversion method | |
CN102664957B (en) | Information integration method of advanced metering infrastructure | |
CN103151845B (en) | Intelligent substation state monitoring platform based on IEC 61850 | |
CN205334719U (en) | Rural granary wireless sensor network monitoring system | |
CN102368715A (en) | IEC-61850 protocol gateway-based realization equipment for centralized network management of exchangers | |
Li et al. | Research on designing methods of the secondary system in digital substation | |
CN102710784A (en) | Electric energy quality communication method applied to microgrid | |
Du et al. | The design of communication system on the real-time relay protection based on goose | |
CN203482219U (en) | Message receiving and sending platform of intelligent equipment IEC61850 statute consistency detection | |
CN201352314Y (en) | Frequency converter Ethernet on-line monitoring device based on TMS320 F2407A DSP | |
CN204733185U (en) | A kind of station level network communication switching equipment | |
Huang et al. | Application of MQTT in power distribution Internet of Things | |
CN104135421B (en) | The method and device of the communication information is transmitted in the communication system of power distribution network | |
CN203933156U (en) | For the information system of complete monitoring measurement of power device | |
Halepoto et al. | Design and Modeling of Substation Time Critical Information Dissemination Model using Publishersubscriber Communication Service Mapping | |
Park et al. | Study on Smart Meter Concentration Protocol for AMI |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: CREAWAY AUTOMATION ENGINEERING CO., LTD.;SHAOXING Free format text: FORMER OWNER: CREAWAY AUTOMATION ENGINEERING CO., LTD.;SHAOXING ELECTRIC POWER BUREAU BEIJING DONGTU TECHNOLOGY CO., LTD. SHAOXING POWER BUREAU Effective date: 20130104 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20130104 Address after: 310007 Huanglong Road, Zhejiang, Hangzhou, No. 8 Applicant after: Zhejiang Electric Power Company Applicant after: Zhejiang Creaway Automation Engineering Co., Ltd. Applicant after: Beijing Dongtu Technology Co., Ltd. Applicant after: Shaoxing Power Bureau Applicant after: State Grid Corporation of China Address before: 310007 Huanglong Road, Zhejiang, Hangzhou, No. 8 Applicant before: Zhejiang Electric Power Company Applicant before: Zhejiang Creaway Automation Engineering Co., Ltd. Applicant before: Beijing Dongtu Technology Co., Ltd. Applicant before: Shaoxing Power Bureau |
|
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120328 |