CN102390047A - Multifunctional header assembly frame - Google Patents

Multifunctional header assembly frame Download PDF

Info

Publication number
CN102390047A
CN102390047A CN2011101702760A CN201110170276A CN102390047A CN 102390047 A CN102390047 A CN 102390047A CN 2011101702760 A CN2011101702760 A CN 2011101702760A CN 201110170276 A CN201110170276 A CN 201110170276A CN 102390047 A CN102390047 A CN 102390047A
Authority
CN
China
Prior art keywords
channel
collection case
steel
section steel
long tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101702760A
Other languages
Chinese (zh)
Other versions
CN102390047B (en
Inventor
任艳明
顾卫红
孙厚彬
陈力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Boiler Works Co Ltd
Original Assignee
Shanghai Boiler Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Boiler Works Co Ltd filed Critical Shanghai Boiler Works Co Ltd
Priority to CN2011101702760A priority Critical patent/CN102390047B/en
Publication of CN102390047A publication Critical patent/CN102390047A/en
Priority to PCT/CN2012/073505 priority patent/WO2012159499A1/en
Priority to ES201390017A priority patent/ES2531427B2/en
Application granted granted Critical
Publication of CN102390047B publication Critical patent/CN102390047B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/10Water tubes; Accessories therefor
    • F22B37/20Supporting arrangements, e.g. for securing water-tube sets
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/22Drums; Headers; Accessories therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/22Drums; Headers; Accessories therefor
    • F22B37/225Arrangements on drums or collectors for fixing tubes or for connecting collectors to each other
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/24Supporting, suspending, or setting arrangements, e.g. heat shielding
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/62Component parts or details of steam boilers specially adapted for steam boilers of forced-flow type
    • F22B37/64Mounting of, or supporting arrangements for, tube units
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/10Water tubes; Accessories therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Connection Of Plates (AREA)
  • Packaging Of Annular Or Rod-Shaped Articles, Wearing Apparel, Cassettes, Or The Like (AREA)
  • Heat Treatment Of Articles (AREA)
  • Exhaust Silencers (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention relates to a multifunctional header assembly frame, which is suitable for assembling a plurality of long tube joints with a header body in a boiler header. The header body to be assembled is arranged on lining shape steel, such as H-shaped steel; the header body is fixed onto the H-shaped steel through a plurality of handcuff plates comprising header pressing plates and staggered pressing plates to ensure the straightness when the header body is assembled; the length direction of the header is provided with a plurality of peripheral frames with adjustable dimensions and positions at intervals; and the matched long tube joints are fixedly supported in the assembly process of the header. In the multifunctional header assembly frame, a plurality of channel steel and flat steel among banks of tubes are also respectively fixed in place when assembly welding is performed to support the banks of tubes, thereby, the assembly precision of the long tube joints is ensured. The multifunctional header assembly frame can be suitable for assembling the long tube joints with different structures with the header, is capable of preventing the header from deforming in the processes of welding and heat treatment, and is capable of conveniently performing hoisting and swinging, the turnover and the hydrostatic test on the header and subsequent allowance processing on the long tube joints.

Description

Multi-functional collection case assembly fixture
Technical field
The present invention be more particularly directed to a kind of multi-functional collection case assembly fixture, it is the frock that is used for the boiler header assembling.
Background technology
As shown in Figure 1, be the water-cooling wall middle transition collection case in existing a kind of 600MW grade W flame super critical boiler, it includes collection case body 19, and with collection case body 19 on some long tube joints 18 of the corresponding connection of some pores.Because the frame type structure that those long tube joints 18 constitute is very special, and the frame space size of sealing pipe big, adjacent pipe is close apart from the gap, the framework center of gravity is inclined to one side; Thereby in the collection case of general structure, the long tube joint can be accomplished through turning rolls with the dress weldering of collection case body, but turning rolls can't be suitable for the assembling manufacturing of special box type long tube joint and collection case body, and this all makes troubles for the whole process of production of collection case.
Summary of the invention
The purpose of this invention is to provide a kind of multi-functional collection case assembly fixture; Be particularly useful for the assembling of long tube joint with the collection case body of special box type structure in the boiler header; Can in welding, heat treatment process, prevent to collect carton deformed, and the convenient surplus processing of the collection case being carried out handling, upset, the water pressure test and follow-up long tube joint.
In order to achieve the above object, technical scheme of the present invention provides a kind of multi-functional collection case assembly fixture, is applicable to some long tube joints and the assembling that collects the case body in the boiler header; Said assembly fixture comprises:
The lining shaped steel that is equipped with and some handcuffss plates, the said collection case of its fixed support in assembling process body;
In collection case length direction spaced apart several peripheral frame, it through size or the adjustment of position is set, fixes said some long tube joints that support size is complementary in assembling process;
Said lining shaped steel the position is set, with said plurality of peripheral base of frame, hold the corresponding coupling of gap position that said collection case body is placed.
Said lining shaped steel is the H shaped steel that is horizontally placed on ground, and the said collection case body that has bored pore is placed on the said H shaped steel, and adjusts its pore orientation;
Said handcuffss plate comprises two collection case pressing plates and some staggered pressing plates, and it is inverted U type structure separately and is located in respectively on the said collection case body, and said collection case pressing plate, staggered pressing plate are fixedly connected with said H shaped steel in its downward separately open bottom.
Said two collection case pressing plates, corresponding respectively two end positions that are not connected on the said collection case body that are arranged on the long tube joint;
Said some staggered pressing plates in the position of interlaced arrangement between two collection case pressing plates, in the middle of corresponding said some long tube joints, are arranged on the said collection case body respectively at interval.
Each said staggered pressing plate further comprises two jigsaw, and it is connected to form said inverted U structure by some pins; And said two jigsaw are controlled this two spacing distances that jigsaw is arranged in parallel not on same plane by the length of pin.
Each said peripheral frame is the frame structure of bottom leaving certain gaps uncovered by the economic plan, and it is around the outward flange setting of said long tube joint; Said peripheral frame comprises some channel-section steels of corresponding welding, has:
Spaced apart two first channel-section steels are vertically arranged;
Horizontally disposed at least one second channel-section steel, it has been fixedly connected the top of two first channel-section steels at least; When a plurality of second channel-section steel was set, it was arranged between two first channel-section steels with interval; And,
Horizontally disposed two the 3rd channel-section steels, it each has an end and is connected with the bottom of one of them first channel-section steel respectively; The other end of two the 3rd channel-section steels is oppositely arranged with interval, and cooperates with said H shaped steel, has formed the said gap position that holds said collection case body on this peripheral frame;
Select to be provided with some brace channel-section steels between the adjacent peripheral framework; The two ends of each brace channel-section steel are fixedly connected the top of one of them peripheral frame and the bottom of another adjacent with it peripheral frame respectively.
The bottom of each peripheral frame also is provided with some upset channel-section steel and gussets that are connected; Each said gusset is fixedly connected with said the 3rd channel-section steel and said H shaped steel respectively;
Said some upset channel-section steels become certain angle of inclination respectively with the level ground, the said upset channel-section steel through a side contacts with ground, make this assembly fixture upset displacement;
Also be provided with the plurality of opening that helps the handling of collection case on the said upset channel-section steel.
After the upset, also be provided with the some support channel-section steels that prevent that assembly fixture from toppling between the part of said assembly fixture perk and the ground; A plurality of said support channel-section steel along the length direction setting that collects case is respectively the single hop channel-section steel.
Said assembly fixture also is provided with some the 4th channel-section steels, and it has been fixedly connected the channel-section steel of same position on the plurality of peripheral framework respectively along the length direction setting parallel to the ground of collection case body;
For each peripheral frame, said the 4th channel-section steel or connects between the pipe of channel-section steel and the long tube joint row and supports between channel-section steel and channel-section steel.
Said assembly fixture also comprises the some channel-section steels that are provided with along collection case length direction, has:
The 5th channel-section steel, it is fixedly connected with first channel-section steel, and is arranged between the pipe row's face and this first channel-section steel of long tube joint, keeps the flatness of the row of pipe side;
The 6th channel-section steel, it is fixedly connected with the 3rd channel-section steel, and is arranged between the long tube joint mouth of pipe and the 3rd channel-section steel down, and row supports to pipe.
Said assembly fixture also is provided with some first band steels and second band steel, wherein:
First band steel bores after the water pressure test when scraping long tube joint surplus and groove, interts and between the pipe row who is arranged on the long tube joint pipe row is supported;
Corresponding channel-section steel is connected on said second band steel and the peripheral frame, and connects said first band steel it is fixed.
Compared with prior art; Multi-functional collection case assembly fixture according to the invention, its advantage is: among the present invention, will collect the case body earlier and bore pore; And being placed on the H shaped steel its pore orientation of adjustment, the fixed-site that will collect the case body with collection case pressing plate and staggered pressing plate is to guarantee its linearity.Along collection case length direction, take structure and welding formation peripheral frame some jaggy separately with some said first, second, third channel-section steels, the brace channel-section steel between the adjacent peripheral framework is set according to circumstances; Then, in a row dress weldering long tube joint successively, and the 4th, the 5th, the 6th channel-section steel between the dress weldering simultaneously will manage row and said first, second band steel be respectively fixed to and support, and guaranteed the assembly precision of long tube joint.The present invention also is provided with the upset channel-section steel and helps assembly fixture to carry out the upset of certain angle, is convenient to the assembling of long tube joint and the pump water of different angles, and is provided with and supports channel-section steel and prevent to topple over; Perforate helps handling on the upset channel-section steel.
Therefore; Collection case assembly fixture according to the invention; Can be through the position and the size of adjustment peripheral frame; Adapt to the assembling of the long tube joint collection case of different structure, and can in welding, heat treatment process, prevent to collect carton deformed, and made things convenient for the surplus processing of this collection case being carried out handling, upset, the water pressure test and follow-up long tube joint.
Description of drawings
Fig. 1 is two views of collection case general structure;
Fig. 2 is the general structure of collection case assembly fixture according to the invention and to the sketch map of collection case positioning supports shown in Figure 1;
Fig. 3 is the side view of collection case in Fig. 2 of collection case assembly fixture according to the invention and assembling thereof;
Fig. 4 is the side view of collection case assembly fixture according to the invention to the collection case upset of its assembling;
Fig. 5 is the structural representation of collection case pressing plate in the collection case assembly fixture according to the invention;
Fig. 6 is the structural representation of staggered pressing plate in the collection case assembly fixture according to the invention;
Fig. 7 is the structural representation of the jigsaw of staggered pressing plate among Fig. 6;
Fig. 8 is the structural representation of the pin of staggered pressing plate among Fig. 6;
Fig. 9 is the structural representation of gusset in the collection case assembly fixture according to the invention;
Figure 10 is the structural representation of upset channel-section steel in the collection case assembly fixture according to the invention;
Figure 11 is the enlarged diagram of band steel syndeton in Fig. 2 in the collection case assembly fixture according to the invention.
The specific embodiment
Below in conjunction with the description of drawings specific embodiment of the present invention.
Cooperation is referring to Fig. 2, shown in Figure 3, and collection case assembly fixture according to the invention is particularly useful for the assembling of long tube joint 18 with the collection case body 19 of special box type structure in the boiler header.Said assembly fixture comprises lining shaped steel and the some handcuffss plates that is equipped with, and it is fixed support collection case body 19 in assembling process; Also be included in spaced apart several peripheral frame of collection case length direction, some long tube joints 18 of fixed support frame type structure in assembling process; Said lining shaped steel is in the gap position that said plurality of peripheral base of frame is offered.
Concrete, to shown in Figure 6, said lining shaped steel is the H shaped steel 1 that is horizontally placed on ground referring to Fig. 2 in cooperation, the collection case body 19 that has bored pore is placed on the said H shaped steel 1, and adjusts its pore orientation.Said handcuffss plate comprises two collection case pressing plates 6 and some staggered pressing plates 16; It is inverted U type structure separately and is located in respectively on the said collection case body 19: said two collection case pressing plates 6, corresponding respectively two end positions that are not connected with long tube joint 18 on the said collection case body 19 that are arranged on; Said some staggered pressing plates 16 in the position of interlaced arrangement between two collection case pressing plates 6, in the middle of corresponding said some long tube joints 18, are arranged on the said collection case body 19 respectively at interval.Said collection case pressing plate 6, staggered pressing plate 16 are fixedly connected through being welded on the said H shaped steel 1 in its downward separately open bottom.Thereby, under the fixation of said H shaped steel that is connected 1 and said collection case pressing plate 6, the pressing plate 16 that interlocks, can prevent to collect case body 19 and in welding and heat treated process, produce flexural deformation, the linearity of collection case body 19 when having guaranteed assembling.
To shown in Figure 8, each said staggered pressing plate 16 further comprises two jigsaw 161 referring to Fig. 6 in cooperation, and it is connected to form said inverted U structure by some pins 162; And; Said two jigsaw 161 are not or not same plane; Length by pin 162 is controlled this two spacing distances that jigsaw 161 is arranged in parallel, and can avoid said jigsaw 161 when fixed set case body 19, to collide with the long tube joint 18 that is interspersed, therefore; Can not influence the dress weldering of long tube joint 18, be applicable to that the long tube joint 18 of asymmetrical design on the collection case is arranged.
Cooperation is referring to Fig. 2, shown in Figure 3, and among the present invention, fixing each said peripheral frame that reaches location long tube joint 18 is the frame structure of bottom leaving certain gaps uncovered by the economic plan, and it is around the outward flange setting of said long tube joint 18.Said peripheral frame is formed by the corresponding welding of some channel-section steels, specifically comprises: spaced apart two first channel-section steels 7 are vertically arranged; Level has spaced apart two second channel-section steels 8, and it is connected to the top and the middle part of two first channel-section steels 7; And horizontally disposed two the 3rd channel-section steels 5 and 14; It each has an end and is connected with the bottom of one of them first channel-section steel 7 respectively; Two the 3rd channel-section steels 5 and 14 the other end are oppositely arranged with interval; And cooperate with said H shaped steel 1, formed the gap position that holds said collection case body 19 on this peripheral frame.In some position of collection case, for avoiding pipe row, second channel-section steel of medium position can be set, only depend on second channel-section steel on top to connect said two first channel-section steels (this kind embodiment is not shown in the drawings).
Cooperation is referring to Fig. 2, Fig. 3, Fig. 4, Fig. 9, shown in Figure 10; In order to make assembly fixture according to the invention turn certain angle; So that the weldering of the dress of the long tube joint 18 of different angles, the bottom of each peripheral frame also is symmetrically arranged with two upset channel-section steels 4 and two gussets 2,3.Said gusset 2,3 is respectively in the bottom of said the 3rd channel-section steel 5,14, and the left and right sides (with Fig. 3 visual angle) of said H shaped steel 1, and welding is fixing with it.Said two upset channel-section steels 4 become certain angle of inclination respectively with the level ground, and are welded on the said gusset 2,3, realize and said the 3rd channel-section steel 5,14 fixed connection of said H shaped steel 1.
As shown in Figure 3, during assembly fixture upset displacement, the upset channel-section steel 4 through a side contacts with ground.And also be provided with some support channel-section steels 15 between the part of assembly fixture perk and the ground, prevent that assembly fixture from toppling over.Those support channel-section steels 15 is single hop channel-section steels, can be provided with a plurality ofly along the length direction of collection case, and its upper end is fixing with the above gusset of assembly fixture or the welding of other parts respectively.The end of said upset channel-section steel 4 also is provided with perforate, can help to collect the case handling through those perforates.
Cooperation among the present invention, also is provided with some the 4th channel-section steels 9 referring to Fig. 2, Fig. 3, shown in Figure 11, and it is horizontally disposed with along collection case body 19 length directions, has been fixedly connected the channel-section steel of same position on the adjacent peripheral framework respectively; For each peripheral frame, said the 4th channel-section steel 9 plays channel-section steel and connecting and supporting role (respectively shown in two examples among Fig. 3) between the channel-section steel, between the pipe row of channel-section steel and long tube joint 18.Between the adjacent peripheral framework some brace channel-section steels 17 can also be set as required; The two ends of each brace channel-section steel 17 are fixedly connected the top of one of them peripheral frame respectively through welding, and the bottom of an adjacent with it peripheral frame.Make all pipe rows of said some long tube joints 18, all be positioned among the frame structure that those peripheral frame and the 4th channel-section steel 9 thereof (with brace channel-section steel 17) be connected to form.Therefore, size, the spacing distance through the adjustment peripheral frame and position etc. is set can adapt to the support location of the above long tube joint 18 of collection case of different structure.
Like Fig. 3, shown in Figure 11, also be provided with some first band steels 10 and second band steel 11 among the present invention, wherein first band steel 10 bores when scraping long tube joint 18 surpluses and groove after the water pressure test, interts between pipe row, pipe to be queued supporting role.Said second channel-section steel 8 welding topmost of the top of said second band steel 11 and peripheral frame are fixing; This second band steel 11 is fixing with the end welding of said first band steel 10 in its part that hangs down, and this first band steel 10 is fixed.Said first band steel 10 and above-mentioned the 4th channel-section steel 9 that pipe row is supported just set in the process of long tube joint 18 assemblings, after brill is scraped, preferably keep, and when said collection case is installed in the building site, just remove.
Like Fig. 2, shown in Figure 3; Also be provided with the some other channel-section steel that is provided with along collection case length direction among the present invention; Comprise: the 5th channel-section steel 12, it is fixedly connected with first channel-section steel 7, and is arranged between the pipe row's face and this first channel-section steel 7 of long tube joint 18; Can prevent that the long tube joint 18 in the row's of pipe face is outwards outstanding, effectively keep the flatness of pipe row side; The 6th channel-section steel 13, it is fixedly connected with the 3rd channel-section steel 14, and is arranged between the mouth of pipe down and the 3rd channel-section steel 14 of long tube joint 18, to its supporting role of pipe row, prevents that the mouth of pipe down is sagging.
In sum, in the assembly fixture according to the invention, will collect case body 19 earlier and bore pore, and be placed on the H shaped steel 1 its pore orientation of adjustment, the fixed-site that will collect case body 19 with collection case pressing plate 6 and staggered pressing plate 16 is to guarantee its linearity.Along collection case length direction, take structure and welding formation peripheral frame some jaggy separately with some said first, second, third channel-section steels, the brace channel-section steel 17 between the adjacent peripheral framework is set according to circumstances; Then, in a row dress weldering long tube joint 18 successively, and the 4th, the 5th, the 6th channel-section steel between the dress weldering simultaneously will manage row and said first, second band steel be respectively fixed to and support, and guaranteed the assembly precision of long tube joint 18.The present invention also is provided with upset channel-section steel 4 and helps assembly fixtures to carry out the upset of certain angle, is convenient to long tube joint 18 assembling and the pump water of different angles, and is provided with and supports channel-section steel 5 and prevent to topple over; Perforate helps handling on the upset channel-section steel 4.
Therefore; Collection case assembly fixture according to the invention; Can be through the position and the size of adjustment peripheral frame; Adapt to the assembling of the long tube joint collection case of different structure, and can in welding, heat treatment process, prevent to collect carton deformed, and made things convenient for the surplus processing of this collection case being carried out handling, upset, the water pressure test and follow-up long tube joint.
Although content of the present invention has been done detailed introduction through above-mentioned preferred embodiment, will be appreciated that above-mentioned description should not be considered to limitation of the present invention.After those skilled in the art have read foregoing, for multiple modification of the present invention with to substitute all will be conspicuous.Therefore, protection scope of the present invention should be limited appended claim.

Claims (10)

1. a multi-functional collection case assembly fixture is applicable to some long tube joints (18) and the assembling that collects case body (19) in the boiler header, it is characterized in that said assembly fixture comprises:
The lining shaped steel that is equipped with and some handcuffss plates, its fixed support in assembling process said collection case body (19);
In collection case length direction spaced apart several peripheral frame, it through size or the adjustment of position is set, fixes said some long tube joints (18) that support size is complementary in assembling process;
Said lining shaped steel the position is set, with said plurality of peripheral base of frame, hold the corresponding coupling of gap position that said collection case body (19) is placed.
2. multi-functional according to claim 1 collection case assembly fixture is characterized in that,
Said lining shaped steel is the H shaped steel (1) that is horizontally placed on ground, and the said collection case body (19) that has bored pore is placed on the said H shaped steel (1), and adjusts its pore orientation;
Said handcuffss plate comprises two collection case pressing plates (6) and some staggered pressing plates (16); It is inverted U type structure separately and is located in respectively on the said collection case body (19); And said collection case pressing plate (6), staggered pressing plate (16) are fixedly connected with said H shaped steel (1) in its downward separately open bottom.
3. like the said multi-functional collection case assembly fixture of claim 2, it is characterized in that,
Said two collection case pressing plates (6), correspondence is arranged on two end positions that are not connected with long tube joint (18) on the said collection case body (19) respectively;
Said some staggered pressing plates (16) in the position of interlaced arrangement between two collection case pressing plates (6), in the middle of corresponding said some long tube joints (18), are arranged on the said collection case body (19) respectively at interval.
4. like the said multi-functional collection case assembly fixture of claim 3, it is characterized in that,
Each said staggered pressing plate (16) further comprises two jigsaw (161), and it is connected to form said inverted U structure by some pins (162); And said two jigsaw (161) are controlled the spacing distance that these two jigsaw (161) are arranged in parallel not on same plane by the length of pin (162).
5. like claim 1 or 4 said multi-functional collection case assembly fixtures, it is characterized in that,
Each said peripheral frame is the frame structure of bottom leaving certain gaps uncovered by the economic plan, and it is around the outward flange setting of said long tube joint (18); Said peripheral frame comprises some channel-section steels of corresponding welding, has:
Spaced apart two first channel-section steels (7) are vertically arranged;
Horizontally disposed at least one second channel-section steel (8), it has been fixedly connected the top of two first channel-section steels (7) at least; When a plurality of second channel-section steels (8) were set, it was arranged between two first channel-section steels (7) with interval; And,
Horizontally disposed two the 3rd channel-section steels (5,14), it each has an end and is connected with the bottom of one of them first channel-section steel (7) respectively; The other end of two the 3rd channel-section steels (5,14) is oppositely arranged with interval, and cooperates with said H shaped steel (1), has formed the said gap position that holds said collection case body (19) on this peripheral frame;
Select to be provided with some brace channel-section steels (17) between the adjacent peripheral framework; The two ends of each brace channel-section steel (17) are fixedly connected the top of one of them peripheral frame and the bottom of another adjacent with it peripheral frame respectively.
6. like the said multi-functional collection case assembly fixture of claim 5, it is characterized in that,
The bottom of each peripheral frame also is provided with some upset channel-section steels (4) that are connected and gusset (2,3); Each said gusset (2,3) is fixedly connected with said the 3rd channel-section steel (5,14) and said H shaped steel (1) respectively;
Said some upset channel-section steels (4) become certain angle of inclination respectively with the level ground, the said upset channel-section steel (4) through a side contacts with ground, make this assembly fixture upset displacement;
Also be provided with the plurality of opening that helps the handling of collection case on the said upset channel-section steel (4).
7. like the said multi-functional collection case assembly fixture of claim 6, it is characterized in that,
After the upset, also be provided with the some support channel-section steels (15) that prevent that assembly fixture from toppling between the part of said assembly fixture perk and the ground; The a plurality of said support channel-section steel (15) that is provided with along the length direction that collects case is respectively the single hop channel-section steel.
8. like the said multi-functional collection case assembly fixture of claim 7, it is characterized in that,
Said assembly fixture also is provided with some the 4th channel-section steels (9), and it has been fixedly connected the channel-section steel of same position on the plurality of peripheral framework respectively along the length direction setting parallel to the ground of collection case body (19);
For each peripheral frame, said the 4th channel-section steel (9) or connects between the pipe of channel-section steel and long tube joint (18) row and supports between channel-section steel and channel-section steel.
9. like the said multi-functional collection case assembly fixture of claim 8, it is characterized in that,
Said assembly fixture also comprises the some channel-section steels that are provided with along collection case length direction, has:
The 5th channel-section steel (12), it is fixedly connected with first channel-section steel (7), and is arranged between the pipe row's face and this first channel-section steel (7) of long tube joint (18), keeps the flatness of the row of pipe side;
The 6th channel-section steel (13), it is fixedly connected with the 3rd channel-section steel (14), and is arranged between long tube joint (18) mouth of pipe and the 3rd channel-section steel (14) down, and row supports to pipe.
10. like the said multi-functional collection case assembly fixture of claim 9, it is characterized in that,
Said assembly fixture also is provided with some first band steels (10) and second band steel (11), wherein:
First band steel (10) bores after the water pressure test when scraping long tube joint (18) surplus and groove, interts and between the pipe row who is arranged on long tube joint (18) pipe row is supported;
Corresponding channel-section steel is connected on said second band steel (11) and the peripheral frame, and connects said first band steel (10) it is fixed.
CN2011101702760A 2011-06-23 2011-06-23 Multifunctional header assembly frame Active CN102390047B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN2011101702760A CN102390047B (en) 2011-06-23 2011-06-23 Multifunctional header assembly frame
PCT/CN2012/073505 WO2012159499A1 (en) 2011-06-23 2012-05-10 Multi-functional header assembly frame
ES201390017A ES2531427B2 (en) 2011-06-23 2012-05-10 MULTIFUNCTIONAL COLLECTOR ASSEMBLY DEVICE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101702760A CN102390047B (en) 2011-06-23 2011-06-23 Multifunctional header assembly frame

Publications (2)

Publication Number Publication Date
CN102390047A true CN102390047A (en) 2012-03-28
CN102390047B CN102390047B (en) 2013-11-27

Family

ID=45857497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101702760A Active CN102390047B (en) 2011-06-23 2011-06-23 Multifunctional header assembly frame

Country Status (3)

Country Link
CN (1) CN102390047B (en)
ES (1) ES2531427B2 (en)
WO (1) WO2012159499A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012159499A1 (en) * 2011-06-23 2012-11-29 上海锅炉厂有限公司 Multi-functional header assembly frame
CN103028944A (en) * 2012-12-11 2013-04-10 上海锅炉厂有限公司 Plane scraper bar
CN103912864A (en) * 2014-03-28 2014-07-09 无锡华光锅炉股份有限公司 Header support and limit device in boiler
CN106078039A (en) * 2016-06-28 2016-11-09 上海锅炉厂有限公司 Overturning-preventing support means

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109556105B (en) * 2018-12-28 2024-05-10 东方菱日锅炉有限公司 Coiled pipe module

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0958329A (en) * 1995-08-17 1997-03-04 Ishikawajima Harima Heavy Ind Co Ltd Truck for gathering and interconnecting pipes
JPH11270519A (en) * 1998-03-23 1999-10-05 Ishikawajima Harima Heavy Ind Co Ltd Header supporting device for boiler
JP2000234703A (en) * 1999-02-10 2000-08-29 Ishikawajima Harima Heavy Ind Co Ltd Fixing device for entrance header of superheater
CN200939553Y (en) * 2006-08-10 2007-08-29 上海锅炉厂有限公司 Anti-tipping bracket of container
CN201133517Y (en) * 2007-12-24 2008-10-15 上海锅炉厂有限公司 Container displacement assembly device

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1077844A (en) * 1952-05-29 1954-11-12 Babcock & Wilcox France Method and apparatus for erecting boilers
CH506751A (en) * 1969-04-17 1971-04-30 Sulzer Ag Steam generator with wall tubing made of vertical, welded tubes
US5722354A (en) * 1995-12-08 1998-03-03 Db Riley, Inc. Heat recovery steam generating apparatus
JP2001041406A (en) * 1999-07-28 2001-02-13 Babcock Hitachi Kk Header supporting unit
JP2007107789A (en) * 2005-10-12 2007-04-26 Babcock Hitachi Kk Installation method of boiler equipment
CN101910776B (en) * 2008-01-14 2013-12-04 巴布科克和威尔科克斯能量产生集团公司 Heat exchanger
CN201168867Y (en) * 2008-03-28 2008-12-24 上海朝阳锅炉厂 Boiler assembling stand
DE102009015961B4 (en) * 2008-04-25 2015-05-28 Alstom Technology Ltd. Method for assembling a steam generator
JO3344B1 (en) * 2008-10-24 2019-03-13 Babcock & Wilcox Co Shop-assembled solar receiver heat exchanger
CN102390047B (en) * 2011-06-23 2013-11-27 上海锅炉厂有限公司 Multifunctional header assembly frame

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0958329A (en) * 1995-08-17 1997-03-04 Ishikawajima Harima Heavy Ind Co Ltd Truck for gathering and interconnecting pipes
JPH11270519A (en) * 1998-03-23 1999-10-05 Ishikawajima Harima Heavy Ind Co Ltd Header supporting device for boiler
JP2000234703A (en) * 1999-02-10 2000-08-29 Ishikawajima Harima Heavy Ind Co Ltd Fixing device for entrance header of superheater
CN200939553Y (en) * 2006-08-10 2007-08-29 上海锅炉厂有限公司 Anti-tipping bracket of container
CN201133517Y (en) * 2007-12-24 2008-10-15 上海锅炉厂有限公司 Container displacement assembly device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012159499A1 (en) * 2011-06-23 2012-11-29 上海锅炉厂有限公司 Multi-functional header assembly frame
CN103028944A (en) * 2012-12-11 2013-04-10 上海锅炉厂有限公司 Plane scraper bar
CN103912864A (en) * 2014-03-28 2014-07-09 无锡华光锅炉股份有限公司 Header support and limit device in boiler
CN103912864B (en) * 2014-03-28 2016-04-06 无锡华光锅炉股份有限公司 Header supporting and limiting device in a kind of boiler
CN106078039A (en) * 2016-06-28 2016-11-09 上海锅炉厂有限公司 Overturning-preventing support means

Also Published As

Publication number Publication date
CN102390047B (en) 2013-11-27
WO2012159499A1 (en) 2012-11-29
ES2531427A2 (en) 2015-03-13
ES2531427B2 (en) 2015-07-23
ES2531427R1 (en) 2015-03-24

Similar Documents

Publication Publication Date Title
CN102390047B (en) Multifunctional header assembly frame
US9200468B2 (en) Wind energy plant tower
CN106149881A (en) A kind of assembled light steel house building system
CN103452188A (en) Steel frame structure using u-shaped composite beam
CN100578879C (en) Electrical cabinet with framework section pieces
CN104988994B (en) A kind of combined member
KR20200051313A (en) Construction Method of Pipe Rack Structure
CN102380734A (en) Multifunctional welding frame
CN104863266B (en) The prefabricated assembled high-ductility girder Column border node of box column-I-beam
CN104453089B (en) Steel beam device of steel structure house
CN112012336A (en) Be applied to quick installation auto-lock node of modularization steel construction building
CN102061807B (en) Method for assembling large-span H-shaped steel truss beam
CN109208454B (en) Inlaid segmented structure between steel bridge roof
CN106703193A (en) Channel steel end plate joint for square steel string
CN204112503U (en) A kind of heating furnace steel structure frame beam column shock-resistant node
CN206951274U (en) A kind of model-container support
CN102829537B (en) Air conditioner indoor unit and evaporator water coil of air conditioner indoor unit
CN202000355U (en) Truss-type steel support
CN207268089U (en) Tool-type hoisting bracket device
CN107806103A (en) A kind of pattern foundation pit supporting structure steel truss shares system with assembled steel trestle column
CN214331729U (en) Pipeline installation system suitable for large-scale steel construction factory building
CN208170362U (en) One kind being used for Piping at Low Temperature Zone Heated Side of Industrial Boiler screen fixed structure
CN109745945A (en) Novel beam type gas blowing type packing support plate
KR102125809B1 (en) Construction Method of Pipe Rack Structure Using Segmente Module
CN210423955U (en) Support hanger and building using same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant