CN102384337B - Rapid plugging method for fiberglass pipeline with water and pressure - Google Patents

Rapid plugging method for fiberglass pipeline with water and pressure Download PDF

Info

Publication number
CN102384337B
CN102384337B CN 201110164851 CN201110164851A CN102384337B CN 102384337 B CN102384337 B CN 102384337B CN 201110164851 CN201110164851 CN 201110164851 CN 201110164851 A CN201110164851 A CN 201110164851A CN 102384337 B CN102384337 B CN 102384337B
Authority
CN
China
Prior art keywords
mouth
band
fiberglass
damaged
glass fibre
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110164851
Other languages
Chinese (zh)
Other versions
CN102384337A (en
Inventor
苏凌平
李明
杨恒林
韦新东
张晓冬
鲜晓斌
刘怀成
朱占举
缪爱军
段海滨
杨兴刚
顾浩
杨旭民
张晓娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Original Assignee
Yongsheng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yongsheng Construction Group Co Ltd filed Critical Yongsheng Construction Group Co Ltd
Priority to CN 201110164851 priority Critical patent/CN102384337B/en
Publication of CN102384337A publication Critical patent/CN102384337A/en
Application granted granted Critical
Publication of CN102384337B publication Critical patent/CN102384337B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a rapid plugging method for a fiberglass pipeline with water and pressure. The method comprises the following steps of: manufacturing a rubber ring (4) for a damaged mouth (5) on the fiberglass pipeline (1); tightly adhering a semicircular fiberglass water sealing belt to the rubber ring (4) to form a mouth-repairing reinforced plate (6); respectively coating and clamping one tension tighten device (2) out of the fiberglass water sealing belt near two sides to seal an opening of the damaged mouth (5); artificially winding and pasting fiberglass alkali-free roving cloth and unsaturated polyester resin at a mouth-repairing area (7) at the right middle of the repaired mouth reinforced plate (6) of the fiberglass pipeline (1) until a mouth-repairing area is solidified and reaches a bearing capacity; respectively releasing the tension tighten devices (2) at both left and right ends at the damaged mouth (5); and respectively winding and pasting the fiberglass alkali-free roving cloth and the unsaturated polyester resin at the left and right end heads of the ready-made mouth-repairing area (7) in the middle until the new formed mouth-repairing area (7) which integrates the existing cure. On the premise of ensuring the normal operation of the damaged pipeline, the fiberglass pipeline is plugged rapidly and efficiently.

Description

Fiber reinforced plastic pipe band water, band are pressed the instantaneous leaking-stopping method
Technical field
The present invention relates to relate to F16L pipe, pipe joint or pipe fitting, method for maintaining technology, especially be with water, band to press the instantaneous leaking-stopping technology under the situation of fiber reinforced plastic pipe experience abnormal spoilage.
Background technique
In the known technology, heat-resisting, freeze proof, the wear-resisting good pressure-resistant performance of fiber reinforced plastic pipe and having from heavy and light, intensity height, plurality of advantages such as easy transportation and installation, maintenance cost are low, be widely used in engineering construction field, but in use often because the construction of other underground engineering, construction of structures causes the artificial or mechanical damage of buried fiber reinforced plastic pipe.Traditional craft leakage mending method is general adopt the discharging of fiber reinforced plastic pipe inner fluid finish the back anhydrous, do not have the artificial winding of carrying out glass fibre and polyester resin under the situation of pressing, not having other fluid and paste, polyester resin must could solidify under dry environment otherwise can not paste mending-leakage.But anhydrous, nothing presses the shortcoming that manually pastes craft leakage mending method obvious:
1, water stopping time is long, and the more big water stopping time in mouth of pipe footpath is more long, approximately about 1-3 days.
2, pipeline inner fluid discharging difficulty, indivedual places are discharged by environment and spatial constraints nowhere, namely enable discharging and also can cause the tube fluid wasting of resources.
3, this pipe-line system is stopped transport substantially in the discharge process, brings to a great extent loss and inconvenience for production, life.
Correlation technique discloses less, as:
Number of patent application number of patent application 200710300058 quick leak stopping adhesive tape of glassfiber for repairing pipes are a kind of leakage stopping technologies, and it is according to certain proportioning, make by certain technology by some industrial chemicals.Number of patent application 200720125267 discloses a kind of combustion gas pipe racks gas leak stopping holding device, comprises the pipeline fixing clamp, and described pipeline fixing clamp is made of the fixing clamp matrix and the fixing clamp movable block that flexibly connect, on the fixing clamp movable block, is provided with tapped hole; Afterburning clamp lever is provided with outside thread, and the outside thread on the afterburning clamp lever matches with tapped hole, and afterburning clamp lever is connected in the screw of fixing clamp movable block; At afterburning clamp lever afterburning handle is set.
Summary of the invention
The purpose of this invention is to provide a kind of at damaged fiber reinforced plastic pipe band water, band pressure instantaneous leaking-stopping method of construction.
Goal of the invention of the present invention realizes by following technical measures: to damaged mouthful on the Glass Steel Tube, make cushion rubber, adopt semicircle glass fibre reinforced plastics water shutoff band to be close to cushion rubber, form the repaired mouth stiffening plate, a close pulling force euphroe of each cuff of dual-side seal wear mouth hole outside glass fibre reinforced plastics water shutoff band, adopt the carefully and neatly done circle of people to twine in Glass Steel Tube repaired mouth stiffening plate middle and stick with paste repaire belt glass fibre alkali-free woven roving and unsaturated polyester resin, solidify and reach bearing capacity until repaire belt; Two ends, the left and right sides, the repaired mouth place pulling force euphroe of loosening respectively; End, the ready-made repaire belt left and right sides twines respectively and sticks with paste glass fibre alkali-free woven roving and unsaturated polyester resin is cured as one until new formation repaire belt in the centre.
The invention has the beneficial effects as follows: band water, pressure sealing under the situation of fiber reinforced plastic pipe experience abnormal spoilage, especially can overcome difficulties such as being subjected to season, weather, operation place and spatial constraints, guaranteeing that broken pipe normally moves under the prerequisite of use, rapidly and efficiently finish the Glass Steel Tube pipeline leakage stopping.Cost of labor and tube fluid waste of material that traditional blocking method produces have been reduced.
Description of drawings
Fig. 1 is scheme of installation of the present invention
Reference character: Glass Steel Tube 1, pulling force euphroe 2, fastening device 3, cushion rubber 4, damaged mouthful 5, stiffening plate 6, repaire belt 7.
Embodiment
To damaged mouthful 5 on the Glass Steel Tube 1, make cushion rubber 4, adopt semicircle glass fibre reinforced plastics water shutoff band to be close to cushion rubber 4, form repaired mouth stiffening plate 6, close pulling force euphroe of each cuff of dual-side 2 seal wear mouths 5 holes outside glass fibre reinforced plastics water shutoff band, adopt the carefully and neatly done circle of people to twine in Glass Steel Tube 1 repaired mouth stiffening plate 6 middles and stick with paste glass fibre alkali-free woven roving and unsaturated polyester resin, solidify and reach bearing capacity until repaire belt 7; Damaged mouthful of two ends, the left and right sides, the 5 place pulling force euphroe 2 of loosening respectively; End, ready-made repaire belt 7 left and right sides twines respectively and sticks with paste glass fibre alkali-free woven roving and unsaturated polyester resin is cured as one until new formation repaire belt 7 in the centre.
Specifically, to damaged mouthful 5 on the Glass Steel Tube 1, be made into 3-4 road disjunctor cushion rubber 4 with ethylene-propylene diene copolymer, adopt the semicircle glass fibre reinforced plastics water shutoff band of wall thickness 10-25mm to be close to cushion rubber 4, form repaired mouth stiffening plate 6, the outer cuff 2 road pulling force euphroes of glass fibre reinforced plastics water shutoff band are positioned at damaged mouthful 5 both sides, adopt fastening pulling force euphroe 2 seal wear mouths 5 holes, there is not the fluid leaks phenomenon until damaged mouthful 5 places, adopt whole circle to twine in stiffening plate 6 middles and stick with paste 04 type glass fibre alkali-free woven roving and unsaturated polyester resin repaire belt 7, solidify and reach the bearing capacity of 2.5mPa until repaire belt 7, damaged mouthful of (5) left and right sides pulling force euphroe 2 of loosening respectively, twine respectively and stick with paste 04 type glass fibre alkali-free woven roving and unsaturated polyester resin solidifies until new system repaire belt 7 making repaire belt 7 left and right side places, reach best repaired mouth mending-leakage effect.
Be applicable to Glass Steel Tube 1 internal diameter at DN150~DN2000, pressure is at 0.25Mpa~2.0Mpa, rigidity: 2500N/m 2~10000N/m 2On-the-spot mending-leakage in the scope.
All damaged mouths 5 are realized safe, fast, efficient mending-leakage at Φ 500 with interior equal energy; Special circumstances or size can be taked same process processing and fabricating repaired mouth stiffening plate separately, also can satisfy the mending-leakage requirement.
Repaire belt 7 should be according to the big or small on-site cutting at the damaged hole of fiber reinforced plastic pipe among the present invention, and the repaired mouth reinforcing strip size of cutting should be 2-3 times of damaged mouthful 5 areas.
The whole circle of repaire belt 7 outer walls twines paste thickness and is preferably 10-20mm.
The novel mending-leakage product that the present invention is not influenced by weather, temperature, environment and working space under band water, state with pressure has thoroughly solved the construction difficult problem of fiber reinforced plastic pipe in wind, rainy season or the mending-leakage of low temperature season band water band pressure.The mending-leakage of carrying out through facts have proved this product artificial or mechanical failure can be safe, fast, efficient to fiber reinforced plastic pipe.
The present invention is mainly used in all kinds of Glass Steel Tube pipeline leakage stoppings and the pipeline rehabilitation, also be widely used in high temperature resistant, corrosion-resistant fiber reinforced plastic pipe, and petrochemical industry, light industry, electric power, industry, agricultural, water conservancy, chemical industry, the oil field, the mine, transport service, building industry, safeguard on the ground of service trade even machine-operated school and resident family and underground piping system or heating power insulation pipe top layer, all kinds of conveying gas (air, coal gas, chemical odor etc.) and liquid (water oil, chemical liquids etc.) crack appears in pipeline, leak or void, polyethylene, rubber, concrete, plastics, glass, fiber and timber matter made with pipeline all size etc.Can press, be with under the water state at band, pipeline is carried out leak stopping, can effectively leakage point be stopped up; Can avoid stopping work that expending time in of leak stopping mode is long, waste resource, contaminated air, to not stopping the supple of gas or steam deficiencies such as having caused tremendous loss and potential safety hazard; Simple in structure, easy to use, have tangible economic benefit and social benefit.

Claims (4)

1. fiber reinforced plastic pipe band water, band are pressed the instantaneous leaking-stopping method, it is characterized in that: to damaged mouthful (5) on the Glass Steel Tube (1), make cushion rubber (4), adopt semicircle glass fibre reinforced plastics water shutoff band to be close to cushion rubber (4), form repaired mouth stiffening plate (6), a close dual-side pulling force euphroe of each cuff (2) seal wear mouth (5) hole outside glass fibre reinforced plastics water shutoff band, adopt the carefully and neatly done circle of people to twine in Glass Steel Tube (1) repaired mouth stiffening plate (6) middle and stick with paste repaire belt (7) glass fibre alkali-free woven roving and unsaturated polyester resin, solidify and reach bearing capacity until repaire belt (7); The damaged mouth (5) of loosening is respectively located two ends, left and right sides pulling force euphroes (2); Ready-made repaire belt (7) end, the left and right sides twines respectively and sticks with paste glass fibre alkali-free woven roving and unsaturated polyester resin is cured as one until new formation repaire belt (7) in the centre.
2. fiber reinforced plastic pipe band water as claimed in claim 1, band is pressed the instantaneous leaking-stopping method, it is characterized in that, to damaged mouthful (5) on the Glass Steel Tube (1), be made into 3-4 road disjunctor cushion rubber (4) with ethylene-propylene diene copolymer, adopt the semicircle glass fibre reinforced plastics water shutoff band of wall thickness 10-25mm to be close to cushion rubber (4), form repaired mouth stiffening plate (6), the outer cuff 2 road pulling force euphroes of glass fibre reinforced plastics water shutoff band are positioned at damaged mouthful (5) both sides, adopt fastening pulling force euphroe (2) seal wear mouth (5) hole, locate not have the fluid leaks phenomenon until damaged mouthful (5), adopt whole circle to twine in stiffening plate (6) middle and stick with paste 04 type glass fibre alkali-free woven roving and unsaturated polyester resin repaire belt (7), solidify and reach the bearing capacity of 2.5mPa until repaire belt (7), loosen about damaged mouthful (5) two respectively Side draw euphroe (2) twines respectively and sticks with paste 04 type glass fibre alkali-free woven roving and unsaturated polyester resin solidifies until new system repaire belt (7) making repaire belt (7) left and right side place.
3. fiber reinforced plastic pipe band water as claimed in claim 1, band are pressed the instantaneous leaking-stopping method, it is characterized in that be applicable to Glass Steel Tube (1) internal diameter at DN150~DN2000, pressure is at 0.25Mpa~2.0Mpa, rigidity: 2500N/m 2~10000N/m 2On-the-spot mending-leakage in the scope.
4. fiber reinforced plastic pipe band water as claimed in claim 1, band are pressed the instantaneous leaking-stopping method, it is characterized in that, the whole circle of repaire belt (7) outer wall twines paste thickness and is preferably 10-20mm.
CN 201110164851 2011-06-20 2011-06-20 Rapid plugging method for fiberglass pipeline with water and pressure Active CN102384337B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110164851 CN102384337B (en) 2011-06-20 2011-06-20 Rapid plugging method for fiberglass pipeline with water and pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110164851 CN102384337B (en) 2011-06-20 2011-06-20 Rapid plugging method for fiberglass pipeline with water and pressure

Publications (2)

Publication Number Publication Date
CN102384337A CN102384337A (en) 2012-03-21
CN102384337B true CN102384337B (en) 2013-07-10

Family

ID=45824019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110164851 Active CN102384337B (en) 2011-06-20 2011-06-20 Rapid plugging method for fiberglass pipeline with water and pressure

Country Status (1)

Country Link
CN (1) CN102384337B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206009B (en) * 2013-04-15 2014-12-24 济南城建集团有限公司 Construction method for preventing temperature deformation and leakage in glass fiber reinforced mortar sewage pipelines
CN104373744B (en) * 2014-10-30 2017-02-01 北京市燃气集团有限责任公司 Ball-locking type emergency repair leakage stoppage plate and method for repairing pipeline in emergency through ball-locking type emergency repair leakage stoppage plate
CN104295855B (en) * 2014-11-05 2016-06-08 唐山迪华石油钻采设备有限公司 Petrochemical industry pipe special leak stopping emergency control method
CN104613272A (en) * 2014-12-16 2015-05-13 陈云伟 Rapid leak repairing method for fire hose
CN104548446A (en) * 2014-12-16 2015-04-29 陈云伟 Rapid leak repair device for fire hose
CN104548445A (en) * 2014-12-16 2015-04-29 陈云伟 Simple rapid leak repair device for fire hose
CN105965204B (en) * 2016-05-31 2017-11-03 上海祥贸实业有限公司 Expansion joint special type restorative procedure
CN106523847A (en) * 2016-10-31 2017-03-22 彩虹(合肥)液晶玻璃有限公司 Low-pressure pipeline pressurized leakage removing method
CN109958836A (en) * 2017-12-25 2019-07-02 上海梅山钢铁股份有限公司 Suitable for not discharging the processing method of liquid pipe leakage
CN108758158A (en) * 2018-04-27 2018-11-06 安徽安纳达钛业股份有限公司 Not parking blocking method for high-temperature acidic etchant gas pipeline and its application
BR102018069448A2 (en) * 2018-09-24 2020-04-07 Endserv Inspecao De Equipamentos E Materiais Ltda Me repair of pipes and the processes of fixation in operation and definitive welding of the same
CN110107773A (en) * 2019-03-27 2019-08-09 北京京燕水务有限公司 Ductile iron pipeline ruptures emergency action method
CN110107771A (en) * 2019-04-16 2019-08-09 贵州开磷有限责任公司 A kind of device for plugging and blocking method of fluid-transporting tubing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2157389A (en) * 1984-01-09 1985-10-23 John Arthur Alcock Sealing punctured or split pipes
CN2695762Y (en) * 2004-04-24 2005-04-27 葛文宇 Binding type pipeline leaking stopage repairing piece
DE102004061743A1 (en) * 2004-12-22 2006-07-06 Fibre Optics Ct Gmbh Holes and cracks sealing method and material for uncut cables and pipes, has sealing material selected from self adhesive, chemical and temperature resistance sealing band, central roll spring and other roll spring
CN101514776A (en) * 2008-02-19 2009-08-26 北京安科管道工程科技有限公司 Method for permanent pressure leak stopping

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2157389A (en) * 1984-01-09 1985-10-23 John Arthur Alcock Sealing punctured or split pipes
CN2695762Y (en) * 2004-04-24 2005-04-27 葛文宇 Binding type pipeline leaking stopage repairing piece
DE102004061743A1 (en) * 2004-12-22 2006-07-06 Fibre Optics Ct Gmbh Holes and cracks sealing method and material for uncut cables and pipes, has sealing material selected from self adhesive, chemical and temperature resistance sealing band, central roll spring and other roll spring
CN101514776A (en) * 2008-02-19 2009-08-26 北京安科管道工程科技有限公司 Method for permanent pressure leak stopping

Also Published As

Publication number Publication date
CN102384337A (en) 2012-03-21

Similar Documents

Publication Publication Date Title
CN102384337B (en) Rapid plugging method for fiberglass pipeline with water and pressure
CN101205999B (en) Renovation reinforcement, reinforced and/or crack arrest technique for pipe
CN101206000B (en) Method for renovation and reinforcement of pipe using basalt fibre complex material
CN202660148U (en) Pipeline repaired and reinforced by fiber composite cloth
CN102691851A (en) Method for reinforcing pipeline by adopting fibrous composite fabric
CN101885898B (en) Composite material for repairing defective pipeline
CN204717225U (en) A kind of fiber reinforced plastic pipe is damaged and is leaked maintenance unit
CN208442454U (en) A kind of clip of pressure pipeline corrosion outer wall enhancing technique
CN102252147A (en) Method for repairing crack of pipeline
RU177511U1 (en) SECTION PROTECTIVE CASE
CN105811280B (en) A kind of GIS device gas leaks powered pressurized leaking stoppage method
CN205560115U (en) Use up cured fiber reinforced composite and carry out pipeline that reinforcement was restoreed to non - excavation
CN203023730U (en) Pipeline rapid-plugging device
RU2374551C2 (en) Method for repair of pipeline defects
CN102788223A (en) Quick repairing device for glass fiber reinforced plastic pipeline
CN102297315A (en) Under-pressure fluid-guiding sealing device for emergency repair of pipe
CN203628139U (en) High-pressure fiberglass pipeline installing and damage maintenance device
CN205155451U (en) Pipeline leaks drainage device
CN205560021U (en) Rigidity composite pipe structure
KR101267482B1 (en) The Inserting Method of Wet-tube
Sever et al. Designing an economical FRP system for pipeline rehabilitation
CN104019324A (en) Quick repairing device for underwater double-layer oil pipeline
CN204312934U (en) A kind of Pipe leakage stopper
US20220178486A1 (en) Methods and systems for sealing a premise-side pipe
CN107053702A (en) Steel member reinforcement process based on vacuum suction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIZHOU CONSTRUCTION ENGINEERING GROUP FIRST CONST

Free format text: FORMER OWNER: YONGSHENG CONSTRUCTION GROUP CO., LTD.

Effective date: 20131107

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 830013 KARAMAY, XINJIANG UYGUR AUTONOMOUS REGION TO: 550003 GUIYANG, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20131107

Address after: 550003 Guizhou province Guiyang Shifeng Road No. 68

Patentee after: NO.1 CONSTRUCTION ENGINEERING CO., LTD. OF GUIZHOU CONSTRUCTION AND ENGINEERING GROUP

Address before: 830013 No. 42, ah Shan Road, the Xinjiang Uygur Autonomous Region, Karamay

Patentee before: Yongsheng Construction Group Co., Ltd.

C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Su Lingping

Inventor after: Duan Haibin

Inventor after: Yang Xinggang

Inventor after: Gu Hao

Inventor after: Yang Xumin

Inventor after: Zhang Xiaona

Inventor after: Zhang Yiyong

Inventor after: Fu Yasong

Inventor after: Fu Dingxin

Inventor after: Mao Huaxiang

Inventor after: Li Ming

Inventor after: Yang Henglin

Inventor after: Wei Xindong

Inventor after: Zhang Xiaodong

Inventor after: Xian Xiaobin

Inventor after: Liu Huaicheng

Inventor after: Zhu Zhanju

Inventor after: Jiu Aijun

Inventor before: Su Lingping

Inventor before: Duan Haibin

Inventor before: Yang Xinggang

Inventor before: Gu Hao

Inventor before: Yang Xumin

Inventor before: Zhang Xiaona

Inventor before: Li Ming

Inventor before: Yang Henglin

Inventor before: Wei Xindong

Inventor before: Zhang Xiaodong

Inventor before: Xian Xiaobin

Inventor before: Liu Huaicheng

Inventor before: Zhu Zhanju

Inventor before: Jiu Aijun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SU LINGPING LI MING YANG HENGLIN WEI XINDONG ZHANG XIAODONG XIAN XIAOBIN LIU HUAICHENG ZHU ZHANJU MIAO AIJUN DUAN HAIBIN YANG XINGGANG GU HAO YANG XUMIN ZHANG XIAONA TO: SU LINGPING LI MING YANG HENGLIN WEI XINDONG ZHANG XIAODONG XIAN XIAOBIN LIU HUAICHENG ZHU ZHANJU MIAO AIJUN DUAN HAIBIN YANG XINGGANG GU HAO YANG XUMIN ZHANG XIAONA ZHANG YIYONG FU YASONG FU DINGXIN MAO HUAXIANG