CN102383808A - 高瓦斯矿工作面优化巷道布置结构 - Google Patents

高瓦斯矿工作面优化巷道布置结构 Download PDF

Info

Publication number
CN102383808A
CN102383808A CN2011103256181A CN201110325618A CN102383808A CN 102383808 A CN102383808 A CN 102383808A CN 2011103256181 A CN2011103256181 A CN 2011103256181A CN 201110325618 A CN201110325618 A CN 201110325618A CN 102383808 A CN102383808 A CN 102383808A
Authority
CN
China
Prior art keywords
work surface
laneway
coal
lanes
lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103256181A
Other languages
English (en)
Other versions
CN102383808B (zh
Inventor
成小勇
徐玉胜
薛军正
秦天太
马晋元
路晓荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201110325618.1A priority Critical patent/CN102383808B/zh
Publication of CN102383808A publication Critical patent/CN102383808A/zh
Application granted granted Critical
Publication of CN102383808B publication Critical patent/CN102383808B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及一种煤矿开采工作面巷道布置,具体为一种高瓦斯矿工作面优化巷道布置结构。高瓦斯煤矿开采中,煤炭资源有效回收利用的问题,所述的工作面结构包括矩形的工作面和梯形的工作面,在工作面一侧布置有三条巷道,另一侧布置有两条巷道,梯形的工作面的斜边为煤矿边界,在五巷和煤矿边界的交叉处横向施工有切眼,同时沿着煤矿边界施工有斜横川,然后连接斜横川横向施工有新调车巷,然后垂直新调车巷纵向施工有延伸一巷、延伸五巷,延伸一巷和煤矿边界的交叉点处横向施工切眼,并与三巷贯通。与已有的技术方案相比较,在保证高瓦斯矿井通风安全的前提下最大限度的提高了回采煤量,减少了煤柱的留设量,增加了经济效益。

Description

高瓦斯矿工作面优化巷道布置结构
技术领域
本发明涉及一种煤矿开采工作面巷道布置,具体为一种高瓦斯矿工作面优化巷道布置结构。
背景技术
我集团寺河矿为高瓦斯(矿井相对瓦斯涌出量大于10立方米/吨或矿井绝对瓦斯涌出量大于40立方米/分)矿井,工作面巷道设计以通风科提供的盘区最大、最小风量为依据,每条巷道(断面一般在19M3)风速允许在(0.25-4m/s)间,每条巷道风量上限为4560 M3/min,寺河矿目前开采工作面风量均大于8000 M3/min,所以工作面巷道采用多巷布置形式,目前均采用三进两回五巷布置形式,工作面尾部布置切眼和调车巷,采用多巷道布置的方式解决了瓦斯的稀释和工作面安撤问题,尤其是在形状不规则的煤田中进行开采施工。如图1所示意,这种高瓦斯工作面为三进两回五巷道布置,因为存在煤矿边界4,所以使煤田成为一个不规则状,包括矩形的工作面3和梯形的工作面5,梯形的工作面5的底边宽度为226米,高(长)度为307米。所以合理的选择巷道布置方式和切眼位置决定着工作面回采量的多少。
发明内容
本发明解决高瓦斯煤矿开采中,煤炭资源有效回收利用的问题,提供了一种高瓦斯矿工作面优化巷道布置结构。
本发明是由以下技术方案实现的,一种高瓦斯矿工作面优化巷道布置结构,所述的工作面结构包括矩形的工作面和梯形的工作面,在工作面一侧布置有二巷、三巷、四巷共三条巷道,另一侧布置有一巷、五巷共两条巷道,梯形的工作面的斜边为煤矿边界,在五巷和煤矿边界的交叉处横向施工有切眼,同时沿着煤矿边界施工有斜横川,然后连接斜横川横向施工有新调车巷,然后垂直新调车巷纵向施工有延伸一巷、延伸五巷,延伸一巷和煤矿边界的交叉点处横向施工切眼,并与三巷贯通。
与已有的技术方案相比较,本发明所述的方案直接将原调车巷的位置作为切眼使用,并充分利用矿界边界保护煤柱,对原设计的切眼与调车巷之间的直横川调整为斜横川,在保证高瓦斯矿井通风安全的前提下最大限度的提高了回采煤量,减少了煤柱的留设量,增加了经济效益。
附图说明
图1为工作面的形状及巷道布置示意图
图2为按照常规方法施工巷道布置结构示意图
图3为本发明所述布置结构示意图
图中:1一巷、2五巷、1a延伸一巷、2a延伸五巷、3矩形的工作面、4煤矿边界、5梯形的工作面、6三巷、7二巷、8四巷、9切眼、9a切眼、10切眼、10a切眼、11斜横川、12新调车巷。
具体实施方式
按照高瓦斯矿正常的开采布置方法,经过函数计算可以得到如图2所示意的布置方式,使开采的工作面面积达到最大,从工作面5的底边的靠近煤矿边界4之处开始横向施工切眼9a和调车巷(即新方案的切眼10a),然后再纵向施工延伸一巷1a、延伸五巷2a达到煤矿边界4,所述的延伸五巷2a长度为247米使可开采面积达到最大值,巷道2a和煤矿边界4的交叉点为最佳值点,同时从二巷7、三巷6侧开始施工切眼9和调车巷(即新方案的切眼10)。最终形成具有切眼和调车巷双向布置结构,以满足切眼到位后的通风需要,然后从切眼9、9a的位置开始回采。
上述方案虽然也提高了开采量,但是这种布置方式使切眼和调车巷之间的区域就被永久留在井下,由于煤炭资源具有不可再生性和稀缺性,所以要求在保证安全的前提下,尽可能的多采煤,以提高经济效益。
如图3所示意,高瓦斯矿工作面优化巷道结构,所述的工作面结构包括矩形的工作面3和梯形的工作面5,在工作面3一侧布置有二巷7、三巷6、四巷8共三条巷道,另一侧布置有一巷1、五巷2共两条巷道,梯形的工作面5的斜边为煤矿边界4,在五巷2和煤矿边界4的交叉处横向施工切眼10a,同时沿着煤矿边界施工有斜横川11,然后连接斜横川11横向施工有新调车巷12,然后垂直新调车巷12纵向施工有延伸一巷1a、延伸五巷2a,延伸一巷1a和煤矿边界4的交叉点处横向施工有切眼10,并与三巷6贯通。
这样与现有常规思路的布置结构相比,本发明所述的结构省略了掘进切眼9,直接将原设计的调车巷的位置作为切眼10的使用,并又掘进了新的调车巷12和斜横川11形成双巷布置保证安全;在另一侧省略了掘进切眼9a,直接在原来调车巷的位置作为切眼10a使用,然后从切眼10及10a处开始回采。显然本发明所述的方案可以将原设计的切眼和调车巷之间的区域(图中虚线区域)开采出来,而且还能够保证高瓦斯矿的安全性,在工作面回采实践过程中,依旧在原风速范围及巷道风量上限的标准之内,很少因为瓦斯超限事故影响工作面的正常推进。此举使工作面提高了资源回收率,经济效益显著,在本采区多开采出的煤炭约五万吨,为企业创造三千万元价值。

Claims (1)

1.一种高瓦斯矿工作面优化巷道结构,其特征在于:所述的工作面结构包括矩形的工作面(3)和梯形的工作面(5),在矩形的工作面(3)一侧布置有二巷(7)、三巷(6)、四巷(8)共三条巷道,另一侧布置有一巷(1)、五巷(2)共两条巷道,梯形的工作面(5)的斜边为煤矿边界(4);在五巷(2)和煤矿边界(4)的交叉处横向施工切眼(10a),同时沿着煤矿边界施工有斜横川(11),然后连接斜横川(11)横向施工有新调车巷(12),然后垂直新调车巷(12)纵向施工有延伸一巷(1a)、延伸五巷(2a),延伸一巷(1a)和煤矿边界(4)的交叉点处横向施工有切眼(10),并与三巷(6)贯通。
CN201110325618.1A 2011-10-24 2011-10-24 高瓦斯矿工作面优化巷道布置结构 Active CN102383808B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110325618.1A CN102383808B (zh) 2011-10-24 2011-10-24 高瓦斯矿工作面优化巷道布置结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110325618.1A CN102383808B (zh) 2011-10-24 2011-10-24 高瓦斯矿工作面优化巷道布置结构

Publications (2)

Publication Number Publication Date
CN102383808A true CN102383808A (zh) 2012-03-21
CN102383808B CN102383808B (zh) 2014-01-15

Family

ID=45823594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110325618.1A Active CN102383808B (zh) 2011-10-24 2011-10-24 高瓦斯矿工作面优化巷道布置结构

Country Status (1)

Country Link
CN (1) CN102383808B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603673A (zh) * 2013-11-22 2014-02-26 山西晋城无烟煤矿业集团有限责任公司 回采工作面并列双u型巷道
CN109209394A (zh) * 2018-09-19 2019-01-15 淮北矿业股份有限公司 一种巷道施工方法
CN109441451A (zh) * 2018-10-29 2019-03-08 山西晋城无烟煤矿业集团有限责任公司 一种台阶开采工作面巷道布置方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1482344A (zh) * 2002-09-09 2004-03-17 神华集团有限责任公司 综采工作面辅巷多通道快速搬家方法
CN101649741A (zh) * 2009-05-27 2010-02-17 山西晋城无烟煤矿业集团有限责任公司 大U套小u方式布置的巷道
CN101915099A (zh) * 2010-07-31 2010-12-15 太原理工大学 厚煤层沿稳定层布巷的双向凹字型采煤方法
CN102094669A (zh) * 2010-12-24 2011-06-15 中国矿业大学 三位立体分源卸压瓦斯治理方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1482344A (zh) * 2002-09-09 2004-03-17 神华集团有限责任公司 综采工作面辅巷多通道快速搬家方法
CN101649741A (zh) * 2009-05-27 2010-02-17 山西晋城无烟煤矿业集团有限责任公司 大U套小u方式布置的巷道
CN101915099A (zh) * 2010-07-31 2010-12-15 太原理工大学 厚煤层沿稳定层布巷的双向凹字型采煤方法
CN102094669A (zh) * 2010-12-24 2011-06-15 中国矿业大学 三位立体分源卸压瓦斯治理方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李永刚: "跨采区工作面的优化布置与生产实践", 《河北煤炭》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603673A (zh) * 2013-11-22 2014-02-26 山西晋城无烟煤矿业集团有限责任公司 回采工作面并列双u型巷道
CN103603673B (zh) * 2013-11-22 2015-11-04 山西晋城无烟煤矿业集团有限责任公司 回采工作面并列双u型巷道
CN109209394A (zh) * 2018-09-19 2019-01-15 淮北矿业股份有限公司 一种巷道施工方法
CN109441451A (zh) * 2018-10-29 2019-03-08 山西晋城无烟煤矿业集团有限责任公司 一种台阶开采工作面巷道布置方法

Also Published As

Publication number Publication date
CN102383808B (zh) 2014-01-15

Similar Documents

Publication Publication Date Title
CN105240013B (zh) 长壁开采n00工法
CN103147761B (zh) 一种缓倾斜松软顶板薄矿床充填采矿方法
CN107339104B (zh) 保安隔离矿柱回收方法
CN108561135B (zh) 一种适合缓倾斜围岩不稳定中厚矿体的机械化回采方法
CN103628877B (zh) 一种多层缓倾斜薄-中厚矿床充填采矿方法
CN107829742B (zh) 一种崩落-充填-空场-崩落采矿方法
CN103628878B (zh) 破碎围岩矿体下向进路分层无分段巷道充填采矿方法
CN104533416B (zh) 极厚大矿体大规模机械化无底柱分段崩落采矿方法
CN103089266B (zh) 露天转地下过渡期无底柱分段空场崩落采矿方法
CN104314570B (zh) 长厚矿体挂帮矿回收及露天转地下过渡期的开采方法
CN103016047B (zh) 综放工作面顶板走向长钻孔抽放采空区瓦斯方法
CN104481543B (zh) 阶段留矿崩落采矿法
CN102392642A (zh) 一种无煤柱回采工作面的巷道布置方法
CN102953732A (zh) 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法
CN102953733A (zh) 中央脉外房柱式联合横巷两端脉内连续分段充填采矿法
CN106499396B (zh) 一种中厚缓倾斜含废石夹层矿体房柱采矿法
CN105804788A (zh) 一种煤层瓦斯巷道治理方法
CN102587960A (zh) 一种高瓦斯煤层回采工作面巷道的布置方法
CN108397227A (zh) 一种倾向递进消突巷道布置方法
CN104806285A (zh) 基于地面水平井的煤矿采空区瓦斯治理方法
CN106194188A (zh) 电耙‑爆力协同搬运伪倾斜房柱采矿法
CN109707381A (zh) 一种上向高分层超前卸荷嗣后充填空场的采矿法
CN110359914A (zh) 一种缓倾斜中厚矿体安全、低成本组合分段采矿方法
CN106640080A (zh) 一种深部高应力环境下自稳窿形采场布置采矿方法
CN108505999A (zh) 一种高突煤层工作面多巷布置方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant