Embodiment
The embodiment of the invention first base station receives the first signal of base station information of the terminal to report of the non-CSG that is in Idle state, carries out the power self-optimizing according to the first signal of base station information of receiving.Because first base station can carry out parameter adjustment according to the report of non-cell terminal, thereby reduced to have improved the channel quality at these terminals near first base station but be not the interference that the terminal of the sub-district of first BTS management produces.
Wherein, first base station of the embodiment of the invention is to have the base station that only allows contracting terminal or authorization terminal access style, such as the Home eNodeB that is in closed mode;
Second base station of the embodiment of the invention is the base station that has all open-destination types, such as the Home eNodeB of macro base station, mixed mode or the Home eNodeB of open mode.
The signal message of the embodiment of the invention can be signal quality and signal strength information, can also be signal quality, can also be signal strength information.
Signal message includes but not limited to one or more in the following message:
RSRP (Reference signal received power; Reference Signal Received Power) value, RSRQ (Reference Signal Received Quality; Reference Signal Received Quality) value, PCI (Physical cell ID, sub-district physical label), CSG ID (closing group id) with the contracted user.
Below in conjunction with Figure of description the embodiment of the invention is described in further detail.
As shown in Figure 1, the system of embodiment of the invention power self-optimizing comprises: the terminal 10 and first base station 20.
Terminal 10 is used for confirming the signal message of first base station 20, and reports the signal message of first base station 20, and wherein terminal 10 is the terminals that are in the non-CSG of Idle state.
First base station 20 is used to receive the first signal of base station information of self terminal 10, carries out the power self-optimizing according to the first signal of base station information of receiving.
The terminal 10 that is in the non-CSG of Idle state is detecting first signal of base station, and can select to select behind this first base station 20, and and first base station 20 between set up RRC (Radio Resource Control, Radio Resource control) and connect.Concrete selection comprises the selection after the gravity treatment that is in connection status and the start.
A kind of preferable mode is self need carry out the power self-optimizing by 20 notice terminals 10, first base station, needs terminal 10 to report signal message.
Concrete, first base station 20 can be through broadcast notice terminal 10 after confirming to carry out the power self-optimizing.
Such as, it is 1 that field Cognitive Interference in SIB (System Information Broadcast, system information broadcast) 1 message (disturbing cognitive) is set, and shows that first base station 20 need carry out the power self-optimizing; Accordingly, terminal 10 checks that Cognitive Interference is 1 after the signal quality of first base station 20 satisfies the selection requirement, and the power self-optimizing need be carried out in then definite first base station 20, selects this first base station 20 then.
It is the strongest that the signal quality of first base station 20 satisfy to select requirement can be that the signal quality of this first base station 20 satisfies the limit priority signal, perhaps satisfies S criterion (S criterion can referring to the TS36.304 agreement).
Need to prove that the selection of the signal quality of the embodiment of the invention requires to be not limited to above-mentioned two kinds, other can let terminal 10 select the selection of the signal quality of first base station 20 to require all is to use the embodiment of the invention.
First base station 20 confirms that the mode that need carry out the power self-optimizing has a lot; (the Operations and Maintenance from OAM can received such as first base station 20; Operation and safeguard) after the indication of equipment or second base station need carry out the information of power self-optimizing, confirm to carry out the power self-optimizing.
If terminal 10 is the gravity treatments that are in connection status; Then the signal message of the first signal of base station information and macrocell can be measured and note in terminal 10 in reuse adoption process; Initiate then to be connected the process of foundation with the RRC of this first base station 20; And inform that first base station, 20 access cause informations (wherein insert cause information and represent that terminal 10 is non-CSG terminals of inserting for the power self-optimizing; Or there is the signal message that need report at expression terminal 10); Terminal 10 can directly report the signal message of the first signal of base station information and macrocell first base station 20 subsequently, also can be after confirming to receive from the indication information of first base station signal message of the first signal of base station information and macrocell be reported first base station 20, and wherein this indication information is used for the signal message of indicating terminal 10 reporting measurements; Accordingly; (if know terminal 10 as non-CSG terminals of inserting for the power self-optimizing after receiving the access cause information in first base station 20; Show that then there is the signal message that need report at this terminal); Can wait for the signal message of the first signal of base station information that receives and macrocell, after the access cause information of can also basis receiving confirms that there is the measurement result that needs report at the terminal, the signal message of indicating terminal 10 reporting measurements.
Such as, terminal 10 can connect at RRC and set up in the request message after confirming to select this first base station 20, and reason for claim is set to " Interference Optimisation (interference optimization) "; Can also in RRC Connection Setup Complete (the RRC connection is set up successfully) message, carry a bit IE (Information Element; Information unit): the measurement result type measure type (measurement type)=0 of idle measure available (having measurement result)=1 and 1 bit; Wherein idle measure available is that 1 expression terminal 10 has the signal message that need report, and measure type is that the signal message that 0 expression terminal 10 reports is the RSRP value; First base station 20 can be through the signal message of RRC message indicating terminal 10 reporting measurements after there is the signal message that need report at definite terminal 10; Terminal 10 can utilize the signal message that the RRC information reporting is measured then.
If the selection after the start; Then the first signal of base station information can measured and note in terminal 10 in reuse adoption process; Initiate then to be connected the process of foundation with the RRC of this first base station 20; And inform that first base station 20 inserts cause informations; Terminal 10 can directly report first base station 20 with the first signal of base station information subsequently, also can after confirming to receive from the indication information of first base station, give first base station 20 with the first signal of base station information reporting, and wherein this indication information is used for the signal message of indicating terminal 10 reporting measurements; Accordingly, first base station 20 receive insert cause information after, can wait for the first signal of base station information of reception, after the access cause information of can also basis receiving confirms that there is the measurement result that needs report at the terminal, the signal message of indicating terminal 10 reporting measurements.
Only carry out the power self-optimizing according to the first signal of base station information, this power self-optimizing is compared background technology and can be reduced near first base station but be not the interference that the terminal of this sub-district produces.Disturb in order further to reduce, the power self-optimizing need be carried out according to the signal message of the first signal of base station information and macrocell in first base station 20.
If the signal message of the first signal of base station information and macrocell is received in first base station 20, then can carry out the power self-optimizing according to the signal message of the first signal of base station information and macrocell.
If the first signal of base station information is received in 20 of first base stations, also need terminal 10 to report the signal message of macrocell.
Concrete; First base station 20 is after only receiving the first signal of base station information; Can measure the parameter of second base station for terminal configuration, be the parameter of 10 allocating and measurings, second base station, terminal such as first base station 20 through RRC Connection Reconfiguration (RRC sets up and reshuffles) message; Accordingly; Terminal 10 is according to the parameter of receiving from measurement second base station of first base station 20; Measure and write down the second signal of base station information; And report the second signal of base station information to first base station 20, such as utilizing common Measurement Report (measurement report) the information reporting second signal of base station information.
Because terminal 10 is just to initiate to be connected the process of foundation with the RRC of first base station 20 for the 20 power self-optimizings of first base station,, first base station 20 is connected with the RRC at terminal 10 so after receiving the signal message that terminal 10 reports, needing to break off.
Concrete, first base station, 20 indicating terminals 10 carry out district reselecting; Accordingly, district reselecting is carried out in terminal 10 after receiving that indicating terminal from first base station carries out the information of district reselecting.
Such as; First base station 20 can be sent the releases of RRC Connection Release (RRC connects release) message to terminal 10 and is connected with the RRC at terminal 10, a flag bit is set in RRC Connection Release message is used for indicating terminal 10 and carries out district reselecting; Terminal 10 just knows that according to the flag bit in the RRC Connection Release message needs carry out district reselecting.
In order to let terminal 10 carry out district reselecting better, cell reselection priority can be sent to terminal 10 in first base station 20, such as cell reselection priority being placed RRC Connection Release message; Accordingly, district reselecting is carried out according to the cell reselection priority of receiving in terminal 10.
Cell reselection priority can be confirmed according to factors such as interference message that reports and covering relations in first base station 20; Such as; Mutual interference is all very big mutually with second base station in the first current base station 20; Terminal 10 can't be resident, can consider so, is directed to terminal 10 with going in the 3G sub-district that covers resident.
Because first base station 20 also might be selected in terminal 10 when gravity treatment, thereby causes the wasting of resources.For need not repeated, terminal 10 selects to insert first base station 20; First base station 20 can be to terminal 10 transmitting time parameters; Indicating terminal 10 is not gravity treatment first base station 20 in the duration of time parameter regulation, such as cell reselection priority being placed RRC Connection Release message; Accordingly, terminal 10 after receiving message, not gravity treatment first base station 20 in the duration of time parameter regulation.
The duration of time parameter regulation can be set as required.Concrete time parameter can be represented the concrete time, such as current time~14:00; Can also represent a period of time, such as two hours.
If expression a period of time, then terminal 10 can pick up counting when carrying out district reselecting, also can begin meter during parameter in the time of receipt (T of R).
In practical implementation, cell reselection priority or transmitting time parameter only can be sent to 10 at terminal in first base station 20; Cell reselection priority and time parameter can also be sent to terminal 10 in first base station 20.
Need to prove that the concrete RRC message of all that relate in the above-mentioned example just illustrates, is not to have only through these concrete RRC message to send relevant information, and other message that can carry information all are applicable to the embodiment of the invention.
As shown in Figure 2, first base station of the embodiment of the invention comprises: receiver module 200 and optimal module 210.
Receiver module 200 is used to receive the first signal of base station information of the terminal to report of the non-CSG that is in Idle state.
Optimal module is used for carrying out the power self-optimizing according to the first signal of base station information that receiver module 200 is received.
Wherein, first base station of the embodiment of the invention can further include: processing module 220.
Processing module 220 is used for after confirming to carry out the power self-optimizing, through broadcast notice terminal.
Processing module 220 can receive need carry out the information of power self-optimizing from the indication of the OAM equipment or second base station after, confirm to carry out the power self-optimizing.
Processing module 220 can also be after there be the measurement result that need report at definite terminal, the signal message that indicating terminal to report is measured.
The second signal of base station information that receiver module 200 can also receiving terminal reports; Accordingly, optimal module 210 is carried out the power self-optimizing according to the first signal of base station information and the second signal of base station information.
Wherein, first base station of the embodiment of the invention can further include: configuration module 230.
Configuration module 230 is used to the parameter that terminal configuration is measured second base station.
Wherein, first base station of the embodiment of the invention can further include: gravity treatment module 240.
Gravity treatment module 240 is used for indicating terminal and carries out district reselecting.
Gravity treatment module 240 can also be to terminal transmitting time parameter, and indicating terminal is not gravity treatment first base station in the duration of time parameter regulation; And/or to terminal transmission cell reselection priority, indicating terminal carries out district reselecting according to cell reselection priority.
As shown in Figure 3, the terminal of the embodiment of the invention can further include: determination module 100 and sending module 110.
Determination module 100 is used for confirming the first signal of base station information that wherein the terminal is the terminal that is in the non-CSG of Idle state.
Sending module 110 is used for the first signal of base station information that reports determination module 100 to confirm to first base station.
Determination module 100 can also after the power self-optimizing need be carried out in definite first base station, be confirmed the first signal of base station information according to the broadcast of receiving from first base station.
Wherein, the terminal of the embodiment of the invention can further include: set up module 120.
Set up module 120, be used for after definite need connecting, initiating RRC and connecting foundation, and send the RRC message of carrying the access cause information to first base station with first base station;
Wherein, insert cause information and represent that the terminal is the non-CSG terminal of inserting for the power self-optimizing, or the expression terminal there is the signal message that need report.
Sending module 110 can also report the first signal of base station information to first base station behind the indication information that receives from first base station, wherein this indication information is used for the signal message that indicating terminal to report is measured.
Determination module 100 can also be confirmed the second signal of base station information, and reports the second signal of base station information to first base station.
Further, determination module 100 can also be confirmed the second signal of base station information according to the parameter of receiving from measurement second base station of first base station configuration.
Wherein, the terminal of the embodiment of the invention can further include: select module 130.
Select module 130, be used for after receiving that indicating terminal from first base station carries out the information of district reselecting, carrying out district reselecting.
Selection module 130 can also be behind the time parameter of receiving from first base station, not gravity treatment first base station in the duration of time parameter regulation; Behind the cell reselection priority of receiving from first base station, carry out district reselecting according to cell reselection priority.
As shown in Figure 4, the method for embodiment of the invention power self-optimizing comprises the following steps:
Step 401, first base station receive the first signal of base station information of the terminal to report of the non-CSG that is in Idle state.
The power self-optimizing is carried out according to the first signal of base station information of receiving in step 402, first base station.
Wherein, can further include before the step 401:
Step 400, first base station are after confirming to carry out the power self-optimizing, through broadcast notice terminal.Such as, the field Cognitive Interference that is provided with in the SIB1 message is 1, shows that first base station 20 need carry out the power self-optimizing.
In the step 400, first base station confirms that the mode need carry out the power self-optimizing has a lot, such as first base station can receive need carry out the information of power self-optimizing from the indication of the OAM equipment or second base station after, definitely need carry out the power self-optimizing.
Wherein, If first base station (is wherein inserted cause information and is represented that the terminal is the non-CSG terminal of inserting for the power self-optimizing through the access cause information of receiving self terminal after the broadcast notice terminal in the step 400; Or there is the signal message that need report at the expression terminal); Confirm that then there is the measurement result that need report at the terminal, and first base station is after there is the measurement result that need report at definite terminal, the signal message of indicating terminal to report measurement; Perhaps first base station is confirming to wait for the signal message that terminal to report is measured after there is the measurement result that need report at the terminal.
Only carry out the power self-optimizing according to the first signal of base station information, this power self-optimizing is compared background technology and can be reduced near first base station but be not the interference that the terminal of this sub-district produces.Disturb in order further to reduce, the power self-optimizing need be carried out according to the signal message of the first signal of base station information and macrocell in first base station.
In the step 401,, then can carry out the power self-optimizing according to the signal message of the first signal of base station information and macrocell in the step 402 if the signal message of the first signal of base station information and macrocell is received in first base station.
In the step 401,, also need the signal message of terminal to report macrocell if the first signal of base station information is only received in first base station.
Concrete; In the step 401; First base station is after only receiving the first signal of base station information; Can measure the parameter of second base station for terminal configuration, be the parameter that terminal configuration is measured second base station such as first base station through RRC Connection Reconfiguration message, and receive the signal message of the macrocell of self terminal; Accordingly, in the step 402, the power self-optimizing is carried out according to the signal message of the first signal of base station information and macrocell in first base station.
Because the terminal is just to initiate to be connected the process of foundation with the RRC of first base station for the first base station power self-optimizing,, first base station is connected with the RRC at terminal so after receiving the signal message of terminal to report, needing to break off.
Concrete, in the step 402, the first base station indicating terminal carries out district reselecting.
Can send RRC Connection Release message to the terminal such as, first base station and discharge and be connected, a flag bit can be set in RRC Connection Release message be used for indicating terminal 10 and carry out district reselecting with the RRC at terminal.
In order to let the terminal carry out district reselecting better, cell reselection priority can be sent to the terminal in first base station, such as cell reselection priority being placed RRC Connection Release message.
Cell reselection priority can be confirmed according to factors such as interference message that reports and covering relations in first base station; Such as, mutual interference is all very big mutually with second base station in the first current base station, and the terminal can't be resident; Can consider so, be directed to the terminal with going in the 3G sub-district that covers resident.
Because first base station also might be selected in the terminal when gravity treatment, thereby causes the wasting of resources.For need not repeated, the terminal selects to insert first base station; First base station can be to terminal transmitting time parameter; Indicating terminal is not gravity treatment first base station in the duration of time parameter regulation, such as cell reselection priority being placed RRC Connection Release message.
In practical implementation, cell reselection priority or transmitting time parameter only can only be sent to the terminal in first base station; Cell reselection priority and time parameter can also be sent to the terminal in first base station.
Need to prove that the concrete RRC message of all that relate in the above-mentioned example just illustrates, is not to have only through these concrete RRC message to send relevant information, and other message that can carry information all are applicable to the embodiment of the invention.
As shown in Figure 5, the embodiment of the invention reports the method for signal message to comprise the following steps:
The first signal of base station information is confirmed at step 501, the terminal that is in the non-CSG of Idle state.
Step 502, terminal report the first signal of base station information to first base station.
In the step 501, the terminal that is in the non-CSG of Idle state is detecting first signal of base station, and can select to select behind this first base station, and with first base station between set up RRC and be connected.Concrete selection comprises the selection after the gravity treatment that is in connection status and the start.
A kind of preferable mode is: this first base station can be selected and according to the broadcast of receiving from first base station in the terminal that is in the non-CSG of Idle state; After confirming that the power self-optimizing need be carried out in first base station; Select, and with first base station between set up RRC and be connected.Concrete selection comprises the selection after the gravity treatment that is in connection status and the start.
The field Cognitive Interference that is provided with in the SIB1 message such as first base station is 1; Show that first base station need carry out the power self-optimizing; Then the terminal is after the first signal of base station quality satisfies the selection requirement; Check that Cognitive Interference is 1, the power self-optimizing need be carried out in then definite first base station, selects this first base station then.
It is the strongest that the first signal of base station quality satisfy to select requirement can be that this first signal of base station quality satisfies the limit priority signal, perhaps satisfies S criterion (S criterion can referring to the TS36.304 agreement).
Need to prove that the selection of the signal quality of the embodiment of the invention requires to be not limited to above-mentioned two kinds, other can let the terminal select the selection of the first signal of base station quality to require all is to use the embodiment of the invention.
If the terminal is the gravity treatment that is in connection status; Then in the step 501; The signal message of the first signal of base station information and macrocell can be measured and note in the terminal in reuse adoption process; Initiate then to be connected the process of foundation, and inform first base station access cause information (wherein insert cause information and represent that the terminal is the non-CSG terminal of inserting for the power self-optimizing, or there is the signal message that need report at the expression terminal) with the RRC of this first base station; The terminal can directly report first base station with the signal message of the first signal of base station information and macrocell in the step 502; Also can be after confirming to receive from the indication information of first base station signal message of the first signal of base station information and macrocell be reported first base station, wherein this indication information is used for the signal message that indicating terminal to report is measured.
If the selection sub-district after the start, then in the step 501, the first signal of base station information can measured and note in the terminal in reuse adoption process, initiates then to be connected the process of foundation with the RRC of this first base station, and inform first base station access cause information; The terminal can directly report first base station with the first signal of base station information in the step 502; Also can after confirming to receive from the indication information of first base station, give first base station with the first signal of base station information reporting, wherein this indication information is used for the signal message that indicating terminal to report is measured.
If in the step 501, the second signal of base station information is measured and write down to the parameter from measurement second base station of first base station configuration that receive at the terminal then according to the parameter of measuring second base station; In the step 502, the terminal reports the second signal of base station information to first base station, such as utilizing the common Measurement Report information reporting second signal of base station information.
After the step 502,, then carry out district reselecting if the information of carrying out district reselecting from the indicating terminal of first base station is received at the terminal.
Such as, terminal 10 just knows that according to the flag bit in the RRC Connection Release message needs carry out district reselecting.
If the cell reselection priority from first base station is received at the terminal, then carry out district reselecting according to cell reselection priority.
If the terminal from first base station time parameter, this first base station of not gravity treatment in the duration of time parameter regulation then.
The duration of time parameter regulation can be set as required.Concrete time parameter can be represented the concrete time, such as current time~14:00; Can also represent a period of time, such as two hours.
If expression a period of time, then the terminal can pick up counting when carrying out district reselecting, also can begin meter during parameter in the time of receipt (T of R).
Need to prove that the concrete RRC message of all that relate in the above-mentioned example just illustrates, is not to have only through these concrete RRC message to send relevant information, and other message that can carry information all are applicable to the embodiment of the invention.
Wherein, Fig. 4 and Fig. 5 can also combine and form new flow process, and promptly first execution in step 400~step 402 is in execution in step 501 and step 502.
With concrete scene scheme of the present invention is elaborated below.
As shown in Figure 6, in the embodiment of the invention application scenarios sketch map, first base station is a Home eNodeB, and second base station is a macro base station, and the terminal is in the macro base station scope, and is in Home eNodeB covering edge.Home eNodeB is a CSG sub-district and is positioned at the border district that macro base station (macro eNB) covers that the terminal is not the Member Users of this Home eNodeB.Home eNodeB and macro base station belong to co-frequency cell,
As shown in Figure 7, suppose that the terminal is in the idle attitude and belongs to macro base station, the embodiment of the invention comprises the following steps: to the method for first kind of power self-optimizing of Fig. 6
Step 701, Home eNodeB confirm that according to the OAM configuration of devices needs carry out power self-optimizing process, and the field Cognitive Interference in the SIB1 message is set to 1, and send.
Step 702, terminal find that the signal quality of Home eNodeB satisfies the strongest selection requirement of limit priority signal; The terminal is not that the Member Users of this Home eNodeB and the Cognitive Interference of this Home eNodeB are 1; Then carry out the reuse adoption process of sub-district, gravity treatment is to the family base station.
The RSRP value of the RSRP value of Home eNodeB and macro base station in the reuse adoption process under step 703, the terminal records.
Step 704, terminal are initiated RRC to this Home eNodeB and are connected the process of setting up; And carry a bit IE (being idle measure available=1) in the RRC Connection Setup Complete message in setting up process, telling this terminal of this Home eNodeB to have measurement result need report.
Step 705, Home eNodeB utilize RRC message indicating terminal to report measurement result.
Step 706, terminal utilize the measurement result of RRC information reporting oneself.
Step 707, Home eNodeB are sent RRC Connection Release message to the terminal and are discharged and be connected with the RRC at terminal, and in this message, carry new gravity treatment priority, time parameter Tx and one and be used to indicate UE to carry out the flag bit of cell selecting.
Wherein, the priority that new gravity treatment priority level is provided with TD (Time Division, the time-division) sub-district that covers is higher than current LTE sub-district, makes the terminal gravity treatment resident in the TD sub-district.
Step 708, Home eNodeB are according to the measurement report information that receives, and the transmitting power and the mobility parameter of adjustment Home eNodeB are provided with.
Wherein, there is not inevitable sequential relationship between step 707 and the step 708, promptly can first execution in step 707, in execution in step 708; All right first execution in step 708 is in execution in step 707; Can also while execution in step 707 and step 708.
As shown in Figure 8, suppose the cell selecting of starting shooting in the terminal, the embodiment of the invention comprises the following steps: to the method for second kind of power self-optimizing of Fig. 6
Step 801, Home eNodeB confirm that according to the OAM configuration of devices needs carry out power self-optimizing process, and the field Cognitive Interference in the SIB1 message is set to 1, and send.
Step 802, terminal find that the signal quality of this Home eNodeB satisfies the S criterion, and the terminal is not that the Member Users of this Home eNodeB and the Cognitive Interference of this Home eNodeB are 1, then chooses Home eNodeB.
The RSRP value of Home eNodeB in the cell selecting process under step 803, the terminal records.
Step 804, terminal are initiated RRC to this Home eNodeB and are connected the process of setting up; In connecting the request of foundation; Its reason for claim is set to " Interference Optimisation "; In RRC Connection Setup Complete message, carry the measurement result type (being measure type=0) of a bit IE (being idle measure available=1) and 1 bit; Wherein idle measure available=1 representes that this UE has measurement result and need report, and measure type=0 representes that the result who measures is the RSRP value.
Step 805, Home eNodeB utilize RRC message indicating terminal to report measurement result.
Step 806, terminal utilize the measurement result of RRC information reporting oneself.
Wherein, the PCI and the CSG ID that comprise the sub-district in the measurement result.
The measurement result of step 807, Home eNodeB discovery terminal to report has only the RSRP value of this sub-district, and in order to obtain the signal message of macrocell, Home eNodeB utilizes the measurement parameter of RRC Connection Reconfiguration for terminal configuration RSRQ, RSRP.
Step 808, terminal are measured according to measurement parameter, obtain the signal message of macrocell, utilize common Measurement Report message to report to Home eNodeB to the signal message of macrocell.
Step 809, Home eNodeB utilize the release of RRC Connection Release message to be connected with the RRC at terminal, and in this message, carry a parameter indicating terminal and select other sub-districts, and time parameter Tx.
Step 810, Home eNodeB are according to the signal message that receives, and the transmitting power and the mobility parameter of adjustment Home eNodeB are provided with.
As shown in Figure 9, suppose that the terminal is in the idle attitude and belongs to macro base station, the embodiment of the invention comprises the following steps: to the method for the third power self-optimizing of Fig. 6
Step 901, macro base station are received the measurement and report at grand terminal, find that the interference ratio that grand terminal receives is bigger, utilize the Home eNodeB in its coverage of X2 message indication to carry out the self-optimizing of power.
The field Cognitive Interference that step 902, Home eNodeB are provided with in the broadcast is 1, and sends.
Step 903, terminal find that the signal quality of Home eNodeB satisfies the strongest selection requirement of limit priority signal; The terminal is not that the Member Users of this Home eNodeB and the Cognitive Interference of this Home eNodeB are 1; Then carry out the reuse adoption process of sub-district, gravity treatment is to the family base station.
The RSRP value of the RSRP value of Home eNodeB and macro base station in the reuse adoption process under step 904, the terminal records.
Step 905, terminal are initiated RRC to this Home eNodeB and are connected the process of setting up; In connecting the request of foundation; Its reason for claim is set to " Interference Optimisation ", carries a bit IE (being idle measure available=1) in the RRC Connection Setup Complete message in setting up process, and telling this terminal of this Home eNodeB to have measurement result need report.
Step 906, Home eNodeB utilize RRC message indicating terminal to report measurement result.
Step 907, terminal utilize the measurement result of RRC information reporting oneself.
Step 908, Home eNodeB are sent RRC Connection Release message to the terminal and are discharged and be connected with the RRC at terminal, and in this message, carry time parameter Tx and one and be used to indicate UE to carry out the flag bit of cell selecting.
Step 909, Home eNodeB are according to the measurement report information that receives, and the transmitting power and the mobility parameter of adjustment Home eNodeB are provided with.
Shown in figure 10, suppose that the terminal is in the idle attitude and belongs to macro base station, the embodiment of the invention comprises the following steps: to the method for the 4th kind of power self-optimizing of Fig. 6
Step 1001, Home eNodeB confirm that according to the OAM configuration of devices needs carry out power self-optimizing process, and the field Cognitive Interference in the SIB1 message is set to 1, and send.
Step 1002, terminal find that the signal quality of Home eNodeB satisfies the strongest selection requirement of limit priority signal; The terminal is not that the Member Users of this Home eNodeB and the Cognitive Interference of this Home eNodeB are 1; Then carry out the reuse adoption process of sub-district, gravity treatment is to the family base station.
The RSRP value of the RSRP value of Home eNodeB and macro base station in the reuse adoption process under step 1003, the terminal records.
Step 1004, terminal are initiated the RRC connection to this Home eNodeB and are set up process, and carry a bit indication Home eNodeB in the RRC Connection Request message in setting up process, and the terminal is to do the non-member terminal of disturbing self-optimizing and inserting.
The sign of Home eNodeB, the RSRP value of Home eNodeB, the sign of macro base station and the RSRP value of macro base station are carried in step 1005, terminal in RRC Connection Complete message.
Step 1006, Home eNodeB are sent RRC Connection Release message to the terminal and are discharged and be connected with the RRC at terminal, and in this message, carry new gravity treatment priority, time parameter Tx and one and be used to indicate UE to carry out the flag bit of cell selecting.
Wherein, the priority that new gravity treatment priority level is provided with the TD sub-district that covers is higher than current LTE sub-district, makes the terminal gravity treatment resident in the TD sub-district.
Step 1007, Home eNodeB are according to the measurement report information that receives, and the transmitting power and the mobility parameter of adjustment Home eNodeB are provided with.
Those skilled in the art should understand that embodiments of the invention can be provided as method, system or computer program.Therefore, the present invention can adopt the form of the embodiment of complete hardware embodiment, complete software implementation example or combination software and hardware aspect.And the present invention can be employed in the form that one or more computer-usable storage medium (including but not limited to magnetic disc store, CD-ROM, optical memory etc.) that wherein include computer usable program code go up the computer program of implementing.
The present invention is that reference is described according to the flow chart and/or the block diagram of method, equipment (system) and the computer program of the embodiment of the invention.Should understand can be by the flow process in each flow process in computer program instructions realization flow figure and/or the block diagram and/or square frame and flow chart and/or the block diagram and/or the combination of square frame.Can provide these computer program instructions to the processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing device to produce a machine, make the instruction of carrying out through the processor of computer or other programmable data processing device produce to be used for the device of the function that is implemented in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame appointments.
These computer program instructions also can be stored in ability vectoring computer or the computer-readable memory of other programmable data processing device with ad hoc fashion work; Make the instruction that is stored in this computer-readable memory produce the manufacture that comprises command device, this command device is implemented in the function of appointment in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame.
These computer program instructions also can be loaded on computer or other programmable data processing device; Make on computer or other programmable devices and to carry out the sequence of operations step producing computer implemented processing, thereby the instruction of on computer or other programmable devices, carrying out is provided for being implemented in the step of the function of appointment in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame.
Although described the preferred embodiments of the present invention, in a single day those skilled in the art get the basic inventive concept could of cicada, then can make other change and modification to these embodiment.So accompanying claims is intended to be interpreted as all changes and the modification that comprises preferred embodiment and fall into the scope of the invention.
From the foregoing description, can find out: the embodiment of the invention first base station receives the first signal of base station information of the terminal to report of the non-CSG that is in Idle state; The power self-optimizing is carried out according to the first signal of base station information of receiving in first base station.
Because parameter adjustment can be carried out according to the report of non-cell terminal in first base station; Thereby reduced near first base station but be not the interference that the terminal of the sub-district of first BTS management produces; Improve the channel quality at these terminals, reduced these terminal cutting off rates.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, belong within the scope of claim of the present invention and equivalent technologies thereof if of the present invention these are revised with modification, then the present invention also is intended to comprise these changes and modification interior.