CN102376153A - Method for remotely updating carrier sheet and acquirer in concentrated meter reading system - Google Patents

Method for remotely updating carrier sheet and acquirer in concentrated meter reading system Download PDF

Info

Publication number
CN102376153A
CN102376153A CN2011103620159A CN201110362015A CN102376153A CN 102376153 A CN102376153 A CN 102376153A CN 2011103620159 A CN2011103620159 A CN 2011103620159A CN 201110362015 A CN201110362015 A CN 201110362015A CN 102376153 A CN102376153 A CN 102376153A
Authority
CN
China
Prior art keywords
collector
carrier wave
program
concentrator
reading system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103620159A
Other languages
Chinese (zh)
Other versions
CN102376153B (en
Inventor
李焱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Clou Precision Instrument Co ltd
Shenzhen Clou Electronics Co Ltd
Original Assignee
Shenzhen Clou Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Clou Electronics Co Ltd filed Critical Shenzhen Clou Electronics Co Ltd
Priority to CN201110362015.9A priority Critical patent/CN102376153B/en
Publication of CN102376153A publication Critical patent/CN102376153A/en
Application granted granted Critical
Publication of CN102376153B publication Critical patent/CN102376153B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method for remotely updating a carrier sheet and an acquirer in a concentrated meter reading system. The method mainly comprises the following steps of: 1, logging in a main station by management software through a front-end processor; 2, transmitting an updating program to a concentrator; 3, writing the updating program in a program backup region of the acquirer or carrier sheet in a point-to-point manner; and 4, after the backup program is complete and correct, automatically restarting and updating, and after the updating is completed, operating a new program. The invention solves the updating difficulty of the carrier sheet of the acquirer, and reduces a large quantity of manual maintenance works of an acquiring system and a metering system, thus the working efficiency is greatly increased and the maintenance cost is reduced.

Description

The method of collector and carrier wave meter remote upgrade in the automatic meter reading system
Technical field
The present invention relates to electric system, especially the method for collector and carrier wave meter remote upgrade in the automatic meter reading system.
Background technology
In the process of building intelligent grid; In order to promote electrical network and user's two-way interaction ability and electricity consumption value-added service level; The scale of power information acquisition system is increasing, and automatic meter reading system is just obtaining application more and more widely, and the system maintenance work amount is increasing; Maintenance cost is also increasing, and maintenance issues has more and more restricted the operational effect of whole centralized automatic meter-reading.Present collector possesses the local upgrade function, but does not have the remote upgrade function, and the carrier wave meter in the metering system does not have upgrade function.Its shortcoming is: collector local upgrade workload is big, and intelligent degree is low, and the maintainer need go hither and thither and seek the collector mounting points, and work efficiency is quite low.In a single day carrier wave meter breaks down or the discovery procedure leak can't be upgraded, and can only replace, and causes huge waste.
Summary of the invention
Technical matters to be solved by this invention provides the method for collector and carrier wave meter remote upgrade in a kind of automatic meter reading system; Solve the problem of centralized meter-reading system collector, a metering system carrier wave meter remote upgrade difficult problem; For in a single day the collector carrier wave meter breaks down a upgrading means very easily is provided; Reduce centralized meter-reading system metering system maintenance staff's workload, the operational effect with automatic meter reading system of increasing work efficiency.
For solving the problems of the technologies described above, technical scheme of the present invention is: the method for collector and carrier wave meter remote upgrade in a kind of automatic meter reading system, and in the said automatic meter reading system, main website is connected with collector with carrier wave meter respectively through concentrator; The inside flash of collector and carrier wave meter is divided into three districts: Bootloader boot district, APP application area, BAK upgrading stand-by program district; Boot uses fever writes burned; Application program adopts the local upgrade mode for the first time; Directly guide burning by boot, had application program just can support remote upgrade; Concrete steps are following:
(1) management software is with front end processor mode telnet automatic meter reading system main website;
(2) main website is transmitted to concentrator with the ROMPaq of collector or carrier wave meter, and concentrator receives whole file and deposits in the external memory storage;
(3) concentrator is selected a free time, according to measuring period, utilizes the route data forwarding capability, deposits the stand-by program district in after point-to-point transmission ROMPaq, carrier wave meter receive ROMPaq and replys; Collector need judge that the measurement point address is table address or the collector address under the collector, if then need ROMPaq be deposited in the stand-by program district and replys, if this frame deposits in then ignores, and prompting concentrator transmission next frame;
(4) collector or carrier wave meter receive whenever a frame checks all whether the ROMPaq of backup area is complete, if whether the end-to-end CRC check is correct, confirm correctly to put a zone bit, require refresh routine during mark startup next time, automatically reset then and restart;
(5) collector or carrier wave meter are restarted back entering Bootloader boot district; Boot at first checks whether to use stand-by program to upgrade current application program; If then guide among the burned Flash of backup area program, whether the inspection programming is errorless, confirms errorless; The application program of APP application area obtains upgrading, and the guiding of Bootloader boot district starts from the APP application area.
As improvement, in the said step (2), main website is transmitted to concentrator with collector or carrier wave meter ROMPaq through the transparent forwarding method.
As improvement, in the said step (3), concentrator is transmitted the upgrading frame to each measurement point, presses the measurement point address and realizes upgrading one by one.
As improvement, in the said step (4), collector is received after the new application program refresh routine automatically, and starts new procedures automatically.
The beneficial effect that the present invention is compared with prior art brought is:
The present invention has realized collector and the remote upgrade function of carrier wave meter in the automatic meter reading system, has added new guarantee for the reliability of collector carrier wave meter, has significantly reduced artificial upgrade job amount, reduces upgrade cost; In the process of upgrading, collector and carrier wave meter ability operate as normal influence very little to checking meter in the escalation process simultaneously.Support breakpoint transmission, support to retransmit that upgrading efficient reliability is higher.
Description of drawings
Fig. 1 is automatic meter reading system general frame figure.
Fig. 2 is application A PP reception ROMPaq and the process flow diagram that deposits backup area in.
Fig. 3 is the process flow diagram that application program is upgraded in boot Bootloader guiding.
Embodiment
Below in conjunction with Figure of description the present invention is described further.
As shown in Figure 1, the method for collector and carrier wave meter remote upgrade in a kind of automatic meter reading system, in the said automatic meter reading system, main website is connected with collector with carrier wave meter respectively through concentrator; The inside flash of collector and carrier wave meter is divided into three districts: Bootloader boot district, APP application area, BAK upgrading stand-by program district; Boot uses fever writes burned; Application program adopts the local upgrade mode for the first time; Directly guide burning by boot, had application program just can support remote upgrade; Concrete steps are following:
(1) management software is with front end processor mode telnet automatic meter reading system main website;
(2) main website is transmitted to concentrator with the ROMPaq of collector or carrier wave meter with the transparent forwarding mode, and concentrator receives whole file and deposits in the external memory storage;
(3) as shown in Figure 2; Concentrator is selected a free time, according to measuring period, utilizes Q/GDW376.2-2009 route data forwarding capability; Port numbers 31; Transmit content and walk to expand the DLT645-1997/2007 agreement, deposit the stand-by program district in after point-to-point transmission ROMPaq, carrier wave meter receive ROMPaq and reply; Collector need judge that the measurement point address is table address or the collector address under the collector.If then need ROMPaq be deposited in the stand-by program district and replys; If this frame deposits in then ignores, and prompting concentrator transmission next frame;
(4) collector or carrier wave meter receive whenever a frame checks all whether the ROMPaq of backup area is complete, if whether the end-to-end CRC check is correct, confirm correctly to put a zone bit, require refresh routine during mark startup next time, automatically reset then and restart; Collector is received after the new application program refresh routine automatically, and starts new procedures automatically;
(5) as shown in Figure 3; Collector or carrier wave meter are restarted the back and are got into Bootloader boot district, and boot at first checks whether to use stand-by program to upgrade current application program, if then guide among the burned Flash of backup area program; Whether the inspection programming is errorless; Confirm errorlessly, the application program of APP application area obtains upgrading, and the guiding of Bootloader boot district starts from the APP application area.
Management software refers to according to State Grid Corporation of China's company standard " power consumer power information acquisition system communication protocol: main website and acquisition terminal communication protocol " exploitation, is used for acquisition terminal is safeguarded the software of management.Communication modes such as management software is supported serial ports, network interface and concentrator connect, and can carry out parameter reading and writing to concentrator, and data read, terminal program upgrading etc.
Management software is with front end processor mode telnet automatic meter reading system main website; Main website passes to concentrator with upgrade file through the GPRS path with the transparent transmission mode; Concentrator is again through power carrier or wireless carrier or bus 485, according to the measurement point address in the archives upgrade one by one collector and carrier wave meter.The measurement point address is if the table under collector or the collector in the upgrading frame, and collector need judge that this frame is transmission start frame, subsequent frame or end frame, and this frame is made reply; Start frame and then start the ROMPaq transmission, subsequent frame then deposits frame data in the program backup district, and end frame then finishes the upgrade file transmission, inspection backup area process integrity; Completely then restart collector, the backup area program is covered application program, accomplish upgrading.The upgrade file transmission course does not influence the operate as normal of collector and carrier wave meter.
The present invention has realized collector and the remote upgrade function of carrier wave meter in the automatic meter reading system, has added new guarantee for the reliability of collector carrier wave meter, has significantly reduced artificial upgrade job amount, reduces upgrade cost; In the process of upgrading, collector and carrier wave meter ability operate as normal influence very little to checking meter in the escalation process simultaneously.Support breakpoint transmission, support to retransmit that upgrading efficient reliability is higher.

Claims (4)

1. the method for collector and carrier wave meter remote upgrade in the automatic meter reading system, in the said automatic meter reading system, main website is connected with collector with carrier wave meter respectively through concentrator; It is characterized in that: the inside flash of collector and carrier wave meter is divided into three districts: Bootloader boot district, APP application area, BAK upgrading stand-by program district; Boot uses fever writes burned; Application program adopts the local upgrade mode for the first time; Directly guide burning by boot, had application program just can support remote upgrade; Concrete steps are following:
(1) management software is with front end processor mode telnet automatic meter reading system main website;
(2) main website is transmitted to concentrator with the ROMPaq of collector or carrier wave meter, and concentrator receives whole file and deposits in the external memory storage;
(3) concentrator is selected a free time, according to measuring period, utilizes the route data forwarding capability, deposits the stand-by program district in after point-to-point transmission ROMPaq, carrier wave meter receive ROMPaq and replys; Collector need judge that the measurement point address is table address or the collector address under the collector, if then need ROMPaq be deposited in the stand-by program district and replys, if this frame deposits in then ignores, and prompting concentrator transmission next frame;
(4) collector or carrier wave meter receive whenever a frame checks all whether the ROMPaq of backup area is complete, if whether the end-to-end CRC check is correct, confirm correctly to put a zone bit, require refresh routine during mark startup next time, automatically reset then and restart;
(5) collector or carrier wave meter are restarted back entering Bootloader boot district; Boot at first checks whether to use stand-by program to upgrade current application program; If then guide among the burned Flash of backup area program, whether the inspection programming is errorless, confirms errorless; The application program of APP application area obtains upgrading, and the guiding of Bootloader boot district starts from the APP application area.
2. the method for collector and carrier wave meter remote upgrade in the automatic meter reading system according to claim 1 is characterized in that: in the said step (2), main website is transmitted to concentrator with collector or carrier wave meter ROMPaq through the transparent forwarding method.
3. the method for collector and carrier wave meter remote upgrade in the automatic meter reading system according to claim 1 is characterized in that: in the said step (3), concentrator is transmitted the upgrading frame to each measurement point, presses the measurement point address and realizes upgrading one by one.
4. the method for collector and carrier wave meter remote upgrade in the automatic meter reading system according to claim 1 is characterized in that: in the said step (4), collector is received after the new application program refresh routine automatically, and starts new procedures automatically.
CN201110362015.9A 2011-11-15 2011-11-15 The method of collector and carrier wave meter remote upgrade in automatic meter reading system Expired - Fee Related CN102376153B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110362015.9A CN102376153B (en) 2011-11-15 2011-11-15 The method of collector and carrier wave meter remote upgrade in automatic meter reading system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110362015.9A CN102376153B (en) 2011-11-15 2011-11-15 The method of collector and carrier wave meter remote upgrade in automatic meter reading system

Publications (2)

Publication Number Publication Date
CN102376153A true CN102376153A (en) 2012-03-14
CN102376153B CN102376153B (en) 2017-05-31

Family

ID=45794693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110362015.9A Expired - Fee Related CN102376153B (en) 2011-11-15 2011-11-15 The method of collector and carrier wave meter remote upgrade in automatic meter reading system

Country Status (1)

Country Link
CN (1) CN102376153B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102693621A (en) * 2012-06-12 2012-09-26 上海市电力公司 Power line carrier meter reading system
CN103577203A (en) * 2012-07-25 2014-02-12 施耐德电器工业公司 Special CPU (Central Process Unit) with storage card and automatic batch update method
CN103778772A (en) * 2014-01-23 2014-05-07 国家电网公司 Framing and interconnection transmitting method in electricity utilization information collecting system
CN103840964A (en) * 2012-11-27 2014-06-04 中国科学院沈阳自动化研究所 Data collection communication system and upgrade method
CN104951341A (en) * 2015-06-18 2015-09-30 烟台东方威思顿电气股份有限公司 Method for remotely upgrading collector
CN105139623A (en) * 2015-09-29 2015-12-09 光一科技股份有限公司 File compression remote upgrading method for collector multistage transmission based on broadband carrier waves
CN105679008A (en) * 2016-03-28 2016-06-15 国网山东省电力公司济宁供电公司 Method and device for multi-meter acquisition simulation on basis of real-time monitoring
CN106789373A (en) * 2017-03-02 2017-05-31 国电南瑞科技股份有限公司 A kind of method that remote upgrade is carried out to concentrator
CN107315620A (en) * 2017-07-28 2017-11-03 国网山东省电力公司电力科学研究院 Collector intelligent remote upgrade method in a kind of AMRS
CN108111336A (en) * 2017-12-05 2018-06-01 宁波三星医疗电气股份有限公司 A kind of Power Line Carrier Communication Module program startup, upgrading and switching method
CN109828766A (en) * 2017-11-23 2019-05-31 阿特斯阳光电力集团有限公司 Photovoltaic apparatus upgrade-system and method
CN110134421A (en) * 2019-05-24 2019-08-16 南方电网科学研究院有限责任公司 Electric energy meter managing chip upgrade method, system and electronic equipment and storage medium
CN110708379A (en) * 2019-10-09 2020-01-17 国网宁夏电力有限公司电力科学研究院 Data acquisition method, concentrator, data acquisition system and readable storage medium
CN111064497A (en) * 2019-11-15 2020-04-24 国网河南省电力公司驻马店供电公司 Acquisition, operation and maintenance system based on HPLC (high performance liquid chromatography) platform area
CN112230961A (en) * 2020-10-20 2021-01-15 杭州海兴电力科技股份有限公司 Intelligent meter upgrading method, device, equipment and medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2906782Y (en) * 2005-07-13 2007-05-30 浙江大学 Embedded processor-based automatic remote electricity metering terminal
JP2008102668A (en) * 2006-10-18 2008-05-01 Yokogawa Electric Corp Intelligent transmitter and its software update method
CN101777003A (en) * 2010-02-08 2010-07-14 宁波大学 Method for remotely updating program of industrial fuel gas meter data reader
CN201674532U (en) * 2010-06-09 2010-12-15 金龙联合汽车工业(苏州)有限公司 Remote updating system of vehicle information acquisition device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2906782Y (en) * 2005-07-13 2007-05-30 浙江大学 Embedded processor-based automatic remote electricity metering terminal
JP2008102668A (en) * 2006-10-18 2008-05-01 Yokogawa Electric Corp Intelligent transmitter and its software update method
CN101777003A (en) * 2010-02-08 2010-07-14 宁波大学 Method for remotely updating program of industrial fuel gas meter data reader
CN201674532U (en) * 2010-06-09 2010-12-15 金龙联合汽车工业(苏州)有限公司 Remote updating system of vehicle information acquisition device

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102693621A (en) * 2012-06-12 2012-09-26 上海市电力公司 Power line carrier meter reading system
CN103577203A (en) * 2012-07-25 2014-02-12 施耐德电器工业公司 Special CPU (Central Process Unit) with storage card and automatic batch update method
CN103840964A (en) * 2012-11-27 2014-06-04 中国科学院沈阳自动化研究所 Data collection communication system and upgrade method
CN103778772A (en) * 2014-01-23 2014-05-07 国家电网公司 Framing and interconnection transmitting method in electricity utilization information collecting system
CN104951341A (en) * 2015-06-18 2015-09-30 烟台东方威思顿电气股份有限公司 Method for remotely upgrading collector
CN105139623A (en) * 2015-09-29 2015-12-09 光一科技股份有限公司 File compression remote upgrading method for collector multistage transmission based on broadband carrier waves
CN105679008A (en) * 2016-03-28 2016-06-15 国网山东省电力公司济宁供电公司 Method and device for multi-meter acquisition simulation on basis of real-time monitoring
CN106789373A (en) * 2017-03-02 2017-05-31 国电南瑞科技股份有限公司 A kind of method that remote upgrade is carried out to concentrator
CN107315620A (en) * 2017-07-28 2017-11-03 国网山东省电力公司电力科学研究院 Collector intelligent remote upgrade method in a kind of AMRS
CN107315620B (en) * 2017-07-28 2020-07-31 国网山东省电力公司电力科学研究院 Intelligent remote upgrading method for collector in electric power centralized meter reading system
CN109828766A (en) * 2017-11-23 2019-05-31 阿特斯阳光电力集团有限公司 Photovoltaic apparatus upgrade-system and method
CN108111336A (en) * 2017-12-05 2018-06-01 宁波三星医疗电气股份有限公司 A kind of Power Line Carrier Communication Module program startup, upgrading and switching method
CN110134421A (en) * 2019-05-24 2019-08-16 南方电网科学研究院有限责任公司 Electric energy meter managing chip upgrade method, system and electronic equipment and storage medium
CN110708379A (en) * 2019-10-09 2020-01-17 国网宁夏电力有限公司电力科学研究院 Data acquisition method, concentrator, data acquisition system and readable storage medium
CN111064497A (en) * 2019-11-15 2020-04-24 国网河南省电力公司驻马店供电公司 Acquisition, operation and maintenance system based on HPLC (high performance liquid chromatography) platform area
CN111064497B (en) * 2019-11-15 2022-04-19 国网河南省电力公司驻马店供电公司 Acquisition, operation and maintenance system based on HPLC (high performance liquid chromatography) platform area
CN112230961A (en) * 2020-10-20 2021-01-15 杭州海兴电力科技股份有限公司 Intelligent meter upgrading method, device, equipment and medium

Also Published As

Publication number Publication date
CN102376153B (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN102376153A (en) Method for remotely updating carrier sheet and acquirer in concentrated meter reading system
CN102194309B (en) Low-voltage power line broadband carrier concentrator
CN2906782Y (en) Embedded processor-based automatic remote electricity metering terminal
CN102194304A (en) Method and system for wireless concentrated collection and management of energy measurement data
CN203573481U (en) ZigBee technology-based wireless meter reading system
CN201698576U (en) Electricity utilization information collecting system and collector
CN111145523B (en) Method for upgrading micropower wireless communication module in electricity consumption information acquisition system
CN201707782U (en) Intelligent meter reading system based on GPRS (General Packet Radio Service)
CN208766825U (en) A kind of LoRa meeting southern network mark standard and carrier wave dual mode communication module
CN101231780A (en) Remote meter reading system based on RF and GPRS radio network
CN103490958A (en) Method for testing local communication unit interchangeability of acquisition terminal
CN105788226A (en) Broadband carrier parallel meter reading method and broadband carrier parallel meter reading system
CN103559784A (en) Electric quantity data transmission system and method based on Beidou satellite communication
CN103021154A (en) Wireless meter reading system based on Ad Hoc
CN104064007A (en) Centralized meter reading system
KR100963105B1 (en) Home Concentrator Unit
CN207518633U (en) Support the ammeter data acquisition terminal of DLMS/COSEM agreements
CN102830281B (en) A kind of intelligent electric energy meter and utility meter kilowatt meter reading-out system
CN104678167A (en) Intelligent electric energy meter and public utility meter reading system
CN202677599U (en) Self-adapting watt-hour meter collector
CN202472899U (en) Heat measurement acquisition concentration system and intelligence management terminal stations
CN214279154U (en) Direct-reading remote water meter collector based on embedded system
CN201985858U (en) Data transmission module for power collector
CN201464583U (en) Power quality on-line monitoring system based on transparent forwarding technology
CN204116529U (en) The abnormal intelligent checking system of cable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170428

Address after: 518057 Guangdong, Nanshan District science and Technology Park, North Road, CLOU Road, building A, block 13-24, building

Applicant after: SHENZHEN CLOU ELECTRONICS Co.,Ltd.

Applicant after: SHENZHEN CLOU PRECISION INSTRUMENT Co.,Ltd.

Address before: 518000 Nanshan District science and Technology Park, Guangdong, Southern District, building T2, building, floor, 5

Applicant before: SHENZHEN CLOU ELECTRONICS Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170531

Termination date: 20211115

CF01 Termination of patent right due to non-payment of annual fee