CN102374645B - Intelligent water heater - Google Patents

Intelligent water heater Download PDF

Info

Publication number
CN102374645B
CN102374645B CN201010259177.5A CN201010259177A CN102374645B CN 102374645 B CN102374645 B CN 102374645B CN 201010259177 A CN201010259177 A CN 201010259177A CN 102374645 B CN102374645 B CN 102374645B
Authority
CN
China
Prior art keywords
initial
period
hot water
water
inner bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010259177.5A
Other languages
Chinese (zh)
Other versions
CN102374645A (en
Inventor
白宁
胡恒中
伯尔尼·施罗德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BSH Electrical Appliances Jiangsu Co Ltd
Original Assignee
BSH Electrical Appliances Jiangsu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BSH Electrical Appliances Jiangsu Co Ltd filed Critical BSH Electrical Appliances Jiangsu Co Ltd
Priority to CN201010259177.5A priority Critical patent/CN102374645B/en
Publication of CN102374645A publication Critical patent/CN102374645A/en
Application granted granted Critical
Publication of CN102374645B publication Critical patent/CN102374645B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Medical Bathing And Washing (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The invention discloses a kind of water heater, it comprises inner bag, for accommodating a certain amount of heated water; Water inlet and delivery port, be communicated with to transmit the water flowing into inner bag and flow out inner bag with inner bag; Thermal source, is associated with inner bag with the water in heating inner liner; Controller, be connected with thermal source, for selected period 1 and second round, the initial time that in the record period 1, hot water consumes and initial hot water consumption, and before the object time corresponding with described initial time within second round, control described thermal source and heat the target using amount of hot water suitable with described initial hot water consumption in advance.In this way, water heater can prepare hot water in advance automatically according to the bathing custom of user, thus improves the convenience of use.

Description

Intelligent water heater
Technical field
The present invention relates to a kind of water heater, particularly relate to a kind of storage-type electric water heater.
Background technology
Storage-type electric water heater is high due to technology maturation, security performance, is extensively adopted at present by Chinese family.This electric heater generally includes the inner bag of water storage, is arranged in inner bag to be used for the electrically heated rod of heating water, coated heat-insulation layer outside the tank and shell.More and more extensive along with storage-type electric water heater application, the instructions for use of people to water heater is also more and more higher.Such as, user has the bathing of oneself to be accustomed to, but the hot water of the bathing that all will repeat before not wishing each bathing to arrange to be prepared in advance.
In view of this, be necessary to be improved to solve the problem to existing storage-type electric water heater.
Summary of the invention
The object of the present invention is to provide a kind of water heater, it can prepare hot water in advance automatically according to the bathing custom of user, thus improves the convenience of use.
For achieving the above object, a kind of water heater of the present invention comprises:
Inner bag, for accommodating a certain amount of heated water;
Water inlet and delivery port, be communicated with to transmit the water flowing into inner bag and flow out inner bag with described inner bag;
Thermal source, is associated with described inner bag with the water in heating inner liner;
Controller, is connected with described thermal source, for
Selected period 1 and second round;
The initial time that in the record period 1, hot water consumes and initial hot water consumption; And
Before object time corresponding with described initial time within second round, control described thermal source in advance
Heat the target using amount of hot water suitable with described initial hot water consumption.
As a further improvement on the present invention, described controller also for
Only have when the hot-water consumption in the period 1 is more than a predetermined value, just start record start time and initial hot water consumption.
As a further improvement on the present invention, the described period 1 comprises continuous print isometric some initial first period, described controller also for
Record initial time and initial hot water consumption that in each initial first period, hot water consumes.
As a further improvement on the present invention, the described period 1 also comprises continuous print isometric some initial second period, and each initial second period is at least more than or equal to two initial first periods in time span; Described controller also for
The initial time that in each initial second period, first occurs is set as the initial time of this initial second period;
The initial hot water consumption of each initial first period in each initial second period accumulative, using the initial hot water consumption as this initial second period.
As a further improvement on the present invention, comprise some targets the first/bis-period corresponding with described some initial the first/bis-periods described second round, described controller also for
Before the object time of described target the first/bis-period, control described thermal source heat target using amount of hot water in advance.
As a further improvement on the present invention, described controller also for
Judge whether hot water consumption is present in the second half section previous in continuous two target the first/bis-periods, and in the first half section of latter;
If so, then this two target the first/bis-periods are merged.
As a further improvement on the present invention, described first/two cycles is a week.
As a further improvement on the present invention, hot water amount during hot water amount-this period concludes by heat source in hot water amount+this period when using amount of hot water=this period in described initial first period is initial in inner bag in inner bag.
As a further improvement on the present invention, the some temperature sensors arranged along inner bag radial direction are also comprised; Some water temperature value that described hot water amount detects according to described some temperature sensors, and the inner bag partial volume be associated with described water temperature value is determined.
As a further improvement on the present invention, described hot water amount refers to heat of mixing water yield when being in specified temp.
As a further improvement on the present invention, arrange continuously described period 1 and second round.
Compared with prior art, the invention has the beneficial effects as follows: owing to setting for the first and second cycles, and within the period 1, record the bathing custom of user, within second round, then apply recorded bathing custom, user need not to be repeated before bathing to arrange to be prepared in advance the hot water of bathing at every turn, thus substantially increase the convenience of use.
Accompanying drawing explanation
Fig. 1 is longitudinal cross-sectional schematic of water heater one detailed description of the invention of the present invention;
Fig. 2 is the schematic block circuit diagram of the Control Component of water heater in above-mentioned embodiment;
Fig. 3 is the screen display schematic diagram of the display unit of water heater in above-mentioned embodiment;
Fig. 4 is the controller of water heater controls heating component work flow chart according to the setting of bather number;
Fig. 5 is the workflow diagram that controller controls display unit display;
Fig. 6 is that controller records the workflow diagram of hot water behaviour in service in initial first period according to the bathing custom of user;
Fig. 7 is the workflow diagram of hot water behaviour in service in controller record initial second period;
To be controller control heating component according to the hot water behaviour in service of record to Fig. 8 prepares corresponding using amount of hot water in advance;
Fig. 9 is that controller controls according to the hot water behaviour in service of record another embodiment that heating component prepares corresponding using amount of hot water in advance.
Detailed description of the invention
Figure 1 shows that a detailed description of the invention of water heater of the present invention.For storage-type electric water heater in this enforcement, certain the present invention also can be applied to the water heater of other types, as gas heater etc.Water heater 100 comprises the inner bag 10 for storing healed water.Usually be also coated with shell (not shown) outside the tank and be formed in the thermal insulation layer (not shown) being filled with foamed material (as being made up of polyurethane material) between inner bag and shell.Inner bag 10 is roughly barrel-shaped in what extend along longitudinal axis direction, and it has drum-shaped bucket wall, is usually made up of ferrous metal, as steel, iron etc.The bottom of inner bag 10 is provided with the water inlet 81 for being introduced by cold water in inner bag and is used for discharging a delivery port 82 of healed water.The shell of water heater 100 is also provided with hanger assembly (not shown) usually, for coordinating with the support member be arranged on body of wall (not shown) so that water heater is suspended to body of wall.
Water heater 100 also includes the heating component 20 for heating cold water.In embodiment as shown in Figure 1, one first electric heating tube 21 is arranged on the first half of inner bag 10, and this heating tube is arranged on one first flange 31.First flange 31 is arranged in the axial domed ends 11 of inner bag 10.First electric heating tube 21 enters in inner bag 10 from horizontal-extending the first flange 31, and downward wriggling extends into the lower position place of the first half of inner bag 10 further.The resistance wire 211 that one has high impedance is provided with in first electric heating tube 11, this resistance wire 211 is connected with the positive and negative electrode terminal (sign) be located on the first flange 31 by wire (not shown), with the AC power conducting with 220V or 110V, thus be heat energy by electric energy conversion.Certainly, for other forms of water heater, as gas water heater, can be heated the liquid in inner bag by the combustion chamber arranged outside the tank.One second and three electric heating tubes 22,23 be jointly arranged on second flange 32, this second flange 32 is fixed on the center of the axial end portion 11 of inner bag 10.Similar to the first electric heating tube 21, second and third electric heating tube 22,23 all wriggles from the second flange 32 and extends downward the bottom of close inner bag 10, is provided with resistance wire (not shown) in it equally.Second electric heating tube 22 is also provided with a plate washer 221 at the water inlet position place of contiguous water inlet pipe 81, is used for guiding the cold water entered from water inlet and makes it transversely flow, thus the hot water layer avoiding it directly to enter being positioned at inner bag upper strata and affect the efficiency of heating surface.
Water heater 100 also comprises a system for detecting temperature 90, and it at least comprises the first temperature sensor 91, second temperature sensor 92 and three-temperature sensor 93 along the radial direction perpendicular to longitudinal axis direction distributes successively from low to high.Temperature sensor can adopt various ways, as thermistor, temperature tube etc., for detecting the water temperature of relevant position in inner bag, and be converted into the signal of telecommunication and feed back to controller 50, thus controller 50 according to the temperature information received, can decide the control (hereinafter will be described in detail) to these heating tubes.In the present embodiment, the first temperature sensor 91 is fixedly installed on the outer surface of inner bag 10 ball-shaped end 11, and this fixed form can be connected to be welded on inner bag ball-shaped end 11 outer surface has (not shown) on externally threaded cylinder.Second and three-temperature sensor 92,93 be separately fixed on the first and second flanges 31,32, and extend into the inside of inner bag 10.Certainly, in other embodiments, first, second and third temperature sensor all can be selected to be arranged on outer surface of liner or inner bag inside.
In the present embodiment, the first temperature sensor 91 is positioned at above plate washer 221 diametrically also near plate washer 221.By this set, the temperature that the first temperature sensor 91 is detected reflects the cold water layer temperature being positioned at inner bag low level substantially.Axial cross section 16 residing for first temperature sensor 91 and define a bottom volume V0 between the bottom of inner bag 10, because the volume of V0 is less, the first temperature sensor 91 can react rapidly, obtains the water temperature value T1 representing V0 soon.One first volume V1 is defined between first and second axial cross section 16,17 residing for temperature sensor 91,92; One second volume V2 is defined between second and third axial cross section 17,18 residing for temperature sensor 92,93; Axial cross section 16 residing for three-temperature sensor 93 and define a top volume V3 between the top of inner bag 10.Second and third water temperature value measured by temperature sensor 92,93 is respectively T2, T3, and wherein can represent the water temperature value of V1 part with the mean value T12 of T1 and T2, the mean value T23 of T2 and T3 represents the water temperature value of V2 part, and T3 represents the water temperature value of V3.
Experimentally show, a normal adult human hot water amount had required for a bath is about 50 liters; By that analogy, the hot water amount required for 2 to 4 people is respectively 100 liters, 150 liters and 200 liters.It should be noted that, the hot water amount of indication refers to pure hot water when being in bath comfort temperature T (as 40 degrees Celsius) and the heat of mixing water yield after cold water mix here.Certainly, in other embodiments, also only can add up the amount of pure hot water, and then be converted into the corresponding heat of mixing water yield.Suppose in inner bag be in temperature T time the heat of mixing water yield be Vm, the cold water temperature of water inlet is T0, and the total measurement (volume) of inner bag is V=V0+V1+V2+V3, then can obtain following equation according to thermal energy balance:
Vm*(T-T0)/V=V0*(T1-T0)/V+V1*(T12-T0)/V+V2*(T23-T0)/V+V3*(T3-T0)/V
Wherein V0, V1, V2, V3 carry out predefined ratio by the position arranging first, second and third temperature sensor 91,92,93, and the cold water temperature T0 of comfort temperature T and water inlet is known, that is, according to the water temperature value measured by each temperature sensor, and then according to the inner bag partial volume that these water temperature value are associated, just can calculate in real time can for the heat of mixing water yield Vm of bathing in inner bag.
For ease of calculating, in present embodiment, the residing diametrically position of second and third temperature sensor 92,93 makes the first volume V1 equal the second volume V2, and the first volume V1 > bottom volume V0.Preferably, the first volume V1=second volume V2=top volume V3 can also be made, that is, the inner bag volume of the axial cross section more than 16 residing for the first temperature sensor 91 is divided into three parts by second and third axial cross section 17,18 residing for temperature sensor 92,93, and the position residing for the first temperature sensor 91 can make V0/V1 be 1/3 ratio, thus greatly can simplify the calculating of heat of mixing water yield Vm.Certainly, those skilled in the art can be understandable, and V1, V2, V3 in above-mentioned embodiment are equal in theory, but possibly cannot guarantee completely equal in engineering, V1, V2 or V1, V2, V3 can only be made quite, that is, roughly equal, allow to there is certain deviation.In addition, those skilled in the art can easily it is contemplated that also can arrange more temperature sensor on inner bag, thus make the calculating of heat of mixing water yield Vm more accurate.
Because the setting position of temperature sensor and the volume of inner bag part are associated, thus the hot water amount in inner bag can be calculated in real time and more adequately, to give user reliably reference.
Coordinate with reference to shown in Fig. 2 and Fig. 3, water heater also comprises input unit 51, display unit 52, and the controller 50 be electrically connected with input unit 51, display unit 52, heating component 20 and system for detecting temperature 90.Input unit 51 is for supplying user's control program menu, selection function, adjustment temperature etc., in the embodiment shown in fig. 3, input unit 51 comprises the some touch button B1-B8 be arranged in bottom display unit 52, these buttons are printed with corresponding mark respectively, identify for user.Display unit 52 can show corresponding programs menu according to the control of user, and other is as necessary informations such as temperature, it can be light emitting diode (Light-EmittingDiode, LED) display screen, also can liquid crystal (LiquidCrystalDisplay, LCD) display screen.In the present embodiment, display unit 52 is light emitting diode (LED) display screen.Controller 50 can be embodied in the analog control circuit of hardware or software, digital control circuit and the integrated circuit by microprocessor or microprocessor control.In the present embodiment, controller 50 is microprocessor, well-known to those skilled in the artly be, microprocessor can comprise CPU (CentralProcessingUnit, CPU), read-only memory module (read-onlymemory, ROM), random access module (randomaccessmemory, RAM), time block, digital-to-analogue conversion module (A/Dconverter) and some input/output end ports.These input/output end ports can realize communicating with input unit 51, display unit 52, heating component 20 and system for detecting temperature 90 respectively and receive data or signal and export control signal.Certainly, controller 50 also can adopt other forms of integrated circuit, as application-specific IC (ApplicationSpecificIntegratedCircuit, ASIC) or field programmable gate array (FieldProgrammableGateArray, FPGA) etc.
As shown in Figure 3, in present embodiment, button B6 is printed with a humanoid mark, is used for setting for user the number wanting bathing.Respective regions 521 on a display screen can show the mark representing bather number, in present embodiment, is 4 humanoid marks.Certainly, in other embodiments, mark can be other figure or form, as the figure of shower nozzle, the figure etc. of bathtub, or represents bather number by means of only the mode of display numerical value.Because these figures or display format are that those skilled in the art can expect easily, so applicant is no longer repeated at this.
Shown in Fig. 4 is that controller 50 carrys out corresponding control heating component 20 to heat the hot water amount adapted according to the bather number that user sets.First, user sets by pressing button B6 the number wanting bathing, and then controller 50 is by the setting signal (step 611) of corresponding port accepts to this sign bather number.Such as, user presses a button B6, and then added their confirmation by pressing OK button, the people at this moment just having a bathing is selected.Correspondingly, controller 50 will receive the setting signal of sign people's bathing; Meanwhile, viewing area 521 display can represent the mark of bather number in the first way, and as first man shape mark becomes half bright, all the other be dark, show that the people of a bathing is chosen.Similarly, two, three or four bather numbers can be set.Certainly, in other embodiments, can for setting bather number can be more or a little less.Next, whether just at work (step 612) controller 50 can detect heating component 20, if whether the hot water amount then detected in inner bag can have a bath (step 614) for setting number; If not, then initialize to start heating component (step 613), then next perform step 614.As previously mentioned, controller 50 calculates the heat of mixing water yield Vm being in comfort temperature T had at present in inner bag in real time by the water temperature value that system for detecting temperature 90 detects, and judges whether the predetermined value (step 615) reaching the hot water amount adapted with setting number.Such as, when the bather number of setting is a people, the predetermined value of hot water amount is 60 liters.Correspondingly, the bather number of setting is two, three, four people time, the predetermined value of hot water amount is respectively 110 liters, 160 liters, 210 liters.If hot water amount has reached setting demand, then controller 50 can judge that whether heating is also in continuation (step 616), if then controller 50 controls heating component and quits work (step 617); If not, then program process (step 617) is terminated.If hot water amount does not also reach setting demand, then controller 50 can judge that whether heating is also in continuation (step 619), if so, then returns step 614, namely continues to detect hot water amount equally; If not, then controller 50 starts heating component work (step 620), next returns step 614, continues to detect hot water amount, until hot water amount reaches setting demand.
With reference to shown in Fig. 5, controller 50 can also according to the display of the hot water amount's real-time update display unit 52 detected.First, controller detects hot water amount Vm (step 620), then judges hot water amount relative to whether having increase before or reducing (step 622).If hot water amount has increase, then controller judges whether hot water amount reaches corresponding predetermined value (step 623) again, such as, whether hot water amount Vm reaches for 60 liters of people's bathing, for two people's bathings 110 liters, for three people's bathings 160 liters and for 210 liters of four people's bathings.When hot water amount reaches mutually deserved predetermined value, controller 50 controls display unit 52 and upgrades show tags (step 625), and namely display represents the mark of bather number in a second manner.During as reached 60 liters as hot water amount, first man shape mark from half bright become entirely bright; Correspondingly, when hot water amount reaches 110 liters, 160 liters, 210 liters respectively, second and third, four humanoid marks respectively from half bright become entirely bright.When hot water amount does not also reach corresponding predetermined value, then get back to step 622, namely continuing to judge whether hot water amount has increases or reduces.If hot water amount is compared to decreasing before, then next judge whether hot water amount reduces specified quantitative (step 624) from corresponding predetermined value; If so, then upgrade show tags (step 625), namely represent the mark of bather number with Third Way display; If not, then get back to step 622, namely continuing to judge whether hot water amount has increases or reduces.In the present embodiment, this specified quantitative is 10 liters.That is, when hot water amount drops to less than 200 liters more than 150 liters, the 4th humanoid mark, by complete bright dimmed, shows that the hot water had in inner bag supplies three people's bathings only.Correspondingly, when hot water amount progressively drops to 150 liters, 100 liters, less than 50 liters, the 3rd, two, a humanoid mark is progressively by complete bright dimmed.
Those skilled in the art easily it is contemplated that first, second and third display mode in above-mentioned embodiment can be exchanged, can certainly adopt other display mode, as filled the interior zone etc. of Manchu's shape mark.Because water heater can show the mark representing bather number, user can be set and the hot water amount wanted corresponding to bather number according to the display of this mark, thus substantially increase the convenience of use; In addition, as long as owing to heating as required, and the state of full heat will be heated to by the water in inner bag, thus avoid energy waste.
Shown in Fig. 6 to Fig. 9 is that controller prepares the workflow schematic block diagram of hot water in advance according to the bathing custom of user.Controller can select at least two continuous print first and second cycle in the present embodiment, then within the period 1, record the use habit of user, then within second round, apply this use habit, thus avoid user all will repeatedly pre-set at every turn.In the present embodiment, Cycle Length is a week, and after have recorded the use habit of first week, second week and each follow-up week all can apply this use habit, unless use habit changes, the use habit after changing can be applied next week after changing like this.In the present embodiment, user can select this function by programs menu button B7, i.e. " weekly intelligence " function of viewing area 522 display.After this function is selected, next controller 50 will perform the control flow shown in Fig. 6 to Fig. 9.Certainly, the time span in this cycle is not limited in week, can be shorter than it, as day; Also can than length, as the moon, season etc.
With reference to shown in Fig. 6, first, controller 50 can set initial first period of short period length, as ten minutes, then the working time (step 631) of the heating component 20 in this initial first period is detected, as heating component work in initial first period five minutes.Subsequently, controller 50 calculates the heating water yield Vh (step 632) in this period.Usually, heating component the hot water amount that energy per minute produces under nominal power can record in advance, and as 2 liters/min, equally, if heating component has worked five minutes within initial first period, then produced hot water amount is 10 liters.Next, controller detects in this initial first period whether have hot water consumption (step 633), the using amount of hot water Vc > 0 namely whether in initial first period.And this period of Vc=initial time inner bag in this period of hot water amount Vm1+ in by the hot water amount Vm2 in inner bag during this period concludes of hot water amount Vh-of heat source.In the present embodiment, Vm1 and Vm2 be when starting timing initial first period respectively and timer expiration time courage in the heat of mixing water yield, as previously mentioned, the water temperature value that this hot water amount detects by system for detecting temperature and calculating, applicant is no longer repeated at this.If do not have hot water consumption in initial first period, then controller does not perform any operation (step 635).If detect in initial first period have hot water consumption, then controller then judges whether it is first time hot water consumption (step 635) detected, if so, then can record initial time and initial hot water consumption.In the present embodiment, initial time is the timing time started of this initial first period, initial hot water consumption and Vc.It should be noted that, in the present embodiment, controller detect be first time water after, also can judge that whether using amount of hot water is more than a predetermined value further, such as 10 liters (step 636).Because if just consume a small amount of hot water due to special circumstances, use regimen condition as washed one's hands etc., these situations do not belong to normal use habit usually, so can not need record temporarily.Therefore, if using amount of hot water does not exceed predetermined value, controller does not need to perform any operation (step 636); If exceeded predetermined value, then controller can record start time and initial hot water consumption (step 636).Get back to step 634, if controller detects that the hot water consumption in this initial first period is not first time, show that this initial first period is the lasting water of then last initial first period, so controller does not need the record start time again, as long as using amount of hot water (step 636) accumulative new on original initial hot water consumption.
Because the time span of initial first period is shorter, if the time interval of hot water consumption is several times short, and each time consumed is not long, and like this, controller just needs frequent starting heating component to prepare hot water within second round.So, as improving further, initial second period that a time span is longer can be set, this initial second period is at least more than or equal to two initial first periods in time span, preferably, the time span of initial second period can be arranged to times over or several times in the time span of initial first period.In the present embodiment, initial first period is set to ten minutes, and initial second period is set to two hours.With reference to shown in Fig. 7, controller can record the hot water behaviour in service (step 641) of each initial second period.Concrete, the initial time that in this initial second period, first occurs can be set as the initial time (step 642) of this initial second period by controller; The initial hot water consumption of each initial first period in this initial second period is added up, as the initial hot water consumption (step 643) of this initial second period.Such as, occurred the consumption of several times hot water in initial second period, then the initial time that consumes of hot water is just as the initial time of this initial second period first time, and the initial hot water consumption of the total amount that the consumption of several times hot water adds up initial second period that is this.Certainly, if there is not hot water consumption in this initial second period, then controller can not carry out record.After the hot water behaviour in service record in this initial second period, then controller terminates the record of this period and enters the record (step 644) of next initial second period.
Shown in Fig. 8 and Fig. 9 be controller according to the hot water behaviour in service recorded in the period 1, then two embodiments of respective application within second round.As shown in Figure 8, first controller can judge whether the object time arrives (step 651).Within second round, be provided with target the first/bis-period corresponding with initial the first/bis-period in the period 1, initial time then in initial the first/bis-period is corresponding with the object time in corresponding target the first/bis-period, and the initial hot water consumption in initial the first/bis-period is suitable with the target using amount of hot water in corresponding target the first/bis-period." quite " of indication comprises completely equal here, also comprise some in particular cases close to equal.Such as, the using amount of hot water prepared is caused to reduce in the object time near there is paroxysmal hot water consumption (as non-habitually bathing) before.Can start heating component in time to supply reduced using amount of hot water when controller finds this situation, but the time of supplementary heating is longer, when the object time arrives, the using amount of hot water of preparation is not also supplied completely, just comparatively close.If detect that the object time does not also arrive, then controller does not perform any operation (step 653).If the object time arrives, then next controller judges target using amount of hot water whether sufficient (step 652), and namely whether target using amount of hot water is suitable with corresponding initial hot water consumption.If target using amount of hot water enough, then continue to judge whether at work (step 654) heating component, if so, then controller controls heating component stopping heating (step 654); If not, then controller does not perform any operation (step 657).If target using amount of hot water is also not enough, then whether at work (step 655) controller can judge heating component equally, and if so, then controller does not perform any operation (step 657); If not, then controller controls heating component startup heating (step 658).
Fig. 9 discloses the embodiment of Another application.In the present embodiment, controller can judge whether the initial time of present period is positioned at the second half section (step 661) of this period.The period of indication is target first or second period here.For the second period, namely to judge after whether the initial time in the first two hour is positioned at one hour.If so, then controller then judges whether the initial time of next period is positioned at its first half section (step 662); If so, then show to be that continuous print or interval are very near with water in two periods, so, for avoiding starting heating component continually, these two periods can be merged and prepare using amount of hot water (step 664) together with follow-up.Certainly, if when the time span of this period is longer, can judge whether the initial time of present period is positioned at the time durations of thereafter 1/4 further, and whether the initial time of next period is positioned at its time durations of front 1/4.Still for the second period, namely the initial time of current two hours is positioned at 30 minutes thereafter, and meanwhile, whether the initial time of next two hours is positioned at its first 30 minutes.
If the initial time of present period is not positioned at its second half section, or the initial time of next period is not positioned at its first half section, or two periods meet after merging condition merges, whether sufficient (step 663) next controller can judge the target using amount of hot water of present period, if the current and next period incorporates, then what judge is whether the cumulative target using amount of hot water of these two periods is sufficient.If so, then controller does not perform any operation (step 665); If not, then controller calculates the time (step 666) of heat target using amount of hot water needs heating.As previously mentioned, the heating component hot water amount that energy per minute produces under nominal power can record, in advance so the time that will produce required for target using amount of hot water just can calculate thus.Next controller judges whether preheating time arrives (step 667), and whether namely the object time shifts to an earlier date target using amount of hot water more forward needs the time span of heating to arrive.If arrived, then controller has started heating component heating (step 668); If be also less than, then controller does not perform any operation (step 668).
Owing to setting for the first and second cycles, and within the period 1, record the bathing custom of user, within second round, then apply recorded bathing custom, user need not to be repeated before bathing to arrange to be prepared in advance the hot water of bathing at every turn, thus substantially increase the convenience of use.In above-mentioned embodiment, period 1 and second round are continuous print, but in other embodiments, these two cycles also can be discontinuous, depending on the demand of user; In addition, period 1 and second round can be isometric, as day, week etc., can be also Length discrepancy, as the moon, and season etc.

Claims (9)

1. a water heater, is characterized in that, comprising:
Inner bag, for accommodating a certain amount of heated water;
Water inlet and delivery port, be communicated with to transmit the water flowing into inner bag and flow out inner bag with described inner bag;
Thermal source, is associated with described inner bag with the water in heating inner liner;
Controller, is connected with described thermal source, for selected period 1 and second round;
The initial time that in the record period 1, hot water consumes and initial hot water consumption; And
Before object time corresponding with described initial time within second round, control described thermal source and heat the target using amount of hot water suitable with described initial hot water consumption in advance;
The described period 1 comprises continuous print isometric some initial first period, and described controller is also for recording the initial time and initial hot water consumption that in each initial first period, hot water consumes;
The described period 1 also comprises continuous print isometric some initial second period, and each initial second period is at least more than or equal to two initial first periods in time span;
Described controller is also for being set as the initial time of this initial second period by the initial time that in each initial second period, first occurs; The initial hot water consumption of each initial first period in each initial second period accumulative, using the initial hot water consumption as this initial second period.
2. water heater as claimed in claim 1, is characterized in that, described controller also for
Only have when the hot-water consumption in the period 1 is more than a predetermined value, just start record start time and initial hot water consumption.
3. water heater as claimed in claim 1, is characterized in that, comprise some targets the first/bis-period corresponding with described some initial the first/bis-periods described second round, described controller also for
Before the object time of described target the first/bis-period, control described thermal source heat target using amount of hot water in advance.
4. water heater as claimed in claim 3, is characterized in that, described controller also for
Judge whether hot water consumption is present in the second half section previous in continuous two target the first/bis-periods, and in the first half section of latter;
If so, then this two target the first/bis-periods are merged.
5. water heater as claimed in claim 1, it is characterized in that, described first/two cycles is a week.
6. water heater as claimed in claim 1, is characterized in that, hot water amount during hot water amount-this period concludes by heat source in hot water amount+this period when using amount of hot water=this period in described initial first period is initial in inner bag in inner bag.
7. water heater as claimed in claim 6, is characterized in that, also comprises the some temperature sensors arranged along inner bag radial direction; Some water temperature value that described hot water amount detects according to described some temperature sensors, and the inner bag partial volume be associated with described water temperature value is determined.
8. water heater as claimed in claim 6, it is characterized in that, described hot water amount refers to heat of mixing water yield when being in specified temp.
9. water heater as claimed in claim 1, it is characterized in that, described period 1 and second round are arranged continuously.
CN201010259177.5A 2010-08-17 2010-08-17 Intelligent water heater Expired - Fee Related CN102374645B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010259177.5A CN102374645B (en) 2010-08-17 2010-08-17 Intelligent water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010259177.5A CN102374645B (en) 2010-08-17 2010-08-17 Intelligent water heater

Publications (2)

Publication Number Publication Date
CN102374645A CN102374645A (en) 2012-03-14
CN102374645B true CN102374645B (en) 2016-02-03

Family

ID=45793628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010259177.5A Expired - Fee Related CN102374645B (en) 2010-08-17 2010-08-17 Intelligent water heater

Country Status (1)

Country Link
CN (1) CN102374645B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107917535A (en) * 2016-10-10 2018-04-17 青岛经济技术开发区海尔热水器有限公司 A kind of method and water heater for predicting bathing custom

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102230672A (en) * 2011-06-09 2011-11-02 海尔集团公司 Water heater and control method thereof
CN103363670B (en) * 2012-03-31 2016-10-05 珠海格力电器股份有限公司 Air-source water heater and control method thereof and device
CN103968552B (en) * 2013-01-30 2018-01-02 美的集团股份有限公司 A kind of electric heater and its control method
CN104110878B (en) * 2013-12-23 2017-12-19 芜湖美的厨卫电器制造有限公司 Electric heater and its control method with ECO functional modes
CN105650886B (en) * 2016-03-23 2019-01-04 广东万和热能科技有限公司 Storage-type electric water heater and its control method and control system
CN106052140B (en) * 2016-06-27 2019-11-01 京东方科技集团股份有限公司 Controlling device for water heater, water heater and its control method
GB2560150B (en) * 2017-01-13 2021-06-30 Kohler Mira Ltd Bath filling
CN107062621B (en) * 2017-03-20 2023-11-14 广东万家乐燃气具有限公司 Central gas water heater capable of automatically adjusting circulation interval time
CN109425120B (en) * 2017-08-31 2021-06-01 芜湖美的厨卫电器制造有限公司 Water heater control method and device and water heater
CN115978787B (en) * 2023-03-15 2023-06-20 绵阳高新区恒奥电子科技有限公司 Energy-saving heat-storage water heater

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004218947A (en) * 2003-01-15 2004-08-05 Denso Corp Hot water storage type water heater
CN1808321A (en) * 2005-10-21 2006-07-26 艾欧史密斯(中国)热水器有限公司 Electrical water heater capable of precisely controlling water amount and temperature, and control method thereof
JP2007211997A (en) * 2006-02-07 2007-08-23 Matsushita Electric Ind Co Ltd Hot water storage type water heater
CN101135471A (en) * 2007-09-29 2008-03-05 江苏天舒电器有限公司 Method for forecasting and controlling heat pump hot-water system dynamic energy conservation operation
CN101738945A (en) * 2008-11-21 2010-06-16 深圳安吉尔饮水产业集团有限公司 Method and system for controlling heating and refrigeration of water dispenser
CN101788189A (en) * 2009-01-24 2010-07-28 海尔集团公司 Electric water heater capable of setting bather number and control method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004218947A (en) * 2003-01-15 2004-08-05 Denso Corp Hot water storage type water heater
CN1808321A (en) * 2005-10-21 2006-07-26 艾欧史密斯(中国)热水器有限公司 Electrical water heater capable of precisely controlling water amount and temperature, and control method thereof
JP2007211997A (en) * 2006-02-07 2007-08-23 Matsushita Electric Ind Co Ltd Hot water storage type water heater
CN101135471A (en) * 2007-09-29 2008-03-05 江苏天舒电器有限公司 Method for forecasting and controlling heat pump hot-water system dynamic energy conservation operation
CN101738945A (en) * 2008-11-21 2010-06-16 深圳安吉尔饮水产业集团有限公司 Method and system for controlling heating and refrigeration of water dispenser
CN101788189A (en) * 2009-01-24 2010-07-28 海尔集团公司 Electric water heater capable of setting bather number and control method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107917535A (en) * 2016-10-10 2018-04-17 青岛经济技术开发区海尔热水器有限公司 A kind of method and water heater for predicting bathing custom

Also Published As

Publication number Publication date
CN102374645A (en) 2012-03-14

Similar Documents

Publication Publication Date Title
CN102374645B (en) Intelligent water heater
CN102620413B (en) There is the water heater of time alert feature
CN102620434B (en) Can select the water heater of bathing kind
CN102620409A (en) Water heater with personalized bath function
CN106123305B (en) The method for heating and controlling and electric heater of electric heater
CN105698397B (en) Electric heater and its method for heating and controlling
CN102374647B (en) There is the water heater of system for detecting temperature
US4568821A (en) Remote water heater controller
CN102374646A (en) Water heater capable of setting number of bath persons
CN108286810B (en) Water heater and control method thereof
US20030183618A1 (en) Programmable domestic water heating system
JPS62202960A (en) Warm-water heating controller
JP5970854B2 (en) Hot water storage water heater
CN110398069A (en) Water heater and its control method and computer readable storage medium
CN109990480A (en) Control method, computer readable storage medium and the electric heater of electric heater
CN108286795B (en) Water heater and control method thereof
JP2011220647A (en) Reduced fuel cost calculating device, and solar hot water supply system
JPH0311385B2 (en)
CN108286814A (en) Electric heater and its control method
CN108571826A (en) A kind of control method of electric water heater and electric heater
CN102455052A (en) Electric water heater
CN109140762A (en) A kind of electric heater and control method
US20110282499A1 (en) Control for indicating available hot fluid supply
CN112762607A (en) Water storage type water heater and equivalent hot water amount measurement and control method and measurement and control device thereof
CN112611112B (en) Method and device for predicting remaining bathable time length of electric water heater when water is not used

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160203