CN102359637A - 蝶阀的流量测量与控制装置 - Google Patents
蝶阀的流量测量与控制装置 Download PDFInfo
- Publication number
- CN102359637A CN102359637A CN2011102332192A CN201110233219A CN102359637A CN 102359637 A CN102359637 A CN 102359637A CN 2011102332192 A CN2011102332192 A CN 2011102332192A CN 201110233219 A CN201110233219 A CN 201110233219A CN 102359637 A CN102359637 A CN 102359637A
- Authority
- CN
- China
- Prior art keywords
- valve
- pipeline
- flow measurement
- valve body
- butterfly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Flow Control (AREA)
Abstract
本发明公开一种蝶阀的流量测量与控制装置包括阀体、蝶板,所述阀体内装有蝶板,特征是:还包括风差压变送器、阀前管道及阀后管道,所述风差压变送器的正压接口通过正压接管与阀前管道的内腔相连接,所述风差压变送器的负压接口通过负压接管与阀后管道的内腔相连接,所述阀前管道设置在阀体前端,阀后管道设置在阀体后端。所述密封圈的内径与阀前管道的内径及阀后管道的内径相等。本发明结构简单、紧凑、合理;稳定性好、计量精度高,完全能满足污水处理精确曝气系统对空气流量即时调节的精度要求,具有明显的节能效果。
Description
技术领域
本发明涉及一种蝶阀的流量测量与控制装置,具体地说是用于污水处理精确曝气系统上精确测量和控制空气流量的专用装置,属于机械结构技术领域。
背景技术
在已有的技术中,污水处理精确曝气系统中,都采用控制阀与气体流量计串联安装,流量计位于靠近控制阀的出口管路上,流量计检测到的信号反馈给智能化自动控制系统,由控制系统将与工艺要求相对应的命令输入控制阀,使控制阀动作以实现对流量的即时调节,从而满足污水处理工艺中各阶段对空气流量的不同要求。此流量计属于温差式流量计,其原理是通过检测头的温度变化来求得气体流量的变化,由于管路中的压力空气运动的复杂性和温度分布的不均匀性,决定了此类流量计的计量精度低、稳定性差,无法满足精确曝气系统对流量控制的精确性,达不到理想的节能要求。
发明内容
本发明的目的在于克服上述不足之处,从而提供一种蝶阀的流量测量与控制装置,其稳定性好,精度高。
按照本发明提供的技术方案,蝶阀的流量测量与控制装置包括阀体、蝶板,所述阀体内装有蝶板,阀体内设置有密封圈,特征是:还包括风差压变送器、阀前管道及阀后管道,所述风差压变送器的正压接口通过正压接管与阀前管道的内腔相连接,所述风差压变送器的负压接口通过负压接管与阀后管道的内腔相连接,所述阀前管道设置在阀体前端,阀后管道设置在阀体后端。
所述密封圈的内径与阀前管道的内径及阀后管道的内径相等,均等于管道直径D。
所述阀前管道上的连接点到蝶板中心的距离A与管道直径D的比值A/D=0.75-1.5。
所述阀后管道上的连接点到蝶板中心的距离B与管道直径D的比值B/D=1-2。
本发明与已有技术相比具有以下优点:
本发明结构简单、紧凑、合理;稳定性好、计量精度高,完全能满足污水处理精确曝气系统对空气流量即时调节的精度要求,具有明显的节能效果。
附图说明
图1为本发明结构示意图。
具体实施方式
下面本发明将结合附图作进一步描述:
如图1所示:其包括阀体1、密封圈2、蝶板3、阀前管道4、阀后管道5、风差压变送器6、正压接管7、负压接管8等。
所述风差压变送器6的正压接口通过正压接管7与阀前管道4的内腔相连接,所述风差压变送器6的负压接口通过负压接管8与阀后管道5的内腔相连接,所述阀前管道4设置在阀体1前端,阀后管道5设置在阀体1后端。
所述阀体内设置有密封圈2,所述密封圈2的内径与阀前管道4的内径及阀后管道5的内径相等,均等于管道直径D。
所述阀前管道4上的连接点到蝶板中心的距离A与管道直径D的比值A:D=0.75-1.5:1。
所述阀后管道5上的连接点到蝶板中心的距离B与管道直径D的比值B:D=1-2:1。
图1中的箭头Q为压力空气流动方向。在精确曝气系统的试验及工程实践中,每个阶段的曝气量(即空气流量)是不同的,当工艺要求改变流量时,风差压变送器6将即时检测到的信号反馈给智能控制系统,系统能自动识别即时流量是否符合工艺要求,并发送指令使蝶板3动作,直至蝶板3的开度完全符合指令要求(如图1中蝶板3沿箭头K旋转到虚线位置),此时管道中的空气流量符合工艺要求的即时流量。
Claims (4)
1.一种蝶阀的流量测量与控制装置,包括阀体(1)、蝶板(3),所述阀体(1)内装有蝶板(3),阀体(1)内设置有密封圈(2),其特征是:还包括风差压变送器(6)、阀前管道(4)及阀后管道(5),所述风差压变送器(6)的正压接口通过正压接管(7)与阀前管道(4)的内腔相连接,所述风差压变送器(6)的负压接口通过负压接管(8)与阀后管道(5)的内腔相连接,所述阀前管道(4)设置在阀体(1)前端,阀后管道(5)设置在阀体(1)后端。
2.如权利要求1所述的蝶阀的流量测量与控制装置,其特征是:所述密封圈(2)的内径与阀前管道(4)的内径及阀后管道(5)的内径相等,均等于管道直径D。
3.如权利要求1所述的蝶阀的流量测量与控制装置,其特征是:所述阀前管道(4)上的连接点到蝶板中心的距离A与管道直径D的比值A/D=0.75-1.5。
4.如权利要求1所述的蝶阀的流量测量与控制装置,其特征是:所述阀后管道(5)上的连接点到蝶板中心的距离B与管道直径D的比值B/D=1-2。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102332192A CN102359637A (zh) | 2011-08-13 | 2011-08-13 | 蝶阀的流量测量与控制装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102332192A CN102359637A (zh) | 2011-08-13 | 2011-08-13 | 蝶阀的流量测量与控制装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102359637A true CN102359637A (zh) | 2012-02-22 |
Family
ID=45585003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102332192A Pending CN102359637A (zh) | 2011-08-13 | 2011-08-13 | 蝶阀的流量测量与控制装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102359637A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5261639A (en) * | 1991-11-11 | 1993-11-16 | Robert Bosch Gmbh | Valve |
CN1804740A (zh) * | 2005-12-02 | 2006-07-19 | 沈新荣 | 基于高级特征计算的电动阀门控制方法及阀门 |
CN101055466A (zh) * | 2007-03-23 | 2007-10-17 | 沈新荣 | 平衡控制节流一体化的阀门控制方法及阀门装置 |
CN101706003A (zh) * | 2009-11-03 | 2010-05-12 | 无锡杰尔压缩机有限公司 | 一种衬里橡胶中线蝶阀的密封结构 |
CN202209468U (zh) * | 2011-08-13 | 2012-05-02 | 无锡杰尔压缩机有限公司 | 蝶阀的流量测量与控制装置 |
-
2011
- 2011-08-13 CN CN2011102332192A patent/CN102359637A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5261639A (en) * | 1991-11-11 | 1993-11-16 | Robert Bosch Gmbh | Valve |
CN1804740A (zh) * | 2005-12-02 | 2006-07-19 | 沈新荣 | 基于高级特征计算的电动阀门控制方法及阀门 |
CN101055466A (zh) * | 2007-03-23 | 2007-10-17 | 沈新荣 | 平衡控制节流一体化的阀门控制方法及阀门装置 |
CN101706003A (zh) * | 2009-11-03 | 2010-05-12 | 无锡杰尔压缩机有限公司 | 一种衬里橡胶中线蝶阀的密封结构 |
CN202209468U (zh) * | 2011-08-13 | 2012-05-02 | 无锡杰尔压缩机有限公司 | 蝶阀的流量测量与控制装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202209468U (zh) | 蝶阀的流量测量与控制装置 | |
CN202252235U (zh) | 菱形阀的流量测量与控制装置 | |
CN106989274B (zh) | 一种气压平衡罐自动补气系统 | |
CN202834251U (zh) | 流量测量和控制的v形阀 | |
CN102359637A (zh) | 蝶阀的流量测量与控制装置 | |
CN102734520A (zh) | 流量测量和控制的v形阀 | |
CN202188195U (zh) | 流量精确测量控制组合阀 | |
CN204255414U (zh) | 气体流量测量装置以及气体流量测量仪 | |
CN202746714U (zh) | 流量分配电动调节阀 | |
CN201964907U (zh) | 流量测量装置 | |
CN202582616U (zh) | 一体化智能威尔巴流量计 | |
CN202148370U (zh) | 一种太阳电池扩散工艺的尾排装置 | |
CN102287560A (zh) | 菱形阀的流量测量与控制装置 | |
CN203443336U (zh) | 富氧燃烧陶瓷辊道窑脉冲燃烧控制装置 | |
CN203084004U (zh) | 具有水滴形减阻的插入型介质流速传感器 | |
CN203342419U (zh) | 酯化分离塔的下部温度控制系统 | |
CN202109941U (zh) | 水滴预整流差压流量计 | |
CN102278510A (zh) | 流量精确测量控制组合阀 | |
CN203342753U (zh) | 酯化反应装置的热媒进料管道控制系统 | |
CN203342752U (zh) | 酯化分离塔的热媒进料管道控制系统 | |
CN205761077U (zh) | 羟基反应釜的缓冲回流管路 | |
CN204740262U (zh) | 靠背笛孔风速差压测量装置 | |
CN203342754U (zh) | 酯化换热器的热媒进料管道控制系统 | |
CN206891511U (zh) | 一体化蒸汽计量系统 | |
CN104208893A (zh) | 酯化分离塔的温度控制系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120222 |