CN102354976B - 快速网络拓扑分析方法 - Google Patents

快速网络拓扑分析方法 Download PDF

Info

Publication number
CN102354976B
CN102354976B CN 201110319873 CN201110319873A CN102354976B CN 102354976 B CN102354976 B CN 102354976B CN 201110319873 CN201110319873 CN 201110319873 CN 201110319873 A CN201110319873 A CN 201110319873A CN 102354976 B CN102354976 B CN 102354976B
Authority
CN
China
Prior art keywords
calculation
switch
topology analysis
bus
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110319873
Other languages
English (en)
Other versions
CN102354976A (zh
Inventor
薛玮
孙秋鹏
汪少辉
谭志海
张云娜
葛亮
赵凤青
冷华
陈宏�
朱吉然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sifang Automation Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Original Assignee
Beijing Sifang Automation Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sifang Automation Co Ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd filed Critical Beijing Sifang Automation Co Ltd
Priority to CN 201110319873 priority Critical patent/CN102354976B/zh
Publication of CN102354976A publication Critical patent/CN102354976A/zh
Application granted granted Critical
Publication of CN102354976B publication Critical patent/CN102354976B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明介绍了一种快速网络拓扑分析方法,该方法为下述步骤:(1)、读入数据;(2)、形成扩展连接点;(3)、形成主母线;(4)、形成支路;(5)、读取开关状态;(6)、形成计算母线;(7)、形成拓扑岛;(8)、循环或触发执行。按本方法所需搜索的设备个数减少4到8倍,使网络拓扑分析的速度提高一个数量级。本发明的有益效果是:(1)调配一体化系统中网络拓扑分析实时性极大提高,满足了电网对拓扑分析实时性的要求;(2)调配一体化拓扑分析的结果对现有EMS的高级应用模块没有影响,现有EMS高级应用模块无需修改就可以应用到调配一体化系统中。

Description

快速网络拓扑分析方法
技术领域
本发明属于电力工程技术领域,涉及一种适用于调配一体化系统的快速网络拓扑分析方法。
背景技术
无论在配电自动化系统还是在调度自动化系统中,网络拓扑分析是一个重要的基础功能模块。网络拓扑分析是实现各种高级应用的基础,如动态着色、状态估计、潮流计算、电压无功优化、故障分析和调度员模拟培训等,是实现智能电网调度支撑系统的基础。目前,常规网络拓扑分析方法应用在大中型配电自动化系统或调配一体化系统时,尚存在如下问题:
(1)由于配电网设备星罗棋布,需要处理的设备过多使网络拓扑分析实时性降低,无法满足电网运行对网络拓扑分析模块的实时性要求。
(2)由于配电网馈线段数量偏多,导致网络拓扑分析在调配一体化系统应用时计算母线数量激增,且配电网和输电网的计算母线区分困难,对现有EMS(英文“Energy Management System”的缩写,中文译文为“能量管理系统”)高级应用模块的影响较大。
为了提高网络拓扑分析速度,核心的工作就是要尽量减少形成计算母线和拓扑岛时递归搜索的次数以及要求搜索的设备范围;而调配一体化系统网络拓扑分析还要求形成的计算母线配电网和输电网应该容易区分,且对现有EMS高级应用模块影响较小。
发明内容
本发明要解决的技术问题是:针对常规网络拓扑分析应用在配电自动化系统和调配一体化系统时存在的缺陷,提供一种适用于调配一体化系统的快速网络拓扑分析方法,使用该方法可减少搜索的设备范围,无需单独对配电网进行拓扑岛的划分,极大提高网络拓扑分析的速度,且对现有EMS高级应用模块没有不利影响。
本发明的技术解决方案是,所提供的这种快速网络拓扑分析方法是为下述步骤:
(1)、读入数据。从配电网的模型库读取原始网络模型的电网连接点模型数据到拓扑分析算法内存中;
(2)、形成扩展连接点。从配电网的模型库中搜索馈线段,找到通过馈线段连接在一起的连接点,使用常规方法形成扩展连接点;
(3)、形成主母线。从配电网的模型库中搜索开关,找到与开关连接在一起的连接点或扩展连接点,使用常规方法形成主母线;
(4)、形成支路。从配电网的模型库中搜索出交流线路和变压器计算模型,使用常规方法将该交流线路和变压器计算模型的变压器绕组形成计算支路;
(5)、读取开关状态。从配电网的实时库中读取上述步骤(3)所搜开关的当前状态;
(6)、形成计算母线。依据步骤(5)所读取的开关的当前状态,使用常规方法形成状态改变的开关。然后,搜索状态改变的开关所属主母线内所有开关,找到通过开关连接在一起的连接点或扩展连接点,再使用常规方法形成计算母线;
(7)、形成拓扑岛。依据步骤(4)所形成的计算支路和步骤(6)所形成的计算母线,使用常规方法找到该计算支路和该计算母线之间的关系,然后,依据该计算支路和计算母线之间的关系,搜索与该计算支路连接在一起的计算母线,使用常规方法形成拓扑岛;
(8)、循环或触发执行。每5秒钟执行一次步骤(5)~步骤(7)的内容,循环往复。定时执行过程中,如遇开关变位,可由开关变位触发执行步骤(5)~步骤(7)一次,随后,上述定时循环执行继续。
本发明的工作原理是:无论多么复杂的配电网,都是由开关通过公共连接点与其它设备连接组成的。相邻开关之间,无论以何种接线方式连接多少设备,其带电属性相同。因此,系统初始化过程中,在原有电力系统初始网络连接模型基础上,搜索馈线段,找到由馈线段连接在一起的连接点形成扩展连接点,这样就消除了馈线段,将初始网络连接模型转换为连接点和扩展连接点连接的配电网模型。这种模型是静态的,不受配电网运行方式的影响。这样,配电网络拓扑分析时不再需要搜索馈线段,简化为开关连接的连接点、扩展连接点的联通性分析。网络拓扑分析过程中需要搜索的设备个数减少4到8倍,从而使网络拓扑分析的速度提高一个数量级。在调配一体化系统中,配电网馈线设备在该网络拓扑分析结果中属于相应变电站的一个计算母线,现有EMS高级应用模块无需进行任何修改即可使用本发明的网络拓扑分析方法计算结果。
本发明的有益效果是:
(1)调配一体化系统中网络拓扑分析实时性极大提高,满足了电网对拓扑分析实时性的要求;
(2)调配一体化拓扑分析的结果对现有EMS的高级应用模块没有影响,现有EMS高级应用模块无需修改就可以应用到调配一体化系统中。
具体实施方式
实施例1:
(1)、从配电网的模型库读取原始网络模型的电网连接点模型数据到拓扑分析算法内存中;
(2)、从配电网的模型库中搜索馈线段,找到通过馈线段连接在一起的连接点,使用常规方法形成扩展连接点;
(3)、从配电网的模型库中搜索开关,找到与开关连接在一起的连接点或扩展连接点,使用常规方法形成主母线;
(4)、从配电网的模型库中搜索出交流线路和变压器计算模型,使用常规方法将该交流线路和变压器计算模型的变压器绕组形成计算支路;
(5)、从配电网的实时库中读取上述步骤(3)所搜开关的当前状态;
(6)、依据步骤(5)所读取的开关的当前状态,使用常规方法形成状态改变的开关。然后,搜索状态改变的开关所属主母线内所有开关,找到通过开关连接在一起的连接点或扩展连接点,再使用常规方法形成计算母线;
(7)、依据步骤(4)所形成的计算支路和步骤(6)所形成的计算母线,使用常规方法找到该计算支路和该计算母线之间的关系,然后,依据该计算支路和计算母线之间的关系,搜索与该计算支路连接在一起的计算母线,使用常规方法形成拓扑岛;
(8)、每5秒钟执行一次步骤(5)~步骤(7)的内容,循环往复。定时执行过程中,如遇开关变位,由开关变位触发执行步骤(5)~步骤(7)一次,随后,上述定时循环执行继续。
实施例2:
步骤(1)~(7)同实施例1;、从配电网的模型库读取原始网络模型的电网连接点模型数据到拓扑分析算法内存中;
(8)、每5秒钟执行一次步骤(5)~步骤(7)的内容,循环往复。

Claims (1)

1.一种快速网络拓扑分析方法,该方法为下述步骤:
(1)、从配电网的模型库读取原始网络模型的电网连接点模型数据到拓扑分析算法内存中;
(2)、从配电网的模型库中搜索馈线段,找到通过馈线段连接在一起的连接点,使用常规方法形成扩展连接点;
(3)、从配电网的模型库中搜索开关,找到与开关连接在一起的连接点或扩展连接点,使用常规方法形成主母线;
(4)、从配电网的模型库中搜索出交流线路和变压器计算模型,使用常规方法将该交流线路和变压器计算模型的变压器绕组形成计算支路;
(5)、从配电网的实时库中读取上述步骤(3)所搜开关的当前状态;
(6)、依据步骤(5)所读取的开关的当前状态,使用常规方法形成状态改变的开关,然后,搜索状态改变的开关所属主母线内所有开关,找到通过开关连接在一起的连接点或扩展连接点,再使用常规方法形成计算母线;
(7)、依据步骤(4)所形成的计算支路和步骤(6)所形成的计算母线,使用常规方法找到该计算支路和该计算母线之间的关系,然后,依据该计算支路和计算母线之间的关系,搜索与该计算支路连接在一起的计算母线,使用常规方法形成拓扑岛;
(8)、每5秒钟执行一次步骤(5)~步骤(7)的内容,循环往复,定时执行过程中,如遇开关变位,由开关变位触发执行步骤(5)~步骤(7)一次,随后,上述定时循环执行继续。
CN 201110319873 2011-10-20 2011-10-20 快速网络拓扑分析方法 Active CN102354976B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110319873 CN102354976B (zh) 2011-10-20 2011-10-20 快速网络拓扑分析方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110319873 CN102354976B (zh) 2011-10-20 2011-10-20 快速网络拓扑分析方法

Publications (2)

Publication Number Publication Date
CN102354976A CN102354976A (zh) 2012-02-15
CN102354976B true CN102354976B (zh) 2013-08-14

Family

ID=45578499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110319873 Active CN102354976B (zh) 2011-10-20 2011-10-20 快速网络拓扑分析方法

Country Status (1)

Country Link
CN (1) CN102354976B (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103699707B (zh) * 2012-09-27 2016-08-10 苏州瑞盈科技有限公司 一种用于配电网的图形空间自动扩充方法
CN103631998A (zh) * 2013-11-27 2014-03-12 国家电网公司 一种针对局部拓扑变化的配电网建模方法
CN103699664B (zh) * 2013-12-27 2017-11-21 国家电网公司 一种配电网动态拓扑分析方法
CN104112240A (zh) * 2014-07-18 2014-10-22 国家电网公司 一种基于拓扑岛分析的停电分析方法
CN104166886B (zh) * 2014-08-18 2017-03-29 国家电网公司 一种用于辨识高危及重要用户供电风险的智能判断方法
CN106602549B (zh) * 2016-11-29 2020-09-22 珠海优特电力科技股份有限公司 电气主接线分析系统、分析方法和操作方法
CN112507499B (zh) * 2020-12-02 2024-01-23 广东电网有限责任公司 基于gis的配电网线损数据采集方法及相关装置
CN112528449B (zh) * 2021-01-01 2022-07-05 青岛公能新能源科技有限公司 一种配电网计算母线形成方法
CN115622057B (zh) * 2022-12-20 2023-03-07 成都交大光芒科技股份有限公司 供电调度系统供电拓扑分析方法、装置及电子设备

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030171851A1 (en) * 2002-03-08 2003-09-11 Peter J. Brickfield Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems
CN101938124B (zh) * 2010-07-22 2012-11-07 大连海事大学 一种电力系统网络拓扑的矩阵分析方法
CN101976840B (zh) * 2010-10-15 2012-11-07 大连海事大学 基于邻接矩阵准平方的电力系统网络拓扑分析方法

Also Published As

Publication number Publication date
CN102354976A (zh) 2012-02-15

Similar Documents

Publication Publication Date Title
CN102354976B (zh) 快速网络拓扑分析方法
CN103605852B (zh) 一种用于大规模电网机电暂态实时仿真的并行拓扑方法
CN104167736B (zh) 一种大电网并行网络拓扑分析方法
CN104133943B (zh) 基于目标导向的配网图形自动生成方法
Dufour et al. Review of state-of-the-art solver solutions for HIL simulation of power systems, power electronic and motor drives
CN101866383B (zh) 电力系统机电/电磁暂态仿真数据转换系统及其设计方法
CN102708225B (zh) 一种交直流大电网电磁暂态仿真的分片调试方法
Muljadi et al. Impact of wind power plants on voltage and transient stability of power systems
CN108181550A (zh) 一种交流微电网故障类型判断和选相方法
Abagiu et al. Solutions for energy losses reduction in power networks with renewable energy sources
CN103455951B (zh) 基于短路功率方向的继电保护仿真方法
CN106599447B (zh) 基于电气间隔的变电站分层拓扑分析方法
Koch-Ciobotaru et al. Distributed FLISR algorithm for smart grid self-reconfiguration based on IEC61850
Khare et al. Optimal PMU placement using matrix modification based integer linear programming
Bélanger et al. A modern and open real-time digital simulator of contemporary power systems
CN105021921B (zh) 一种基于拓扑分析的电网合解环识别方法
CN105391058A (zh) 一种地区电网防误网络拓扑分析方法
CN111553040B (zh) 一种基于gpu加速的电网拓扑分析高性能计算方法及装置
Wang et al. Krylov subspace based model reduction method for transient simulation of active distribution grid
Yamane et al. Multi-FPGA solution for large power systems and microgrids real time simulation
CN105514981B (zh) 一种基于建筑信息模型的光伏逆变器接入位置优化方法
Frimpong et al. Generator out-of-step prediction using wavelet analysis
Mahseredjian et al. Electromagnetic Transients Simulation Program: A unified simulation environment for power system engineers
Chen et al. Guest editorial: Models, methods, and platforms for electromagnetic transient simulation of modern power systems with high penetration power electronic integration
CN118643088B (zh) 基于内存计算的潮流计算数据生成方法、系统和设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: BEIJING SIFANG AUTOMATION CO., LTD. STATE GRID COR

Free format text: FORMER OWNER: BEIJING SIFANG AUTOMATION CO., LTD.

Effective date: 20121126

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121126

Address after: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Applicant after: Science Research Institute of Hunan Electric Power Co., Ltd.

Applicant after: Beijing Sifang Jibao Automation Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Applicant before: Science Research Institute of Hunan Electric Power Co., Ltd.

Applicant before: Beijing Sifang Jibao Automation Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant